Back to bathroom remodel contractors
We Do Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Oct 2018 to Oct 2026
- Last 24 months
- 102 permits filed
157 permits since 2000: 110 completed, 45 in progress, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
95 bathroom remodel permits: 75 completed, 18 in progress, 2 expired or cancelled. Typically 0 days from filing to permit and 99 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 14, 2026 | In progress issued Aug 2026 | 946 Stockton St | master bath remodel. no structural changes with plans. revision to pa #202608056102Details
master bath remodel. no structural changes with plans. revision to pa #202608056102 | $15,000 |
| Aug 5, 2026 | In progress issued Aug 2026 | 946 Stockton St | unit #12d: master bath remodel like for like, shower to shower, 60 sqft. no change to floor layout. no change to wall layout. no structural work.Details
unit #12d: master bath remodel like for like, shower to shower, 60 sqft. no change to floor layout. no change to wall layout. no structural work. | $25,000 |
| Aug 5, 2026 | In progress issued Aug 2026 | 946 Stockton St | unit #12d: guest bath remodel like for like, convert tub to shower, 40 sqft. no change to floor layout. no change to wall layout. no structural work. not a curbless shower.Details
unit #12d: guest bath remodel like for like, convert tub to shower, 40 sqft. no change to floor layout. no change to wall layout. no structural work. not a curbless shower. | $25,000 |
| Jul 24, 2026 | In progress issued Jul 2026 | 1000 North Point St | unit # 905: bathroom and kitchen, like for like. bathroom approximately 40f. kitchen approximately 60sf.Details
unit # 905: bathroom and kitchen, like for like. bathroom approximately 40f. kitchen approximately 60sf. | $120,000 |
| Jul 22, 2026 | Completed final sign-off Aug 2026 | 176 15th Av | bathroom remodel, like for like. no layout change. approximately 40sfDetails
bathroom remodel, like for like. no layout change. approximately 40sf | $10,000 |
| Jul 17, 2026 | In progress issued Jul 2026 | 1845 Leavenworth St | unit #202: bathroom remodel, upgrade mep as neededDetails
unit #202: bathroom remodel, upgrade mep as needed | $20,000 |
| May 29, 2026 | Completed final sign-off Aug 2026 | 218 Wawona St | bathroom remodel tub to shower conversion, replace plumbing and lighting as needed. in kind except tub to shower. no moving walls. approx 55 sq ft.Details
bathroom remodel tub to shower conversion, replace plumbing and lighting as needed. in kind except tub to shower. no moving walls. approx 55 sq ft. | $15,000 |
| May 27, 2026 | In progress issued Jun 2026 | 90 Byxbee St | interior renovation including partial garage conversion into living space. some demo of certain exiting elements replacement of gas powered system with electric by design; add half bath on main level; demo existing fireplace on main levelDetails
interior renovation including partial garage conversion into living space. some demo of certain exiting elements replacement of gas powered system with electric by design; add half bath on main level; demo existing fireplace on main level | $100,000 |
| May 11, 2026 | In progress issued May 2026 | 2567 Bryant St | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 2 bathroom(s) in 1st fl, 2nd fl with 1 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 2 bathroom(s) in 1st fl, 2nd fl with 1 shower pan(s). | $120,000 |
| Mar 9, 2026 | Completed final sign-off Jun 2026 | 219 Lily St | 1-bathroom remodel 35 sqft, replace tub to shower, replace plumbing fixtures 4 new rl update mep to code.Details
1-bathroom remodel 35 sqft, replace tub to shower, replace plumbing fixtures 4 new rl update mep to code. | $28,000 |
