C & L Builders Inc.

Contractor license
860328
State license record
Based in
San Francisco
On San Francisco permits
Feb 2008 to Oct 2026
Last 24 months
5 permits filed

96 permits since 2000: 86 completed, 5 in progress, 3 never finaled, 2 expired or cancelled.

Of the 3 never-finaled permits, 3 are over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Bathroom remodel permits

AllRoof deck 1Deck 5Stairs 13Kitchen remodel 15Bathroom remodel 25

25 bathroom remodel permits: 23 completed, 2 in progress. Typically 10 days from filing to permit and 206 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Sep 4, 2026In progress
issued Sep 2026
748 Cabrillo Strevision various drawing pages to pa#202604240029 to change outside bathroom shower to tub, add 1 sink in primary bathroom, add 1 mop sink in utility room. change hydronic radiant floor heating system to heat pump. additionally, remove w/d/laundry sink from 2nd floor.
Details
Permit
202609047700
Permit issued
Sep 9, 2026

revision various drawing pages to pa#202604240029 to change outside bathroom shower to tub, add 1 sink in primary bathroom, add 1 mop sink in utility room. change hydronic radiant floor heating system to heat pump. additionally, remove w/d/laundry sink from 2nd floor.

Open the permit page

Apr 24, 2026In progress
issued May 2026
748 Cabrillo St3/f - unit 748: interior remodel in duplex building. relocate existing living room and bedroom. add 1 bathroom. 3/f window replacement and skylights under separate permit.
Details
Permit
202604240029
Permit issued
May 4, 2026

3/f - unit 748: interior remodel in duplex building. relocate existing living room and bedroom. add 1 bathroom. 3/f window replacement and skylights under separate permit.

Open the permit page

$180,000
Oct 21, 2022Completed
final sign-off Mar 2025
217 16th Avinterior remodel to (e) 2 unit dwelling per plans. unit 217: remove 2nd floor powder and laundry. unit 219: remove 2 bath tubs, no change to exterior. no added conditioned space. remodel in both units includes kitchens and baths and minor wall reconfigurations per plans
Details
Permit
202210214851
Permit issued
Oct 24, 2022
Final sign-off
Mar 28, 2025

interior remodel to (e) 2 unit dwelling per plans. unit 217: remove 2nd floor powder and laundry. unit 219: remove 2 bath tubs, no change to exterior. no added conditioned space. remodel in both units includes kitchens and baths and minor wall reconfigurations per plans

Open the permit page

$80,000
Sep 5, 2020Completed
final sign-off Feb 2022
1610 41st Avnew rear deck on 2nd floor. add new master bathroom, one powder room, relocate (e) kitchen on 2nd floor. add (n) mechanical room & laundry on 1st floor.
Details
Permit
202009053567
Permit issued
Nov 4, 2020
Final sign-off
Feb 23, 2022

new rear deck on 2nd floor. add new master bathroom, one powder room, relocate (e) kitchen on 2nd floor. add (n) mechanical room & laundry on 1st floor.

Open the permit page

$70,000
Oct 18, 2019Completed
final sign-off Jan 2022
1544 Powell Stadd adu @ basement per ordinance# 162-16. (1 bedroom & 1 bathroom unit). legalize (e) unit under separate permit. replace (e) entry door with glass window.
Details
Permit
201910184947
Permit issued
Jan 28, 2021
Final sign-off
Jan 14, 2022

add adu @ basement per ordinance# 162-16. (1 bedroom & 1 bathroom unit). legalize (e) unit under separate permit. replace (e) entry door with glass window.

Open the permit page

$15,000
Oct 18, 2019Completed
final sign-off Jan 2022
1544 Powell Stlegalize (e) unit in basement per ordinance # 43-14. (1 bedroom & 1 bathroom unit). add adu @ basement under separate permit. remove internal stairs in unit.
Details
Permit
201910184946
Permit issued
Jan 28, 2021
Final sign-off
Jan 14, 2022

legalize (e) unit in basement per ordinance # 43-14. (1 bedroom & 1 bathroom unit). add adu @ basement under separate permit. remove internal stairs in unit.

Open the permit page

$15,000
Apr 2, 2019Completed
final sign-off Aug 2019
746 Cabrillo Strevise pa 201801188877. add 1 bathroom, change t24 to radiant heat, infill under rear popout for utility room.
Details
Permit
201904026851
Permit issued
May 1, 2019
Final sign-off
Aug 23, 2019

revise pa 201801188877. add 1 bathroom, change t24 to radiant heat, infill under rear popout for utility room.

