Back to kitchen remodel contractors
7 Hills Construction
- Based in
- San Francisco
- On San Francisco permits
- Nov 2013 to Nov 2026
- Last 24 months
- 38 permits filed
84 permits since 2000: 63 completed, 18 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Where they worked
- Single-family 13
- Multi-family (2-family, apartments) 18
- Commercial 2
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Kitchen remodel permits
33 kitchen remodel permits: 27 completed, 5 in progress, 1 never finaled. Typically 0 days from filing to permit and 142 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 4, 2026 | In progress issued Sep 2026 | 2200 Pacific Av | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 2 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 2 bathroom(s) in 1st fl with 1 shower pan(s). | $31,683 |
| Aug 31, 2026 | In progress issued Aug 2026 | 616 39th Av | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 3 bathroom(s) in 1st fl, 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 3 bathroom(s) in 1st fl, 2nd fl with 0 shower pan(s). | $42,244 |
| Jun 30, 2026 | Completed final sign-off Aug 2026 | 23 Esquina Dr | in-kind remodeling of 1 kitchen(s) in 2nd flDetails
in-kind remodeling of 1 kitchen(s) in 2nd fl | $20,000 |
| Jan 27, 2026 | Completed final sign-off Jun 2026 | 2848 Union St | in-kind remodeling of 1 kitchen(s) in 1st fl installing gas line.Details
in-kind remodeling of 1 kitchen(s) in 1st fl installing gas line. | $16,000 |
| Jan 12, 2026 | Completed final sign-off Mar 2026 | 2518 25th Av | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 2 bathroom(s) in 1st fl, 2nd fl with 1 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 2 bathroom(s) in 1st fl, 2nd fl with 1 shower pan(s). | $32,000 |
| Oct 2, 2025 | Completed final sign-off Oct 2025 | 550 09th Av | revision to pa # 2025-0917-5490 clarify framing around kitchen skylightDetails
revision to pa # 2025-0917-5490 clarify framing around kitchen skylight | |
| Sep 17, 2025 | Completed final sign-off Oct 2025 | 550 09th Av | remodel of (e) powder room in kind. (n) kitchen countertops. removal of non structural interior partitions at kitchen. removal of non structural entry closets, removal of door at dining. (n) full height closet at hall. (n) interior paintDetails
remodel of (e) powder room in kind. (n) kitchen countertops. removal of non structural interior partitions at kitchen. removal of non structural entry closets, removal of door at dining. (n) full height closet at hall. (n) interior paint | $10,000 |
| Aug 15, 2025 | Completed final sign-off Dec 2025 | 2223 44th Av | kitchen remodel . repalce all fixtures, and repalce rear patio door. no wall removed and layout changeDetails
kitchen remodel . repalce all fixtures, and repalce rear patio door. no wall removed and layout change | $30,000 |
| Jul 28, 2025 | In progress issued Jul 2025 | 21 18th Av | interior renovations only- non structural (no exterior changes). 2nd floor: remodel kitchen and powder room. 3rd floor: renovate 2 bathrooms and add w/d. divide bedroom. 4th floor: renovate primary bedroom, bath and powder.Details
interior renovations only- non structural (no exterior changes). 2nd floor: remodel kitchen and powder room. 3rd floor: renovate 2 bathrooms and add w/d. divide bedroom. 4th floor: renovate primary bedroom, bath and powder. | $110,000 |
| Jul 25, 2025 | In progress issued Jul 2025 | 578 Vermont St | in kind replacement of (e) kitchen and bathroom. the scope includes repair of (e) rear exterioir wall that is being replaced to repair dryrot & new windows. reconfiguration of select interior walls at both levels and an addtion of select walls at basement garage.Details
in kind replacement of (e) kitchen and bathroom. the scope includes repair of (e) rear exterioir wall that is being replaced to repair dryrot & new windows. reconfiguration of select interior walls at both levels and an addtion of select walls at basement garage. | $180,000 |
| Jul 1, 2025 | Completed final sign-off Nov 2025 | 568 Vermont St | kitchen and bathroom remodel.Details
