Back to bathroom remodel contractors
Toni's Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Jan 2026
- Last 24 months
- 2 permits filed
180 permits since 2000: 152 completed, 7 never finaled, 21 expired or cancelled.
Of the 7 never-finaled permits, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
67 bathroom remodel permits: 65 completed, 2 expired or cancelled. Typically 0 days from filing to permit and 141 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 18, 2025 | Completed final sign-off Jan 2026 | 134 Springfield Dr | renovation to existing home. 1st level renovation: (e) bathroom and den addition, 2nd level renovation kitchen and bedroom and bathroom and 1/2 batnhroom,and addition (n) sklylight in kitchen and replace non-visible windows to vinyl. front windows alum clad wood casements.Details
renovation to existing home. 1st level renovation: (e) bathroom and den addition, 2nd level renovation kitchen and bedroom and bathroom and 1/2 batnhroom,and addition (n) sklylight in kitchen and replace non-visible windows to vinyl. front windows alum clad wood casements. | $280,000 |
| Sep 29, 2023 | Completed final sign-off Feb 2024 | 3640 18th St | apt c: 1 kitchen and 1 bathroom remodel: replace cabinets, tile, plumbing fixtures. remove bathtub change to shower, paintDetails
apt c: 1 kitchen and 1 bathroom remodel: replace cabinets, tile, plumbing fixtures. remove bathtub change to shower, paint | $35,000 |
| Jan 31, 2023 | Completed final sign-off Oct 2023 | 878 31st Av | replace (4) windows at front to clad over wood. one at dining room. (2) vinyl (at kitchen), (2) vinyl in bathroom. replace all cracked plaster to sheetrock install insulation at exterior walls. r3 at roof, r19 between floors.Details
replace (4) windows at front to clad over wood. one at dining room. (2) vinyl (at kitchen), (2) vinyl in bathroom. replace all cracked plaster to sheetrock install insulation at exterior walls. r3 at roof, r19 between floors. | $100,000 |
| Jan 31, 2023 | Completed final sign-off Oct 2023 | 880 31st Av | replace (6) windows at front to clad over wood. one at dining room. (2) vinyl (at kitchen), (2) vinyl in bathroom. replace all cracked plaster to sheetrock install insulation at exterior walls. r3 at roof, r19 between floors.Details
replace (6) windows at front to clad over wood. one at dining room. (2) vinyl (at kitchen), (2) vinyl in bathroom. replace all cracked plaster to sheetrock install insulation at exterior walls. r3 at roof, r19 between floors. | $100,000 |
| Jan 19, 2023 | Completed final sign-off Oct 2023 | 878 31st Av | unit 878: kitchen remodel. cabinet, sheetrock, plumbing, tile, paint.. 2.25 bathroom remodel. remodel shower, vanity, toilet, tile.Details
unit 878: kitchen remodel. cabinet, sheetrock, plumbing, tile, paint.. 2.25 bathroom remodel. remodel shower, vanity, toilet, tile. | $100,000 |
| Jan 19, 2023 | Completed final sign-off Oct 2023 | 880 31st Av | unit 880: kitchen remodel. cabinet, sheetrock, plumbing, tile, paint.. 2.25 bathroom remodel. remodel shower, vanity, toilet, tile.Details
unit 880: kitchen remodel. cabinet, sheetrock, plumbing, tile, paint.. 2.25 bathroom remodel. remodel shower, vanity, toilet, tile. | $100,000 |
| Aug 16, 2022 | Completed final sign-off Oct 2022 | 3620 Lawton St | one kitchen and one bathroom in kind remodel. no wall removed. (n) cabinet. faucets, tile, pant, drywallDetails
one kitchen and one bathroom in kind remodel. no wall removed. (n) cabinet. faucets, tile, pant, drywall | $30,000 |
| Jul 25, 2022 | Completed final sign-off Dec 2022 | 558 09th Av | in-kind remodeling of 2 bathroom(s) in 2nd fl with 2 shower pan(s).Details
