Permit GraphShortlistSan Francisco building permits since 2000

Rene Garcia Calara

License
C30788
Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
About the two boards
Look the license up with the state (Architects Board)
Look up C30788 at the Board for Professional Engineers
Listed as
architect, authorized agent-others, engineer
Firm
Huntsman Arch.Group
Based in
San Francisco
On San Francisco permits
Apr 2005 to Feb 2022

80 permits since 2000 (architect on 76 permits, authorized agent-others on 2 permits, engineer on 2 permits): 61 completed, 17 never finaled, 2 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Dpr Construction (38), Skyline Construction (6), Novo Construction Inc (5), Richlen Construction (4), Bcci Construction Company (3), Gci, Inc (3), San Francisco Commercial Builders Inc (3), Hathaway Dinwiddie Co. (2), Peacock Construction (2), Principal Builders Inc. (2), Associated Builders, C B 2 Builders Incorporated, M C S Construction Services, Miguel A Padilla Construction, Swinerton Builders, Tcg Builders Inc Dba The Core Group, Turner Construction Co, Zion Construction Company
Architects
Dan Huntsman (2), Douglas Zucker, John V. Mares
Engineers
Robert Nixdorf (14), Sebastian Fahim (14), Alexander F. Graebe, Elisabeth M Allen, Guil Orihuela, Jose Herrera, Joshua Mcmahan, Michael Shepherd, Michael Steinmann, Sargon Ishaya M.S., Stephen Shaffer

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Feb 24, 2022Completed
final sign-off Jun 2022
1 California StM C S Construction Servicestenant improvement 19th fl to include construction of non structural partiions to create private officess. elec under sep permit
Details
Permit
202202248620
Permit issued
Mar 16, 2022
Final sign-off
Jun 3, 2022

tenant improvement 19th fl to include construction of non structural partiions to create private officess. elec under sep permit

Open the permit page

$75,150
Jan 24, 2022Completed
final sign-off Aug 2022
111 Sutter StGci, Inc10/f: non structural demo a construction of non structural partitions, doors, sidelights, ceilings, power , finishes a millwork.
Details
Permit
202201246490
Permit issued
Mar 7, 2022
Final sign-off
Aug 11, 2022

10/f: non structural demo a construction of non structural partitions, doors, sidelights, ceilings, power , finishes a millwork.

Open the permit page

$591,132
Sep 14, 2021Never finaled
issued Sep 2021, no final
301 Howard Stroof level: evac sign submittal per request of fire nov 2108-0103.
Details
Permit
202109148346
Permit issued
Sep 30, 2021

roof level: evac sign submittal per request of fire nov 2108-0103.

Open the permit page

Mar 16, 2021Completed
final sign-off Feb 2022
121 Spear StBcci Construction Company2nd fl: selective demolition of non-structural partitions, ceilings, lights & finishes. construction of (n) partitions, ceilings, millwork, lights & finishes. no change in use or area. mep under separate deferred submittal/permit.
Details
Permit
202103166616
Permit issued
Jun 15, 2021
Final sign-off
Feb 4, 2022

2nd fl: selective demolition of non-structural partitions, ceilings, lights & finishes. construction of (n) partitions, ceilings, millwork, lights & finishes. no change in use or area. mep under separate deferred submittal/permit.

Open the permit page

$737,500
Dec 1, 2020Completed
final sign-off Aug 2021
301 Howard StNovo Construction Inc13/f: revision to pa #2020-0914-4100 to remove door at service elevator lobby #1341.
Details
Permit
202012019968
Permit issued
Feb 9, 2021
Final sign-off
Aug 5, 2021

13/f: revision to pa #2020-0914-4100 to remove door at service elevator lobby #1341.

Open the permit page

Nov 24, 2020Completed
final sign-off Jul 2021
301 Howard StSkyline Constructionsuite 1050: interior remodel of (e) 1-hr rated elevator lobby and corridor on the 10/f. including interior selective non-structural demolition, no change in occupancy, use or area.
Details
Permit
202011249562
Permit issued
Feb 22, 2021
Final sign-off
Jul 22, 2021

suite 1050: interior remodel of (e) 1-hr rated elevator lobby and corridor on the 10/f. including interior selective non-structural demolition, no change in occupancy, use or area.

Open the permit page

$562,653
Oct 6, 2020Completed
final sign-off Sep 2022
301 Howard StPeacock Construction16th flr. interior tenant improvement of a full floor occupied tenant suite incl selective interior non-structural demo of partitions, ceiling, lights, finishes, millwork. (n) hearing rms, lobby, interior offices, ceilings, lights, millwork, finishes. upgrades to single accommodation toilet room.
Details
Permit
202010066019
Permit issued
Mar 15, 2021
Final sign-off
Sep 23, 2022

16th flr. interior tenant improvement of a full floor occupied tenant suite incl selective interior non-structural demo of partitions, ceiling, lights, finishes, millwork. (n) hearing rms, lobby, interior offices, ceilings, lights, millwork, finishes. upgrades to single accommodation toilet room.