kitchen and bathroom remodel. | $15,000 |
| Jun 2, 2025 | Completed final sign-off Jul 2025 | 160 Broadmoor Dr | kitchen remodel. new cabinets, counters, appliances. no structural or floor plan alteration.Details
kitchen remodel. new cabinets, counters, appliances. no structural or floor plan alteration. | $25,000 |
| Feb 13, 2025 | In progress issued Feb 2025 | 4729 18th St | revision 202212299333- remove overhead pergola at exterior deck. change layout at ground level and kitchen . eliminate exterior at bbq area at deck . add (n) window at the rear yard.Details
revision 202212299333- remove overhead pergola at exterior deck. change layout at ground level and kitchen . eliminate exterior at bbq area at deck . add (n) window at the rear yard. | |
| Jan 17, 2025 | Completed final sign-off Jul 2026 | 687 Kansas St | restoration of an existing 3 story 2 units residence damaged by fire with minor alterations as follows: reconfigure 1st and 3rd floor kitchens, install new windows at 1st floor rear, rebuild damaged stair, reroof, replace damaged heating and water systems.Details
restoration of an existing 3 story 2 units residence damaged by fire with minor alterations as follows: reconfigure 1st and 3rd floor kitchens, install new windows at 1st floor rear, rebuild damaged stair, reroof, replace damaged heating and water systems. | $200,000 |
| Jan 6, 2025 | Completed final sign-off Feb 2025 | 186 Jules Av | remodel kitchen. all new finishes. all locations to remain.Details
remodel kitchen. all new finishes. all locations to remain. | $40,000 |
| Nov 25, 2024 | Completed final sign-off Nov 2025 | 566 Vermont St | add powder room at level 1, legalize bathrooms and kitchen on level 1 and 2. legalize rear deck. replace nine front windows (report number cc8672)Details
add powder room at level 1, legalize bathrooms and kitchen on level 1 and 2. legalize rear deck. replace nine front windows (report number cc8672) | $75,000 |
| Sep 27, 2024 | Completed final sign-off Dec 2024 | 434 Otsego Av | cosmetic kitchen remodel, remove and replace cabinets, sink, pendent lights, no wall demolition or construction, no change in plumbing fixture count.Details
cosmetic kitchen remodel, remove and replace cabinets, sink, pendent lights, no wall demolition or construction, no change in plumbing fixture count. | $15,000 |
| Jul 11, 2024 | Completed final sign-off Oct 2024 | 2331 North Point St | kitchen remodel new cabinets, new counters, new finishes & repair existing fl. no wall changes.Details
kitchen remodel new cabinets, new counters, new finishes & repair existing fl. no wall changes. | $40,000 |
| Sep 28, 2023 | Completed final sign-off Feb 2024 | 2210 32nd Av | remodel existing kitchen & bathroom, like for likeDetails
remodel existing kitchen & bathroom, like for like | $70,000 |
| Sep 18, 2023 | Completed final sign-off May 2024 | 1622 11th Av | abatement of nov. restoration of a removed unit according to permit records. restore a unit door on both 1/f & 2/f. restore kitchen on 2/f. no exterior change.Details
abatement of nov. restoration of a removed unit according to permit records. restore a unit door on both 1/f & 2/f. restore kitchen on 2/f. no exterior change. | $20,000 |
| Dec 7, 2022 | Completed final sign-off Aug 2023 | 1856 Alemany Bl | updates to kitchen and bathrooms and addition of a powder room, no change to building foot print replacement of rear yard facing windowsDetails
updates to kitchen and bathrooms and addition of a powder room, no change to building foot print replacement of rear yard facing windows | $50,000 |
| Jul 5, 2022 | Completed final sign-off Jun 2023 | 273 Vienna St | interior conversion of single family dwelling from 2 bedroom 1 bath to 3 bedroom 2 bath. remove structural wall between kitchen and living room.Details
interior conversion of single family dwelling from 2 bedroom 1 bath to 3 bedroom 2 bath. remove structural wall between kitchen and living room. | $19,000 |
| Jan 27, 2022 | Completed final sign-off Jun 2022 | 2999 California St | unit 701. remove and replace alll fixtures and utilities in kitchen and bathroom. no utility relocation. no wall or layout changes.Details