Open the permit page

$10,000
Feb 21, 2019Completed
final sign-off Jan 2020
60 Yerba Buena Avinterior kitchen & master bathroom remodel. no change to exterior.
Details
Permit
201902213445
Permit issued
Mar 4, 2019
Final sign-off
Jan 24, 2020

interior kitchen & master bathroom remodel. no change to exterior.

Open the permit page

$50,000
Mar 27, 2018Completed
final sign-off Aug 2018
85 El Verano Wyremodel ground flr: convert laundry rm to bathroom, garage & utility room. no change to ecterior or structural. remove office behind garage. extend garage space w/sink, counter & outlets. move existing laundry to utility room.
Details
Permit
201803274664
Permit issued
Apr 10, 2018
Final sign-off
Aug 30, 2018

remodel ground flr: convert laundry rm to bathroom, garage & utility room. no change to ecterior or structural. remove office behind garage. extend garage space w/sink, counter & outlets. move existing laundry to utility room.

Open the permit page

$8,000
Mar 20, 2018Completed
final sign-off Mar 2024
1534 17th Avvertical & horizontal addition. add 3rd fl, extend 1st & 2nd fl @ rear. excavate ground fl for ceiling height. remodel front facade & entry. add (2) bathrooms & (3) bedrooms.
Details
Permit
201803204100
Permit issued
Oct 11, 2019
Final sign-off
Mar 27, 2024

vertical & horizontal addition. add 3rd fl, extend 1st & 2nd fl @ rear. excavate ground fl for ceiling height. remodel front facade & entry. add (2) bathrooms & (3) bedrooms.

Open the permit page

$400,000
Feb 6, 2018Completed
final sign-off Jan 2019
1666 45th Avrevision to pa 2018/-0112-/8508 - remodel sfd, fill in below existing rear 2nd story pop out. add rear deck in buildable area. add 2 bedrooms, bathroom, add bar on 1st floor. new bathroom on 2nd floor. replace windows in kind
Details
Permit
201802060469
Permit issued
Feb 16, 2018
Final sign-off
Jan 31, 2019

revision to pa 2018/-0112-/8508 - remodel sfd, fill in below existing rear 2nd story pop out. add rear deck in buildable area. add 2 bedrooms, bathroom, add bar on 1st floor. new bathroom on 2nd floor. replace windows in kind

Open the permit page

$100,000
Jan 18, 2018Completed
final sign-off Aug 2019
746 Cabrillo Stextend unit 746 to gr fl. reconstruct rear stairs. remodel kitchen, add 1 bath. replace side and rear windows with alum frame. no change to front facade. revision to permit 2017-1017-1407.
Details
Permit
201801188877
Permit issued
Jan 31, 2018
Final sign-off
Aug 23, 2019

extend unit 746 to gr fl. reconstruct rear stairs. remodel kitchen, add 1 bath. replace side and rear windows with alum frame. no change to front facade. revision to permit 2017-1017-1407.

Open the permit page

$80,000
Jan 12, 2018Completed
final sign-off Jan 2019
1666 45th Avremodel interior of (e) single family dwelling., 2nd flr- remodel bathroom add beam in ceiling. 1st flr - reinforce garage beam, replace foundation, remove interior finishes for exploratory demo. no change to floor plan or exterior.
Details
Permit
201801128508
Permit issued
Jan 22, 2018
Final sign-off
Jan 31, 2019

remodel interior of (e) single family dwelling., 2nd flr- remodel bathroom add beam in ceiling. 1st flr - reinforce garage beam, replace foundation, remove interior finishes for exploratory demo. no change to floor plan or exterior.

Open the permit page

$20,000
Jul 27, 2017Completed
final sign-off Jan 2018
220 Taraval Stunit #4 remodel & alteration at 3rd floor. renovate one kitchen & one bathroom. relocate entry door & window. no structural work.
Details
Permit
201707273083
Permit issued
Aug 8, 2017
Final sign-off
Jan 12, 2018

unit #4 remodel & alteration at 3rd floor. renovate one kitchen & one bathroom. relocate entry door & window. no structural work.

Open the permit page

$20,000
Dec 6, 2016Completed
final sign-off Jul 2017
220 Taraval Stinterior remodel of unit #3 on the 3rd floor. add one bedroom and one bathroom. no change to exterior.
Details
Permit
201612064204
Permit issued
Dec 12, 2016
Final sign-off
Jul 6, 2017

interior remodel of unit #3 on the 3rd floor. add one bedroom and one bathroom. no change to exterior.

Open the permit page

$10,000
Jun 29, 2016Completed
final sign-off Oct 2016
2130 32nd Avremodel (e) living, dining, kitchen & full bath. convert closet to create new powder room. work on 2nd floor only.
Details
Permit
201606291226
Permit issued
Jul 1, 2016
Final sign-off
Oct 17, 2016

remodel (e) living, dining, kitchen & full bath. convert closet to create new powder room. work on 2nd floor only.