Open the permit page

$1,082,125
Sep 14, 2020Completed
final sign-off Sep 2021
301 Howard StNovo Construction Inc13th floor: ti of an existing multi-tenant floor. non-structural demolition, new non-structural partitions, lighting, millwork & finishes.toilet room upgrades. no change in occupancy.
Details
Permit
202009144100
Permit issued
Oct 20, 2020
Final sign-off
Sep 24, 2021

13th floor: ti of an existing multi-tenant floor. non-structural demolition, new non-structural partitions, lighting, millwork & finishes.toilet room upgrades. no change in occupancy.

Open the permit page

$1,061,958
Jul 23, 2020Expired or cancelled
cancelled Jan 2026
50 California St25th fl - to document accessible toilet in women's restroom to remain in existing location. all other conditions will be code compliant. addition of 25th fl technical infeasibility request (sheet 25rr-2) 25rr-1;modified demo and construction sheet notes, modified accessory & toilet locations,
Details
Permit
202007230740

25th fl - to document accessible toilet in women's restroom to remain in existing location. all other conditions will be code compliant. addition of 25th fl technical infeasibility request (sheet 25rr-2) 25rr-1;modified demo and construction sheet notes, modified accessory & toilet locations,

Open the permit page

$32,365
Jul 14, 2020Never finaled
issued Aug 2020, no final
1655 03rd StDpr Constructionrev to pa#2018-1127-6767 mb3 north tower in response to sffd inspection comments. as-built oil piping & rated enclosure elements.
Details
Permit
202007140144
Permit issued
Aug 12, 2020

rev to pa#2018-1127-6767 mb3 north tower in response to sffd inspection comments. as-built oil piping & rated enclosure elements.

Open the permit page

Jun 12, 2020Never finaled
issued Jul 2020, no final
1725 03rd StDpr Constructionrev to pa#201907166064: evacuation plans for level 1 to level 11. maher n/a.
Details
Permit
202006128624
Permit issued
Jul 27, 2020

rev to pa#201907166064: evacuation plans for level 1 to level 11. maher n/a.

Open the permit page

Mar 10, 2020Completed
final sign-off Feb 2022
1655 03rd StDpr Construction3rd fl - mb3 l3 - revision to 2019-0716-6059 revised areas clouded w/delta's 15-27. scope of work limited to area of b&a occupancy spce on the south west side of the 3rd fl. no change in occupancy groups or use. da checklist updated to include added scope.
Details
Permit
202003106696
Permit issued
Jan 12, 2021
Final sign-off
Feb 17, 2022

3rd fl - mb3 l3 - revision to 2019-0716-6059 revised areas clouded w/delta's 15-27. scope of work limited to area of b&a occupancy spce on the south west side of the 3rd fl. no change in occupancy groups or use. da checklist updated to include added scope.

Open the permit page

$1,475,000
Jan 27, 2020Never finaled
issued Oct 2020, no final
300 16th StDpr Constructionmb3: admin pa to memorialize installation equipment per ab005 for framery phone boots as shown in ti permits for 2nd fl-11th. l2-201907166051, l3-201907166059, l4-201905221410, l5-201905221406, l6-201904026930, l7-201904026931, l8-201909232413, l9-201909232409, l10-201909232391 & l11-201909232408
Details
Permit
202001272827
Permit issued
Oct 30, 2020

mb3: admin pa to memorialize installation equipment per ab005 for framery phone boots as shown in ti permits for 2nd fl-11th. l2-201907166051, l3-201907166059, l4-201905221410, l5-201905221406, l6-201904026930, l7-201904026931, l8-201909232413, l9-201909232409, l10-201909232391 & l11-201909232408

Open the permit page

Jan 27, 2020Never finaled
issued Oct 2020, no final
300 16th StDpr Constructionmb4: admin pa to memorialize installation req per ab-005 for framery phone booths as shown in ti permits for levels 3-11. l3-2019-0716-6063, l4-2019-0522-1411, l5-2019-0522-1416, l6-2018-1001-1925 & rev 2019-0402-6929, l8- 2019-0923-2389, l9-2019-0923-2383, l10-2019-0923-2384;l11-2019-0923-2386
Details
Permit
202001272822
Permit issued
Oct 30, 2020

mb4: admin pa to memorialize installation req per ab-005 for framery phone booths as shown in ti permits for levels 3-11. l3-2019-0716-6063, l4-2019-0522-1411, l5-2019-0522-1416, l6-2018-1001-1925 & rev 2019-0402-6929, l8- 2019-0923-2389, l9-2019-0923-2383, l10-2019-0923-2384;l11-2019-0923-2386

Open the permit page

Oct 2, 2019Never finaled
issued Oct 2019, no final
75 Hawthorne StNovo Construction Inc6th flr - int ti construction of non structural partitions, doors, interior glazing, ceiling, light fixtures, millwork and finishes. no change in occp/use/area. plm/fire/life safety under sep permit
Details
Permit
201910023258
Permit issued
Oct 7, 2019

6th flr - int ti construction of non structural partitions, doors, interior glazing, ceiling, light fixtures, millwork and finishes. no change in occp/use/area. plm/fire/life safety under sep permit

