Block 0218, lot 015
1590 Sacramento St
- City’s use
- Multi-Family Residential
- Built
- 1911
- Stories
- 5
- Units
- 43
- Rooms
- 43 bathrooms
- Building
- 25,460 sq ft
- Lot
- 6,991 sq ft
- Zoning
- RM3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
35 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 14, 2025 | Completed final sign-off Apr 2025 | 1590 Sacramento St | Yiu's Construction Co | unit #29: replace bottom kitchen cabinets, sink, faucet. replace range & fridge, replace bathtub faucet & vanity, upgrade power.Details
unit #29: replace bottom kitchen cabinets, sink, faucet. replace range & fridge, replace bathtub faucet & vanity, upgrade power. | $26,000 |
| Jun 10, 2024 | Completed final sign-off Jun 2024 | 1590 Sacramento St | Crime Watch Security Sys Llc | as built change log to permit 202404190371. removed sprinkler tamper valve to reflect details on site.Details
as built change log to permit 202404190371. removed sprinkler tamper valve to reflect details on site. | |
| Apr 19, 2024 | Completed final sign-off Jun 2024 | 1590 Sacramento St | Crime Watch Security Sys Llc | as built change log ref pa 202311271368 4/17/24 updated fire alarm equipment list to reflect what devices are present on siteDetails
as built change log ref pa 202311271368 4/17/24 updated fire alarm equipment list to reflect what devices are present on site | |
| Nov 27, 2023 | Completed final sign-off Jun 2024 | 1590 Sacramento St | Crime Watch Security Sys Llc | upgrade existing fire alarm system to comply with sffc section 1103.7.6.1Details
upgrade existing fire alarm system to comply with sffc section 1103.7.6.1 | $46,150 |
| May 9, 2023 | Completed final sign-off Sep 2023 | 1590 Sacramento St | Yiu's Construction Co | unit 42: remodel kitchen- reove and replace kitchen cabinets, replace kitchen appliances- upgrade power. replace bathroom faucet, sink, and toilet.Details
unit 42: remodel kitchen- reove and replace kitchen cabinets, replace kitchen appliances- upgrade power. replace bathroom faucet, sink, and toilet. | $30,000 |
| May 9, 2023 | Completed final sign-off Sep 2023 | 1590 Sacramento St | Yiu's Construction Co | unit 16: remodel kitchen- remove and replace cabinets, replace all kitchen appliances, upgrade power. replace bathroom faucet, and windowDetails
unit 16: remodel kitchen- remove and replace cabinets, replace all kitchen appliances, upgrade power. replace bathroom faucet, and window | $30,000 |
| May 9, 2023 | Completed final sign-off Sep 2023 | 1590 Sacramento St | Yiu's Construction Co | unit 2: remodel kitchen- remove and replace kitchen cabinets- replace all kitchen appliances, upgrade power. bathroom replace lights and windows.Details
unit 2: remodel kitchen- remove and replace kitchen cabinets- replace all kitchen appliances, upgrade power. bathroom replace lights and windows. | $25,000 |
| Mar 28, 2022 | Completed final sign-off Oct 2022 | 1590 Sacramento St | Yiu's Construction Co | apt 26: replace sink, faucet and bathtub in bathroom. replace countertop, sink and faucet in kitchen & cabinets. replace g.f.i. in kitchen.Details
apt 26: replace sink, faucet and bathtub in bathroom. replace countertop, sink and faucet in kitchen & cabinets. replace g.f.i. in kitchen. | $16,000 |
| Mar 28, 2022 | Completed final sign-off Oct 2022 | 1590 Sacramento St | Yiu's Construction Co | apt 27: replace lightview window. lights and faucet in bathroom. replace kitchen appliances, new water line, new power in kitchen.Details
apt 27: replace lightview window. lights and faucet in bathroom. replace kitchen appliances, new water line, new power in kitchen. | $18,000 |
| Mar 28, 2022 | Completed final sign-off Oct 2022 | 1590 Sacramento St | Yiu's Construction Co | apt 36: replace one window in bathroom lightview. replace faucet and sink in bathroom. remodel kitchen - change water line, new power. replace kitchen cabinet and appliances. new countertop.Details
apt 36: replace one window in bathroom lightview. replace faucet and sink in bathroom. remodel kitchen - change water line, new power. replace kitchen cabinet and appliances. new countertop. | $20,000 |
