Back to bathroom remodel contractors
Be Home Remodeling Inc
- Based in
- San Jose
- On San Francisco permits
- Jan 2020 to Sep 2026
- Last 24 months
- 75 permits filed
78 permits since 2000: 55 completed, 22 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
49 bathroom remodel permits: 36 completed, 13 in progress. Typically 0 days from filing to permit and 63 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 18, 2026 | In progress issued Aug 2026 | 474 02nd Av | revise pa# 202605010538 (sheet a-2): revise 3rd & 4th fl bathroom and kitchen configurations. no change in plumbing fixture count.Details
revise pa# 202605010538 (sheet a-2): revise 3rd & 4th fl bathroom and kitchen configurations. no change in plumbing fixture count. | $5 |
| Aug 13, 2026 | In progress issued Aug 2026 | 1979 28th Av | master bathroom remodel - relocating toilet, tub - walk-in shower; guest bathroom remodel, like for likeDetails
master bathroom remodel - relocating toilet, tub - walk-in shower; guest bathroom remodel, like for like | $50,000 |
| Jul 17, 2026 | Completed final sign-off Sep 2026 | 2311 Scott St | unit#4: bathroom remodel-like for like. no structural changes. replace fan, tub, toilet and vanity. upgarde mep to code ad needed.Details
unit#4: bathroom remodel-like for like. no structural changes. replace fan, tub, toilet and vanity. upgarde mep to code ad needed. | $20,000 |
| Jul 8, 2026 | In progress issued Jul 2026 | 3300 Folsom St | kitchen and (2) bathroom remodel (guest + master). replace kitchen sink + plumbing fixtures upgrade appliances and lights all in the same location, no change to plumbing or electrical layouts. no structural changes. no structural changes to bathroom(s) layout, replace toielt, vanity, tubs and fan..Details
kitchen and (2) bathroom remodel (guest + master). replace kitchen sink + plumbing fixtures upgrade appliances and lights all in the same location, no change to plumbing or electrical layouts. no structural changes. no structural changes to bathroom(s) layout, replace toielt, vanity, tubs and fan.. | $15,000 |
| Jun 17, 2026 | Completed final sign-off Aug 2026 | 318 Ortega St | second floor bathroom remodel like for like.Details
second floor bathroom remodel like for like. | $25,000 |
| May 14, 2026 | In progress issued May 2026 | 7 Juanita Wy | 3 bathroom remodels and 1 is tub to shower. 2 master bathrooms 60 sq ft and 40 sq ft. 1 guest bathroom 40 sq ft. upgrade meps as needed, replace toilets, vanity, sinks, fans, fixtures, in bathroom.Details
3 bathroom remodels and 1 is tub to shower. 2 master bathrooms 60 sq ft and 40 sq ft. 1 guest bathroom 40 sq ft. upgrade meps as needed, replace toilets, vanity, sinks, fans, fixtures, in bathroom. | $60,000 |
| May 14, 2026 | Completed final sign-off Jul 2026 | 1924 Filbert St | unit 2: bathroom remodel like for like, tub to tub, replace toilet, vanity sink, fixtures, tub, upgrade meps, no structual changes.Details
unit 2: bathroom remodel like for like, tub to tub, replace toilet, vanity sink, fixtures, tub, upgrade meps, no structual changes. | $25,000 |
| May 14, 2026 | In progress issued May 2026 | 2548 14th Av | guest bathroom remodel like for like & kitchen remodel like for like.Details
guest bathroom remodel like for like & kitchen remodel like for like. | $62,700 |
| May 8, 2026 | In progress issued May 2026 | 1601 Pacific Av | bathroom remodel: like for like, curbless shower. replace vanity sink, toilet, fixtures, upgrade fan all in same location upgrade mep to code as needed.Details
bathroom remodel: like for like, curbless shower. replace vanity sink, toilet, fixtures, upgrade fan all in same location upgrade mep to code as needed. | $20,000 |
| May 5, 2026 | Completed final sign-off Jun 2026 | 1715 Sanchez St | guest bathroom remodel like for like, no relocations or structural changes.Details
guest bathroom remodel like for like, no relocations or structural changes. | $20,000 |
| May 4, 2026 | Completed final sign-off Sep 2026 | 4040 17th St | bathroom remodel removing stand alone bath and creating walk in shower and adding toilet. water closet to include replace toilet in kindDetails
bathroom remodel removing stand alone bath and creating walk in shower and adding toilet. water closet to include replace toilet in kind | $15,000 |
