Back to bathroom remodel contractors
S H C I
- Based in
- San Francisco
- On San Francisco permits
- Jan 2007 to Sep 2023
- Last 24 months
- 0 permits filed
61 permits since 2000: 56 completed, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
30 bathroom remodel permits: 30 completed. Typically 0 days from filing to permit and 129 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 1, 2023 | Completed final sign-off Nov 2024 | 1125 Rhode Island St | upgrade partial foundation & ground lvl shear walls, repair & replace sog in-kind where req'd, convert 370 sqft of unconditioned gr lvl to conditioned space to contain laundry, storage, utility closets and new bath, add new windows in lightwell, replace exterior doors at ground floor in-kind,...Details
upgrade partial foundation & ground lvl shear walls, repair & replace sog in-kind where req'd, convert 370 sqft of unconditioned gr lvl to conditioned space to contain laundry, storage, utility closets and new bath, add new windows in lightwell, replace exterior doors at ground floor in-kind,... | $95,000 |
| Dec 16, 2019 | Completed final sign-off Sep 2020 | 757 Panorama Dr | develop ground floor rooms and legalize existing non-permitted rooms @ the time of construction. spaces include bedroom, office, bathroom and family room. new vinyl windows and replace door in kind at rear elevation ground floor. new aluminum clad wood window at front elevation ground floor.Details
develop ground floor rooms and legalize existing non-permitted rooms @ the time of construction. spaces include bedroom, office, bathroom and family room. new vinyl windows and replace door in kind at rear elevation ground floor. new aluminum clad wood window at front elevation ground floor. | $60,000 |
| Jun 25, 2019 | Completed final sign-off Jul 2021 | 306 Foerster St | rear horizontal addition on first & second floor for new bedrooms, rear deck, side extension to remodel kitchen & bathroom, replace (e) interior stair with (n) stair.Details
rear horizontal addition on first & second floor for new bedrooms, rear deck, side extension to remodel kitchen & bathroom, replace (e) interior stair with (n) stair. | $250,000 |
| May 28, 2019 | Completed final sign-off Aug 2023 | 313 Mount Vernon Av | revision to app#201811196332 to revise bathroom layout and add storage nameDetails
revision to app#201811196332 to revise bathroom layout and add storage name | |
| Nov 19, 2018 | Completed final sign-off Nov 2019 | 313 Mount Vernon Av | conversion of an existing room and bathroom on the ground level to an accessory dwelling unit (adu) per ordinance 95-17.Details
conversion of an existing room and bathroom on the ground level to an accessory dwelling unit (adu) per ordinance 95-17. | $40,000 |
| Aug 24, 2018 | Completed final sign-off May 2019 | 206 Lisbon St | renovation of garage level storage area to media room office and bathroom, new communicating stair, rear deck, replace ahu and hot water heaterDetails
renovation of garage level storage area to media room office and bathroom, new communicating stair, rear deck, replace ahu and hot water heater | $132,000 |
| Jan 10, 2018 | Completed final sign-off Oct 2018 | 572 Moultrie St | ground floor conversion to habitable space (garage to remain intact) partial excavation to lower slab. new spiral stair connecting floors. new sliding galss door at rear. (n) rooms @ ground floor - bedroom, bath, closet, home office, laundryDetails
ground floor conversion to habitable space (garage to remain intact) partial excavation to lower slab. new spiral stair connecting floors. new sliding galss door at rear. (n) rooms @ ground floor - bedroom, bath, closet, home office, laundry | $45,000 |
| Jun 30, 2017 | Completed final sign-off Nov 2019 | 125 Bertita St | (e) 2 story structure & (e) exterior stair @ rear garden to be modified with a 2 story structure with a interior stair. new windows & siding as drawn. new bedroom & bath on ground floor.Details
(e) 2 story structure & (e) exterior stair @ rear garden to be modified with a 2 story structure with a interior stair. new windows & siding as drawn. new bedroom & bath on ground floor. | $65,000 |