| Feb 18, 2026 | Completed final sign-off Apr 2026 | 220 Denslowe Dr | in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s). | $25,000 |
| Feb 2, 2026 | Completed final sign-off May 2026 | 2299 Pacific Av | unit 81: bathroom remodel like for like, kitchen remodel, like for like.Details
unit 81: bathroom remodel like for like, kitchen remodel, like for like. | $50,000 |
| Feb 2, 2026 | Completed final sign-off Aug 2026 | 126 Galewood Cr | 2 bathroom remodels like for like, kitchen remodel, upgrade supanel 100amps.Details
2 bathroom remodels like for like, kitchen remodel, upgrade supanel 100amps. | $85,000 |
| Jan 27, 2026 | Completed final sign-off Feb 2026 | 220 Denslowe Dr | revision to pa #2025-1231-3111 (bathroom remodel): adding layout changeDetails
revision to pa #2025-1231-3111 (bathroom remodel): adding layout change | |
| Dec 31, 2025 | Completed final sign-off Feb 2026 | 220 Denslowe Dr | bathroom remodel like for like.Details
bathroom remodel like for like. | $20,000 |
| Dec 31, 2025 | Completed final sign-off Jul 2026 | 5011 Diamond Heights Bl | 2 bathrooms remodeling like for like. 1 kitchen remodel.Details
2 bathrooms remodeling like for like. 1 kitchen remodel. | $100,000 |
| Dec 22, 2025 | In progress issued Mar 2026 | 2254 Fulton St | upper unit 2254: kitchen and bath remodel of an existing 4-story duplex, including shifted walls, openings, and fixtures, and new pantryDetails
upper unit 2254: kitchen and bath remodel of an existing 4-story duplex, including shifted walls, openings, and fixtures, and new pantry | $40,000 |
| Dec 9, 2025 | In progress issued Dec 2025 | 241 Granville Wy | 2nd floor bathroom remodel in-kind, sink, shower pan, toilet.Details
2nd floor bathroom remodel in-kind, sink, shower pan, toilet. | $47,000 |
| Nov 23, 2025 | Completed final sign-off Mar 2026 | 241 Moultrie St | in-kind remodeling of 2 bathroom(s) in 1st fl with 2 shower pan(s).Details
in-kind remodeling of 2 bathroom(s) in 1st fl with 2 shower pan(s). | $38,000 |
| Nov 13, 2025 | Completed final sign-off Apr 2026 | 4121 Cesar Chavez St | work at unit# 4. 2nd bathroom remodel. like for like.Details
work at unit# 4. 2nd bathroom remodel. like for like. | $38,000 |
| Nov 12, 2025 | Completed final sign-off Jun 2026 | 2524 Anza St | bathroom remodel in kind like for like no wall removal or layout changeDetails
bathroom remodel in kind like for like no wall removal or layout change | $36,000 |
| Nov 12, 2025 | Completed final sign-off May 2026 | 24 Ord St | bathroom remodel in kind like for like no wall removal or layout changeDetails
bathroom remodel in kind like for like no wall removal or layout change | $38,000 |
| Nov 6, 2025 | In progress issued Nov 2025 | 112 Andover St | in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). | $25,000 |
| Nov 4, 2025 | Completed final sign-off Dec 2025 | 1751 North Point St | bathroom replace all plumbing fixtures, shower, tub, plumbing only.Details
bathroom replace all plumbing fixtures, shower, tub, plumbing only. | $18,000 |
| Nov 3, 2025 | Completed final sign-off Feb 2026 | 1785 San Jose Av | in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $22,000 |
| Oct 30, 2025 | Completed final sign-off Jan 2026 | 25 Montclair Tr | in-kind remodeling of 1 bathroom(s) in 3rd fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 3rd fl with 1 shower pan(s). | $25,000 |
| Oct 23, 2025 | In progress issued Oct 2025 | 100 Paloma Av | demo all sheet rock and r-15 insulation. master bathroom remodel on 2/f. hallway bath remodel. relocate laundry from master bath to hallway bath. replace all windows. front and east elevations windows to be wood or aluminum clad wood; same operation and grille pattern. rewire the whole house.Details
