C & L Builders Inc.
- Based in
- San Francisco
- On San Francisco permits
- Feb 2008 to Sep 2026
- Last 24 months
- 4 permits filed
95 permits since 2000: 86 completed, 4 in progress, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 4, 2026 | In progress issued Sep 2026 | 748 Cabrillo St | revision various drawing pages to pa#202604240029 to change outside bathroom shower to tub, add 1 sink in primary bathroom, add 1 mop sink in utility room. change hydronic radiant floor heating system to heat pump. additionally, remove w/d/laundry sink from 2nd floor.Details
revision various drawing pages to pa#202604240029 to change outside bathroom shower to tub, add 1 sink in primary bathroom, add 1 mop sink in utility room. change hydronic radiant floor heating system to heat pump. additionally, remove w/d/laundry sink from 2nd floor. | |
| Apr 27, 2026 | In progress issued Apr 2026 | 748 Cabrillo St | addressing permit only: purpose of this permit is to link 748 cabrillo st to apn 1636/009. 748 cabrillo st is to be assigned to the residential unitDetails
addressing permit only: purpose of this permit is to link 748 cabrillo st to apn 1636/009. 748 cabrillo st is to be assigned to the residential unit | |
| Apr 24, 2026 | In progress issued May 2026 | 748 Cabrillo St | 3/f - unit 748: interior remodel in duplex building. relocate existing living room and bedroom. add 1 bathroom. 3/f window replacement and skylights under separate permit.Details
3/f - unit 748: interior remodel in duplex building. relocate existing living room and bedroom. add 1 bathroom. 3/f window replacement and skylights under separate permit. | $180,000 |
| Apr 24, 2026 | In progress issued May 2026 | 748 Cabrillo St | 3/f - unit 748: 3/f window replacement and add skylights. interior remodel under separate permit.Details
3/f - unit 748: 3/f window replacement and add skylights. interior remodel under separate permit. | $30,000 |
| Jan 19, 2024 | Completed final sign-off Mar 2025 | 217 16th Av | revision to pa# 202210214851, replace in-kind rear facing windows & doors (not visible from public way) per plan. minor interior revision, no structural changes.Details
revision to pa# 202210214851, replace in-kind rear facing windows & doors (not visible from public way) per plan. minor interior revision, no structural changes. | $10,000 |
| Nov 16, 2022 | Completed final sign-off Aug 2023 | 1035 Market St | work includes selective demo and construction of non-load bearing partitions, relocated and new light fixtures, new office door frames, new millwork and sinks and new finishesDetails
work includes selective demo and construction of non-load bearing partitions, relocated and new light fixtures, new office door frames, new millwork and sinks and new finishes | $300,000 |
| Oct 21, 2022 | Completed final sign-off Mar 2025 | 217 16th Av | interior remodel to (e) 2 unit dwelling per plans. unit 217: remove 2nd floor powder and laundry. unit 219: remove 2 bath tubs, no change to exterior. no added conditioned space. remodel in both units includes kitchens and baths and minor wall reconfigurations per plansDetails
interior remodel to (e) 2 unit dwelling per plans. unit 217: remove 2nd floor powder and laundry. unit 219: remove 2 bath tubs, no change to exterior. no added conditioned space. remodel in both units includes kitchens and baths and minor wall reconfigurations per plans | $80,000 |
| Jun 1, 2022 | Completed final sign-off Mar 2024 | 1534 17th Av | revise previously approved building pa 2018-03204100 for existing foundation & framing condition. excavation of approximately 5 cubic yards. expand 1st fl patio north + south to align with (e) retaining walls.Details
revise previously approved building pa 2018-03204100 for existing foundation & framing condition. excavation of approximately 5 cubic yards. expand 1st fl patio north + south to align with (e) retaining walls. | $10,000 |
| Jul 2, 2021 | Completed final sign-off Oct 2021 | 416 24th Av | replace damaged stucco in kind at front of buildingDetails
replace damaged stucco in kind at front of building | $20,000 |
| Jul 2, 2021 | Completed final sign-off Sep 2021 | 1035 Market St | #150: mechanical and electrical only for 1st floor office t.i. per approved application # 202104128337. reconnecting (e) duct w/ (e) water source hear pump. addition and modification of diffusersDetails
#150: mechanical and electrical only for 1st floor office t.i. per approved application # 202104128337. reconnecting (e) duct w/ (e) water source hear pump. addition and modification of diffusers | $30,000 |