in-kind remodeling of 2 bathroom(s) in 2nd fl with 2 shower pan(s). | $22,000 |
| Nov 10, 2021 | Completed final sign-off May 2022 | 2575 22nd Av | revision to bpa#2020/0714/0157, from 1 bedroom & 1 storage to 1 bedroom with 1 bath & 1 1/2 bath.Details
revision to bpa#2020/0714/0157, from 1 bedroom & 1 storage to 1 bedroom with 1 bath & 1 1/2 bath. | |
| Jul 12, 2021 | Completed final sign-off Jun 2022 | 3749 Clement St | in-kind remodeling of 2 bathroom(s) in 2nd fl, 3rd fl with 1 shower pan(s). installing gas line.Details
in-kind remodeling of 2 bathroom(s) in 2nd fl, 3rd fl with 1 shower pan(s). installing gas line. | $15,000 |
| Jul 14, 2020 | Completed final sign-off May 2022 | 2575 22nd Av | renovate (e) rooms on 1st fl. behind (e) garage, move (e) bath, (e) hwh, (e) furnace and (e) laundry, add 1-hr rated walls and ceiling separations between the garage, entryway and habitable rooms both floors from garage, extend (e) deck w/in the buildable area 205 sf added 1 hr. rated walls at propDetails
renovate (e) rooms on 1st fl. behind (e) garage, move (e) bath, (e) hwh, (e) furnace and (e) laundry, add 1-hr rated walls and ceiling separations between the garage, entryway and habitable rooms both floors from garage, extend (e) deck w/in the buildable area 205 sf added 1 hr. rated walls at prop | $35,000 |
| Jul 26, 2019 | Completed final sign-off Oct 2019 | 1890 30th Av | g/f: add habitable rooms, bathroom, laundry & rate walls between grage 7 exterior entry stairs from habitable areas.(e) furnace & (e) hot water heater to moved.Details
g/f: add habitable rooms, bathroom, laundry & rate walls between grage 7 exterior entry stairs from habitable areas.(e) furnace & (e) hot water heater to moved. | $30,000 |
| May 30, 2019 | Completed final sign-off Oct 2019 | 1890 30th Av | replace bathtub at first floor bathroom. install floor tile, patch wall, and paintDetails
replace bathtub at first floor bathroom. install floor tile, patch wall, and paint | $5,000 |
| Oct 15, 2018 | Completed final sign-off Jun 2019 | 2316 15th Av | g/f accessory rooms: relocate (e) 120sf bedroom, add bath and family rm. (766 sf total), replace (e) windows & doors, new window at bedroom facing yard, new raised subfloor, provide shear walls, holdowns and new footing, insulate througt grd fl. gen mep upgrades.Details
g/f accessory rooms: relocate (e) 120sf bedroom, add bath and family rm. (766 sf total), replace (e) windows & doors, new window at bedroom facing yard, new raised subfloor, provide shear walls, holdowns and new footing, insulate througt grd fl. gen mep upgrades. | $80,000 |
| Sep 10, 2018 | Completed final sign-off Jun 2019 | 2316 15th Av | kitchen remodel. new cabinet, counter, tile, paint. replace sliding door, 3 windows, behind kitchen ( all in back). replace rotted wood siding to hardie siding (at back). replace shower on 1st fl guest bath.Details
kitchen remodel. new cabinet, counter, tile, paint. replace sliding door, 3 windows, behind kitchen ( all in back). replace rotted wood siding to hardie siding (at back). replace shower on 1st fl guest bath. | $20,000 |
| May 24, 2018 | Completed final sign-off Jan 2019 | 1722 33rd Av | develop gr fl rooms; add 2 bedrooms, 1 fam room, 1 full bath, add a wetbar. (e) stairs to remain. remove door at top of stairs. straighten out partion front entrance wall. laundry & utilities in garage. replace windows not visible from st, add patio door to yard. no excavations. add bearing wall andDetails