demo all sheet rock and r-15 insulation. master bathroom remodel on 2/f. hallway bath remodel. relocate laundry from master bath to hallway bath. replace all windows. front and east elevations windows to be wood or aluminum clad wood; same operation and grille pattern. rewire the whole house. | $85,000 |
| Oct 21, 2025 | In progress issued Dec 2025 | 35 Brewster St | interior renovations, facade upgrades. new cladding and improve to main entrance. 1st flr-master bathroom remodel, replace interior and exterior doors & windows. relocate ahu and add new laundry closet. 2nd flr bathroom remodeling partial remodeling partial remodel of kitchen. structural upgradeDetails
interior renovations, facade upgrades. new cladding and improve to main entrance. 1st flr-master bathroom remodel, replace interior and exterior doors & windows. relocate ahu and add new laundry closet. 2nd flr bathroom remodeling partial remodeling partial remodel of kitchen. structural upgrade | $95,000 |
| Oct 7, 2025 | In progress issued Jan 2026 | 1900 15th Av | (n) attached 558 sqft adu - unit #2. main home addition & remodel including demo of (e) fireplace, (n) master bedroom, bathroom, & closet; living/dining relocation, new deckDetails
(n) attached 558 sqft adu - unit #2. main home addition & remodel including demo of (e) fireplace, (n) master bedroom, bathroom, & closet; living/dining relocation, new deck | $200,000 |
| Oct 3, 2025 | Completed final sign-off Dec 2025 | 825 La Playa | unit 130: bathroom remodel in kind.Details
unit 130: bathroom remodel in kind. | $34,000 |
| Oct 3, 2025 | Completed final sign-off Aug 2026 | 201 Folsom St | unit#26a: kitchen remodeling like for like, 2 bathroom remodeling like for likeDetails
unit#26a: kitchen remodeling like for like, 2 bathroom remodeling like for like | $70,000 |
| Sep 22, 2025 | Completed final sign-off May 2026 | 2736 Baker St | kitchen and bathroom remodel in-kind.Details
kitchen and bathroom remodel in-kind. | $50,000 |
| Sep 12, 2025 | Completed final sign-off Jul 2026 | 11 Wright St | bathroom remodel like for like.Details
bathroom remodel like for like. | $30,000 |
| Sep 3, 2025 | In progress issued Oct 2025 | 2519 32nd Av | interior remodel converting ground fl. into habitable space on ground floor. remodeling kitchen, bathroom, new plan configuration, adding 2 moere bedrooms & recreational room in ground fl., rebuilding stairs, adding a 2nd floor deck & exterior stairs, adding new windows/skylights. replacing cielingDetails
interior remodel converting ground fl. into habitable space on ground floor. remodeling kitchen, bathroom, new plan configuration, adding 2 moere bedrooms & recreational room in ground fl., rebuilding stairs, adding a 2nd floor deck & exterior stairs, adding new windows/skylights. replacing cieling | $400,000 |
| Aug 19, 2025 | Completed final sign-off Dec 2025 | 790 21st Av | bathroom remodel in kindDetails
bathroom remodel in kind | $35,000 |
| Aug 13, 2025 | In progress issued Aug 2025 | 612 Guerrero St | unit#2: kitchen remodel like for like. bathroom remodel like for like. rewire apartment. install electric tankless water heater. no removal of wallsDetails
unit#2: kitchen remodel like for like. bathroom remodel like for like. rewire apartment. install electric tankless water heater. no removal of walls | $42,000 |
| Jul 8, 2025 | Completed final sign-off Oct 2025 | 959 Church St | bathroom remodel, relocate plumbing, adding toilet, cancel shower, 6 r,l,. replace tub, outlets and switches. no removal of wallsDetails
bathroom remodel, relocate plumbing, adding toilet, cancel shower, 6 r,l,. replace tub, outlets and switches. no removal of walls | $45,000 |