| Apr 12, 2021 | Completed final sign-off Sep 2021 | 1035 Market St | ste 150: modification of (e) tenant improvements, with selective demolition & construction of non-load bearing partitions. new light fixtures, new office doors & frames, millwork & new sinks & new finishes.Details
ste 150: modification of (e) tenant improvements, with selective demolition & construction of non-load bearing partitions. new light fixtures, new office doors & frames, millwork & new sinks & new finishes. | $99,450 |
| Oct 2, 2020 | Completed final sign-off Mar 2021 | 323 29th Av | revise previously approved application 201512044244 for stair configuration.Details
revise previously approved application 201512044244 for stair configuration. | |
| Sep 5, 2020 | Completed final sign-off Feb 2022 | 1610 41st Av | new rear deck on 2nd floor. add new master bathroom, one powder room, relocate (e) kitchen on 2nd floor. add (n) mechanical room & laundry on 1st floor.Details
new rear deck on 2nd floor. add new master bathroom, one powder room, relocate (e) kitchen on 2nd floor. add (n) mechanical room & laundry on 1st floor. | $70,000 |
| Aug 22, 2020 | Completed final sign-off Mar 2021 | 2100 Market St | tenant improvement of ground floor office into sterling bank per cua 2019-020070Details
tenant improvement of ground floor office into sterling bank per cua 2019-020070 | $400,000 |
| Oct 18, 2019 | Completed final sign-off Jan 2022 | 1544 Powell St | legalize (e) unit in basement per ordinance # 43-14. (1 bedroom & 1 bathroom unit). add adu @ basement under separate permit. remove internal stairs in unit.Details
legalize (e) unit in basement per ordinance # 43-14. (1 bedroom & 1 bathroom unit). add adu @ basement under separate permit. remove internal stairs in unit. | $15,000 |
| Oct 18, 2019 | Completed final sign-off Jan 2022 | 1544 Powell St | add adu @ basement per ordinance# 162-16. (1 bedroom & 1 bathroom unit). legalize (e) unit under separate permit. replace (e) entry door with glass window.Details
add adu @ basement per ordinance# 162-16. (1 bedroom & 1 bathroom unit). legalize (e) unit under separate permit. replace (e) entry door with glass window. | $15,000 |
| Jun 24, 2019 | Completed final sign-off Jan 2020 | 60 Yerba Buena Av | replace side/rear (e) vinyl windows w/wood windows by marvin or equal. not visible from street. total (9) windows. same size/location, max u.factor 0.32Details
replace side/rear (e) vinyl windows w/wood windows by marvin or equal. not visible from street. total (9) windows. same size/location, max u.factor 0.32 | $4,000 |
| Apr 2, 2019 | Completed final sign-off Aug 2019 | 746 Cabrillo St | revise pa 201801188877. add 1 bathroom, change t24 to radiant heat, infill under rear popout for utility room.Details
revise pa 201801188877. add 1 bathroom, change t24 to radiant heat, infill under rear popout for utility room. | $10,000 |
| Mar 19, 2019 | Completed final sign-off Jan 2020 | 60 Yerba Buena Av | infill side porch on ground fl, add/relocate windows (not visible from street)Details
infill side porch on ground fl, add/relocate windows (not visible from street) | $25,000 |
| Feb 21, 2019 | Completed final sign-off Jan 2020 | 60 Yerba Buena Av | interior kitchen & master bathroom remodel. no change to exterior.Details
interior kitchen & master bathroom remodel. no change to exterior. | $50,000 |
| Jan 4, 2019 | Completed final sign-off Apr 2019 | 2339 29th Av | dry rot repair: rebuild existing wood deck & rear staircase in-kind. repair existing rear siding. replace rear door on basement level.Details
dry rot repair: rebuild existing wood deck & rear staircase in-kind. repair existing rear siding. replace rear door on basement level. | $20,000 |
| Oct 24, 2018 | Completed final sign-off Apr 2019 | 2339 29th Av | interior remodel on ground flr only. expand (e) bedroom into (e) game room. remove and add window in lightwell, not visible from streetDetails
interior remodel on ground flr only. expand (e) bedroom into (e) game room. remove and add window in lightwell, not visible from street | $50,000 |
| Jun 4, 2018 | Completed final sign-off Sep 2019 | 220 Taraval St | rebuild existing front stairDetails
rebuild existing front stair | $20,000 |
| Apr 9, 2018 | Completed final sign-off May 2018 | 3491 Pacific Av | at non-visible side, replace (e) stucco w/(n) cement fiber siding. approx 1,000 sq ft. no other work.Details
at non-visible side, replace (e) stucco w/(n) cement fiber siding. approx 1,000 sq ft. no other work. | $10,000 |