| Jul 6, 2020 | Completed final sign-off Dec 2020 | 1590 Sacramento St | Yiu's Construction Co | unit #32: replace kitchen cabinets and appliances. upgrade power. replace sink, faucet and toilet in bathroom. all work in kind. size of kitchen approx 10ft x 12ft. size of bathroom approx 5ft x 5ftDetails
unit #32: replace kitchen cabinets and appliances. upgrade power. replace sink, faucet and toilet in bathroom. all work in kind. size of kitchen approx 10ft x 12ft. size of bathroom approx 5ft x 5ft | $20,000 |
| Jan 7, 2020 | Never finaled issued Jan 2020, no final | 1590 Sacramento St | Yiu's Construction Co | unit #30: remodel kitchen. replace cabinet and appliances, upgrade power to 60m. replace bathroom sink and faucetDetails
unit #30: remodel kitchen. replace cabinet and appliances, upgrade power to 60m. replace bathroom sink and faucet | $22,000 |
| Dec 6, 2019 | Never finaled issued Dec 2019, no final | 1590 Sacramento St | Yiu's Construction Co | apt 10: remodel ktichen: replace cabinets, install gfi, install appliances & fixtures.Details
apt 10: remodel ktichen: replace cabinets, install gfi, install appliances & fixtures. | $18,000 |
| Dec 6, 2019 | Completed final sign-off Mar 2020 | 1590 Sacramento St | Yiu's Construction Co | unit 39: kitchen remodel replace cabinets and appliancesDetails
unit 39: kitchen remodel replace cabinets and appliances | $18,000 |
| Sep 28, 2018 | Completed final sign-off Dec 2018 | 1590 Sacramento St | Yiu's Construction Co | apt #20: kitchen remodel - remove and replace kitchen cabinet, countertop tile, floor lineoleum, install gfi and replace all kitchen appliances. size 10'x10'. replace bathtub faucet.Details
apt #20: kitchen remodel - remove and replace kitchen cabinet, countertop tile, floor lineoleum, install gfi and replace all kitchen appliances. size 10'x10'. replace bathtub faucet. | $12,000 |
| Jul 19, 2018 | Never finaled issued Jul 2018, no final | 1590 Sacramento St | street spaceDetails
street space | ||
| May 3, 2018 | Completed final sign-off Jul 2018 | 1590 Sacramento St | Yiu's Construction Co | unit #15: kitchen remodel-remove and relace cabinets, countertop tiles, floor. install gfi. replace all appliances. replace bathtub faucetDetails
unit #15: kitchen remodel-remove and relace cabinets, countertop tiles, floor. install gfi. replace all appliances. replace bathtub faucet | $12,000 |
| Jan 8, 2018 | Never finaled issued Jan 2018, no final | 1590 Sacramento St | street spaceDetails
street space | ||
| Dec 13, 2017 | Never finaled issued Dec 2017, no final | 1590 Sacramento St | street spaceDetails
street space | ||
| Oct 10, 2017 | Never finaled issued Oct 2017, no final | 1590 Sacramento St | street spaceDetails
street space | ||
| Oct 6, 2017 | Completed final sign-off Dec 2017 | 1590 Sacramento St | Yiu's Construction Co | unit #33: kitchen remodel - replace cabinets, sink, faucet, appliances. install new tiles, upgrade power. install gfiDetails
unit #33: kitchen remodel - replace cabinets, sink, faucet, appliances. install new tiles, upgrade power. install gfi | $11,000 |
| Aug 10, 2017 | Completed final sign-off Oct 2017 | 1590 Sacramento St | Yiu's Construction Co | unit 12: kitchen remodel, replace cabinets, replace appliances, install tiles, gfi; bathroom remodel, replace tub, sink, toilet, window; no structural work, same configurationDetails
unit 12: kitchen remodel, replace cabinets, replace appliances, install tiles, gfi; bathroom remodel, replace tub, sink, toilet, window; no structural work, same configuration | $20,000 |
| Jun 29, 2017 | Completed final sign-off Aug 2017 | 1590 Sacramento St | Yiu's Construction Co | unit #40: kitchen remodel - replace cabinets, replace appliances, relocate water & gas lines. bathroom remodel - replace bath tub, faucet, replace sink and vanityDetails
unit #40: kitchen remodel - replace cabinets, replace appliances, relocate water & gas lines. bathroom remodel - replace bath tub, faucet, replace sink and vanity | $15,000 |
