Permit GraphSan Francisco building permits since 2000

Kenneth Chiu

Contractor license
817869
State license record
Based in
San Francisco
On San Francisco permits
Oct 2011 to Sep 2026
Last 24 months
36 permits filed

51 permits since 2000: 46 completed, 3 in progress, 2 never finaled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

Bathroom remodel permits

AllDeck 5Stairs 9Kitchen remodel 22Bathroom remodel 26

26 bathroom remodel permits: 25 completed, 1 in progress. Typically 4 days from filing to permit and 93 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Jul 31, 2026In progress354 Monticello Strevision to #202607245525: remodel (e) kitchen, bathroom, add 1 new bathroom,rebuilt interior staricase, replace (e) sheetrock w/ new at 2/f. construct 2 bedroom, 1 full bath, & media room at g/f.$318,000
Apr 23, 2026Completed127 Springfield Drrevision to #202604159513: remodel (e) kitchen. convert (e) full bath to 2 full bath. repair (e) interior staircase in-kind & replace (e) sheetrock w/ new at 2/f. construct 2 bedroom, 1 full bath, family room, & install wetbar at g/f.$298,000
Mar 3, 2026Completed2050 33rd Avrevision to #202602196190: remodel (e) kitchen, bathroom. construct 1 new bathroom & replace (e) sheetrock w/ new at 2/f. construct family room, bedroom, 1 full bathroom. install wetbar & repair (e) interior stair in-kind at g/f. install 3 skylight. re-built staircase to (e) deck.$298,000
Jan 16, 2026Completed725 Lakeview Avollegalize (e) bedroom. convert powder room to full bath at g/f. remodel (e) kitchen, bathroom, & add full bath on 2/f. two new sliding doors at rear on ground floor (expansion of existing window openings).$120,000
Dec 29, 2025Completed2330 43rd Avconstruct 1 bedroom, family room, 1 full bath, & install wetbar at g/f. remodel (e) kitchen, convert (e) full bath to 2 full bath & replace (e) sheetrock w/ new at 2/f.$248,000
Dec 23, 2025Completed4418 Kirkham Stremodel ground floor bedroom and media room; construct new wet bar in media room; convert ground floor family room to non-sleeping office; remodel 2nd floor kitchen; remove tub from 2nd floor bathroom; construct (2) new, full, 2nd floor bathrooms.$220,000
Nov 18, 2025Completed4329 Pacheco Stremodel (e) kitchen, bathroom, add 1 (n) full bath, & replace (e) sheetrock w/ new on 2/f. remodel (e) bathroom, construct 1 bedroom, family room, 1 full bath, & wetbar at g/f.$237,800
Oct 22, 2025Completed25 Ramsell Stconstruct 2 bedroom, 1 full bath, family room, & install wet bar at g/f (including 1 bedroom in-fill). add 2 new bathroom, convert (e) full bathroom to powder room & replace (e) sheetrock w/ new at 2/f. add skylight.$325,000
Sep 12, 2025Completed3060 19th Avcomply w/ nov 2025-41975: relocate (e) bath & convert (e) study room to bedroom at g/f. relocate (e) kitchen in dining room, convert (e) kitchen space to (n) bedroom. remodel 1 (e) bathroom. add 2 new full bath at 2/. replace (e) sheetrock w/ new. replace partial dryrot at roof.$185,000
Aug 21, 2025Completed134 Monticello Stremodel existing 1.5 bathroom, like for like.$5,000
Jul 25, 2025Completed134 Monticello Strevision to pa # 202507241524: replace (e) sheetrock w/ new @ 2/f. construct 1 family room, one bedroom, one full bath & install wetbar at g/f.$149,000
Jun 27, 2025Completed2300 29th Avconstruct 2 bedroom, 2 bathroom, family room, & install wetbar at ground floor (include one bedroom in-fill).$276,000
Jun 4, 2025Completed2300 29th Avremodel one kitchen and 2 bathrooms. replace 3 windows in front, same to same. no removal of walls$25,000
Apr 29, 2025Completed3139 Balboa St1/f: convert storage to gym room, office and 3 fixtures bathroom. install 2 tankless water heater and washer/dryer. 2/f and 3/f: remodel kitchen, bathroom and dining room (ref 202503283275 for kitchen and bath remodel in kind). add a 3 fixtures bathroom in the bedroom.$60,000
Apr 17, 2025Completed140 Bertita Stremodel (e) kitchen & add 1 new full bathroom at 2/f. construct 1 bedroom, 2 full bathroom, fmaily room, media room, & install wetbar at g/f.$240,000
Jan 27, 2025Completed163 Stratford Drrevision to pa # 202412187106: re-arrange (e) 2 bathroom, & closet at 2/f. construct 1 bedroom & 1 bathroom at g/f.$105,000
Dec 18, 2024Completed163 Stratford Drremodel kitchen and 2 bathroom$75,000
Dec 16, 2024Completed219 Denslowe Drre-arrange (e) two bath rm and closect at 2/f. construct one bedroom and re-arrange (e) bath room at g/f$105,000
Dec 4, 2024Completed219 Denslowe Drremodel 1 kitchen, 3 bathrooms. replace 4 windows on the side not street visible. replace in kinds$50,000
Mar 6, 2023Completed666 Vienna Stg/f: interior remodel. add one media room, one full bath, 2 bedrooms on ground floor.$50,888
Feb 9, 2023Completed644 Sargent Strevision to 202210043689, add 1 bath at ground floor, relocate bath$10,000
Oct 19, 2022Completed157 Ulloa Stadd two bedroom, one family room w/ 2 burner kitchenette and two bath @ ground above. relocation of kitchen, add two full bath @ 2nd floor remodel (e) bath @ 2/f$123,698
Oct 4, 2022Completed644 Sargent Stg/f: add two bedrooms, one family room, and one laundry room @ ground floor. add 2-burners stove kitchennett. add one full bath @ ground floor.$80,888
Apr 5, 2022Completed1 Putnam Stcomply w/ nov# 202182758/202179282/201982101/201811101/201706233/200000669. relocate kitchan @ 2nd flr, change full bath to 1/2 bath. add one bedrm, one master bath, relocate (e) bath. whole house rewiring.$80,888
Feb 7, 2022Completed896 Rhode Island Stcomply w/ complaint #202287137, 202287175: remodel (e) kitchen, construct half bathroom at basement. remodel (e) bathroom. remove/replace (e) sheetrock w/ new at g/f. construct (n) bathroom at 2nd floor & upgrade floor joists. construct 1 new dormer at north side slope roof. repair (e) deck in kind.$136,000
Oct 20, 2011Completed3079 Broderick St#1 - remodel kitchen & bathroom. no structural work and no new lighting.$20,000