Back to bathroom remodel contractors
7 Hills Construction
- Based in
- San Francisco
- On San Francisco permits
- Nov 2013 to Oct 2026
- Last 24 months
- 38 permits filed
82 permits since 2000: 63 completed, 16 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
36 bathroom remodel permits: 30 completed, 5 in progress, 1 never finaled. Typically 0 days from filing to permit and 122 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 4, 2026 | In progress issued Sep 2026 | 2200 Pacific Av | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 2 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 2 bathroom(s) in 1st fl with 1 shower pan(s). | $31,683 |
| Aug 31, 2026 | In progress issued Aug 2026 | 616 39th Av | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 3 bathroom(s) in 1st fl, 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 3 bathroom(s) in 1st fl, 2nd fl with 0 shower pan(s). | $42,244 |
| Jul 30, 2026 | Completed final sign-off Sep 2026 | 160 Broadmoor Dr | in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s). | $11,000 |
| Apr 2, 2026 | Completed final sign-off Apr 2026 | 80 Jersey St | remodel bathroom inkind. all fixture replaced no relocation.Details
remodel bathroom inkind. all fixture replaced no relocation. | $20,000 |
| Apr 2, 2026 | Completed final sign-off Jul 2026 | 153 Divisadero St | bathroom remodel in-kind. all fixtures replaced, no utility relocation.Details
bathroom remodel in-kind. all fixtures replaced, no utility relocation. | $20,000 |
| Jan 12, 2026 | Completed final sign-off Mar 2026 | 2518 25th Av | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 2 bathroom(s) in 1st fl, 2nd fl with 1 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 2 bathroom(s) in 1st fl, 2nd fl with 1 shower pan(s). | $32,000 |
| Sep 19, 2025 | Completed final sign-off Feb 2026 | 2329 North Point St | remodel (2) bathroom to the studs. no utility relocation . all (n) fixtures and finishes. replace tub and shower in kind. no wall removal or layout change.Details
remodel (2) bathroom to the studs. no utility relocation . all (n) fixtures and finishes. replace tub and shower in kind. no wall removal or layout change. | $30,000 |
| Jul 28, 2025 | In progress issued Jul 2025 | 21 18th Av | interior renovations only- non structural (no exterior changes). 2nd floor: remodel kitchen and powder room. 3rd floor: renovate 2 bathrooms and add w/d. divide bedroom. 4th floor: renovate primary bedroom, bath and powder.Details
interior renovations only- non structural (no exterior changes). 2nd floor: remodel kitchen and powder room. 3rd floor: renovate 2 bathrooms and add w/d. divide bedroom. 4th floor: renovate primary bedroom, bath and powder. | $110,000 |
| Jul 25, 2025 | In progress issued Jul 2025 | 578 Vermont St | in kind replacement of (e) kitchen and bathroom. the scope includes repair of (e) rear exterioir wall that is being replaced to repair dryrot & new windows. reconfiguration of select interior walls at both levels and an addtion of select walls at basement garage.Details
in kind replacement of (e) kitchen and bathroom. the scope includes repair of (e) rear exterioir wall that is being replaced to repair dryrot & new windows. reconfiguration of select interior walls at both levels and an addtion of select walls at basement garage. | $180,000 |
| Jul 1, 2025 | Completed final sign-off Nov 2025 | 568 Vermont St | kitchen and bathroom remodel.Details
kitchen and bathroom remodel. | $15,000 |
| Feb 14, 2025 | Completed final sign-off Nov 2025 | 566 Vermont St | revise sheets a201, a401, a601 of pa# 202411255678. remove 1/2 bath. no change to exterior.Details
revise sheets a201, a401, a601 of pa# 202411255678. remove 1/2 bath. no change to exterior. | |
| Jan 29, 2025 | Completed final sign-off Aug 2025 | 733 De Haro St | interior remodel of basement floor. deck and spa replacement. bathroom plumbing fixture replacement. removal of wood deck at rear yard. upstairs deck repairDetails