| Apr 12, 2017 | Completed final sign-off May 2017 | 1619 Page St | remodel existing bathroom and power room. all plumbing & electrical to remain in existing location. no changes to wall layout. add new led lights & extractor fan to vent to exterior 3' from window.Details
remodel existing bathroom and power room. all plumbing & electrical to remain in existing location. no changes to wall layout. add new led lights & extractor fan to vent to exterior 3' from window. | $30,000 |
| Jan 20, 2017 | Completed final sign-off Apr 2017 | 747 14th Av | remodel (2) (e) bathrooms, new plumbing fixtures, electrical fixtures & tile. all fixtures to remain in (e) location.Details
remodel (2) (e) bathrooms, new plumbing fixtures, electrical fixtures & tile. all fixtures to remain in (e) location. | $40,000 |
| Jun 16, 2016 | Completed final sign-off Oct 2016 | 1110 Dolores St | remodel existing bathroom all fixtures to remain in same location, new plumbing fixtures, electrical fixtures and tile.Details
remodel existing bathroom all fixtures to remain in same location, new plumbing fixtures, electrical fixtures and tile. | $25,000 |
| May 25, 2016 | Completed final sign-off Jul 2016 | 610 Russia Av | remodel existing bathroom,new plumbing fixtures, new electrical fixtures and tile. all fixtures to remain in existing location.Details
remodel existing bathroom,new plumbing fixtures, new electrical fixtures and tile. all fixtures to remain in existing location. | $20,000 |
| May 25, 2016 | Completed final sign-off Jul 2016 | 4763 18th St | remodel existing bathroom, new plumbing fixtures,new electrical fixtures & tile, all fixtures to remain in existing location.Details
remodel existing bathroom, new plumbing fixtures,new electrical fixtures & tile, all fixtures to remain in existing location. | $25,000 |
| Mar 1, 2016 | Completed final sign-off Jul 2016 | 587 24th Av | remodel (e) kitchen & bathroom new plumbing & electrical fixtures, cabinets, & tile all fixtures to reamin in same location no change on wallsDetails
remodel (e) kitchen & bathroom new plumbing & electrical fixtures, cabinets, & tile all fixtures to reamin in same location no change on walls | $38,000 |
| Jan 12, 2016 | Completed final sign-off Jul 2016 | 967 Bay St | remodel two (e) bathrooms all fixtures to remain in same location.Details
remodel two (e) bathrooms all fixtures to remain in same location. | $40,000 |
| Nov 4, 2015 | Completed final sign-off Mar 2016 | 207 Claremont Bl | bathroom remodel; replace (e) fan. all fixtures to stay in same location. all new lites shall be led.Details
bathroom remodel; replace (e) fan. all fixtures to stay in same location. all new lites shall be led. | $30,000 |
| Nov 4, 2015 | Completed final sign-off Mar 2016 | 587 Buena Vista West Av | lower unit - bathroom remodel- replace (e) fan. all fixtures to remain in same location. all new lites shall be led.Details
lower unit - bathroom remodel- replace (e) fan. all fixtures to remain in same location. all new lites shall be led. | $20,000 |
| Jun 2, 2015 | Completed final sign-off Dec 2015 | 53 Walter St | remodel existing bathroom in kind, change bath tub, shower valve and floor tileDetails
remodel existing bathroom in kind, change bath tub, shower valve and floor tile | $8,000 |
| May 4, 2015 | Completed final sign-off Jun 2015 | 695 Grand View Av | #103- bathroom remodel, new plumbing fixtures and tile, all fixtures to remain in same location. no new wall and no existing wall relocation. no electrical & no lighting alternation work.Details
#103- bathroom remodel, new plumbing fixtures and tile, all fixtures to remain in same location. no new wall and no existing wall relocation. no electrical & no lighting alternation work. | $12,000 |
| Mar 4, 2015 | Completed final sign-off Jun 2015 | 137 Caselli Av | remodel existing bathroom new tile, electrical fixtures & plumbing fixtures all fixtures to remain in same location.Details
remodel existing bathroom new tile, electrical fixtures & plumbing fixtures all fixtures to remain in same location. | $18,000 |
