Back to bathroom remodel contractors
Kenneth Chiu
- Based in
- San Francisco
- On San Francisco permits
- Oct 2011 to Sep 2026
- Last 24 months
- 36 permits filed
51 permits since 2000: 46 completed, 3 in progress, 2 never finaled.
CompletedIn progressNever finaledExpired or cancelled
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
Bathroom remodel permits
26 bathroom remodel permits: 25 completed, 1 in progress. Typically 4 days from filing to permit and 93 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 31, 2026 | In progress | 354 Monticello St | revision to #202607245525: remodel (e) kitchen, bathroom, add 1 new bathroom,rebuilt interior staricase, replace (e) sheetrock w/ new at 2/f. construct 2 bedroom, 1 full bath, & media room at g/f. | $318,000 |
| Apr 23, 2026 | Completed | 127 Springfield Dr | revision to #202604159513: remodel (e) kitchen. convert (e) full bath to 2 full bath. repair (e) interior staircase in-kind & replace (e) sheetrock w/ new at 2/f. construct 2 bedroom, 1 full bath, family room, & install wetbar at g/f. | $298,000 |
| Mar 3, 2026 | Completed | 2050 33rd Av | revision to #202602196190: remodel (e) kitchen, bathroom. construct 1 new bathroom & replace (e) sheetrock w/ new at 2/f. construct family room, bedroom, 1 full bathroom. install wetbar & repair (e) interior stair in-kind at g/f. install 3 skylight. re-built staircase to (e) deck. | $298,000 |
| Jan 16, 2026 | Completed | 725 Lakeview Av | ollegalize (e) bedroom. convert powder room to full bath at g/f. remodel (e) kitchen, bathroom, & add full bath on 2/f. two new sliding doors at rear on ground floor (expansion of existing window openings). | $120,000 |
| Dec 29, 2025 | Completed | 2330 43rd Av | construct 1 bedroom, family room, 1 full bath, & install wetbar at g/f. remodel (e) kitchen, convert (e) full bath to 2 full bath & replace (e) sheetrock w/ new at 2/f. | $248,000 |
| Dec 23, 2025 | Completed | 4418 Kirkham St | remodel ground floor bedroom and media room; construct new wet bar in media room; convert ground floor family room to non-sleeping office; remodel 2nd floor kitchen; remove tub from 2nd floor bathroom; construct (2) new, full, 2nd floor bathrooms. | $220,000 |
| Nov 18, 2025 | Completed | 4329 Pacheco St | remodel (e) kitchen, bathroom, add 1 (n) full bath, & replace (e) sheetrock w/ new on 2/f. remodel (e) bathroom, construct 1 bedroom, family room, 1 full bath, & wetbar at g/f. | $237,800 |
| Oct 22, 2025 | Completed | 25 Ramsell St | construct 2 bedroom, 1 full bath, family room, & install wet bar at g/f (including 1 bedroom in-fill). add 2 new bathroom, convert (e) full bathroom to powder room & replace (e) sheetrock w/ new at 2/f. add skylight. | $325,000 |
| Sep 12, 2025 | Completed | 3060 19th Av | comply w/ nov 2025-41975: relocate (e) bath & convert (e) study room to bedroom at g/f. relocate (e) kitchen in dining room, convert (e) kitchen space to (n) bedroom. remodel 1 (e) bathroom. add 2 new full bath at 2/. replace (e) sheetrock w/ new. replace partial dryrot at roof. | $185,000 |
| Aug 21, 2025 | Completed | 134 Monticello St | remodel existing 1.5 bathroom, like for like. | $5,000 |
| Jul 25, 2025 | Completed | 134 Monticello St | revision to pa # 202507241524: replace (e) sheetrock w/ new @ 2/f. construct 1 family room, one bedroom, one full bath & install wetbar at g/f. | $149,000 |
| Jun 27, 2025 | Completed | 2300 29th Av | construct 2 bedroom, 2 bathroom, family room, & install wetbar at ground floor (include one bedroom in-fill). | $276,000 |
| Jun 4, 2025 | Completed | 2300 29th Av | remodel one kitchen and 2 bathrooms. replace 3 windows in front, same to same. no removal of walls | $25,000 |
| Apr 29, 2025 | Completed | 3139 Balboa St | 1/f: convert storage to gym room, office and 3 fixtures bathroom. install 2 tankless water heater and washer/dryer. 2/f and 3/f: remodel kitchen, bathroom and dining room (ref 202503283275 for kitchen and bath remodel in kind). add a 3 fixtures bathroom in the bedroom. | $60,000 |
| Apr 17, 2025 | Completed | 140 Bertita St | remodel (e) kitchen & add 1 new full bathroom at 2/f. construct 1 bedroom, 2 full bathroom, fmaily room, media room, & install wetbar at g/f. | $240,000 |
| Jan 27, 2025 | Completed | 163 Stratford Dr | revision to pa # 202412187106: re-arrange (e) 2 bathroom, & closet at 2/f. construct 1 bedroom & 1 bathroom at g/f. | $105,000 |
| Dec 18, 2024 | Completed | 163 Stratford Dr | remodel kitchen and 2 bathroom | $75,000 |
| Dec 16, 2024 | Completed | 219 Denslowe Dr | re-arrange (e) two bath rm and closect at 2/f. construct one bedroom and re-arrange (e) bath room at g/f | $105,000 |
| Dec 4, 2024 | Completed | 219 Denslowe Dr | remodel 1 kitchen, 3 bathrooms. replace 4 windows on the side not street visible. replace in kinds | $50,000 |
| Mar 6, 2023 | Completed | 666 Vienna St | g/f: interior remodel. add one media room, one full bath, 2 bedrooms on ground floor. | $50,888 |
| Feb 9, 2023 | Completed | 644 Sargent St | revision to 202210043689, add 1 bath at ground floor, relocate bath | $10,000 |
| Oct 19, 2022 | Completed | 157 Ulloa St | add two bedroom, one family room w/ 2 burner kitchenette and two bath @ ground above. relocation of kitchen, add two full bath @ 2nd floor remodel (e) bath @ 2/f | $123,698 |
| Oct 4, 2022 | Completed | 644 Sargent St | g/f: add two bedrooms, one family room, and one laundry room @ ground floor. add 2-burners stove kitchennett. add one full bath @ ground floor. | $80,888 |
| Apr 5, 2022 | Completed | 1 Putnam St | comply w/ nov# 202182758/202179282/201982101/201811101/201706233/200000669. relocate kitchan @ 2nd flr, change full bath to 1/2 bath. add one bedrm, one master bath, relocate (e) bath. whole house rewiring. | $80,888 |
| Feb 7, 2022 | Completed | 896 Rhode Island St | comply w/ complaint #202287137, 202287175: remodel (e) kitchen, construct half bathroom at basement. remodel (e) bathroom. remove/replace (e) sheetrock w/ new at g/f. construct (n) bathroom at 2nd floor & upgrade floor joists. construct 1 new dormer at north side slope roof. repair (e) deck in kind. | $136,000 |
| Oct 20, 2011 | Completed | 3079 Broderick St | #1 - remodel kitchen & bathroom. no structural work and no new lighting. | $20,000 |