| Mar 27, 2018 | Completed final sign-off Aug 2018 | 85 El Verano Wy | remodel ground flr: convert laundry rm to bathroom, garage & utility room. no change to ecterior or structural. remove office behind garage. extend garage space w/sink, counter & outlets. move existing laundry to utility room.Details
remodel ground flr: convert laundry rm to bathroom, garage & utility room. no change to ecterior or structural. remove office behind garage. extend garage space w/sink, counter & outlets. move existing laundry to utility room. | $8,000 |
| Mar 20, 2018 | Completed final sign-off Mar 2024 | 1534 17th Av | vertical & horizontal addition. add 3rd fl, extend 1st & 2nd fl @ rear. excavate ground fl for ceiling height. remodel front facade & entry. add (2) bathrooms & (3) bedrooms.Details
vertical & horizontal addition. add 3rd fl, extend 1st & 2nd fl @ rear. excavate ground fl for ceiling height. remodel front facade & entry. add (2) bathrooms & (3) bedrooms. | $400,000 |
| Mar 13, 2018 | Completed final sign-off Dec 2018 | 220 Taraval St | new exterior stair canopy above 3rd floorDetails
new exterior stair canopy above 3rd floor | $5,000 |
| Feb 6, 2018 | Completed final sign-off Jan 2019 | 1666 45th Av | revision to pa 2018/-0112-/8508 - remodel sfd, fill in below existing rear 2nd story pop out. add rear deck in buildable area. add 2 bedrooms, bathroom, add bar on 1st floor. new bathroom on 2nd floor. replace windows in kindDetails
revision to pa 2018/-0112-/8508 - remodel sfd, fill in below existing rear 2nd story pop out. add rear deck in buildable area. add 2 bedrooms, bathroom, add bar on 1st floor. new bathroom on 2nd floor. replace windows in kind | $100,000 |
| Jan 18, 2018 | Completed final sign-off Aug 2019 | 746 Cabrillo St | extend unit 746 to gr fl. reconstruct rear stairs. remodel kitchen, add 1 bath. replace side and rear windows with alum frame. no change to front facade. revision to permit 2017-1017-1407.Details
extend unit 746 to gr fl. reconstruct rear stairs. remodel kitchen, add 1 bath. replace side and rear windows with alum frame. no change to front facade. revision to permit 2017-1017-1407. | $80,000 |
| Jan 12, 2018 | Completed final sign-off Jan 2019 | 1666 45th Av | remodel interior of (e) single family dwelling., 2nd flr- remodel bathroom add beam in ceiling. 1st flr - reinforce garage beam, replace foundation, remove interior finishes for exploratory demo. no change to floor plan or exterior.Details
remodel interior of (e) single family dwelling., 2nd flr- remodel bathroom add beam in ceiling. 1st flr - reinforce garage beam, replace foundation, remove interior finishes for exploratory demo. no change to floor plan or exterior. | $20,000 |
| Nov 14, 2017 | Completed final sign-off Aug 2018 | 85 El Verano Wy | provide reinforcing concrete hand dug piers and lintel beams for existing foundation stabilization. no change to exterior or life safety systems.Details
provide reinforcing concrete hand dug piers and lintel beams for existing foundation stabilization. no change to exterior or life safety systems. | $100,000 |
| Oct 17, 2017 | Completed final sign-off Aug 2019 | 746 Cabrillo St | replace existiong brick foundation with concrete. reinforce existing garage beam. no change to exterior or living spaceDetails
replace existiong brick foundation with concrete. reinforce existing garage beam. no change to exterior or living space | $25,000 |
| Jul 27, 2017 | Completed final sign-off Jan 2018 | 220 Taraval St | unit #4 remodel & alteration at 3rd floor. renovate one kitchen & one bathroom. relocate entry door & window. no structural work.Details
unit #4 remodel & alteration at 3rd floor. renovate one kitchen & one bathroom. relocate entry door & window. no structural work. | $20,000 |
| Jul 24, 2017 | Completed final sign-off Jan 2022 | 1544 Powell St | soft story retrofit per sfebc chapter 4d per engineering creteria 2016 cebc appendix a-4.Details
soft story retrofit per sfebc chapter 4d per engineering creteria 2016 cebc appendix a-4. | $18,000 |
| Jun 12, 2017 | Completed final sign-off Sep 2017 | 108 Fillmore St | inkind replacement of approx. 200 sf of stucco on the front facadeDetails
inkind replacement of approx. 200 sf of stucco on the front facade | $10,000 |
| Apr 14, 2017 | Completed final sign-off Jul 2017 | 2121 Webster St | unit #508: entrance den remodel - remove (e) non struct wall and pocket door for open dining rm. mstr closet - remove (e) his/her closet dividing non struct wall create 1 closet. reinstall (e) pocket door to closet.inst new temp glass shower screen over (e) guest bathtub. no structural workDetails
