Block 1669, lot 025A
5050 Fulton St
- City’s use
- Multi-Family Residential
- Built
- 1937
- Stories
- 3
- Units
- 15
- Rooms
- 15 bathrooms
- Building
- 12,600 sq ft
- Lot
- 4,996 sq ft
- Zoning
- RM3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
13 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 7, 2026 | In progress issued Jul 2026 | 5050 Fulton St | Yiu's Construction Co | unit #202: remodel kitchen, remove and replace kitchen cabinets, new floor, new countertop, new appliances. replace gfci. replace bathroom vanity faucet. no removal of wallsDetails
unit #202: remodel kitchen, remove and replace kitchen cabinets, new floor, new countertop, new appliances. replace gfci. replace bathroom vanity faucet. no removal of walls | $26,000 |
| Jun 29, 2023 | Completed final sign-off Oct 2023 | 5050 Fulton St | Firelectric | upgrade of existing fire alarm system to comply with ab3.08 - addition of low frequency sounders.Details
upgrade of existing fire alarm system to comply with ab3.08 - addition of low frequency sounders. | $30,800 |
| Feb 16, 2023 | Completed final sign-off May 2023 | 5050 Fulton St | Yiu's Construction Co | unit 301: remodel kitchen, remove/replace kitchen cabinets. replace bathroom bathtub, sink, toilet, & faucet. kitchen & bathroom remodel.Details
unit 301: remodel kitchen, remove/replace kitchen cabinets. replace bathroom bathtub, sink, toilet, & faucet. kitchen & bathroom remodel. | $25,000 |
| Feb 8, 2022 | Completed final sign-off Aug 2022 | 5050 Fulton St | Yiu's Construction Co | #201: remodel kitchen: remove and replace kitchen cabinets. install kitchen appliances. new g.f.i. replace sink,toilet and faucet in bathroom. non structural.Details
#201: remodel kitchen: remove and replace kitchen cabinets. install kitchen appliances. new g.f.i. replace sink,toilet and faucet in bathroom. non structural. | $18,000 |
| Jan 7, 2022 | Completed final sign-off Oct 2022 | 5050 Fulton St | Yiu's Construction Co | unit 303: convert existing kitchen to bedroom, and existing closet to kitchen. new tile and toilet for the existing bathroom.Details
unit 303: convert existing kitchen to bedroom, and existing closet to kitchen. new tile and toilet for the existing bathroom. | $20,000 |
| Jan 16, 2019 | Completed final sign-off Mar 2019 | 5050 Fulton St | Yiu's Construction Co | apt 104: remodel kitchen - remove and replace kitchen cabinet, counter top tile, 7x14 floor lineoleum, upgrade power in kitchen. install gfi, replace all kitchen appliances. replace bathtub faucet, toilet and sink in bathroom.Details
apt 104: remodel kitchen - remove and replace kitchen cabinet, counter top tile, 7x14 floor lineoleum, upgrade power in kitchen. install gfi, replace all kitchen appliances. replace bathtub faucet, toilet and sink in bathroom. | $12,000 |
| Oct 21, 2016 | Completed final sign-off Jan 2017 | 5050 Fulton St | Yiu's Construction Co | unit 103 interior remodel - kitchen and bedroom remodelDetails
unit 103 interior remodel - kitchen and bedroom remodel | $10,000 |
| Aug 11, 2016 | Never finaled issued Aug 2016, no final | 5050 Fulton St | Yiu's Construction Co | unit #105: remodel kitchen - replace cabinets, install new appliances, upgrade power. no change in walls and opening layout. kitchen lighting shall require 50% wattage min. as high efficacy.Details
unit #105: remodel kitchen - replace cabinets, install new appliances, upgrade power. no change in walls and opening layout. kitchen lighting shall require 50% wattage min. as high efficacy. | $10,000 |
| Apr 1, 2015 | Completed final sign-off Jul 2015 | 5050 Fulton St | Yiu's Construction Co | unit #203: interior remodel, relocate kitchen, turn extg kitchen location into bedroom and closet.Details
unit #203: interior remodel, relocate kitchen, turn extg kitchen location into bedroom and closet. | $20,000 |
| May 14, 2012 | Completed final sign-off Jul 2012 | 5050 Fulton St | remove existing door and widen opening between kitchen and dining room to r'11 per plans. revision to 201205079889Details
remove existing door and widen opening between kitchen and dining room to r'11 per plans. revision to 201205079889 | $800 | |
| May 7, 2012 | Completed final sign-off Jul 2012 | 5050 Fulton St | update kitchen. no structural unit # 205 only. new kitchen sink, cabinets, linoleum no electrical or plumbing under this permit. comply with 200672253 and 200672243.Details
update kitchen. no structural unit # 205 only. new kitchen sink, cabinets, linoleum no electrical or plumbing under this permit. comply with 200672253 and 200672243. | $15,000 | |
| May 7, 2012 | Completed final sign-off May 2012 | 5050 Fulton St | Westco Roofing Co. Inc. | reroofingDetails
reroofing | $25,000 |
| Aug 13, 2008 | Never finaled issued Aug 2008, no final | 5050 Fulton St | street space permit only.Details
street space permit only. |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.