| Jul 3, 2025 | Completed final sign-off Mar 2026 | 3100 Moraga St | in kind renovation of existing (1) bathroom on 2nd floor. infill the door from bedroom to bathroom, change tub to shower.Details
in kind renovation of existing (1) bathroom on 2nd floor. infill the door from bedroom to bathroom, change tub to shower. | $45,000 |
| Jun 30, 2025 | Completed final sign-off Sep 2025 | 550 Broderick St | remodeling the existing primary bathroom and constructing a new full bathroom within the existing closet space.Details
remodeling the existing primary bathroom and constructing a new full bathroom within the existing closet space. | $60,000 |
| Jun 27, 2025 | Completed final sign-off Aug 2025 | 54 Marietta Dr | in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s). | $20,000 |
| Jun 18, 2025 | Completed final sign-off Feb 2026 | 4121 Cesar Chavez St | bathroom remodel like for like.Details
bathroom remodel like for like. | $61,800 |
| May 23, 2025 | Completed final sign-off Jul 2025 | 137 Buchanan St | 1 bathroom remodeling like to likeDetails
1 bathroom remodeling like to like | $40,000 |
| May 14, 2025 | Completed final sign-off Feb 2026 | 640 Davis St | unit 1; 1 guest bathroom like for like. 1 powder room like for like, 1 primary bathroom like for likeDetails
unit 1; 1 guest bathroom like for like. 1 powder room like for like, 1 primary bathroom like for like | $68,000 |
| May 8, 2025 | Completed final sign-off Aug 2025 | 25 Kingston St | master bathroom remodel, inkind. no removal of wallsDetails
master bathroom remodel, inkind. no removal of walls | $24,000 |
| Apr 15, 2025 | Completed final sign-off Dec 2025 | 1775 Broadway | unit 18-bathroom remodel like for like no wall removalDetails
unit 18-bathroom remodel like for like no wall removal | $20,000 |
| Mar 12, 2025 | Completed final sign-off Apr 2026 | 112 Andover St | one bathroom remodeling like for likeDetails
one bathroom remodeling like for like | $35,000 |
| Feb 25, 2025 | Expired or cancelled expired Apr 2025 | 975 Union St | partial bathroom remodeling, replace tub tile. no other work.Details
partial bathroom remodeling, replace tub tile. no other work. | $20,000 |
| Feb 4, 2025 | Completed final sign-off Apr 2025 | 737 Union St | bathroom remodel like for like. replace shower, update e/p/m up to code. replace plumbing fixtures and 2 recess lights.Details
bathroom remodel like for like. replace shower, update e/p/m up to code. replace plumbing fixtures and 2 recess lights. | $28,000 |
| Jan 16, 2025 | Completed final sign-off Apr 2025 | 345 Church St | unit 1-d: remodel bathroom, like for like.Details
unit 1-d: remodel bathroom, like for like. | $32,000 |
| Dec 10, 2024 | Completed final sign-off Apr 2025 | 415 Bryant St | revision to 202411275838. delete wall removal. bathroom not to be enlarged.Details
revision to 202411275838. delete wall removal. bathroom not to be enlarged. | |
| Nov 27, 2024 | Completed final sign-off Apr 2025 | 415 Bryant St | add walk in shower in half bath at 1st fl. remove non load bearing wall and new wall, replace lights to recessed lights, fan, outlet. replace plumbing fixtures.Details
add walk in shower in half bath at 1st fl. remove non load bearing wall and new wall, replace lights to recessed lights, fan, outlet. replace plumbing fixtures. | $40,000 |
| Nov 22, 2024 | In progress filed Nov 2024, not yet issued | 1874 Market St | revision to pa 202408088261 remove ada details from & bathroom #2; comply with ada regulationfor the other bathroom (full) change swing doors directionDetails
revision to pa 202408088261 remove ada details from & bathroom #2; comply with ada regulationfor the other bathroom (full) change swing doors direction | |
