7 Hills Construction
- Based in
- San Francisco
- On San Francisco permits
- Nov 2013 to Oct 2026
- Last 24 months
- 38 permits filed
82 permits since 2000: 63 completed, 16 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
4 deck permits: 3 completed, 1 in progress. Typically 1 days from filing to permit and 183 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 13, 2025 | In progress issued Feb 2025 | 4729 18th St | revision 202212299333- remove overhead pergola at exterior deck. change layout at ground level and kitchen . eliminate exterior at bbq area at deck . add (n) window at the rear yard.Details
revision 202212299333- remove overhead pergola at exterior deck. change layout at ground level and kitchen . eliminate exterior at bbq area at deck . add (n) window at the rear yard. | |
| Jan 29, 2025 | Completed final sign-off Aug 2025 | 733 De Haro St | interior remodel of basement floor. deck and spa replacement. bathroom plumbing fixture replacement. removal of wood deck at rear yard. upstairs deck repairDetails
interior remodel of basement floor. deck and spa replacement. bathroom plumbing fixture replacement. removal of wood deck at rear yard. upstairs deck repair | $20,000 |
| Nov 25, 2024 | Completed final sign-off Nov 2025 | 566 Vermont St | add powder room at level 1, legalize bathrooms and kitchen on level 1 and 2. legalize rear deck. replace nine front windows (report number cc8672)Details
add powder room at level 1, legalize bathrooms and kitchen on level 1 and 2. legalize rear deck. replace nine front windows (report number cc8672) | $75,000 |
| Nov 22, 2023 | Completed final sign-off Jan 2024 | 2331 North Point St | 1) spot repair/replace dryrot deck lumber on rear deck(less than 50%). 2)repair/replace damaged and cracking stucco and water proofing on bottom of front bay window.Details
1) spot repair/replace dryrot deck lumber on rear deck(less than 50%). 2)repair/replace damaged and cracking stucco and water proofing on bottom of front bay window. | $7,000 |