| Apr 14, 2017 | Completed final sign-off Jun 2017 | 1590 Sacramento St | Yiu's Construction Co | kitchen remodel, replace cabinets, install new appliances , bathroom remodel replace faucet ,tiles & sink i add window & bathtub in unit # 28Details
kitchen remodel, replace cabinets, install new appliances , bathroom remodel replace faucet ,tiles & sink i add window & bathtub in unit # 28 | $15,000 |
| Jan 31, 2017 | Completed final sign-off Apr 2017 | 1590 Sacramento St | Yiu's Construction Co | unit # 3, kitchen remodel repolace cabinets, instlal tiles on walls & counterrop, install appliancesDetails
unit # 3, kitchen remodel repolace cabinets, instlal tiles on walls & counterrop, install appliances | $10,000 |
| Sep 2, 2016 | Completed final sign-off Oct 2016 | 1590 Sacramento St | Yiu's Construction Co | unit #17 - bathroom remodel: bathtub, faucet, sink, vanity, install gfi. high efficacy lighting or controlled by manual on sensor and high efficacy main light. replace window at same opening.Details
unit #17 - bathroom remodel: bathtub, faucet, sink, vanity, install gfi. high efficacy lighting or controlled by manual on sensor and high efficacy main light. replace window at same opening. | $2,500 |
| Aug 11, 2016 | Completed final sign-off Oct 2016 | 1590 Sacramento St | Yiu's Construction Co | unit #17: kitchen remodel - replace cabinets, upgrade power. change water lines, new tiles, new floor, install appliances. kitchen lighting shall require 50% wattage min. as high efficacy. no change in wall and opening layout.Details
unit #17: kitchen remodel - replace cabinets, upgrade power. change water lines, new tiles, new floor, install appliances. kitchen lighting shall require 50% wattage min. as high efficacy. no change in wall and opening layout. | $12,000 |
| Jun 10, 2016 | Completed final sign-off Sep 2016 | 1590 Sacramento St | Yiu's Construction Co | unit 14: kitchen remodel: remove/replace cabinets, floor tiles, sink, faucet & vent; replace lights (min50%) (e) hood remain; bathroom remodel: remove/replace bathtub, sink, faucet, floor tiles, replace (e) opaque window, replace lights (min 1 light), toilets, (e) fan remains.Details
unit 14: kitchen remodel: remove/replace cabinets, floor tiles, sink, faucet & vent; replace lights (min50%) (e) hood remain; bathroom remodel: remove/replace bathtub, sink, faucet, floor tiles, replace (e) opaque window, replace lights (min 1 light), toilets, (e) fan remains. | $15,000 |
| May 27, 2016 | Completed final sign-off Sep 2016 | 1590 Sacramento St | Yiu's Construction Co | unit 5: kitchen remodel - replace cabinetes, install tiles, dishwasher, garbage disposal, vent, faucet, lights; bathroom remodel - install sink, faucet, bathtub, lights, gfi, replace window.Details
unit 5: kitchen remodel - replace cabinetes, install tiles, dishwasher, garbage disposal, vent, faucet, lights; bathroom remodel - install sink, faucet, bathtub, lights, gfi, replace window. | $15,000 |
| Oct 14, 2010 | Never finaled issued Oct 2010, no final | 1590 Sacramento St | street spaceDetails
street space | ||
| Oct 7, 2010 | Completed final sign-off Nov 2010 | 1590 Sacramento St | Acker & Guerrero Roof Co | reroofingDetails
reroofing | $51,450 |
| Aug 14, 2008 | Never finaled issued Aug 2008, no final | 1590 Sacramento St | street space permit only.Details
street space permit only. | ||
| Oct 5, 2001 | Expired or cancelled expired Oct 2002 | 1590 Sacramento St | streetspaceDetails
streetspace | ||
| Apr 3, 2001 | Expired or cancelled expired Aug 2001 | 1590 Sacramento St | street spaceDetails
street space | ||
| Mar 6, 2000 | Expired or cancelled expired Dec 2000 | 1590 Sacramento St | On-Site Maintenance | remodel & kitchen and bathroomDetails
remodel & kitchen and bathroom |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Yiu's Construction Co (22), Crime Watch Security Sys Llc (3), Acker & Guerrero Roof Co, On-Site Maintenance
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.