Back to kitchen remodel contractors
Be Home Remodeling Inc
- Based in
- San Jose
- On San Francisco permits
- Jan 2020 to Sep 2026
- Last 24 months
- 75 permits filed
78 permits since 2000: 55 completed, 22 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
25 kitchen remodel permits: 14 completed, 10 in progress, 1 expired or cancelled. Typically 0 days from filing to permit and 141 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 18, 2026 | In progress issued Aug 2026 | 474 02nd Av | revise pa# 202605010538 (sheet a-2): revise 3rd & 4th fl bathroom and kitchen configurations. no change in plumbing fixture count.Details
revise pa# 202605010538 (sheet a-2): revise 3rd & 4th fl bathroom and kitchen configurations. no change in plumbing fixture count. | $5 |
| Aug 5, 2026 | In progress issued Aug 2026 | 2146 Great Hy | kitchen remodel: replace cabinets, appliances, kitchen sink, dishwasher, all in same location, like for like remodel. no removal of wallsDetails
kitchen remodel: replace cabinets, appliances, kitchen sink, dishwasher, all in same location, like for like remodel. no removal of walls | $30,000 |
| Jul 31, 2026 | In progress issued Jul 2026 | 136 Seal Rock Dr | kitchen remodel (in kind) and remove (e) window in kitchen, new window (4030) in kitchen.Details
kitchen remodel (in kind) and remove (e) window in kitchen, new window (4030) in kitchen. | $37,000 |
| Jul 8, 2026 | In progress issued Jul 2026 | 3300 Folsom St | kitchen and (2) bathroom remodel (guest + master). replace kitchen sink + plumbing fixtures upgrade appliances and lights all in the same location, no change to plumbing or electrical layouts. no structural changes. no structural changes to bathroom(s) layout, replace toielt, vanity, tubs and fan..Details
kitchen and (2) bathroom remodel (guest + master). replace kitchen sink + plumbing fixtures upgrade appliances and lights all in the same location, no change to plumbing or electrical layouts. no structural changes. no structural changes to bathroom(s) layout, replace toielt, vanity, tubs and fan.. | $15,000 |
| Jul 1, 2026 | Completed final sign-off Aug 2026 | 1081 Goettingen St | kitchenette to be added to ground floor living area, microwave with fan, two gfci receptacles, electric cooktop, sink and fridge.Details
kitchenette to be added to ground floor living area, microwave with fan, two gfci receptacles, electric cooktop, sink and fridge. | $15,000 |
| Jun 12, 2026 | Completed final sign-off Sep 2026 | 770 Duncan St | kitchen remodel, like for like no structual changes. replace kitchen sink, dishwasher, range vent, upgrade mep to code. 200sfDetails
kitchen remodel, like for like no structual changes. replace kitchen sink, dishwasher, range vent, upgrade mep to code. 200sf | $25,000 |
| May 14, 2026 | In progress issued May 2026 | 2548 14th Av | guest bathroom remodel like for like & kitchen remodel like for like.Details
guest bathroom remodel like for like & kitchen remodel like for like. | $62,700 |
| May 1, 2026 | In progress issued Jun 2026 | 474 02nd Av | kitchen remodel, 3rd floor bathroom remodel, add laundry room, convert 4th floor room to bathroomDetails
kitchen remodel, 3rd floor bathroom remodel, add laundry room, convert 4th floor room to bathroom | $60,000 |
| Apr 3, 2026 | In progress issued Apr 2026 | 2342 48th Av | kitchen remodel - like for like. replace cabinets, fixtures in same location.Details
kitchen remodel - like for like. replace cabinets, fixtures in same location. | $30,000 |
| Apr 2, 2026 | Completed final sign-off Jun 2026 | 1601 Pacific Av | unit 404: kitchen remodel like for like, replace cabinets, counter tops, sink. same location.Details
unit 404: kitchen remodel like for like, replace cabinets, counter tops, sink. same location. | $30,000 |
| Apr 2, 2026 | Expired or cancelled cancelled Apr 2026 | 2362 48th Av | kitchen remodel: like for like, replace cabinets, fixtures in same location.Details
kitchen remodel: like for like, replace cabinets, fixtures in same location. | $30,000 |
| Mar 27, 2026 | Completed final sign-off Aug 2026 | 938 Market St | unit#403: kitchen remodel - like for like, upgrade mep to codeDetails
unit#403: kitchen remodel - like for like, upgrade mep to code | $25,000 |
| Mar 3, 2026 | In progress issued Mar 2026 | 30 Constanso Wy | kitchen remodel: remove wall between kitchen area and dining room area. kitchen island remdeling, gas stove, update electrical and subpnael. replace sink in kitchenDetails
kitchen remodel: remove wall between kitchen area and dining room area. kitchen island remdeling, gas stove, update electrical and subpnael. replace sink in kitchen | $18,000 |