develop gr fl rooms; add 2 bedrooms, 1 fam room, 1 full bath, add a wetbar. (e) stairs to remain. remove door at top of stairs. straighten out partion front entrance wall. laundry & utilities in garage. replace windows not visible from st, add patio door to yard. no excavations. add bearing wall and | $61,500 |
| Nov 2, 2017 | Completed final sign-off Apr 2018 | 558 09th Av | revision to pa #201708074074: move bath & closet walls + doors, remove 2 doos + wall planked in original permit. add new laundry & new wetbar.Details
revision to pa #201708074074: move bath & closet walls + doors, remove 2 doos + wall planked in original permit. add new laundry & new wetbar. | $2,000 |
| Oct 6, 2017 | Completed final sign-off Nov 2018 | 2635 15th Av | create habitable rooms down in present garage with storage area, includes family room, bedroom, bathroom and laundryDetails
create habitable rooms down in present garage with storage area, includes family room, bedroom, bathroom and laundry | $25,000 |
| Aug 7, 2017 | Completed final sign-off Mar 2018 | 558 09th Av | add rooms down in present garage/ storage space for a den. renovate (e) guest bedroom & bath. add rated walls & ceilings at garage car parking space w/rated door, same at (n) storage under stair from floor above. add deck at bottom level under 3 ft above (e) aboveDetails
add rooms down in present garage/ storage space for a den. renovate (e) guest bedroom & bath. add rated walls & ceilings at garage car parking space w/rated door, same at (n) storage under stair from floor above. add deck at bottom level under 3 ft above (e) above | $20,000 |
| Aug 2, 2017 | Completed final sign-off Nov 2017 | 2787 Golden Gate Av | replace (e) in-kind aluminum windows to vinyl due glase to back.(bedrooms), bathroom and kitchen). total: 12 windowsDetails
replace (e) in-kind aluminum windows to vinyl due glase to back.(bedrooms), bathroom and kitchen). total: 12 windows | $10,000 |
| May 11, 2017 | Completed final sign-off Aug 2017 | 239 Chenery St | 2nd floor: bathroom remodel. remove bathtub change to shower, new fixtures and faucet, tile, add recess light in living roomDetails
2nd floor: bathroom remodel. remove bathtub change to shower, new fixtures and faucet, tile, add recess light in living room | $20,000 |
| May 11, 2017 | Completed final sign-off Aug 2017 | 239 Chenery St | replace (3) front windows (in-kind) clad over wood. replace (1) bathroom window.Details
replace (3) front windows (in-kind) clad over wood. replace (1) bathroom window. | $15,000 |
| Feb 9, 2017 | Completed final sign-off May 2017 | 1637 48th Av | bathroom remodel on 2/f, change bath tub to shower. (n) plumbing fixture & faucts, (n)light fixture. tile, painting.Details
bathroom remodel on 2/f, change bath tub to shower. (n) plumbing fixture & faucts, (n)light fixture. tile, painting. | $10,000 |
| Dec 15, 2016 | Completed final sign-off May 2017 | 1637 48th Av | remodel (e) kitchen. remove 2 walls, add new beam & 2 columns. develop ground floor accessory rooms, add bedroom, office & full bath. replace windows & doors not visible from st facing yard. add plywood shear walls, holdowns, new column footings, new slab as needed. bolt foundations, insulate, genDetails
remodel (e) kitchen. remove 2 walls, add new beam & 2 columns. develop ground floor accessory rooms, add bedroom, office & full bath. replace windows & doors not visible from st facing yard. add plywood shear walls, holdowns, new column footings, new slab as needed. bolt foundations, insulate, gen | $85,000 |
| Sep 8, 2016 | Completed final sign-off Mar 2017 | 3640 18th St | apt #a. replace cabinet, floor tile & counter for kitchen. replace new fixture and faucets for 2 bathrooms. remove one tub change to shower.Details