unit #508: entrance den remodel - remove (e) non struct wall and pocket door for open dining rm. mstr closet - remove (e) his/her closet dividing non struct wall create 1 closet. reinstall (e) pocket door to closet.inst new temp glass shower screen over (e) guest bathtub. no structural work | $10,000 |
| Dec 6, 2016 | Completed final sign-off Jul 2017 | 220 Taraval St | interior remodel of unit #3 on the 3rd floor. add one bedroom and one bathroom. no change to exterior.Details
interior remodel of unit #3 on the 3rd floor. add one bedroom and one bathroom. no change to exterior. | $10,000 |
| Oct 18, 2016 | Completed final sign-off Mar 2017 | 1540 17th Av | replace sheetrock on property line walls.Details
replace sheetrock on property line walls. | $1,000 |
| Sep 6, 2016 | Completed final sign-off Jan 2019 | 1540 17th Av | remove sections of interior plaster & foundation for structural analysis. work not affecting fire rating or life safety systems in vacant building. no work on p/l walls. no work on exterior.Details
remove sections of interior plaster & foundation for structural analysis. work not affecting fire rating or life safety systems in vacant building. no work on p/l walls. no work on exterior. | $1,000 |
| Aug 24, 2016 | Completed final sign-off Sep 2016 | 1035 Market St | revision to 201605197938 to show existing restrooms maher not reqDetails
revision to 201605197938 to show existing restrooms maher not req | |
| Jun 29, 2016 | Completed final sign-off Oct 2016 | 2130 32nd Av | remodel (e) living, dining, kitchen & full bath. convert closet to create new powder room. work on 2nd floor only.Details
remodel (e) living, dining, kitchen & full bath. convert closet to create new powder room. work on 2nd floor only. | $40,000 |
| May 19, 2016 | Completed final sign-off Sep 2016 | 1035 Market St | construction of one fire rated non-structural demising wall on the ground floor only. demolition of interior storefront wall on ground floor. construction of interior storefront wall and door on ground floor. n/a for maher. mep, life safety deferred.Details
construction of one fire rated non-structural demising wall on the ground floor only. demolition of interior storefront wall on ground floor. construction of interior storefront wall and door on ground floor. n/a for maher. mep, life safety deferred. | $10,000 |
| Feb 24, 2016 | Expired or cancelled withdrawn Feb 2017 | 1035 Market St | add (n) conference room in existing hallway, partition (e) conference room to use as office space; maher n/aDetails
add (n) conference room in existing hallway, partition (e) conference room to use as office space; maher n/a | $5,000 |
| Dec 4, 2015 | Completed final sign-off Mar 2021 | 325 29th Av | to erect 4 stories, no basement, 2 units residential & garage building.Details
to erect 4 stories, no basement, 2 units residential & garage building. | $500,000 |
| Dec 4, 2015 | Completed final sign-off Sep 2016 | 311 California St | commercial ti 2nd fl. new partitions, doors, frames, ceiling, lighting, finishes, casework, electrical, mech. gr fl lobby work includes new reception desk and casework. life safety deferred. n/a maher ord. # 155-13Details
commercial ti 2nd fl. new partitions, doors, frames, ceiling, lighting, finishes, casework, electrical, mech. gr fl lobby work includes new reception desk and casework. life safety deferred. n/a maher ord. # 155-13 | $770,000 |
| Nov 3, 2015 | Completed final sign-off Jan 2019 | 1540 17th Av | horizontal & vertical to rear of single family dwelling at grount & 2nd fl, add new 3rd fl. excavate ground fl rear for 9' ceiling height. remodel front facade & entry, replace (e) windows, add 2 bedrms and 3 bathrms.Details
horizontal & vertical to rear of single family dwelling at grount & 2nd fl, add new 3rd fl. excavate ground fl rear for 9' ceiling height. remodel front facade & entry, replace (e) windows, add 2 bedrms and 3 bathrms. | $400,000 |
| May 19, 2015 | Completed final sign-off Aug 2015 | 675 28th St | existing kitchen & 2 bath rooms, refinish, no structural work, exterior & interior painting work, no alteration of wall, window and door.Details
existing kitchen & 2 bath rooms, refinish, no structural work, exterior & interior painting work, no alteration of wall, window and door. | $20,000 |
| Apr 1, 2015 | Completed final sign-off Sep 2016 | 311 California St | selective demo of non load bearing partition, (e) ceiling tile and grid, light fictures and finishes. maher - not req'dDetails
selective demo of non load bearing partition, (e) ceiling tile and grid, light fictures and finishes. maher - not req'd | $40,000 |