Open the permit page

$694,903
Oct 2, 2019Never finaled
issued Oct 2019, no final
75 Hawthorne StNovo Construction Inc8th flr - int ti construction of non structural partitions, doors, interior glazing, ceiling, light fixtures, millwork and finishes. no change in occp/use/area. plm/fire/life safety under sep permit
Details
Permit
201910023263
Permit issued
Oct 7, 2019

8th flr - int ti construction of non structural partitions, doors, interior glazing, ceiling, light fixtures, millwork and finishes. no change in occp/use/area. plm/fire/life safety under sep permit

Open the permit page

$635,855
Sep 23, 2019Completed
final sign-off Sep 2020
300 16th StDpr Constructionmb4 level 8: t. i. work includes non structural partitions, doors, frames, millwork, finishes light fixtures ceiling and mep work. n/a for maher
Details
Permit
201909232389
Permit issued
Dec 20, 2019
Final sign-off
Sep 24, 2020

mb4 level 8: t. i. work includes non structural partitions, doors, frames, millwork, finishes light fixtures ceiling and mep work. n/a for maher

Open the permit page

$2,236,961
Sep 23, 2019Completed
final sign-off Sep 2020
300 16th StDpr Constructionmb3 level 8- non-structural partitions, doors, frames, millwork, finishes, light fixtures ceilings & mep work.
Details
Permit
201909232413
Permit issued
Dec 20, 2019
Final sign-off
Sep 18, 2020

mb3 level 8- non-structural partitions, doors, frames, millwork, finishes, light fixtures ceilings & mep work.

Open the permit page

$2,116,305
Sep 23, 2019Completed
final sign-off Sep 2020
300 16th Stmb3 level 9- non-structural partitions, doors, frames, millwork, finishes, light fixtures ceilings & mep work. core restrooms submitted under separate pa 2018-0802-6290
Details
Permit
201909232409
Permit issued
Dec 5, 2019
Final sign-off
Sep 18, 2020

mb3 level 9- non-structural partitions, doors, frames, millwork, finishes, light fixtures ceilings & mep work. core restrooms submitted under separate pa 2018-0802-6290

Open the permit page

$2,250,015
Sep 23, 2019Completed
final sign-off Sep 2020
300 16th StDpr Constructionmb4 l10: non structural partitions, doors, frames, millwork, finishes light fixtures ceiling and mep work. n/a for maher
Details
Permit
201909232384
Permit issued
Dec 20, 2019
Final sign-off
Sep 24, 2020

mb4 l10: non structural partitions, doors, frames, millwork, finishes light fixtures ceiling and mep work. n/a for maher

Open the permit page

$2,235,187
Sep 23, 2019Completed
final sign-off Sep 2020
300 16th StDpr Constructionmb3 level 10 - non-structural partitions, doors, frames, millwork, finishes, light fixtures ceilings & mep work
Details
Permit
201909232391
Permit issued
Dec 5, 2019
Final sign-off
Sep 18, 2020

mb3 level 10 - non-structural partitions, doors, frames, millwork, finishes, light fixtures ceilings & mep work

Open the permit page

$2,250,015
Sep 23, 2019Completed
final sign-off Sep 2020
300 16th StDpr Constructionmb4 level 9 - non-structural partitions, doors, frames, millwork, finishes, light fixtures ceilings & mep work
Details
Permit
201909232383
Permit issued
Dec 20, 2019
Final sign-off
Sep 24, 2020

mb4 level 9 - non-structural partitions, doors, frames, millwork, finishes, light fixtures ceilings & mep work

Open the permit page

$2,235,187
Sep 23, 2019Completed
final sign-off Sep 2020
300 16th StDpr Constructionmb3 level 11: non structural partitions, doors, frames, millwork, finishes, light fixtures ceilings and mep work. n/a for maher
Details
Permit
201909232408
Permit issued
Dec 5, 2019
Final sign-off
Sep 18, 2020

mb3 level 11: non structural partitions, doors, frames, millwork, finishes, light fixtures ceilings and mep work. n/a for maher

Open the permit page

$2,145,835
Sep 23, 2019Completed
final sign-off Sep 2020
300 16th StDpr Constructionmb4 level 11 - non-structural partitions, doors, frames, millwork, finishes, light fixtures ceilings & mep work
Details
Permit
201909232386
Permit issued
Dec 20, 2019
Final sign-off
Sep 24, 2020

mb4 level 11 - non-structural partitions, doors, frames, millwork, finishes, light fixtures ceilings & mep work

Open the permit page

$2,133,034
Aug 15, 2019Never finaled
issued Oct 2019, no final
300 16th StDpr Constructionmb3-l5: revision to bpa #2019052251406. revised areas clouded w/delta 17. revision to memorialize new smoke control system.
Details
Permit
201908158958
Permit issued
Oct 22, 2019

mb3-l5: revision to bpa #2019052251406. revised areas clouded w/delta 17. revision to memorialize new smoke control system.