apt #a. replace cabinet, floor tile & counter for kitchen. replace new fixture and faucets for 2 bathrooms. remove one tub change to shower. | $5,000 |
| Sep 8, 2016 | Completed final sign-off Mar 2017 | 25 Ulloa St | revision to ref pa 201605268416 switch new bath & laundry locations. add shower to convert 1/2 bath to full. no other changes. 2 bedrooms,office, playroom are to remain. 2 full bathrooms included in accessory roomsDetails
revision to ref pa 201605268416 switch new bath & laundry locations. add shower to convert 1/2 bath to full. no other changes. 2 bedrooms,office, playroom are to remain. 2 full bathrooms included in accessory rooms | $500 |
| May 26, 2016 | Completed final sign-off Mar 2017 | 25 Ulloa St | develop new grd flr acc. rooms, bedrm, 1/2 bath, ofc & laundry/playrm. (e) bedrm and full bath remodel. replace (e) window w/n window & patio door. add 4 new windows. relocate int stair to center, new stairs, new stair footings. open wall at kitchen/dining to liv rm (e) furnance & w/h to be reloc..Details
develop new grd flr acc. rooms, bedrm, 1/2 bath, ofc & laundry/playrm. (e) bedrm and full bath remodel. replace (e) window w/n window & patio door. add 4 new windows. relocate int stair to center, new stairs, new stair footings. open wall at kitchen/dining to liv rm (e) furnance & w/h to be reloc.. | $74,700 |
| Dec 10, 2015 | Completed final sign-off Jul 2016 | 3430 Kirkham St | fill in center patio at 2nd floor not visible from street. remodel kitchen, add skylts. reframe roof. replace extg 4 wndws in kind not visible from st. add grnd fl accessory rms: family, bedroom, full bath, add new wndw new patio door. new conditionesd area aprx 598 sq ft. relocate extg frn & wh,Details
fill in center patio at 2nd floor not visible from street. remodel kitchen, add skylts. reframe roof. replace extg 4 wndws in kind not visible from st. add grnd fl accessory rms: family, bedroom, full bath, add new wndw new patio door. new conditionesd area aprx 598 sq ft. relocate extg frn & wh, | $84,800 |
| May 6, 2014 | Completed final sign-off Aug 2015 | 239 Chenery St | fitting out lower 2 floors with a master suite with bathroom, 2 bedrooms, and 2nd bathroom. remove unwarranted kitchen at garage level. new deck at grade at lower level less than 30" above gradeDetails
fitting out lower 2 floors with a master suite with bathroom, 2 bedrooms, and 2nd bathroom. remove unwarranted kitchen at garage level. new deck at grade at lower level less than 30" above grade | $185,000 |
| Feb 26, 2014 | Completed final sign-off Dec 2014 | 2821 Pine St | remodeling of existing 1st floor of residence: new living space behind garage including a mudroom, hall, laundry & bath, new concrete stair up to yard (below ground level).Details
remodeling of existing 1st floor of residence: new living space behind garage including a mudroom, hall, laundry & bath, new concrete stair up to yard (below ground level). | $50,000 |
| Sep 9, 2013 | Completed final sign-off Dec 2013 | 2431 Ortega St | bathroom remodel change fixture and faucets, tile, painting, convert shower stall to closet for bedroomDetails
bathroom remodel change fixture and faucets, tile, painting, convert shower stall to closet for bedroom | $10,000 |
| Aug 6, 2013 | Completed final sign-off Sep 2013 | 619 Clayton St | unit 1 - kitchen: new cabinet, sink faucet, tile, painting; bathroom - convert tub to shwoer. new vanity sink & faucet. tile & paintingDetails
unit 1 - kitchen: new cabinet, sink faucet, tile, painting; bathroom - convert tub to shwoer. new vanity sink & faucet. tile & painting | $15,000 |