| Mar 3, 2026 | Completed final sign-off May 2026 | 3137 Washington St | 1)remove wall that seperates the kitchen from living room. 2)kitchen remodel. 3)remove closet in bedroom.Details
1)remove wall that seperates the kitchen from living room. 2)kitchen remodel. 3)remove closet in bedroom. | $30,000 |
| Feb 19, 2026 | In progress issued Feb 2026 | 200 Brannan St | bathroom remodel like for like replace shower, sink, vanity, toilet, fan upgrade mep to code. 63 sqft kitchen remodel like for like. 72 sqft. unit 208Details
bathroom remodel like for like replace shower, sink, vanity, toilet, fan upgrade mep to code. 63 sqft kitchen remodel like for like. 72 sqft. unit 208 | $50,000 |
| Nov 21, 2025 | Completed final sign-off May 2026 | 1307 Francisco St | master bathroom remodel and full kitchen remodel, re-pipe all water pipes and rewire plus new 100 amp subpanel.Details
master bathroom remodel and full kitchen remodel, re-pipe all water pipes and rewire plus new 100 amp subpanel. | $85,000 |
| Oct 29, 2025 | Completed final sign-off Apr 2026 | 949 Hampshire St | kitchen and bathroom remodel: kitchen-demolish existing cabinets, island, pony wall 2" wall sigment, install new cabinets & island. bathroom: demolish existing vanity and toile, install enw double sink vanity and toilet.Details
kitchen and bathroom remodel: kitchen-demolish existing cabinets, island, pony wall 2" wall sigment, install new cabinets & island. bathroom: demolish existing vanity and toile, install enw double sink vanity and toilet. | $30,000 |
| Aug 15, 2025 | Completed final sign-off Oct 2025 | 137 Congo St | kitchen remodel like for like, no structural changes 120 sqft.Details
kitchen remodel like for like, no structural changes 120 sqft. | $18,000 |
| Jul 25, 2025 | Completed final sign-off Dec 2025 | 2091 32nd Av | kitchen and master bathroom remodel like for like. no structual changes. bathroom 80 sqft and kitchen 120 sqft.Details
kitchen and master bathroom remodel like for like. no structual changes. bathroom 80 sqft and kitchen 120 sqft. | $30,000 |
| Jul 18, 2025 | Completed final sign-off Sep 2026 | 2053 Golden Gate Av | kitchen remodel. demolition of interior wall in kitchen area. bathroom remodel. new bathroom in master bedroom. house rewiring.Details
kitchen remodel. demolition of interior wall in kitchen area. bathroom remodel. new bathroom in master bedroom. house rewiring. | $150,000 |
| Jul 11, 2025 | Completed final sign-off Jan 2026 | 1310 Fulton St | kitchen remodel, no structural changes like for like 50 sq ft. guest bathroom remodel, no structural changes, like for like shower 45 sq ft. masterbathroom remodel, no structural changes like for like tub 55 sq ft. all on first floorDetails
kitchen remodel, no structural changes like for like 50 sq ft. guest bathroom remodel, no structural changes, like for like shower 45 sq ft. masterbathroom remodel, no structural changes like for like tub 55 sq ft. all on first floor | $50,000 |
| Jan 16, 2025 | Completed final sign-off May 2025 | 1978 Palou Av | remodel kitchen & 1 bathroom, like for like. convert tub to shower in same location. no structural changes. no moving walls.Details
remodel kitchen & 1 bathroom, like for like. convert tub to shower in same location. no structural changes. no moving walls. | $40,000 |
| Jan 3, 2025 | Completed final sign-off Feb 2026 | 1430 Hyde St | reconfiguration of one split bathroom into one full bath and one half bath on 2nd flr. removal of wall in kitchen and dining room, kitchen remodel. new cabinets at laundry room, sink repair.Details
reconfiguration of one split bathroom into one full bath and one half bath on 2nd flr. removal of wall in kitchen and dining room, kitchen remodel. new cabinets at laundry room, sink repair. | $100,000 |
| Nov 21, 2024 | Completed final sign-off Feb 2025 | 4218 Lawton St | one bathroom remodel like for like, one kitchen remodel like for like, rewire entire house (beside the garage).Details
one bathroom remodel like for like, one kitchen remodel like for like, rewire entire house (beside the garage). | $60,000 |
| Jan 7, 2020 | In progress issued May 2024 | 552 Hill St | abate complaint #2018-002876enf;return (e) units as permit bybpa #200312313258 (2 legal units);(e) 1st+2nd/fl to be 1 unit (552),retain a 2nd kitchen on 1st floor;(e) 3rd/fl to be kept as a stand-alone unit,including (n) kitchen (554);legalize 72sf & deck + extension rear.Details
abate complaint #2018-002876enf;return (e) units as permit bybpa #200312313258 (2 legal units);(e) 1st+2nd/fl to be 1 unit (552),retain a 2nd kitchen on 1st floor;(e) 3rd/fl to be kept as a stand-alone unit,including (n) kitchen (554);legalize 72sf & deck + extension rear. | $50,000 |