S H C I
- Based in
- San Francisco
- On San Francisco permits
- Jan 2007 to Sep 2023
- Last 24 months
- 0 permits filed
61 permits since 2000: 56 completed, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
9 stairs permits: 8 completed, 1 expired or cancelled. Typically 47 days from filing to permit and 302 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 7, 2021 | Expired or cancelled cancelled Jan 2026 | 53 Milton St | remove & replace (e) rear yard access stair & deck with new rear deck.Details
remove & replace (e) rear yard access stair & deck with new rear deck. | $20,000 |
| Jun 25, 2019 | Completed final sign-off Jul 2021 | 306 Foerster St | rear horizontal addition on first & second floor for new bedrooms, rear deck, side extension to remodel kitchen & bathroom, replace (e) interior stair with (n) stair.Details
rear horizontal addition on first & second floor for new bedrooms, rear deck, side extension to remodel kitchen & bathroom, replace (e) interior stair with (n) stair. | $250,000 |
| Aug 24, 2018 | Completed final sign-off May 2019 | 206 Lisbon St | renovation of garage level storage area to media room office and bathroom, new communicating stair, rear deck, replace ahu and hot water heaterDetails
renovation of garage level storage area to media room office and bathroom, new communicating stair, rear deck, replace ahu and hot water heater | $132,000 |
| Jan 10, 2018 | Completed final sign-off Oct 2018 | 572 Moultrie St | ground floor conversion to habitable space (garage to remain intact) partial excavation to lower slab. new spiral stair connecting floors. new sliding galss door at rear. (n) rooms @ ground floor - bedroom, bath, closet, home office, laundryDetails
ground floor conversion to habitable space (garage to remain intact) partial excavation to lower slab. new spiral stair connecting floors. new sliding galss door at rear. (n) rooms @ ground floor - bedroom, bath, closet, home office, laundry | $45,000 |
| Jun 30, 2017 | Completed final sign-off Nov 2019 | 125 Bertita St | (e) 2 story structure & (e) exterior stair @ rear garden to be modified with a 2 story structure with a interior stair. new windows & siding as drawn. new bedroom & bath on ground floor.Details
(e) 2 story structure & (e) exterior stair @ rear garden to be modified with a 2 story structure with a interior stair. new windows & siding as drawn. new bedroom & bath on ground floor. | $65,000 |
| Jun 1, 2017 | Completed final sign-off May 2018 | 380 San Benito Wy | kitchen to be remodeled and expanded. bedroom at main leel to be expanded and stair to lower level to be relocated. existing storage area at lower level to be converted into heated space for a new bedroom and laundry room. no expansion of existing envelopeDetails
kitchen to be remodeled and expanded. bedroom at main leel to be expanded and stair to lower level to be relocated. existing storage area at lower level to be converted into heated space for a new bedroom and laundry room. no expansion of existing envelope | $50,000 |
| Mar 4, 2014 | Completed final sign-off Mar 2016 | 47 Clifford Tr | basement remodel: covert to 1 bedroom, 1 media room + bath. 2' addition to basement ar rear of house. recomfiguration of stair to basement: relocate to center of house. partial kitchen remodel. two firest floor windows changed. lower (e) brick padio to new basement level, replace with new wood deck.Details
basement remodel: covert to 1 bedroom, 1 media room + bath. 2' addition to basement ar rear of house. recomfiguration of stair to basement: relocate to center of house. partial kitchen remodel. two firest floor windows changed. lower (e) brick padio to new basement level, replace with new wood deck. | $180,000 |
| Sep 29, 2011 | Completed final sign-off Jul 2012 | 515 Foerster St | replace stair handrail treads & risers in front of house, less than 50%Details
replace stair handrail treads & risers in front of house, less than 50% | $4,000 |
| Aug 6, 2007 | Completed final sign-off Nov 2007 | 412 Broderick St | to comply with his nov# 200710827, dated 07/17/2007. repair damaged wood @ rear stair exits. elevate post base from grade. rpovide approved handrails throughout to address complaint# 200710827.Details
to comply with his nov# 200710827, dated 07/17/2007. repair damaged wood @ rear stair exits. elevate post base from grade. rpovide approved handrails throughout to address complaint# 200710827. | $2,000 |