Open the permit page

$40,000
May 19, 2015Completed
final sign-off Aug 2015
675 28th Stexisting kitchen & 2 bath rooms, refinish, no structural work, exterior & interior painting work, no alteration of wall, window and door.
Details
Permit
201505196734
Permit issued
May 19, 2015
Final sign-off
Aug 21, 2015

existing kitchen & 2 bath rooms, refinish, no structural work, exterior & interior painting work, no alteration of wall, window and door.

Open the permit page

$20,000
Jan 29, 2015Completed
final sign-off Aug 2015
1275 21st Avremodel existing one full bathroom on 3rd floor per plan.
Details
Permit
201501296962
Permit issued
Apr 2, 2015
Final sign-off
Aug 5, 2015

remodel existing one full bathroom on 3rd floor per plan.

Open the permit page

$8,000
Oct 15, 2014Completed
final sign-off Jan 2015
3176 Washington Stinterior remodel - add 2nd floor bathroom & relocate closets, no changes to structural system or egress.
Details
Permit
201410158935
Permit issued
Oct 16, 2014
Final sign-off
Jan 9, 2015

interior remodel - add 2nd floor bathroom & relocate closets, no changes to structural system or egress.

Open the permit page

$10,000
Aug 25, 2014Completed
final sign-off Jan 2015
1277 21st Avremodel existing kitchen & one bathroom on 2nd floor per plan.
Details
Permit
201408254593
Permit issued
Sep 2, 2014
Final sign-off
Jan 9, 2015

remodel existing kitchen & one bathroom on 2nd floor per plan.

Open the permit page

$20,000
Dec 28, 2011Completed
final sign-off Feb 2013
1170 Sacramento Stunit #11d-interior remodel of residential condo, no work on common walls or exterior envelope. egress route to remain throughout construction. combine master bathrooms, rebuild kitchen & bathroom fixtures
Details
Permit
201112281355
Permit issued
Dec 29, 2011
Final sign-off
Feb 4, 2013

unit #11d-interior remodel of residential condo, no work on common walls or exterior envelope. egress route to remain throughout construction. combine master bathrooms, rebuild kitchen & bathroom fixtures

Open the permit page

$80,000
Jul 1, 2010Completed
final sign-off Sep 2011
3491 Pacific Avinterior remodel of (e0 building. replace (e0 4 story elevator. remove accessory stair. relocate (e) furnace and water heater. replace exterior windows on rear and side. add 1 full bath room.
Details
Permit
201007015759
Permit issued
Jul 29, 2010
Final sign-off
Sep 12, 2011

interior remodel of (e0 building. replace (e0 4 story elevator. remove accessory stair. relocate (e) furnace and water heater. replace exterior windows on rear and side. add 1 full bath room.

Open the permit page

$350,000
May 19, 2009Completed
final sign-off Aug 2009
311 California Stpermit revision to pa#200904247031, demolition revealed a 7" heigh difference between the tenant suite and common area restrooms. in order to provide an accessible restroom to each level, we are raising the slab at one bathroom and making the both unisex. all plumbing & electrical devices along with
Details
Permit
200905198638
Permit issued
Jun 5, 2009
Final sign-off
Aug 24, 2009

permit revision to pa#200904247031, demolition revealed a 7" heigh difference between the tenant suite and common area restrooms. in order to provide an accessible restroom to each level, we are raising the slab at one bathroom and making the both unisex. all plumbing & electrical devices along with

Open the permit page

$10,000
Apr 24, 2009Completed
final sign-off Aug 2009
311 California Stbarrier removal. provide access to ada restroom from ground floor tenant suite. reconfigure bathroom affected by demolition to remain ada compliant. provide new toilet and sink and accessories.
Details
Permit
200904247031
Permit issued
Apr 28, 2009
Final sign-off
Aug 20, 2009

barrier removal. provide access to ada restroom from ground floor tenant suite. reconfigure bathroom affected by demolition to remain ada compliant. provide new toilet and sink and accessories.

Open the permit page

$20,000
Apr 3, 2008Completed
final sign-off Jun 2008
2240 Hyde Stwork @ unit# 5 only. existing 2 bathrooms fixtures & tiles replaced. no structural (e) light fixtures to remain.
Details
Permit
200804038722
Permit issued
Apr 3, 2008
Final sign-off
Jun 9, 2008

work @ unit# 5 only. existing 2 bathrooms fixtures & tiles replaced. no structural (e) light fixtures to remain.

Open the permit page

$12,000