interior remodel of basement floor. deck and spa replacement. bathroom plumbing fixture replacement. removal of wood deck at rear yard. upstairs deck repair | $20,000 |
| Jan 6, 2025 | Completed final sign-off Apr 2025 | 2225 23rd St | bathroom remodel, in kind. no wall or utility relocationDetails
bathroom remodel, in kind. no wall or utility relocation | $16,000 |
| Nov 25, 2024 | Completed final sign-off Nov 2025 | 566 Vermont St | add powder room at level 1, legalize bathrooms and kitchen on level 1 and 2. legalize rear deck. replace nine front windows (report number cc8672)Details
add powder room at level 1, legalize bathrooms and kitchen on level 1 and 2. legalize rear deck. replace nine front windows (report number cc8672) | $75,000 |
| Mar 4, 2024 | Completed final sign-off Oct 2024 | 212 Edgewood Av | remodel second floor bathroom, convert tub to shower, new finishes. no removal of wallsDetails
remodel second floor bathroom, convert tub to shower, new finishes. no removal of walls | $12,000 |
| Mar 4, 2024 | Completed final sign-off Jun 2024 | 299 Seneca Av | remodel (e) bathroom, all new finishes except tub, spot reapir siding on interior lightwell.Details
remodel (e) bathroom, all new finishes except tub, spot reapir siding on interior lightwell. | $12,000 |
| Mar 4, 2024 | In progress issued Mar 2024 | 144 Belvedere St | remodel fist floor bathroom - convert tub to shower. all new fixtures and finishes.Details
remodel fist floor bathroom - convert tub to shower. all new fixtures and finishes. | $12,000 |
| Jan 11, 2024 | Completed final sign-off Sep 2024 | 2336 Chestnut St | ti (new use= restaurant) of (e) commercial space (current use= retail) including bathroom upgrades and associated plumbing, electrical, and mechanical work. no structural work , no expansion of building envelope and no work to street facade.Details
ti (new use= restaurant) of (e) commercial space (current use= retail) including bathroom upgrades and associated plumbing, electrical, and mechanical work. no structural work , no expansion of building envelope and no work to street facade. | $65,000 |
| Sep 28, 2023 | Completed final sign-off Feb 2024 | 2210 32nd Av | remodel existing kitchen & bathroom, like for likeDetails
remodel existing kitchen & bathroom, like for like | $70,000 |
| Jul 19, 2023 | Completed final sign-off Nov 2023 | 390 Melrose Av | remodel 2 top floor bathrooms, replace all fixtures and finishes. no structural or layout changes.Details
remodel 2 top floor bathrooms, replace all fixtures and finishes. no structural or layout changes. | $15,000 |
| Jan 9, 2023 | Completed final sign-off May 2023 | 186 Jules Av | remodel bathroom, new insulation, drywall, all new finishesDetails
remodel bathroom, new insulation, drywall, all new finishes | $8,000 |
| Dec 7, 2022 | Completed final sign-off Aug 2023 | 1856 Alemany Bl | updates to kitchen and bathrooms and addition of a powder room, no change to building foot print replacement of rear yard facing windowsDetails
updates to kitchen and bathrooms and addition of a powder room, no change to building foot print replacement of rear yard facing windows | $50,000 |
| Jul 5, 2022 | Completed final sign-off Jun 2023 | 273 Vienna St | interior conversion of single family dwelling from 2 bedroom 1 bath to 3 bedroom 2 bath. remove structural wall between kitchen and living room.Details
interior conversion of single family dwelling from 2 bedroom 1 bath to 3 bedroom 2 bath. remove structural wall between kitchen and living room. | $19,000 |
| Apr 19, 2022 | Completed final sign-off Aug 2022 | 80 Jersey St | remodel (e) family room, closet, bathroom to be master bedroom, closet, bathroomDetails
remodel (e) family room, closet, bathroom to be master bedroom, closet, bathroom | $50,000 |
| Jan 27, 2022 | Completed final sign-off Jun 2022 | 2999 California St | unit 701. remove and replace alll fixtures and utilities in kitchen and bathroom. no utility relocation. no wall or layout changes.Details
