Block 0605, lot 027
2325 Jackson St
- City’s use
- Multi-Family Residential
- Built
- 1927
- Stories
- 3
- Units
- 12
- Rooms
- 12 bathrooms
- Building
- 8,658 sq ft
- Lot
- 3,619 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
13 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 8, 2022 | Completed final sign-off Jun 2022 | 2325 Jackson St | Yiu's Construction Co | #201: remodel one kitchen: remove and replace kitchen cabinets. install kitchen appliances. new g.f.i. remodel one bathroom: replace tiles, sink,toilet and faucet in bathroom. non structural.Details
#201: remodel one kitchen: remove and replace kitchen cabinets. install kitchen appliances. new g.f.i. remodel one bathroom: replace tiles, sink,toilet and faucet in bathroom. non structural. | $26,000 |
| Jan 3, 2020 | Completed final sign-off Mar 2020 | 2325 Jackson St | Yiu's Construction Co | unit 301 - kitchen remodel - replace cabinets & appliancesDetails
unit 301 - kitchen remodel - replace cabinets & appliances | $18,000 |
| Dec 6, 2019 | Completed final sign-off Feb 2020 | 2325 Jackson St | Yiu's Construction Co | kitchen remodel replace cabinets and appliances. bath remodel replce sink toiletDetails
kitchen remodel replace cabinets and appliances. bath remodel replce sink toilet | $18,000 |
| Jun 11, 2019 | Completed final sign-off Aug 2019 | 2325 Jackson St | Yiu's Construction Co | unit 104: kitchen remodel - remove and replace kitchen cabinet, counter tops granite, floor linoleum. install gfi, replace all kitchen appliances. upgrade power in kitchen. 8x10.Details
unit 104: kitchen remodel - remove and replace kitchen cabinet, counter tops granite, floor linoleum. install gfi, replace all kitchen appliances. upgrade power in kitchen. 8x10. | $18,000 |
| Jul 17, 2018 | Completed final sign-off Sep 2018 | 2325 Jackson St | Yiu's Construction Co | unit 204: remove/replace kitchen cabinet, countertop tile, floor linoleum, install gfi, replace kitchen appliancesDetails
unit 204: remove/replace kitchen cabinet, countertop tile, floor linoleum, install gfi, replace kitchen appliances | $12,000 |
| Mar 2, 2018 | Completed final sign-off Jan 2023 | 2325 Jackson St | Kerley Construction Inc | structural revision to pa 2017-0223-0014 - memorialize structural modifications based on existing site conditions. n/a maherDetails
structural revision to pa 2017-0223-0014 - memorialize structural modifications based on existing site conditions. n/a maher | $10,000 |
| Mar 1, 2018 | Completed final sign-off Jun 2018 | 2325 Jackson St | San Francisco Fire Protection | like for like fire sytem upgrade and replacement with new control panel, smoke detector and pull station at same location . tie in existing 6 bells to new panel. install new lf sounders in every unit. no records of previous sytem local fire alarm. n/a maherDetails
like for like fire sytem upgrade and replacement with new control panel, smoke detector and pull station at same location . tie in existing 6 bells to new panel. install new lf sounders in every unit. no records of previous sytem local fire alarm. n/a maher | $10,000 |
| Sep 25, 2017 | Completed final sign-off Nov 2017 | 2325 Jackson St | Yiu's Construction Co | unit #302 - remodel kitchen: remove/replace cabinets, faucet, sink, floor tiles, dishwasher, garbage disposal, microwave hook, install 6 gfiDetails
unit #302 - remodel kitchen: remove/replace cabinets, faucet, sink, floor tiles, dishwasher, garbage disposal, microwave hook, install 6 gfi | $16,000 |
| Aug 10, 2017 | Completed final sign-off Oct 2017 | 2325 Jackson St | Yiu's Construction Co | unit 202: kitchen remodel, replace cabinets, replace appliances; no structural work, same configurationDetails
unit 202: kitchen remodel, replace cabinets, replace appliances; no structural work, same configuration | $12,000 |
| Aug 9, 2017 | Completed final sign-off Jan 2023 | 2325 Jackson St | Kerley Construction Inc | replace (e) wood beam with (n) steel beam. remove (e) wood posts at ground floor. ref pa 2017-0223-0014 (soft story)Details
replace (e) wood beam with (n) steel beam. remove (e) wood posts at ground floor. ref pa 2017-0223-0014 (soft story) | $3,000 |
| Feb 23, 2017 | Completed final sign-off Jun 2018 | 2325 Jackson St | Kerley Construction Inc | soft story retrofit to comply with sfbc chapter 34b based on iebc appx a4 calcsDetails
soft story retrofit to comply with sfbc chapter 34b based on iebc appx a4 calcs | $91,500 |
| Jul 16, 2015 | Completed final sign-off Sep 2015 | 2325 Jackson St | Yiu's Construction Co | apt 102: kitchen - remove cabinets and install new, put linoleum on floors, put tiles on couter top, install dishwahser, faucet, stove top, and refig. bathroom - remove tiles, replace faucet, replace toilet, sink, faucet, install tiles.Details
apt 102: kitchen - remove cabinets and install new, put linoleum on floors, put tiles on couter top, install dishwahser, faucet, stove top, and refig. bathroom - remove tiles, replace faucet, replace toilet, sink, faucet, install tiles. | $15,000 |
| Feb 11, 2008 | Completed final sign-off Feb 2008 | 2325 Jackson St | Westco Roofing Co. Inc. | reroofingDetails
reroofing | $3,200 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Yiu's Construction Co (8), Kerley Construction Inc (3), San Francisco Fire Protection, Westco Roofing Co. Inc.
- Engineers
- Rodrigo Santos (3)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.