| May 4, 2026 | Completed final sign-off Sep 2026 | 4042 17th St | bathroom remodel removing stand alone bath and creating walk in shower and adding toilet. water closet to include replace toilet in kindDetails
bathroom remodel removing stand alone bath and creating walk in shower and adding toilet. water closet to include replace toilet in kind | $15,000 |
| May 1, 2026 | In progress issued Jun 2026 | 474 02nd Av | kitchen remodel, 3rd floor bathroom remodel, add laundry room, convert 4th floor room to bathroomDetails
kitchen remodel, 3rd floor bathroom remodel, add laundry room, convert 4th floor room to bathroom | $60,000 |
| Apr 24, 2026 | In progress issued Apr 2026 | 200 Brannan St | like for like remodel of 2 (e) bathrooms. one with bathtub/shower, one with walk-in shower. replace fixtures, finishes and plumbing - same location- no change to structure or layout. all stays in same location.Details
like for like remodel of 2 (e) bathrooms. one with bathtub/shower, one with walk-in shower. replace fixtures, finishes and plumbing - same location- no change to structure or layout. all stays in same location. | $40,000 |
| Mar 20, 2026 | Completed final sign-off May 2026 | 324 Arkansas St | bathroom remodel like for like ¿ shower to shower on first floor, upgrade mep to code, replace toilet, sink & vanity.Details
bathroom remodel like for like ¿ shower to shower on first floor, upgrade mep to code, replace toilet, sink & vanity. | $25,000 |
| Mar 20, 2026 | In progress issued Mar 2026 | 142 Clearfield Dr | first floor bathroom remodel like for like, relocate fan from wall to ceiling, upgrade mep to code. no removal of wallsDetails
first floor bathroom remodel like for like, relocate fan from wall to ceiling, upgrade mep to code. no removal of walls | $25,000 |
| Mar 3, 2026 | In progress issued Mar 2026 | 1944 15th Av | creation of 2 (n) bathrooms. remodel (e) bathroom. creation of ground floor bedroom/office area. conventional framing changes.Details
creation of 2 (n) bathrooms. remodel (e) bathroom. creation of ground floor bedroom/office area. conventional framing changes. | $90,000 |
| Feb 26, 2026 | Completed final sign-off May 2026 | 451 Kansas St | unit # 316: guest bathroom remodel, like for like, replace tub, sink, vanity, toilet, fan upgrade mep to code.Details
unit # 316: guest bathroom remodel, like for like, replace tub, sink, vanity, toilet, fan upgrade mep to code. | $12,000 |
| Feb 19, 2026 | In progress issued Feb 2026 | 200 Brannan St | bathroom remodel like for like replace shower, sink, vanity, toilet, fan upgrade mep to code. 63 sqft kitchen remodel like for like. 72 sqft. unit 208Details
bathroom remodel like for like replace shower, sink, vanity, toilet, fan upgrade mep to code. 63 sqft kitchen remodel like for like. 72 sqft. unit 208 | $50,000 |
| Feb 19, 2026 | Completed final sign-off Apr 2026 | 1475 33rd Av | master bathroom remodel. like for like replace shower, toilet, vanity, sink, fan upgrade mep to code. 48 sqftDetails
master bathroom remodel. like for like replace shower, toilet, vanity, sink, fan upgrade mep to code. 48 sqft | $25,000 |
| Feb 19, 2026 | Completed final sign-off Apr 2026 | 1587 Sanchez St | guest bathroom remodel like for like no structural changes replace tub, sink, vanity, toilet, fan upgrade mep to code 50 sq ft.Details
guest bathroom remodel like for like no structural changes replace tub, sink, vanity, toilet, fan upgrade mep to code 50 sq ft. | $30,000 |
| Jan 30, 2026 | Completed final sign-off May 2026 | 623 Noriega St | bathroom remodel upstaires convert tub to shower, replace toilet, sink, vanity, fan, upgrade mep to code, 42 sq ft. bathroom remodel downstaires like for like, replace shower,toilet, sink, vanity, fan, upgrade mep to code, 37 sq ft.Details
bathroom remodel upstaires convert tub to shower, replace toilet, sink, vanity, fan, upgrade mep to code, 42 sq ft. bathroom remodel downstaires like for like, replace shower,toilet, sink, vanity, fan, upgrade mep to code, 37 sq ft. | $30,000 |
| Jan 30, 2026 | In progress issued Jan 2026 | 474 02nd Av | removing one wall per engineering plans, adding a new wall per plan. remodeling one bathroom, opening wall to add a closet to the bathroom, relocating vanity to new location rest will be remain the same. replacing portion of 2nd floor framing.Details