| Jan 29, 2015 | Completed final sign-off Aug 2015 | 1275 21st Av | remodel existing one full bathroom on 3rd floor per plan.Details
remodel existing one full bathroom on 3rd floor per plan. | $8,000 |
| Dec 22, 2014 | Completed final sign-off Mar 2016 | 1035 Market St | build out of tenant space in existing suite on gr fl. rough in kitchenette, walls, for office, hvac, elec, lighting, finishes, plumbing for futre use as a post secondarey educational institutionDetails
build out of tenant space in existing suite on gr fl. rough in kitchenette, walls, for office, hvac, elec, lighting, finishes, plumbing for futre use as a post secondarey educational institution | $45,000 |
| Oct 15, 2014 | Completed final sign-off Jan 2015 | 3176 Washington St | interior remodel - add 2nd floor bathroom & relocate closets, no changes to structural system or egress.Details
interior remodel - add 2nd floor bathroom & relocate closets, no changes to structural system or egress. | $10,000 |
| Aug 25, 2014 | Completed final sign-off Jan 2015 | 1277 21st Av | remodel existing kitchen & one bathroom on 2nd floor per plan.Details
remodel existing kitchen & one bathroom on 2nd floor per plan. | $20,000 |
| Jun 23, 2014 | Completed final sign-off Oct 2014 | 110 Ralston St | overlay hardie plank siding over (e) plywood siding on the rear face of the bldg. & new painting for front & back of the building. not visible from street.Details
overlay hardie plank siding over (e) plywood siding on the rear face of the bldg. & new painting for front & back of the building. not visible from street. | $5,000 |
| Dec 9, 2013 | Completed final sign-off May 2014 | 1239 Noriega St | change of use to financial, provide vestibule for atm, construct new accessible restroom, no changes to structural.Details
change of use to financial, provide vestibule for atm, construct new accessible restroom, no changes to structural. | $45,000 |
| Dec 9, 2013 | Completed final sign-off May 2014 | 1237 Noriega St | divide existing commercial space (1237 & 1239) into 2 spaces, raise floor height in front to match sidewalk landing, construct new accessible restroom, no changes to structural.Details
divide existing commercial space (1237 & 1239) into 2 spaces, raise floor height in front to match sidewalk landing, construct new accessible restroom, no changes to structural. | $45,000 |
| Sep 16, 2013 | Completed final sign-off Jan 2014 | 1035 Market St | construction of tenant offices in e tenant suite on basement and gr level. construction of walls, ceilings, finishes. warming kitchen gr fl, plumbing, mech related to hvac. lighting, electrical, data outlets. reconfigure stair connecting basement and gr flDetails
construction of tenant offices in e tenant suite on basement and gr level. construction of walls, ceilings, finishes. warming kitchen gr fl, plumbing, mech related to hvac. lighting, electrical, data outlets. reconfigure stair connecting basement and gr fl | $500,000 |
| May 6, 2013 | Completed final sign-off Jun 2013 | 1035 Market St | modification of (e) fire sprinkler system for partial basement & ground floor areas. no underground work. ti w/ 24 sprinklers for coverage of communicating stair.Details
modification of (e) fire sprinkler system for partial basement & ground floor areas. no underground work. ti w/ 24 sprinklers for coverage of communicating stair. | $3,000 |
| Mar 5, 2013 | Completed final sign-off Jan 2014 | 1035 Market St | removal of portion of grnd flr for stair frm ground to basement, installation of new elevator in (e) shaft, new compliant egress route to stevenson st, new air intake for smoke control system, new storefront, doors & walls for grnd flr/basement steDetails
removal of portion of grnd flr for stair frm ground to basement, installation of new elevator in (e) shaft, new compliant egress route to stevenson st, new air intake for smoke control system, new storefront, doors & walls for grnd flr/basement ste | $95,000 |
| Feb 21, 2013 | Completed final sign-off Mar 2013 | 3030 California St | to obtain final inspection for work approved under pa#2010-03-01-7323. all work is complete.Details
to obtain final inspection for work approved under pa#2010-03-01-7323. all work is complete. | |
| Jan 7, 2013 | Completed final sign-off Apr 2013 | 115 West Portal Av | commercial tenant improvement for bank office new limited financial use. new storefront door for accessible entry. no changes to structural or egress systemsDetails
commercial tenant improvement for bank office new limited financial use. new storefront door for accessible entry. no changes to structural or egress systems | $13,000 |