Open the permit page

Aug 15, 2019Never finaled
issued Oct 2019, no final
300 16th StDpr Constructionrev to pa# 201905221411; revised areas clouded w/ delta 17. revision to memorialize new smoke control system
Details
Permit
201908158964
Permit issued
Oct 21, 2019

rev to pa# 201905221411; revised areas clouded w/ delta 17. revision to memorialize new smoke control system

Open the permit page

Aug 15, 2019Never finaled
issued Oct 2019, no final
300 16th StDpr Constructionmb4-l5: revision to bpa #201905221416. revised areas clouded w/delta 17. revision to memorialize new smoke control system.
Details
Permit
201908158956
Permit issued
Oct 21, 2019

mb4-l5: revision to bpa #201905221416. revised areas clouded w/delta 17. revision to memorialize new smoke control system.

Open the permit page

Aug 15, 2019Never finaled
issued Oct 2019, no final
300 16th StDpr Constructionrev to pa# 201810011925 & 201904026929; revised areas clouded w/ delta 17. revision to memorialize new smoke conrol system (provided in base bldg per mit rev 2019061333375 original pa# 201606149954527 and corresponding smoke conrol nairative update
Details
Permit
201908158961
Permit issued
Oct 21, 2019

rev to pa# 201810011925 & 201904026929; revised areas clouded w/ delta 17. revision to memorialize new smoke conrol system (provided in base bldg per mit rev 2019061333375 original pa# 201606149954527 and corresponding smoke conrol nairative update

Open the permit page

Jul 16, 2019Completed
final sign-off Sep 2020
300 16th StDpr Constructionmb3 north, 1st time ti level 3, work includes new partitons, finishes, mep
Details
Permit
201907166059
Permit issued
Dec 5, 2019
Final sign-off
Sep 18, 2020

mb3 north, 1st time ti level 3, work includes new partitons, finishes, mep

Open the permit page

$3,178,766
Jul 3, 2019Completed
final sign-off Feb 2020
50 California StSwinerton Builderssuite 2500: interior t.i. demo & new interior non-load bearing partitions including meps, add l/v telecomm equipment installation. fire alarm/fire sprinkler under sep permit. maher n/a.
Details
Permit
201907035113
Permit issued
Aug 15, 2019
Final sign-off
Feb 28, 2020

suite 2500: interior t.i. demo & new interior non-load bearing partitions including meps, add l/v telecomm equipment installation. fire alarm/fire sprinkler under sep permit. maher n/a.

Open the permit page

$500,000
Jun 3, 2019Completed
final sign-off Sep 2019
50 California StGci, Inc13th fl - ti of (e) office - replace all interior finishes & furniture, ceiling & tiles, electrical
Details
Permit
201906032238
Permit issued
Jun 14, 2019
Final sign-off
Sep 3, 2019

13th fl - ti of (e) office - replace all interior finishes & furniture, ceiling & tiles, electrical

Open the permit page

$267,000
May 22, 2019Completed
final sign-off Sep 2020
300 16th StDpr Constructionmb4 - level 5 - 1st time ti, interior only, work to include non-structural partitions, doors, frames, millwork, finishes, light fixtures, ceiling and mep work. maher na
Details
Permit
201905221416
Permit issued
Oct 21, 2019
Final sign-off
Sep 24, 2020

mb4 - level 5 - 1st time ti, interior only, work to include non-structural partitions, doors, frames, millwork, finishes, light fixtures, ceiling and mep work. maher na

Open the permit page

$4,055,807
May 22, 2019Completed
final sign-off Sep 2020
300 16th StDpr Constructionmb3 - level 5 - 1st time ti, interior only, work to include non-structural partitions, doors, frames, millwork, finishes, light fixtures, ceiling and mep work. maher na
Details
Permit
201905221406
Permit issued
Oct 22, 2019
Final sign-off
Sep 18, 2020

mb3 - level 5 - 1st time ti, interior only, work to include non-structural partitions, doors, frames, millwork, finishes, light fixtures, ceiling and mep work. maher na

Open the permit page

$4,807,428
May 22, 2019Completed
final sign-off Sep 2020
300 16th StDpr Constructioninstallation of new rooftop equipment on roof. work includes house keeping pads, waterproofing at roof patch.
Details
Permit
201905221413
Permit issued
Dec 5, 2019
Final sign-off
Sep 18, 2020

installation of new rooftop equipment on roof. work includes house keeping pads, waterproofing at roof patch.

Open the permit page

$16,000
May 22, 2019Completed
final sign-off Sep 2020
300 16th StDpr Constructionmb4 - level 4 - 1st time ti, interior only, work to include non-structural partitions, doors, frames, millwork, finishes, light fixtures, ceiling and mep work. maher na
Details
Permit
201905221411
Permit issued
Oct 21, 2019
Final sign-off
Sep 24, 2020

mb4 - level 4 - 1st time ti, interior only, work to include non-structural partitions, doors, frames, millwork, finishes, light fixtures, ceiling and mep work. maher na

Open the permit page

$3,979,382
May 22, 2019Completed
final sign-off Nov 2020
300 16th StDpr Constructionmb3 - level 4 - 1st time ti, interior only, work to include non-structural partitions, doors, frames, millwork, finishes, light fixtures, ceiling and mep work.
Details
Permit
201905221410
Permit issued
Oct 22, 2019
Final sign-off
Nov 4, 2020

mb3 - level 4 - 1st time ti, interior only, work to include non-structural partitions, doors, frames, millwork, finishes, light fixtures, ceiling and mep work.