| Oct 29, 2024 | Completed final sign-off Feb 2025 | 218 Randall St | bathroom remodeling likd for like (545 sqft), replace plumbing fixtures, shower, toilet, sink, replace outlet, switches, fan, 2 recess lights.no moving walls. fixtures to remain in the same locationDetails
bathroom remodeling likd for like (545 sqft), replace plumbing fixtures, shower, toilet, sink, replace outlet, switches, fan, 2 recess lights.no moving walls. fixtures to remain in the same location | $40,000 |
| Oct 11, 2024 | Completed final sign-off Nov 2024 | 882 Filbert St | bathroom remodel like for likeDetails
bathroom remodel like for like | $28,000 |
| Oct 1, 2024 | Completed final sign-off Aug 2026 | 1740 Sanchez St | 1/f: remove e) garage, create new reconfifing garage, bedroom, bathroom & stair. 2nd/f: convert (e) living rm to 1 bedroom, family rm to 1 bedroom. remove (e) dining room and create (n) bathroom and dining room. remodel (e) kitchen. remove (e) bathroom to create new kids area. remove (e) dining roomDetails
1/f: remove e) garage, create new reconfifing garage, bedroom, bathroom & stair. 2nd/f: convert (e) living rm to 1 bedroom, family rm to 1 bedroom. remove (e) dining room and create (n) bathroom and dining room. remodel (e) kitchen. remove (e) bathroom to create new kids area. remove (e) dining room | $250,000 |
| Sep 24, 2024 | Completed final sign-off Nov 2024 | 714 44th Av | 1. bathroom remodel like for like. replace plumbing fixtures sink & tub to walk in shower. recess light one (n) outlet behind mirrorDetails
1. bathroom remodel like for like. replace plumbing fixtures sink & tub to walk in shower. recess light one (n) outlet behind mirror | $18,000 |
| Sep 13, 2024 | Completed final sign-off Sep 2025 | 1475 29th Av | kitchen and bathroom remodel in single family residence. (e) windows to be replaced w/ new throughout 2/f.Details
kitchen and bathroom remodel in single family residence. (e) windows to be replaced w/ new throughout 2/f. | $155,000 |
| Sep 10, 2024 | Completed final sign-off Mar 2025 | 11 Wright St | bathroom remodeling like for like tub to shower relocate vanity and toilet replace one window and skylight;same size, same location. not visible from the st. add new fan. new recess lights. max u-factor 0.30.Details
bathroom remodeling like for like tub to shower relocate vanity and toilet replace one window and skylight;same size, same location. not visible from the st. add new fan. new recess lights. max u-factor 0.30. | $40,000 |
| Sep 10, 2024 | Completed final sign-off Dec 2024 | 66 Cleary Ct | bathroom remodel like for like: replace vanity, shower, toilet, replace existing mount lights fixtures.Details
bathroom remodel like for like: replace vanity, shower, toilet, replace existing mount lights fixtures. | $35,000 |
| Aug 29, 2024 | Completed final sign-off Sep 2024 | 125 Tiffany Av | revision to 202407237065, add to scope to enlarge bathroom 9.8 sq ft, build new closet in bedroom at gr flDetails
revision to 202407237065, add to scope to enlarge bathroom 9.8 sq ft, build new closet in bedroom at gr fl | $1,000 |
| Aug 15, 2024 | Completed final sign-off Nov 2024 | 2715 Lake St | master bath remodel like for like shower to shower 3 switches replace, 2 gfci, track light vanity, replace all plumbing fixtures. replace fan. kids bathroom remodeling like for like. tub to tub 2 switch, 2 gfci, 1 fan replace all plumbing fixtures.Details
master bath remodel like for like shower to shower 3 switches replace, 2 gfci, track light vanity, replace all plumbing fixtures. replace fan. kids bathroom remodeling like for like. tub to tub 2 switch, 2 gfci, 1 fan replace all plumbing fixtures. | $40,000 |