removing one wall per engineering plans, adding a new wall per plan. remodeling one bathroom, opening wall to add a closet to the bathroom, relocating vanity to new location rest will be remain the same. replacing portion of 2nd floor framing. | $30,000 |
| Dec 29, 2025 | Completed final sign-off Feb 2026 | 1834 38th Av | bathroom remodel like for like - remove walk in shower and convert to closet.Details
bathroom remodel like for like - remove walk in shower and convert to closet. | $15,000 |
| Dec 17, 2025 | In progress issued Dec 2025 | 490 34th Av | unit #202: master bathroom remodel shower like for like replace toilet, sink, vanity, fan, upgrade mep to code. 50 sq ft. guest bathroom remodel tub like for like replace toilet, sink, vanity, fan, upgrade mep to code. 50 sq ft.Details
unit #202: master bathroom remodel shower like for like replace toilet, sink, vanity, fan, upgrade mep to code. 50 sq ft. guest bathroom remodel tub like for like replace toilet, sink, vanity, fan, upgrade mep to code. 50 sq ft. | $30,000 |
| Dec 17, 2025 | Completed final sign-off Jan 2026 | 144 27th St | bathroom remodel tub to shower. replace toilet, vanity, sink, fan upgrade in kind. mep to code. 40 sq ft.Details
bathroom remodel tub to shower. replace toilet, vanity, sink, fan upgrade in kind. mep to code. 40 sq ft. | $20,000 |
| Dec 10, 2025 | Completed final sign-off Feb 2026 | 620 Lake St | unit#4: bathroom remodel tub to shower replace toilet, sink, vanity, fan, upgrade mep to code.not walls to be remove or add.Details
unit#4: bathroom remodel tub to shower replace toilet, sink, vanity, fan, upgrade mep to code.not walls to be remove or add. | $20,000 |
| Nov 21, 2025 | Completed final sign-off Dec 2025 | 2087 23rd Av | tub to tub remodel like for like. replace (e) fan to new (not a full bathroom remodel).Details
tub to tub remodel like for like. replace (e) fan to new (not a full bathroom remodel). | $7,000 |
| Nov 21, 2025 | Completed final sign-off May 2026 | 1307 Francisco St | master bathroom remodel and full kitchen remodel, re-pipe all water pipes and rewire plus new 100 amp subpanel.Details
master bathroom remodel and full kitchen remodel, re-pipe all water pipes and rewire plus new 100 amp subpanel. | $85,000 |
| Oct 29, 2025 | Completed final sign-off Apr 2026 | 949 Hampshire St | kitchen and bathroom remodel: kitchen-demolish existing cabinets, island, pony wall 2" wall sigment, install new cabinets & island. bathroom: demolish existing vanity and toile, install enw double sink vanity and toilet.Details
kitchen and bathroom remodel: kitchen-demolish existing cabinets, island, pony wall 2" wall sigment, install new cabinets & island. bathroom: demolish existing vanity and toile, install enw double sink vanity and toilet. | $30,000 |
| Sep 19, 2025 | Completed final sign-off Nov 2025 | 466 Joost Av | guest bathroom remodel (partial) replace vanity, fan, toilet, floor tile, paint upgrade mep to code (like for like) 35 sqft. of work area. no work at tub and tub surround.Details
guest bathroom remodel (partial) replace vanity, fan, toilet, floor tile, paint upgrade mep to code (like for like) 35 sqft. of work area. no work at tub and tub surround. | $4,000 |
| Aug 29, 2025 | Completed final sign-off Jan 2026 | 300 Beale St | unit 504 - bathroom remodel, replace vanity, toilet, exhaust fan, security bars, mirror, light fixtures, new recessed light above shower and replace existing door for laundry closet & 2 recessed lights in bedroom. bathroom 50sqftDetails
unit 504 - bathroom remodel, replace vanity, toilet, exhaust fan, security bars, mirror, light fixtures, new recessed light above shower and replace existing door for laundry closet & 2 recessed lights in bedroom. bathroom 50sqft | $2,500 |
| Aug 15, 2025 | Completed final sign-off Oct 2025 | 1506 Newcomb Av | bathroom remodel, convert walk in shower to a tub. new wall tiles, new vanity, and fan 40 sq ft. like for like, in kind remodel.Details
bathroom remodel, convert walk in shower to a tub. new wall tiles, new vanity, and fan 40 sq ft. like for like, in kind remodel. | $8,000 |
| Aug 7, 2025 | Completed final sign-off Sep 2025 | 111 Topeka Av | bathroom remodel like for like. 33 sq ft. tub to shower.Details
bathroom remodel like for like. 33 sq ft. tub to shower. | $25,000 |
| Jul 25, 2025 | Completed final sign-off Dec 2025 | 2091 32nd Av | kitchen and master bathroom remodel like for like. no structual changes. bathroom 80 sqft and kitchen 120 sqft.Details