Open the permit page

$4,868,336
May 14, 2019Completed
final sign-off Sep 2019
4408 17th StMiguel A Padilla Constructionnew wood pergola @ rear yard
Details
Permit
201905140571
Permit issued
Jul 12, 2019
Final sign-off
Sep 11, 2019

new wood pergola @ rear yard

Open the permit page

$1,200
May 3, 2019Completed
final sign-off Sep 2020
75 Hawthorne StTcg Builders Inc Dba The Core Group4th fl - mep for interior ti on (e) unoccupied space, reflected in pa 2019-0412-7813. maher n/a.
Details
Permit
201905039653
Permit issued
May 6, 2019
Final sign-off
Sep 22, 2020

4th fl - mep for interior ti on (e) unoccupied space, reflected in pa 2019-0412-7813. maher n/a.

Open the permit page

Apr 2, 2019Completed
final sign-off Sep 2020
300 16th StDpr Constructionmb3 north level 6 ti - non structural partitions, doors & frames, millwork and finishes
Details
Permit
201904026930
Permit issued
Jun 28, 2019
Final sign-off
Sep 18, 2020

mb3 north level 6 ti - non structural partitions, doors & frames, millwork and finishes

Open the permit page

$5,727,579
Apr 2, 2019Completed
final sign-off Sep 2020
300 16th StDpr Constructionrevision to 201810011925 work includes revisions to partitions, layout and finishes mb4 south
Details
Permit
201904026929
Permit issued
Jun 28, 2019
Final sign-off
Sep 24, 2020

revision to 201810011925 work includes revisions to partitions, layout and finishes mb4 south

Open the permit page

Feb 1, 2019Completed
final sign-off May 2019
555 California StBcci Construction Company33rd fl, ste 3360 - selective demo of (e) non-structural partitions & doors. construction of new non-structural walls, glazing doors, millwork & finishes. n/a for maher.
Details
Permit
201902011880
Permit issued
Feb 4, 2019
Final sign-off
May 10, 2019

33rd fl, ste 3360 - selective demo of (e) non-structural partitions & doors. construction of new non-structural walls, glazing doors, millwork & finishes. n/a for maher.

Open the permit page

$145,644
Jan 16, 2019Completed
final sign-off Jul 2020
300 16th StDpr Constructioninstallation of (n) grease exhaust fan on level 12 (roof) for kitchen exhaust on levels 6 & 7 (app #2018-1001-1925). work includes house keeping pads, waterproofing at roof patch.**maher n/a**
Details
Permit
201901160518
Permit issued
May 13, 2019
Final sign-off
Jul 16, 2020

installation of (n) grease exhaust fan on level 12 (roof) for kitchen exhaust on levels 6 & 7 (app #2018-1001-1925). work includes house keeping pads, waterproofing at roof patch.**maher n/a**

Open the permit page

$50,000
Nov 27, 2018Completed
final sign-off Jul 2020
300 16th StDpr Constructionsouth tower-mb4. provide new grease separator.** maher: n/a **
Details
Permit
201811276766
Permit issued
May 13, 2019
Final sign-off
Jul 13, 2020

south tower-mb4. provide new grease separator.** maher: n/a **

Open the permit page

$75,000
Nov 27, 2018Never finaled
issued Aug 2019, no final
300 16th StDpr Constructionnorth tower-mb3. installation of new generator on roof, level 12, for the purpose of providing emergency power to non-life-safety devices. work includes house keeping pad, exterior wall waterproofing @ penetration. ** maher: n/a **
Details
Permit
201811276767
Permit issued
Aug 5, 2019

north tower-mb3. installation of new generator on roof, level 12, for the purpose of providing emergency power to non-life-safety devices. work includes house keeping pad, exterior wall waterproofing @ penetration. ** maher: n/a **

Open the permit page

$125,000
Nov 27, 2018Never finaled
issued Aug 2019, no final
300 16th StDpr Constructionsouth tower-mb4. installation of new generator on roof, level 12, for the purpose of providing emergency power to non-life safety devices. work includes house keeping pad, exterior wall waterproofing @ penetration. ** maher: n/a **
Details
Permit
201811276770
Permit issued
Aug 5, 2019

south tower-mb4. installation of new generator on roof, level 12, for the purpose of providing emergency power to non-life safety devices. work includes house keeping pad, exterior wall waterproofing @ penetration. ** maher: n/a **

Open the permit page

$125,000
Oct 26, 2018Completed
final sign-off Jan 2019
1 California StGci, Inc28/f:interior non-structural demo of (e) unoccupied 28th flr including partitions, ceiling, lighting, finishes, doors, frames, hardware & millwork. desing build sprinkler scope required by removal of ceiling in on unoccupied tenant. ab-017 space will rem,ain unoccupied.
Details
Permit
201810264287
Permit issued
Nov 7, 2018
Final sign-off
Jan 17, 2019

28/f:interior non-structural demo of (e) unoccupied 28th flr including partitions, ceiling, lighting, finishes, doors, frames, hardware & millwork. desing build sprinkler scope required by removal of ceiling in on unoccupied tenant. ab-017 space will rem,ain unoccupied.