| Nov 10, 2014 | Completed final sign-off Apr 2015 | 186 Prague St | remodel existing kitchen & bathroom, new cabinets, tile, plumbing & electrical fixtures. all fixtures to remain in same location. bath approx 45 sq ft, kitchen approx 100 sq ft.Details
remodel existing kitchen & bathroom, new cabinets, tile, plumbing & electrical fixtures. all fixtures to remain in same location. bath approx 45 sq ft, kitchen approx 100 sq ft. | $27,000 |
| Sep 8, 2014 | Completed final sign-off Nov 2014 | 1464 Grove St | kitchen remodel:take walls to living room, replace kitchen cabinets, counter tops, kitchen appliances, sink, lighting. bathroom remodel: replace bathtub, tiles, sink, and fixtures.Details
kitchen remodel:take walls to living room, replace kitchen cabinets, counter tops, kitchen appliances, sink, lighting. bathroom remodel: replace bathtub, tiles, sink, and fixtures. | $20,000 |
| Mar 4, 2014 | Completed final sign-off Mar 2016 | 47 Clifford Tr | basement remodel: covert to 1 bedroom, 1 media room + bath. 2' addition to basement ar rear of house. recomfiguration of stair to basement: relocate to center of house. partial kitchen remodel. two firest floor windows changed. lower (e) brick padio to new basement level, replace with new wood deck.Details
basement remodel: covert to 1 bedroom, 1 media room + bath. 2' addition to basement ar rear of house. recomfiguration of stair to basement: relocate to center of house. partial kitchen remodel. two firest floor windows changed. lower (e) brick padio to new basement level, replace with new wood deck. | $180,000 |
| Jan 21, 2014 | Completed final sign-off Feb 2014 | 65 Collingwood St | unit#1: bathroom remodel, remove and reinstall all plumbing and electrical fixtures all to stay in same location and retile, one bathroom only in unit #1Details
unit#1: bathroom remodel, remove and reinstall all plumbing and electrical fixtures all to stay in same location and retile, one bathroom only in unit #1 | $18,000 |
| Nov 8, 2013 | Completed final sign-off Dec 2013 | 650 Chestnut St | remodel 2 bathrooms, install new plumbing and electrical fixtures, tile all fixtures to remain in existing location.Details
remodel 2 bathrooms, install new plumbing and electrical fixtures, tile all fixtures to remain in existing location. | $25,000 |
| Feb 13, 2013 | Completed final sign-off May 2013 | 70 Ravenwood Dr | remodel (e) bathroom all fixtures to remain in same location & retile. remove lath and plaster from perimter wall in bedrooms insulate and sheetrock. install r-13 insulation.Details
remodel (e) bathroom all fixtures to remain in same location & retile. remove lath and plaster from perimter wall in bedrooms insulate and sheetrock. install r-13 insulation. | $29,900 |
| Nov 26, 2012 | Completed final sign-off Jan 2013 | 3276 Market St | bathroom remodel - remove & reinstall plumbing fixtures + tub in same location of retile. no structural work.Details
bathroom remodel - remove & reinstall plumbing fixtures + tub in same location of retile. no structural work. | $10,000 |
| Aug 30, 2012 | Completed final sign-off Jan 2013 | 461 02nd St | add new partition with door, demo partial wall to make door opening, add new electrical outlets, add new plumbing fixture in bathroom on lower level floor.Details
add new partition with door, demo partial wall to make door opening, add new electrical outlets, add new plumbing fixture in bathroom on lower level floor. | $5,000 |
| Aug 21, 2008 | Completed final sign-off Jan 2009 | 2104 Divisadero St | remodel 2 exist bathrooms and kitchen. install new kitchen & vanity cabinets, tiling, countertops. plumbing & exlectiral fixtures, occ sensor in bathroom florescent lighting in kitchen no structural changes.Details
remodel 2 exist bathrooms and kitchen. install new kitchen & vanity cabinets, tiling, countertops. plumbing & exlectiral fixtures, occ sensor in bathroom florescent lighting in kitchen no structural changes. | $65,000 |
| Aug 14, 2008 | Completed final sign-off Apr 2009 | 2030 Broadway | work @ unit# 1 only. remodel (e) master bathroom. non structural. no lighting.Details
work @ unit# 1 only. remodel (e) master bathroom. non structural. no lighting. | $9,000 |