| Nov 9, 2012 | Completed final sign-off Dec 2012 | 2707 Larkin St | revise previous approved building permit applications: #2011-0927-5612, #2012-0530-1446, and #2012-0620-2990. revise approved side planter/parapet to 42" height/ no structural, plumbing, or electrical work to be done.Details
revise previous approved building permit applications: #2011-0927-5612, #2012-0530-1446, and #2012-0620-2990. revise approved side planter/parapet to 42" height/ no structural, plumbing, or electrical work to be done. | |
| Nov 9, 2012 | Completed final sign-off Mar 2013 | 945 Green St | interior remodel of residential apartment. no work on common walls or exterior envelope. no structural work. egress route to remain during construction.Details
interior remodel of residential apartment. no work on common walls or exterior envelope. no structural work. egress route to remain during construction. | $85,000 |
| Aug 17, 2012 | Completed final sign-off Jun 2013 | 2617 Pacific Av | merge two (e) units (in a 5-unit bldg) into one. convert (e) kitchen to laundry, (e) living /dining to master bedroom, and (e) bedroom #2 to office.Details
merge two (e) units (in a 5-unit bldg) into one. convert (e) kitchen to laundry, (e) living /dining to master bedroom, and (e) bedroom #2 to office. | $500 |
| Jun 20, 2012 | Completed final sign-off Feb 2013 | 2707 Larkin St | new safety parapet at front of extg unoccupied roof. set back 15'0" from front wall. rebuild rear parapet to 42" ht.Details
new safety parapet at front of extg unoccupied roof. set back 15'0" from front wall. rebuild rear parapet to 42" ht. | $2,000 |
| May 30, 2012 | Completed final sign-off Dec 2012 | 2707 Larkin St | add 42" safety parapet to roof at side walls, set back 15' from front walls.Details
add 42" safety parapet to roof at side walls, set back 15' from front walls. | $5,000 |
| Dec 28, 2011 | Completed final sign-off Feb 2013 | 1170 Sacramento St | unit #11d-interior remodel of residential condo, no work on common walls or exterior envelope. egress route to remain throughout construction. combine master bathrooms, rebuild kitchen & bathroom fixturesDetails
unit #11d-interior remodel of residential condo, no work on common walls or exterior envelope. egress route to remain throughout construction. combine master bathrooms, rebuild kitchen & bathroom fixtures | $80,000 |
| Nov 4, 2011 | Completed final sign-off Jan 2012 | 3491 Pacific Av | enlarge rear window in bedroom 3 on 3rd fl. close 5 windows from interior side. add storage at front courtyard, garage,shed under rear deck. add awnings to deck and courtyard. misc interior remodel, no structural work.Details
enlarge rear window in bedroom 3 on 3rd fl. close 5 windows from interior side. add storage at front courtyard, garage,shed under rear deck. add awnings to deck and courtyard. misc interior remodel, no structural work. | $30,000 |
| Sep 27, 2011 | Completed final sign-off Dec 2012 | 2707 Larkin St | construct new planter and railing at rear of (e) roofDetails
construct new planter and railing at rear of (e) roof | $3,000 |
| Aug 31, 2011 | Completed final sign-off Feb 2013 | 1170 Sacramento St | 12 exploratory holes upto 24"x36" no change to windows, wall or doors.Details
12 exploratory holes upto 24"x36" no change to windows, wall or doors. | $500 |
| Mar 2, 2011 | Completed final sign-off Sep 2011 | 3491 Pacific Av | revision to app#201007015759.interior remodel,new 4th floor deck.Details
revision to app#201007015759.interior remodel,new 4th floor deck. | $10,000 |
| Oct 25, 2010 | Completed final sign-off Dec 2010 | 1035 Market St | install 24 each fire sprinkers around new stairs opening on 3rd and 2nd floors. remove 10 each extg heads. relocate 17 each heads.Details
install 24 each fire sprinkers around new stairs opening on 3rd and 2nd floors. remove 10 each extg heads. relocate 17 each heads. | $7,500 |
| Sep 7, 2010 | Completed final sign-off Dec 2010 | 1035 Market St | remove portion of floor at floors 3 and 4 as req for new opening and stair. install steel stairs, handrails, guardrails between floors 2 and 3, 3 and 4Details
remove portion of floor at floors 3 and 4 as req for new opening and stair. install steel stairs, handrails, guardrails between floors 2 and 3, 3 and 4 | $57,200 |
| Jul 23, 2010 | Completed final sign-off Sep 2010 | 1035 Market St | modify existing fire alarm system for 1st fl. removing existing hornstrobes in ti area of work and installing 18 horn strobes, 4 strobes, & 2 new batteries. 2 new fire/smoke dampers & 5 new duct detectors installed inder sep permit, connected to facp w/ this permit. changing sequence of operationDetails