| Jul 27, 2012 | Completed final sign-off Dec 2012 | 830 Rockdale Dr | kitchen remodel, change countertop, new circuit for appliances. new sink and faucet. bathroom remodel, new tub and faucets. two vanity and faucets. drywall, painting, tile. no wall remove.Details
kitchen remodel, change countertop, new circuit for appliances. new sink and faucet. bathroom remodel, new tub and faucets. two vanity and faucets. drywall, painting, tile. no wall remove. | $18,000 |
| Mar 27, 2012 | Completed final sign-off Apr 2012 | 419 Locust St | bathroom remodel. change bathtub to shower. new tile, dry wall, painting. no structual work. no new lighting.Details
bathroom remodel. change bathtub to shower. new tile, dry wall, painting. no structual work. no new lighting. | $7,000 |
| Mar 22, 2012 | Completed final sign-off Dec 2012 | 841 Rockdale Dr | add bedroom and bath in garage. enlarge extg window for escape, excavate 6"-12" to gain headroom. extend footings if necessary. bearing walls and cols not affected.Details
add bedroom and bath in garage. enlarge extg window for escape, excavate 6"-12" to gain headroom. extend footings if necessary. bearing walls and cols not affected. | $15,000 |
| Oct 13, 2011 | Completed final sign-off Dec 2011 | 826 Peralta Av | bathroom remodel, change plumbing fixture & faucets, light fixture, tile, drywall, painting. replace kitchen sink and faucet only. lighting to comply with cec150(k)Details
bathroom remodel, change plumbing fixture & faucets, light fixture, tile, drywall, painting. replace kitchen sink and faucet only. lighting to comply with cec150(k) | $10,000 |
| Feb 7, 2011 | Completed final sign-off Apr 2011 | 830 Rockdale Dr | revision to pa # 200912173405. remodel (e) bathroom from pa # 200912173405.Details
revision to pa # 200912173405. remodel (e) bathroom from pa # 200912173405. | |
| Nov 18, 2010 | Completed final sign-off Oct 2011 | 1426 23rd Av | add (n) family room, (n) full bath, (n) bedroom at ground floor. (n) windows at (e) light well & bedroom. (n) wet bar @ (n) family room. relocate washer, dryer & sink.Details
add (n) family room, (n) full bath, (n) bedroom at ground floor. (n) windows at (e) light well & bedroom. (n) wet bar @ (n) family room. relocate washer, dryer & sink. | $45,000 |
| Mar 3, 2010 | Completed final sign-off Mar 2010 | 405 Locust St | bathroom remodel. change faucets, floor tile, fixtures, sheetrock, paining. lighting high eff or occupancy sensor controlDetails
bathroom remodel. change faucets, floor tile, fixtures, sheetrock, paining. lighting high eff or occupancy sensor control | $10,000 |
| Dec 17, 2009 | Completed final sign-off Apr 2011 | 830 Rockdale Dr | double(sister in) floor joist at fireplace due to fire damage & repair fireplace to gas log. new tile. remodel existing bathroom change fixtures faucets, new tile, sheetrock and painting.Details
double(sister in) floor joist at fireplace due to fire damage & repair fireplace to gas log. new tile. remodel existing bathroom change fixtures faucets, new tile, sheetrock and painting. | $23,000 |
| Dec 15, 2009 | Completed final sign-off Mar 2010 | 2431 Ortega St | (n) family & bedroom. full bath. (n) sliding door and window. (n) bar sink & wine storage. relocate washer, dryer and laundry sink.Details
(n) family & bedroom. full bath. (n) sliding door and window. (n) bar sink & wine storage. relocate washer, dryer and laundry sink. | $23,000 |
| Apr 3, 2009 | Completed final sign-off May 2009 | 407 Locust St | kitchen & bathroom remodel. re-wire bedroom outlets.Details
kitchen & bathroom remodel. re-wire bedroom outlets. | $20,000 |