Open the permit page

$60,000
Nov 14, 2017Completed
final sign-off Apr 2018
220 Montgomery StSan Francisco Commercial Builders Inc4th floor #460 - non-structural demolition & construction of non-structural partitions, doors & glazing, lighting, electrical, ceiling & finishes. no increase in occupancy, use or area. design/build mech, elec, plbg, fire alarm & fire sprinkelrs under separate permit. n/a maher ordinance
Details
Permit
201711143911
Permit issued
Dec 5, 2017
Final sign-off
Apr 12, 2018

4th floor #460 - non-structural demolition & construction of non-structural partitions, doors & glazing, lighting, electrical, ceiling & finishes. no increase in occupancy, use or area. design/build mech, elec, plbg, fire alarm & fire sprinkelrs under separate permit. n/a maher ordinance

Open the permit page

$137,826
Oct 24, 2017Completed
final sign-off Jun 2018
75 Hawthorne StC B 2 Builders Incorporatedti on 5th fl suite (partial floor), includes demolition, construction of non-structural partitions, doors, interior glazing, ceiling lighting, millwork & finishes. no change in occupancy. mep under sep. permit.
Details
Permit
201710242128
Permit issued
Nov 8, 2017
Final sign-off
Jun 19, 2018

ti on 5th fl suite (partial floor), includes demolition, construction of non-structural partitions, doors, interior glazing, ceiling lighting, millwork & finishes. no change in occupancy. mep under sep. permit.

Open the permit page

$645,645
Sep 26, 2017Never finaled
issued Oct 2017, no final
1 Post StSkyline Construction36/f- commercial t.i. including but not limited to new interior non structural partitions, floor, wall, ceiling, finishes & restroom upgrades. new m.e.p. under seperate permit. no change to bldg. exterior or floor plate s.f. no (e) parking in bldg.
Details
Permit
201709269541
Permit issued
Oct 10, 2017

36/f- commercial t.i. including but not limited to new interior non structural partitions, floor, wall, ceiling, finishes & restroom upgrades. new m.e.p. under seperate permit. no change to bldg. exterior or floor plate s.f. no (e) parking in bldg.

Open the permit page

$758,989
Sep 25, 2017Never finaled
issued Oct 2017, no final
1 Post StSkyline Construction37th fl: commercial t.i. including but not limited to: new interior non-struct. partitions, floors, walls & ceiling, finishes, & restroom upgrades. new mep/engineered drawings under sep. permit. no changes to bldg exterior or floor plate sf. no (e) parking in bldg. life safety deferred.
Details
Permit
201709259419
Permit issued
Oct 10, 2017

37th fl: commercial t.i. including but not limited to: new interior non-struct. partitions, floors, walls & ceiling, finishes, & restroom upgrades. new mep/engineered drawings under sep. permit. no changes to bldg exterior or floor plate sf. no (e) parking in bldg. life safety deferred.

Open the permit page

$762,608
Jun 15, 2017Completed
final sign-off Dec 2017
220 Montgomery StSan Francisco Commercial Builders Inc4th flr- upgrades to (e) men's room; addition of women's restrm from (e) office suite 417. demo & construct non-structural prtitions, doors, ele, plbg, ceiling & finishes. no increase in area or change in occupancy. mep, sprinklers, l/s deferred
Details
Permit
201706159414
Permit issued
Jun 19, 2017
Final sign-off
Dec 8, 2017

4th flr- upgrades to (e) men's room; addition of women's restrm from (e) office suite 417. demo & construct non-structural prtitions, doors, ele, plbg, ceiling & finishes. no increase in area or change in occupancy. mep, sprinklers, l/s deferred

Open the permit page

$120,000
May 26, 2017Completed
final sign-off Oct 2017
360 03rd StPrincipal Builders Inc.3rd fl t.i. in existing tenant space to demo doors and partition and replace with new doors. upgrade mep. life safety & sprinkler under seperate permit. maher na
Details
Permit
201705267757
Permit issued
May 30, 2017
Final sign-off
Oct 24, 2017

3rd fl t.i. in existing tenant space to demo doors and partition and replace with new doors. upgrade mep. life safety & sprinkler under seperate permit. maher na

Open the permit page

$68,000
Mar 21, 2017Completed
final sign-off Oct 2017
1 Market StDpr Constructionspear tower-37th floor - revision to pa 2016-0908-7059 and includes the conversion of a break area/hub to a crepe station/serving area. new non-structural partitions. equipment, millwork, lights and mep will be installed. no change in use or area
Details
Permit
201703212007
Permit issued
Apr 20, 2017
Final sign-off
Oct 20, 2017

spear tower-37th floor - revision to pa 2016-0908-7059 and includes the conversion of a break area/hub to a crepe station/serving area. new non-structural partitions. equipment, millwork, lights and mep will be installed. no change in use or area