unit 701. remove and replace alll fixtures and utilities in kitchen and bathroom. no utility relocation. no wall or layout changes. | $45,000 |
| Jan 27, 2022 | Completed final sign-off Jan 2023 | 188 Jules Av | kitchen and two bathroom remodel. new floors, trim and paint throughout unit.Details
kitchen and two bathroom remodel. new floors, trim and paint throughout unit. | $20,000 |
| Dec 7, 2021 | Completed final sign-off Jun 2022 | 4343 17th St | remodel kitchen and laundry room. all utility to remain in place. upgrade to code. new cabinets, counter and floors. non structural.Details
remodel kitchen and laundry room. all utility to remain in place. upgrade to code. new cabinets, counter and floors. non structural. | $30,000 |
| Aug 18, 2021 | Completed final sign-off Jan 2022 | 3401 California St | tenant improvement of an (e) groung level resturant space, new interior non structural partitons and finishes, lighting, millwork, and kitchen equipment, fire sprinkler is design/build under a separtae permit mechanical is (e) and electrical are design/build under a sep permitDetails
tenant improvement of an (e) groung level resturant space, new interior non structural partitons and finishes, lighting, millwork, and kitchen equipment, fire sprinkler is design/build under a separtae permit mechanical is (e) and electrical are design/build under a sep permit | $146,385 |
| Jul 1, 2021 | Completed final sign-off Dec 2021 | 83 Westgate Dr | kitchen remodel. replace cabinets, counters floor, upgrade utilities to code. no change to layout/utility locations. no structural changes.Details
kitchen remodel. replace cabinets, counters floor, upgrade utilities to code. no change to layout/utility locations. no structural changes. | $30,000 |
| Apr 23, 2021 | Completed final sign-off Dec 2024 | 189 Bonview St | update main floor kitchen, laundry room and bathroom. cosmetic only. no utility relocation no shower pan inspection.Details
update main floor kitchen, laundry room and bathroom. cosmetic only. no utility relocation no shower pan inspection. | $43,000 |
| Apr 14, 2021 | Completed final sign-off Jul 2021 | 868 Minnesota St | cosmetic remodel bathroom. no fixture relocations. new kitchen counter onlyDetails
cosmetic remodel bathroom. no fixture relocations. new kitchen counter only | $30,000 |
| Apr 12, 2021 | Completed final sign-off Dec 2021 | 3600 Taraval St | to comply with nov# 202173422. repair damage to kitchen, bar & ceiling caused by fire. relocate dishwashing to 104. extend service window & millwork.Details
to comply with nov# 202173422. repair damage to kitchen, bar & ceiling caused by fire. relocate dishwashing to 104. extend service window & millwork. | $55,000 |
| Feb 26, 2021 | Completed final sign-off Jul 2021 | 865 Corbett Av | #7: remodel kitchen. new cabinet, new countetrs, new floors, new paint. no utility relocation. no new walls & no exiting wall relocation. new lighting to comply with ces 150.0(k)3.Details
#7: remodel kitchen. new cabinet, new countetrs, new floors, new paint. no utility relocation. no new walls & no exiting wall relocation. new lighting to comply with ces 150.0(k)3. | $25,000 |
| Jan 15, 2021 | Completed final sign-off Feb 2022 | 1763 Hayes St | remodel bath and kitchen. add (n) bathroom. move laundry from back stairs to closet. install patio doors in existing opening.Details
remodel bath and kitchen. add (n) bathroom. move laundry from back stairs to closet. install patio doors in existing opening. | $70,000 |
| Jul 8, 2020 | Never finaled filed Jul 2020, never issued | 725 Rhode Island St | develop lower level space into legal adu per ordinance no-162-17. upgrade plumbing, electrical, add kitchen, bathroom. all work performed within existing envelope. no structural changes required.Details
develop lower level space into legal adu per ordinance no-162-17. upgrade plumbing, electrical, add kitchen, bathroom. all work performed within existing envelope. no structural changes required. | $100,000 |