| Mar 13, 2009 | Completed final sign-off Apr 2009 | 656 Sweeny St | bathroom remodel. replace two in kind front windows. two in kind at back. rewire whole house, outlet, replace heating system. drywall + painting, in bahtoom only. no new wall no modification of existing wall/non bearing (high efficiency direct vent furnace in same location, u factor 0.67 max.Details
bathroom remodel. replace two in kind front windows. two in kind at back. rewire whole house, outlet, replace heating system. drywall + painting, in bahtoom only. no new wall no modification of existing wall/non bearing (high efficiency direct vent furnace in same location, u factor 0.67 max. | $15,000 |
| Aug 5, 2008 | Completed final sign-off Oct 2008 | 841 Rockdale Dr | remodel (e) bathroom. replace tile, plumbing fixture & faucet. sheetrock, painting.Details
remodel (e) bathroom. replace tile, plumbing fixture & faucet. sheetrock, painting. | $8,000 |
| Jul 30, 2008 | Completed final sign-off Oct 2008 | 2743 34th Av | ground floor master bathroom, remodel, change bath room window. change sheetrock, painting, tile, change m. bedroom door.Details
ground floor master bathroom, remodel, change bath room window. change sheetrock, painting, tile, change m. bedroom door. | $12,000 |
| Feb 22, 2008 | Completed final sign-off May 2008 | 2425 16th Av | kitchen and bath remodel. change cabinets and counter. new plumbing fixtures and faucets. steam shower, replace drywall and paint. not structural work.Details
kitchen and bath remodel. change cabinets and counter. new plumbing fixtures and faucets. steam shower, replace drywall and paint. not structural work. | $38,000 |
| Nov 21, 2006 | Completed final sign-off Nov 2007 | 875 Portola Dr | convert ground floor from storage to family room,office. 2 bedrooms, full bath/ add 1 bath, kitchen, bath remodel and convert to master bedroom @ 2nd flrDetails
convert ground floor from storage to family room,office. 2 bedrooms, full bath/ add 1 bath, kitchen, bath remodel and convert to master bedroom @ 2nd flr | $120,000 |
| Jan 13, 2005 | Completed final sign-off Apr 2005 | 1426 23rd Av | kitchen, bathroom, toilet rm, remodel change cabs plumbing fixture & faucets, sheetrock tile paintinDetails
kitchen, bathroom, toilet rm, remodel change cabs plumbing fixture & faucets, sheetrock tile paintin | $35,000 |
| Nov 22, 2004 | Completed final sign-off Dec 2004 | 2435 24th Av | bath room remodelDetails
bath room remodel | $9,800 |
| Oct 27, 2004 | Completed final sign-off Dec 2004 | 2721 Bush St | remodel bathroom,change plumbing fixtures and faucets,tile work,sheetrock,painting. 1 bath onlyDetails
remodel bathroom,change plumbing fixtures and faucets,tile work,sheetrock,painting. 1 bath only | $8,000 |
| Sep 15, 2004 | Completed final sign-off Dec 2004 | 1268 05th Av | kitchen remodel,new cabinet,sink,faucets,sheetrock,painting,tile.new toilet @(e)1/2 bath convert toDetails
kitchen remodel,new cabinet,sink,faucets,sheetrock,painting,tile.new toilet @(e)1/2 bath convert to | $58,000 |
| Jun 9, 2004 | Completed final sign-off Jul 2004 | 751 Clayton St | add (n) sink at (e) toilet room. for both units. add (n) toilet at (e) 1/2 bath convert to full bathDetails
add (n) sink at (e) toilet room. for both units. add (n) toilet at (e) 1/2 bath convert to full bath | $15,000 |
| May 11, 2004 | Completed final sign-off Jun 2004 | 2274 40th Av | bath remodel. change all plumbing fixtures and faucets. change light fixtures, tile at 2nd fl.Details
bath remodel. change all plumbing fixtures and faucets. change light fixtures, tile at 2nd fl. | $6,500 |
| Mar 23, 2004 | Completed final sign-off Jul 2004 | 116 Tara St | remodel (e) kitchen +bath. repalce crack plaster through the house. rewire/replace cabinet, fixtureDetails