| Aug 8, 2024 | Completed final sign-off Dec 2024 | 1874 Market St | 1st fl convert shower to relaxing room , convert ada half bath to full bathDetails
1st fl convert shower to relaxing room , convert ada half bath to full bath | $30,000 |
| Jul 23, 2024 | Completed final sign-off Sep 2024 | 125 Tiffany Av | 1 bathroom remodel like for like., replace plumbing fixtures, replace tub to walk in shower, 2 new recess lights, replace fan 2 swtiches and 2 gfci.Details
1 bathroom remodel like for like., replace plumbing fixtures, replace tub to walk in shower, 2 new recess lights, replace fan 2 swtiches and 2 gfci. | $25,000 |
| Jun 27, 2024 | Completed final sign-off Oct 2026 | 2167 North Point St | 1st fl: (n) family room, bedroom, closet, bathroom & stairs to 2nd fl., laundry room and storage. (n) mudroom, remove (e) outdoor stairs. relocate upgrade main panel. 2nd fl: remodel kitchen & bathroom, infill (e) covered deck. (n) alum clad windows at front.Details
1st fl: (n) family room, bedroom, closet, bathroom & stairs to 2nd fl., laundry room and storage. (n) mudroom, remove (e) outdoor stairs. relocate upgrade main panel. 2nd fl: remodel kitchen & bathroom, infill (e) covered deck. (n) alum clad windows at front. | $70,000 |
| Jun 5, 2024 | Completed final sign-off Jan 2025 | 736 Page St | kitchen & bathroom, and laundry remodel per plansDetails
kitchen & bathroom, and laundry remodel per plans | $35,000 |
| May 8, 2024 | Completed final sign-off Sep 2024 | 75 Ora Wy | one bathroom remodeling like for like replace all plumbing fixtures replace tub, toilet sink 4 new recess lights fan update emp up to code.Details
one bathroom remodeling like for like replace all plumbing fixtures replace tub, toilet sink 4 new recess lights fan update emp up to code. | $30,000 |
| May 6, 2024 | Completed final sign-off Aug 2024 | 2324 15th Av | master bathroom remodel per plan at 3rd fl. plumbing/ electric & mech (u.r.c.) note: 202403288847 is for a different bathroomDetails
master bathroom remodel per plan at 3rd fl. plumbing/ electric & mech (u.r.c.) note: 202403288847 is for a different bathroom | $35,000 |
| May 6, 2024 | Completed final sign-off Aug 2024 | 2106 Scott St | bath remodel like for like , tub to walkin shower, 4 new recessed lights, rpelace plumbing fixtres,toilet, faucet, vanity, fanDetails
bath remodel like for like , tub to walkin shower, 4 new recessed lights, rpelace plumbing fixtres,toilet, faucet, vanity, fan | $44,000 |
| May 3, 2024 | Completed final sign-off Dec 2025 | 726 Masonic Av | repair fire damage throughout to comply with bid nov# 202316970. replace all finishes fixtures etc at 1 kitchen 2 bathroomsDetails
repair fire damage throughout to comply with bid nov# 202316970. replace all finishes fixtures etc at 1 kitchen 2 bathrooms | $100,000 |
| Apr 29, 2024 | In progress issued Feb 2025 | 2566 42nd Av | 1/f: remodel (e) bathroom, remodel (e) exterior stairs provide new, create new addition for new sitting room/ recreation room; 2/f: remove and replace (e) balcony railings as indicated,Details
1/f: remodel (e) bathroom, remodel (e) exterior stairs provide new, create new addition for new sitting room/ recreation room; 2/f: remove and replace (e) balcony railings as indicated, | $65,000 |
| Apr 4, 2024 | Completed final sign-off Aug 2024 | 701 Minnesota St | unit 119: remodel 1 (e) bathroom like for like. replace tub to tub, sink, toilet, 1 receptacle.Details
unit 119: remodel 1 (e) bathroom like for like. replace tub to tub, sink, toilet, 1 receptacle. | $35,000 |
| Mar 28, 2024 | Completed final sign-off May 2024 | 2324 15th Av | 1 bathroom remodeling like for like replace plumbing fixtures, tub, fan toilet sinks 4 new recessed and a powder bathroom. like for likeDetails
