Back to kitchen remodel contractors
C & L Builders Inc.
- Based in
- San Francisco
- On San Francisco permits
- Feb 2008 to Sep 2026
- Last 24 months
- 4 permits filed
95 permits since 2000: 86 completed, 4 in progress, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
15 kitchen remodel permits: 15 completed. Typically 11 days from filing to permit and 253 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 21, 2022 | Completed final sign-off Mar 2025 | 217 16th Av | interior remodel to (e) 2 unit dwelling per plans. unit 217: remove 2nd floor powder and laundry. unit 219: remove 2 bath tubs, no change to exterior. no added conditioned space. remodel in both units includes kitchens and baths and minor wall reconfigurations per plansDetails
interior remodel to (e) 2 unit dwelling per plans. unit 217: remove 2nd floor powder and laundry. unit 219: remove 2 bath tubs, no change to exterior. no added conditioned space. remodel in both units includes kitchens and baths and minor wall reconfigurations per plans | $80,000 |
| Sep 5, 2020 | Completed final sign-off Feb 2022 | 1610 41st Av | new rear deck on 2nd floor. add new master bathroom, one powder room, relocate (e) kitchen on 2nd floor. add (n) mechanical room & laundry on 1st floor.Details
new rear deck on 2nd floor. add new master bathroom, one powder room, relocate (e) kitchen on 2nd floor. add (n) mechanical room & laundry on 1st floor. | $70,000 |
| Feb 21, 2019 | Completed final sign-off Jan 2020 | 60 Yerba Buena Av | interior kitchen & master bathroom remodel. no change to exterior.Details
interior kitchen & master bathroom remodel. no change to exterior. | $50,000 |
| Jan 18, 2018 | Completed final sign-off Aug 2019 | 746 Cabrillo St | extend unit 746 to gr fl. reconstruct rear stairs. remodel kitchen, add 1 bath. replace side and rear windows with alum frame. no change to front facade. revision to permit 2017-1017-1407.Details
extend unit 746 to gr fl. reconstruct rear stairs. remodel kitchen, add 1 bath. replace side and rear windows with alum frame. no change to front facade. revision to permit 2017-1017-1407. | $80,000 |
| Jul 27, 2017 | Completed final sign-off Jan 2018 | 220 Taraval St | unit #4 remodel & alteration at 3rd floor. renovate one kitchen & one bathroom. relocate entry door & window. no structural work.Details
unit #4 remodel & alteration at 3rd floor. renovate one kitchen & one bathroom. relocate entry door & window. no structural work. | $20,000 |
| Jun 29, 2016 | Completed final sign-off Oct 2016 | 2130 32nd Av | remodel (e) living, dining, kitchen & full bath. convert closet to create new powder room. work on 2nd floor only.Details
remodel (e) living, dining, kitchen & full bath. convert closet to create new powder room. work on 2nd floor only. | $40,000 |
| May 19, 2015 | Completed final sign-off Aug 2015 | 675 28th St | existing kitchen & 2 bath rooms, refinish, no structural work, exterior & interior painting work, no alteration of wall, window and door.Details
existing kitchen & 2 bath rooms, refinish, no structural work, exterior & interior painting work, no alteration of wall, window and door. | $20,000 |
| Dec 22, 2014 | Completed final sign-off Mar 2016 | 1035 Market St | build out of tenant space in existing suite on gr fl. rough in kitchenette, walls, for office, hvac, elec, lighting, finishes, plumbing for futre use as a post secondarey educational institutionDetails
build out of tenant space in existing suite on gr fl. rough in kitchenette, walls, for office, hvac, elec, lighting, finishes, plumbing for futre use as a post secondarey educational institution | $45,000 |
| Aug 25, 2014 | Completed final sign-off Jan 2015 | 1277 21st Av | remodel existing kitchen & one bathroom on 2nd floor per plan.Details
remodel existing kitchen & one bathroom on 2nd floor per plan. | $20,000 |
| Sep 16, 2013 | Completed final sign-off Jan 2014 | 1035 Market St | construction of tenant offices in e tenant suite on basement and gr level. construction of walls, ceilings, finishes. warming kitchen gr fl, plumbing, mech related to hvac. lighting, electrical, data outlets. reconfigure stair connecting basement and gr flDetails
construction of tenant offices in e tenant suite on basement and gr level. construction of walls, ceilings, finishes. warming kitchen gr fl, plumbing, mech related to hvac. lighting, electrical, data outlets. reconfigure stair connecting basement and gr fl | $500,000 |
| Aug 17, 2012 | Completed final sign-off Jun 2013 | 2617 Pacific Av | merge two (e) units (in a 5-unit bldg) into one. convert (e) kitchen to laundry, (e) living /dining to master bedroom, and (e) bedroom #2 to office.Details
merge two (e) units (in a 5-unit bldg) into one. convert (e) kitchen to laundry, (e) living /dining to master bedroom, and (e) bedroom #2 to office. | $500 |
| Dec 28, 2011 | Completed final sign-off Feb 2013 | 1170 Sacramento St | unit #11d-interior remodel of residential condo, no work on common walls or exterior envelope. egress route to remain throughout construction. combine master bathrooms, rebuild kitchen & bathroom fixturesDetails
unit #11d-interior remodel of residential condo, no work on common walls or exterior envelope. egress route to remain throughout construction. combine master bathrooms, rebuild kitchen & bathroom fixtures | $80,000 |
| May 26, 2009 | Completed final sign-off Dec 2009 | 1035 Market St | tenant improvement in 5th fl suites including new lighting, new hvac and related piping, ductwork, new electrical devices and outlets, new walls and doors for offices, conference rooms, new kitchens w/related piping and electricalDetails
tenant improvement in 5th fl suites including new lighting, new hvac and related piping, ductwork, new electrical devices and outlets, new walls and doors for offices, conference rooms, new kitchens w/related piping and electrical | $456,360 |
| Aug 14, 2008 | Completed final sign-off Apr 2009 | 3450 Clay St | kitchen cabinet replace 3 windows and 4 doors. not visable from the street. windows/doors dryrotted repair. no structure work. no alteration. doors & windows replaced in kind.Details
kitchen cabinet replace 3 windows and 4 doors. not visable from the street. windows/doors dryrotted repair. no structure work. no alteration. doors & windows replaced in kind. | $25,000 |
| Feb 25, 2008 | Completed final sign-off Feb 2013 | 120 Cherry St | one full story vertical addition. interior renovation of (e) 2nd floor for fill in (e) light well and side extension of (e) kitchen to side. new roof deck.Details
one full story vertical addition. interior renovation of (e) 2nd floor for fill in (e) light well and side extension of (e) kitchen to side. new roof deck. | $350,000 |