remodel (e) kitchen +bath. repalce crack plaster through the house. rewire/replace cabinet, fixture | $28,000 |
| Feb 13, 2004 | Expired or cancelled expired Dec 2004 | 274 Casitas Av | adding new bath, exercise area, office space at (e) sub-lower floor & (n) extyerior hot tub on pavedDetails
adding new bath, exercise area, office space at (e) sub-lower floor & (n) extyerior hot tub on paved | $20,000 |
| Sep 16, 2003 | Completed final sign-off Dec 2003 | 749 Panorama Dr | remodel existing bathroom at 2nd fl. replace fixtures, vanities, flooring & sheetrock.Details
remodel existing bathroom at 2nd fl. replace fixtures, vanities, flooring & sheetrock. | $8,500 |
| Sep 15, 2003 | Expired or cancelled expired Nov 2006 | 65 Dorado Tr | provide 1 hr sepration @garage for new 2 bedrms, 1 bath 1/2, storage accessory spacess in (e) garageDetails
provide 1 hr sepration @garage for new 2 bedrms, 1 bath 1/2, storage accessory spacess in (e) garage | $25,000 |
| Jun 23, 2003 | Completed final sign-off May 2004 | 274 Casitas Av | replace interior plaster with sheetrock. replace dryrot lumber. add ne master bathrm & 1/2 bath @ loDetails
replace interior plaster with sheetrock. replace dryrot lumber. add ne master bathrm & 1/2 bath @ lo | $15,000 |
| May 20, 2003 | Completed final sign-off Mar 2004 | 274 Casitas Av | remodel two bathrooms. change fixture & faucets. tile, sheetrock, painting. kitchen remodel. changeDetails
remodel two bathrooms. change fixture & faucets. tile, sheetrock, painting. kitchen remodel. change | $23,000 |
| Mar 19, 2003 | Completed final sign-off Aug 2003 | 338 Staples Av | new 1/2 bath on 2 flr,new full bath on grd flr; repl back room footing (sun room);2 new bedrmDetails
new 1/2 bath on 2 flr,new full bath on grd flr; repl back room footing (sun room);2 new bedrm | $28,000 |
| Mar 4, 2003 | Completed final sign-off Aug 2003 | 338 Staples Av | kitchen & bathroom remodel. change cabinet,floor tile,sheetrock,plumbing fixts & faucet.Details
kitchen & bathroom remodel. change cabinet,floor tile,sheetrock,plumbing fixts & faucet. | $9,800 |
| Dec 16, 2002 | Completed final sign-off Jan 2003 | 2575 22nd Av | remodel bathroom, change fix. & faucets, floor tile, paintingDetails
remodel bathroom, change fix. & faucets, floor tile, painting | $6,800 |
| Nov 7, 2002 | Completed final sign-off Dec 2002 | 3816 23rd St | remodel bathroom-change plumbing bathtub & faucets, tile & sheetrock. no change in walls.Details
remodel bathroom-change plumbing bathtub & faucets, tile & sheetrock. no change in walls. | $3,816 |
| Oct 4, 2002 | Completed final sign-off May 2003 | 2650 Alemany Bl | replace front & back windows, total 5, remodel 2/f bathroomDetails
replace front & back windows, total 5, remodel 2/f bathroom | $6,800 |
| Aug 20, 2002 | Completed final sign-off Oct 2002 | 311 28th Av | bathroom remodel,change fixture & faucet. tile work,sheetrock,painting.Details
bathroom remodel,change fixture & faucet. tile work,sheetrock,painting. | $5,800 |
| Jul 18, 2002 | Completed final sign-off Sep 2002 | 622 Geneva Av | kitchen remodel bathrm remodel 1/f & 2/f change 2 windows at kitchen one for bathroom (none visiblDetails
kitchen remodel bathrm remodel 1/f & 2/f change 2 windows at kitchen one for bathroom (none visibl | $15,000 |
| Apr 8, 2002 | Completed final sign-off Jun 2002 | 3348 Scott St | bathrm remodel replace wall tile. and plumbing fixture for sink only. 1/2 bath install sink. no struDetails
bathrm remodel replace wall tile. and plumbing fixture for sink only. 1/2 bath install sink. no stru | $1,000 |