kitchen and master bathroom remodel like for like. no structual changes. bathroom 80 sqft and kitchen 120 sqft. | $30,000 |
| Jul 18, 2025 | Completed final sign-off Sep 2026 | 2053 Golden Gate Av | kitchen remodel. demolition of interior wall in kitchen area. bathroom remodel. new bathroom in master bedroom. house rewiring.Details
kitchen remodel. demolition of interior wall in kitchen area. bathroom remodel. new bathroom in master bedroom. house rewiring. | $150,000 |
| Jul 11, 2025 | Completed final sign-off Jan 2026 | 1310 Fulton St | kitchen remodel, no structural changes like for like 50 sq ft. guest bathroom remodel, no structural changes, like for like shower 45 sq ft. masterbathroom remodel, no structural changes like for like tub 55 sq ft. all on first floorDetails
kitchen remodel, no structural changes like for like 50 sq ft. guest bathroom remodel, no structural changes, like for like shower 45 sq ft. masterbathroom remodel, no structural changes like for like tub 55 sq ft. all on first floor | $50,000 |
| Jul 2, 2025 | Completed final sign-off Sep 2025 | 2538 Bryant St | bathroom remodel on third floor. remove interior walls- non load bearing wall and load bearing wall.Details
bathroom remodel on third floor. remove interior walls- non load bearing wall and load bearing wall. | $22,000 |
| Jul 2, 2025 | Completed final sign-off Sep 2025 | 2776 35th Av | bathroom remodel. remove non structural wall. move washer and dryer to the garage.Details
bathroom remodel. remove non structural wall. move washer and dryer to the garage. | $30,000 |
| Jun 4, 2025 | Completed final sign-off Aug 2025 | 423 Waller St | unit 1 - bathroom remodel like for like, no structural changes, walk-in shower.Details
unit 1 - bathroom remodel like for like, no structural changes, walk-in shower. | $25,000 |
| May 2, 2025 | Completed final sign-off Jun 2025 | 5175 Diamond Heights Bl | unit 109: bathroom remodel (not a full bathroom remodel) only shower remodel. replace fan.Details
unit 109: bathroom remodel (not a full bathroom remodel) only shower remodel. replace fan. | $8,000 |
| Feb 27, 2025 | Completed final sign-off Mar 2025 | 555 Golden Gate Av | unit 601: convert tub to shower. install 1 recessed lights in the bathroom. not a full bathroom remodel.Details
unit 601: convert tub to shower. install 1 recessed lights in the bathroom. not a full bathroom remodel. | $10,000 |
| Jan 24, 2025 | Completed final sign-off Apr 2025 | 750 Van Ness Av | unit 204: bathroom remodel convert tub to showerDetails
unit 204: bathroom remodel convert tub to shower | $30,000 |
| Jan 16, 2025 | Completed final sign-off May 2025 | 1978 Palou Av | remodel kitchen & 1 bathroom, like for like. convert tub to shower in same location. no structural changes. no moving walls.Details
remodel kitchen & 1 bathroom, like for like. convert tub to shower in same location. no structural changes. no moving walls. | $40,000 |
| Jan 3, 2025 | Completed final sign-off Feb 2026 | 1430 Hyde St | reconfiguration of one split bathroom into one full bath and one half bath on 2nd flr. removal of wall in kitchen and dining room, kitchen remodel. new cabinets at laundry room, sink repair.Details
reconfiguration of one split bathroom into one full bath and one half bath on 2nd flr. removal of wall in kitchen and dining room, kitchen remodel. new cabinets at laundry room, sink repair. | $100,000 |
| Dec 10, 2024 | Completed final sign-off Apr 2025 | 695 27th Av | bathroom remodel (117sf)Details
bathroom remodel (117sf) | $30,000 |
| Dec 10, 2024 | Completed final sign-off Mar 2025 | 774 30th Av | remove (e) doors & window in bathroom. (n) window in bathroom. remove (e) bathtub, new showerDetails
remove (e) doors & window in bathroom. (n) window in bathroom. remove (e) bathtub, new shower | $40,000 |
| Nov 21, 2024 | Completed final sign-off Feb 2025 | 4218 Lawton St | one bathroom remodel like for like, one kitchen remodel like for like, rewire entire house (beside the garage).Details
one bathroom remodel like for like, one kitchen remodel like for like, rewire entire house (beside the garage). | $60,000 |
| Nov 15, 2024 | Completed final sign-off Jan 2025 | 626 Detroit St | bathroom remodel like for like no wall removal and no layout change.Details
bathroom remodel like for like no wall removal and no layout change. | $35,000 |