modify existing fire alarm system for 1st fl. removing existing hornstrobes in ti area of work and installing 18 horn strobes, 4 strobes, & 2 new batteries. 2 new fire/smoke dampers & 5 new duct detectors installed inder sep permit, connected to facp w/ this permit. changing sequence of operation | $8,000 |
| Jul 1, 2010 | Completed final sign-off Sep 2011 | 3491 Pacific Av | interior remodel of (e0 building. replace (e0 4 story elevator. remove accessory stair. relocate (e) furnace and water heater. replace exterior windows on rear and side. add 1 full bath room.Details
interior remodel of (e0 building. replace (e0 4 story elevator. remove accessory stair. relocate (e) furnace and water heater. replace exterior windows on rear and side. add 1 full bath room. | $350,000 |
| May 27, 2010 | Completed final sign-off Jul 2010 | 1035 Market St | 6th & 7th floors-modify (e) fire sprinkler system for office spaces. relocate 34 heads, remove 19 heads & add 16 heads to recessed pendant.Details
6th & 7th floors-modify (e) fire sprinkler system for office spaces. relocate 34 heads, remove 19 heads & add 16 heads to recessed pendant. | $4,200 |
| May 17, 2010 | Completed final sign-off Jul 2010 | 1035 Market St | modify (e) fire alarm system on floors 6th & 7th fl. install 13 new horn/strobes on 6th fl, & relocate 4 horn/strobes from 6th & 7th fl. ref. pa# 2003.06.10.6741 for fire alarmand sprinklers ( base bldg). changing sequence of operation matrix ref. pa# 2009-0318-4334.Details
modify (e) fire alarm system on floors 6th & 7th fl. install 13 new horn/strobes on 6th fl, & relocate 4 horn/strobes from 6th & 7th fl. ref. pa# 2003.06.10.6741 for fire alarmand sprinklers ( base bldg). changing sequence of operation matrix ref. pa# 2009-0318-4334. | $10,000 |
| Apr 7, 2010 | Completed final sign-off Jul 2010 | 1035 Market St | interior partition walls and finishesto 6th. & 7th. floor office. electrical, lighting and mechanical distribution system improvements.Details
interior partition walls and finishesto 6th. & 7th. floor office. electrical, lighting and mechanical distribution system improvements. | $450,000 |
| Jan 22, 2010 | Completed final sign-off Sep 2010 | 1035 Market St | construction of rated demising wall, construction of utility entrance with stairs on stevenson street & access entry on market street.Details
construction of rated demising wall, construction of utility entrance with stairs on stevenson street & access entry on market street. | $34,200 |
| Sep 3, 2009 | Never finaled issued Sep 2009, no final | 1035 Market St | revision to appl #200007286439/s5-r3: installation of diesel generator w/sub-base tank on roof. connect fuel piping to diesel generator system. extend tank vents, 4 install remote emergency engine stop. install tank leak detector.Details
revision to appl #200007286439/s5-r3: installation of diesel generator w/sub-base tank on roof. connect fuel piping to diesel generator system. extend tank vents, 4 install remote emergency engine stop. install tank leak detector. | $1,000 |
| Aug 10, 2009 | Never finaled issued Aug 2009, no final | 1035 Market St | to obtain final inspection for work approved under pa#200007286439. all work is complete.Details
to obtain final inspection for work approved under pa#200007286439. all work is complete. | |
| Aug 10, 2009 | Completed final sign-off Dec 2009 | 1035 Market St | to obtain final inspection for work approved under pa#200206149061. all work is complete.Details
to obtain final inspection for work approved under pa#200206149061. all work is complete. | |
| Aug 10, 2009 | Never finaled issued Aug 2009, no final | 1035 Market St | to obtain final inspection for work approved under pa#200007286439. all work is complete.Details
to obtain final inspection for work approved under pa#200007286439. all work is complete. | |
| Aug 10, 2009 | Completed final sign-off Dec 2009 | 1035 Market St | to obtain final inspection for work approved under pa#200306106741. all work is complete.Details
to obtain final inspection for work approved under pa#200306106741. all work is complete. | |
| Aug 10, 2009 | Completed final sign-off Dec 2009 | 1035 Market St | to obtain final inspection for work approved under pa#200801313685. all work is complete.Details
to obtain final inspection for work approved under pa#200801313685. all work is complete. | |
| Aug 5, 2009 | Completed final sign-off Dec 2009 | 1035 Market St | to obtain final inspection for work approved under pa#200601273238.Details