1 bathroom remodeling like for like replace plumbing fixtures, tub, fan toilet sinks 4 new recessed and a powder bathroom. like for like | $60,000 |
| Mar 28, 2024 | Expired or cancelled cancelled Apr 2024 | 701 Minnesota St | unit#: 119; bathroom remdeling like for like. replace tub to tub sink toilet, replace 1 outlet. non structural.Details
unit#: 119; bathroom remdeling like for like. replace tub to tub sink toilet, replace 1 outlet. non structural. | $35,000 |
| Mar 21, 2024 | Completed final sign-off Jul 2024 | 750 Congo St | master bathroom remodeling like for like. replace all plumbing fixtures, shower, fan 8 new recess lights.Details
master bathroom remodeling like for like. replace all plumbing fixtures, shower, fan 8 new recess lights. | $50,000 |
| Mar 18, 2024 | Completed final sign-off Mar 2024 | 1818 Broadway | unit: 201, water damage repair all work in kind. install dry wall. install denshiled water proof, install tile. install sink. no electrical/plumbing work. all in bathroomDetails
unit: 201, water damage repair all work in kind. install dry wall. install denshiled water proof, install tile. install sink. no electrical/plumbing work. all in bathroom | $10,000 |
| Feb 15, 2024 | In progress issued Feb 2024 | 2167 North Point St | to comply with nov #202419491. remove all finishing demo kitchen and bathroom. demo all ceililng plaster for asbestor remove. demo kitchen & bathroom finishes to bear framing members. no structural work on this permit.Details
to comply with nov #202419491. remove all finishing demo kitchen and bathroom. demo all ceililng plaster for asbestor remove. demo kitchen & bathroom finishes to bear framing members. no structural work on this permit. | $30,000 |
| Jan 30, 2024 | Completed final sign-off Aug 2024 | 1650 Jackson St | 2 bathroom remodeling like for like. (1 tub combo) (shower) replace all plumbing fixtures, electricalDetails
2 bathroom remodeling like for like. (1 tub combo) (shower) replace all plumbing fixtures, electrical | $45,000 |
| Jan 5, 2024 | Completed final sign-off May 2024 | 3731 23rd St | comply with physical inspection report cc-8574 to address items for #3731 only - note; compliance with this report requiers a separate permit for item #1. kitchen & bath remodel per item #11; relocated and exhaust laundry per item #12 & 13. install new combined boilerDetails
comply with physical inspection report cc-8574 to address items for #3731 only - note; compliance with this report requiers a separate permit for item #1. kitchen & bath remodel per item #11; relocated and exhaust laundry per item #12 & 13. install new combined boiler | $20,000 |
| Dec 28, 2023 | Completed final sign-off Jan 2024 | 25 Kingston St | bathroom remodeling like for like. replace shower, plumbing fixtures, update e/m/p up to code. replace fan, 3 recess lights.Details
bathroom remodeling like for like. replace shower, plumbing fixtures, update e/m/p up to code. replace fan, 3 recess lights. | $15,000 |
| Nov 30, 2023 | Completed final sign-off Jul 2024 | 2195 25th Av | one bathroom remodel like for like, replace all plumbing fixtures, 4 recess lights, update e/m/p up to codeDetails
one bathroom remodel like for like, replace all plumbing fixtures, 4 recess lights, update e/m/p up to code | $30,000 |
| Nov 16, 2023 | Completed final sign-off Jan 2024 | 1785 San Jose Av | bathroom remodel like for like, 2 recess lights. tub to shower. replace plumbing fixtures, toilet, sink. 40 sq ft.Details
bathroom remodel like for like, 2 recess lights. tub to shower. replace plumbing fixtures, toilet, sink. 40 sq ft. | $25,000 |