unit 701. remove and replace alll fixtures and utilities in kitchen and bathroom. no utility relocation. no wall or layout changes. | $45,000 |
| Jan 27, 2022 | Completed final sign-off Jan 2023 | 188 Jules Av | kitchen and two bathroom remodel. new floors, trim and paint throughout unit.Details
kitchen and two bathroom remodel. new floors, trim and paint throughout unit. | $20,000 |
| Jul 1, 2021 | Completed final sign-off Sep 2021 | 530 Alvarado St | remodel top floor bathroom, replace tub w/shower, shower pan, upgrade utilities, no structural or layout changes.Details
remodel top floor bathroom, replace tub w/shower, shower pan, upgrade utilities, no structural or layout changes. | $18,000 |
| Apr 23, 2021 | Completed final sign-off Dec 2024 | 189 Bonview St | update main floor kitchen, laundry room and bathroom. cosmetic only. no utility relocation no shower pan inspection.Details
update main floor kitchen, laundry room and bathroom. cosmetic only. no utility relocation no shower pan inspection. | $43,000 |
| Apr 14, 2021 | Completed final sign-off Jul 2021 | 868 Minnesota St | cosmetic remodel bathroom. no fixture relocations. new kitchen counter onlyDetails
cosmetic remodel bathroom. no fixture relocations. new kitchen counter only | $30,000 |
| Jan 15, 2021 | Completed final sign-off Feb 2022 | 1763 Hayes St | remodel bath and kitchen. add (n) bathroom. move laundry from back stairs to closet. install patio doors in existing opening.Details
remodel bath and kitchen. add (n) bathroom. move laundry from back stairs to closet. install patio doors in existing opening. | $70,000 |
| Aug 14, 2020 | Completed final sign-off Oct 2020 | 222 Valencia St | unit 5: bathroom remodel, in-kind. bring plumbing up to code.Details
unit 5: bathroom remodel, in-kind. bring plumbing up to code. | $9,000 |
| Jul 10, 2020 | Completed final sign-off Nov 2020 | 2274 Great Hy | remodel bathroom. new fixtures. bring plumbing up to code. the bathroom is 96" x 66" (about 44 sq ft) and is located on the 2nd flDetails
remodel bathroom. new fixtures. bring plumbing up to code. the bathroom is 96" x 66" (about 44 sq ft) and is located on the 2nd fl | $9,000 |
| Jul 10, 2020 | Completed final sign-off Oct 2020 | 2276 Great Hy | remodel bathroom. new fixtures. bring plumbing up to code. the bathroom is 96" x 66" (about 44 sq ft) and is located on the first floor.Details
remodel bathroom. new fixtures. bring plumbing up to code. the bathroom is 96" x 66" (about 44 sq ft) and is located on the first floor. | $9,000 |
| Jul 8, 2020 | Never finaled filed Jul 2020, never issued | 725 Rhode Island St | develop lower level space into legal adu per ordinance no-162-17. upgrade plumbing, electrical, add kitchen, bathroom. all work performed within existing envelope. no structural changes required.Details
develop lower level space into legal adu per ordinance no-162-17. upgrade plumbing, electrical, add kitchen, bathroom. all work performed within existing envelope. no structural changes required. | $100,000 |
| Jul 7, 2020 | Completed final sign-off Sep 2020 | 3141 Gough St | cosmetic bathroom remodel. new fixtures. replace shower with bathtub. no structural changes required. 21 sfDetails
cosmetic bathroom remodel. new fixtures. replace shower with bathtub. no structural changes required. 21 sf | $9,000 |
| May 27, 2020 | Completed final sign-off Jul 2020 | 1767 Hayes St | convert existing den/office into closet and bathroom. add new tub, sink and toilet, add fan and new lighting, divider wall, new doors into existing openings, add laundry hookups and drain. all work at middle floor.Details
convert existing den/office into closet and bathroom. add new tub, sink and toilet, add fan and new lighting, divider wall, new doors into existing openings, add laundry hookups and drain. all work at middle floor. | $17,000 |