Open the permit page

$60,000
Mar 17, 2017Completed
final sign-off Dec 2017
220 Montgomery StSan Francisco Commercial Builders Incground floor suite 132 - commercial t.i. including two accessible restrooms with showers & elec. room. (e) space is vancant & will remain vacant until future t.i. under separate permit. no increase in occupancy use or area. design/build mep, life safety, & fire sprinkelrs under separate permit.
Details
Permit
201703171671
Permit issued
Mar 20, 2017
Final sign-off
Dec 18, 2017

ground floor suite 132 - commercial t.i. including two accessible restrooms with showers & elec. room. (e) space is vancant & will remain vacant until future t.i. under separate permit. no increase in occupancy use or area. design/build mep, life safety, & fire sprinkelrs under separate permit.

Open the permit page

$90,000
Feb 28, 2017Completed
final sign-off May 2017
50 California StRichlen Construction17th flr -selective demolition of finishes & plumbing fixtures. new construction consists of non-structural partitions, restroom fixtures, accessories & finishes. all within common areas only. tenant improvement under separate permit. space is occupied & will remain occupied during project.n/a maher
Details
Permit
201702280229
Permit issued
Mar 9, 2017
Final sign-off
May 10, 2017

17th flr -selective demolition of finishes & plumbing fixtures. new construction consists of non-structural partitions, restroom fixtures, accessories & finishes. all within common areas only. tenant improvement under separate permit. space is occupied & will remain occupied during project.n/a maher

Open the permit page

$160,000
Feb 24, 2017Completed
final sign-off Jul 2017
50 California StPrincipal Builders Inc.17th floor: t.i. to demo and construct new partitions, doors, millwork, ceiling and finishes and mechanical and electrical equipment. life safty and fire under seperate permit. n/a for maher.
Details
Permit
201702240109
Permit issued
Mar 6, 2017
Final sign-off
Jul 24, 2017

17th floor: t.i. to demo and construct new partitions, doors, millwork, ceiling and finishes and mechanical and electrical equipment. life safty and fire under seperate permit. n/a for maher.

Open the permit page

$800,000
Dec 30, 2016Completed
final sign-off Dec 2017
123 Townsend StNovo Construction Inc3rd flr: ti - of an (e) full floor suite. non structural demo of interior partitions & door/frame/hardware. lighting & finishes. new non structural interior partitions & doors/frame/hardware. new ele/plumb/mech & lighting & life safety to tie into (e) bld. new millwork & finishes maher na
Details
Permit
201612306268
Permit issued
Feb 2, 2017
Final sign-off
Dec 20, 2017

3rd flr: ti - of an (e) full floor suite. non structural demo of interior partitions & door/frame/hardware. lighting & finishes. new non structural interior partitions & doors/frame/hardware. new ele/plumb/mech & lighting & life safety to tie into (e) bld. new millwork & finishes maher na

Open the permit page

$1,489,411
Oct 31, 2016Completed
final sign-off Mar 2017
50 California StRichlen Construction19/f- selective demo of non structural partitions, doors, glazing, hardware, millwork, lighting, ceiling grid & tile, electrical & finishes. new work consists non structural partitions, elevator lobby doors, restroom fixtures/accessories/finishes, space remain unoccupied. ti will follow. n/a maher;
Details
Permit
201610311476
Permit issued
Dec 7, 2016
Final sign-off
Mar 14, 2017

19/f- selective demo of non structural partitions, doors, glazing, hardware, millwork, lighting, ceiling grid & tile, electrical & finishes. new work consists non structural partitions, elevator lobby doors, restroom fixtures/accessories/finishes, space remain unoccupied. ti will follow. n/a maher;

Open the permit page

$155,000
Sep 6, 2016Expired or cancelled
cancelled Jan 2026
1 Market St7th flr (spear tower)this submittal is a permit revision to approved 201511031519; card readers @ passenger elev lobby are not installed; filed inspector removal of documentation on permit set to reflect as such; maher n/a
Details
Permit
201609066833

7th flr (spear tower)this submittal is a permit revision to approved 201511031519; card readers @ passenger elev lobby are not installed; filed inspector removal of documentation on permit set to reflect as such; maher n/a

Open the permit page

Aug 11, 2016Completed
final sign-off Oct 2017
1 Market StDpr Construction37/f spear tower- project consists of addition of a few painted metal louver @ (e) window at north builing 37/f, louver is to vent (n) restroom exhaust, associated interior t.i. included arch. & mep will be submitted under seperate permit. n/a ordinance #155-13
Details
Permit
201608114841
Permit issued
Nov 1, 2016
Final sign-off
Oct 11, 2017

37/f spear tower- project consists of addition of a few painted metal louver @ (e) window at north builing 37/f, louver is to vent (n) restroom exhaust, associated interior t.i. included arch. & mep will be submitted under seperate permit. n/a ordinance #155-13