| Oct 19, 2023 | Completed final sign-off Apr 2024 | 2455 Franklin St | upper unit. bath remodel. remove existing demising wall between water closet room and adjacent 1/2 bath. reconfigure bath and laundry rmDetails
upper unit. bath remodel. remove existing demising wall between water closet room and adjacent 1/2 bath. reconfigure bath and laundry rm | $30,000 |
| Aug 10, 2023 | Completed final sign-off Sep 2023 | 68 Uranus Tr | guest bathroom. like for like. replace plumbing fixtures. update mep up to code. 2 recess lights, replace fan.Details
guest bathroom. like for like. replace plumbing fixtures. update mep up to code. 2 recess lights, replace fan. | $34,800 |
| Aug 8, 2023 | Completed final sign-off Dec 2023 | 2155 Beach St | bathroom remodeling like for like. shower tub, 3 (n) recess lights. replace fan. udate mep up to code.Details
bathroom remodeling like for like. shower tub, 3 (n) recess lights. replace fan. udate mep up to code. | $38,000 |
| Aug 8, 2023 | Completed final sign-off Nov 2023 | 64 Cook St | 2 bathrooms like for like. rebuild walking shower. no removal of walls.Details
2 bathrooms like for like. rebuild walking shower. no removal of walls. | $60,000 |
| Jul 17, 2023 | Completed final sign-off Sep 2023 | 354 Walnut St | like for like bathroom remodel.Details
like for like bathroom remodel. | $25,000 |
| Jun 14, 2023 | Completed final sign-off Feb 2024 | 924 Corbett Av | unit b. kitchen & 1 bathroom remodel like for like. water heater to tankless. same location.Details
unit b. kitchen & 1 bathroom remodel like for like. water heater to tankless. same location. | $60,000 |
| Jun 13, 2023 | Completed final sign-off Aug 2023 | 68 Uranus Tr | master bathroom remodel - like for like. 5'10" x 12'5" 85 sfDetails
master bathroom remodel - like for like. 5'10" x 12'5" 85 sf | $25,000 |
| Jun 13, 2023 | Completed final sign-off Oct 2023 | 73 Santa Rosa Av | bathroom remodel like for like 6 x 8Details
bathroom remodel like for like 6 x 8 | $25,000 |
| Jun 13, 2023 | Completed final sign-off Aug 2023 | 640 Castro St | bathroom remodel like for like. 8' x 10'Details
bathroom remodel like for like. 8' x 10' | $25,000 |
| May 18, 2023 | Completed final sign-off Jun 2023 | 900 Bush St | custom vanity - bathroom.Details
custom vanity - bathroom. | $2,000 |
| May 17, 2023 | Completed final sign-off Jul 2023 | 30 Rossi Av | bathroom remodel like for like plumbing, electrical, tile installationDetails
bathroom remodel like for like plumbing, electrical, tile installation | $25,000 |
| May 8, 2023 | Completed final sign-off Aug 2024 | 666 37th Av | construct a new bathroom in existing closet space including 11 sqft lightwell infill; remodel bathroom and add two skylight to each bathroom at 2nd floor.Details
construct a new bathroom in existing closet space including 11 sqft lightwell infill; remodel bathroom and add two skylight to each bathroom at 2nd floor. | $64,797 |
| Mar 28, 2023 | Completed final sign-off Jun 2023 | 776 Tehama St | bathroom like for like - convert tub to showerDetails
bathroom like for like - convert tub to shower | $30,000 |
| Oct 16, 2018 | Completed final sign-off Aug 2024 | 1769 Lombard St | alterations to e dog care facility on gr fl of building for a kennel, training services and boarding for greater than 12 dogs. conditional use authorization. g/f -install floor drain slope flooring to drains. enlarge bathroom to make ada complaint. planning case #2018-021576Details
alterations to e dog care facility on gr fl of building for a kennel, training services and boarding for greater than 12 dogs. conditional use authorization. g/f -install floor drain slope flooring to drains. enlarge bathroom to make ada complaint. planning case #2018-021576 | $41,000 |