to obtain final inspection for work approved under pa#200601273238. | |
| Aug 4, 2009 | Completed final sign-off Nov 2009 | 1035 Market St | construction of walls for offices and conference rooms. installation of cabinets, sink, and dishwasher. revise lighting and mechanical.Details
construction of walls for offices and conference rooms. installation of cabinets, sink, and dishwasher. revise lighting and mechanical. | $75,000 |
| Jul 7, 2009 | Completed final sign-off Nov 2009 | 1035 Market St | revision to pa# 2009.03.18.4334. to change 5th floor architectural background & add 2 horn / strobes.Details
revision to pa# 2009.03.18.4334. to change 5th floor architectural background & add 2 horn / strobes. | $400 |
| May 26, 2009 | Completed final sign-off Dec 2009 | 1035 Market St | tenant improvement in 5th fl suites including new lighting, new hvac and related piping, ductwork, new electrical devices and outlets, new walls and doors for offices, conference rooms, new kitchens w/related piping and electricalDetails
tenant improvement in 5th fl suites including new lighting, new hvac and related piping, ductwork, new electrical devices and outlets, new walls and doors for offices, conference rooms, new kitchens w/related piping and electrical | $456,360 |
| May 19, 2009 | Completed final sign-off Aug 2009 | 311 California St | permit revision to pa#200904247031, demolition revealed a 7" heigh difference between the tenant suite and common area restrooms. in order to provide an accessible restroom to each level, we are raising the slab at one bathroom and making the both unisex. all plumbing & electrical devices along withDetails
permit revision to pa#200904247031, demolition revealed a 7" heigh difference between the tenant suite and common area restrooms. in order to provide an accessible restroom to each level, we are raising the slab at one bathroom and making the both unisex. all plumbing & electrical devices along with | $10,000 |
| Apr 24, 2009 | Completed final sign-off Aug 2009 | 311 California St | barrier removal. provide access to ada restroom from ground floor tenant suite. reconfigure bathroom affected by demolition to remain ada compliant. provide new toilet and sink and accessories.Details
barrier removal. provide access to ada restroom from ground floor tenant suite. reconfigure bathroom affected by demolition to remain ada compliant. provide new toilet and sink and accessories. | $20,000 |
| Oct 15, 2008 | Completed final sign-off Dec 2010 | 2623 Pacific Av | architectural revision to app # 200609273552 s1. remove skylights and relocate skylights not visible from the street, relocate gas meters & garage door and misc. interior revisions. see approved app #200809121457 for as built structural plans. no change to exterior.Details
architectural revision to app # 200609273552 s1. remove skylights and relocate skylights not visible from the street, relocate gas meters & garage door and misc. interior revisions. see approved app #200809121457 for as built structural plans. no change to exterior. | |
| Sep 12, 2008 | Expired or cancelled expired May 2011 | 2623 Pacific Av | as built structural revisions to application 200609273552 s-1, changes to interior structural framings & details at all floors per plan.Details
as built structural revisions to application 200609273552 s-1, changes to interior structural framings & details at all floors per plan. | $3,000 |
| Aug 14, 2008 | Completed final sign-off Apr 2009 | 3450 Clay St | kitchen cabinet replace 3 windows and 4 doors. not visable from the street. windows/doors dryrotted repair. no structure work. no alteration. doors & windows replaced in kind.Details
kitchen cabinet replace 3 windows and 4 doors. not visable from the street. windows/doors dryrotted repair. no structure work. no alteration. doors & windows replaced in kind. | $25,000 |
| Apr 3, 2008 | Completed final sign-off Jun 2008 | 2240 Hyde St | work @ unit# 5 only. existing 2 bathrooms fixtures & tiles replaced. no structural (e) light fixtures to remain.Details
work @ unit# 5 only. existing 2 bathrooms fixtures & tiles replaced. no structural (e) light fixtures to remain. | $12,000 |
| Feb 25, 2008 | Completed final sign-off Feb 2013 | 120 Cherry St | one full story vertical addition. interior renovation of (e) 2nd floor for fill in (e) light well and side extension of (e) kitchen to side. new roof deck.Details
one full story vertical addition. interior renovation of (e) 2nd floor for fill in (e) light well and side extension of (e) kitchen to side. new roof deck. | $350,000 |