Open the permit page

$20,000
Jun 2, 2016Completed
final sign-off Aug 2016
330 Townsend StPeacock Construction#136- scope of work for this project is to demolish all existing non-structural partitions, doors, glazing, millwork and flooring, remove all electrical from delmoished wall. demo only per ab-017. n/a ordinance #155-13
Details
Permit
201606028978
Permit issued
Jun 2, 2016
Final sign-off
Aug 2, 2016

#136- scope of work for this project is to demolish all existing non-structural partitions, doors, glazing, millwork and flooring, remove all electrical from delmoished wall. demo only per ab-017. n/a ordinance #155-13

Open the permit page

$6,492
Jun 2, 2016Completed
final sign-off Aug 2016
1 Market StDpr Constructionrevision to pa 2015-0804-3216, addition of powered door operators @ (e) restrooms in lieu of interior door side clearances as requested by field inspector. maher na
Details
Permit
201606028955
Permit issued
Jul 5, 2016
Final sign-off
Aug 30, 2016

revision to pa 2015-0804-3216, addition of powered door operators @ (e) restrooms in lieu of interior door side clearances as requested by field inspector. maher na

Open the permit page

$3,500
Jun 2, 2016Completed
final sign-off Aug 2016
1 Market StDpr Constructionrevision to pa 2015-0805-3357, addition of powered door operators @ (e) restrooms in lieu of interior door side clearances as requested by field inspector. maher na
Details
Permit
201606028958
Permit issued
Jul 5, 2016
Final sign-off
Aug 30, 2016

revision to pa 2015-0805-3357, addition of powered door operators @ (e) restrooms in lieu of interior door side clearances as requested by field inspector. maher na

Open the permit page

$3,500
May 19, 2016Completed
final sign-off Dec 2016
1 Market StDpr Constructionspear tower: selective interior non-structural demolition, (n) non-structural partitions, doors, ceiling, lights, millwork, finishes, electrical and hvac. no change in occupancy, use or floor area. n/a ordinance #155-13
Details
Permit
201605197863
Permit issued
Jul 5, 2016
Final sign-off
Dec 8, 2016

spear tower: selective interior non-structural demolition, (n) non-structural partitions, doors, ceiling, lights, millwork, finishes, electrical and hvac. no change in occupancy, use or floor area. n/a ordinance #155-13

Open the permit page

$131,040
Apr 19, 2016Completed
final sign-off Aug 2016
1 Market StDpr Construction7th flr: this submittal is a permit revision to issued permit 201511031519, this permit submittal is to establish use of flame retardant product to be used on art piece installation.no change in occupant load,occupancy & no change in floor area; maher n/a
Details
Permit
201604195120
Permit issued
Apr 20, 2016
Final sign-off
Aug 30, 2016

7th flr: this submittal is a permit revision to issued permit 201511031519, this permit submittal is to establish use of flame retardant product to be used on art piece installation.no change in occupant load,occupancy & no change in floor area; maher n/a

Open the permit page

Apr 19, 2016Completed
final sign-off Jul 2016
1 Market StDpr Construction#7055: this submittal is a permit revision to issued permit 201511031519, this permit submittal is to establish occupant load @tech talk rm 7055 for purposes of assembly permit application.no change in occupant load,occupancy or floor area.; maher n/a
Details
Permit
201604195119
Permit issued
Apr 20, 2016
Final sign-off
Jul 23, 2016

#7055: this submittal is a permit revision to issued permit 201511031519, this permit submittal is to establish occupant load @tech talk rm 7055 for purposes of assembly permit application.no change in occupant load,occupancy or floor area.; maher n/a

Open the permit page

Dec 23, 2015Completed
final sign-off Aug 2016
1 Market StDpr Constructionwork on 07th flr.this project is a permit revision to p/a #201511031519 includes the installation of a food staging area. no change in area, occupancy or occupancy load. mep under separate permit. n/a for maher ordinance no. 155-13
Details
Permit
201512235885
Permit issued
Feb 11, 2016
Final sign-off
Aug 30, 2016

work on 07th flr.this project is a permit revision to p/a #201511031519 includes the installation of a food staging area. no change in area, occupancy or occupancy load. mep under separate permit. n/a for maher ordinance no. 155-13

Open the permit page

$40,000
Aug 6, 2015Completed
final sign-off May 2016
1 Market StDpr Construction13th floor - selective interior non-structural demo; (n) non-structural partitions, doors, ceiling, lights, millwork, finishes. no change in occupancy and no change in floor area. providing horizontial exits. mep. seperate permit.
Details
Permit
201508063547
Permit issued
Sep 3, 2015
Final sign-off
May 16, 2016

13th floor - selective interior non-structural demo; (n) non-structural partitions, doors, ceiling, lights, millwork, finishes. no change in occupancy and no change in floor area. providing horizontial exits. mep. seperate permit.

Open the permit page

$1,300,000
Aug 5, 2015Never finaled
issued Aug 2015, no final
1 Market StDpr Constructionselective interior non-structural demo, (n) non structural partitions, doors, ceilings, lights, millwork, finishes, electrical, plumbing & hvac. no change in occupancy and no change in floor area. providing horizontal exits. n/a ordinance #155-13
Details
Permit
201508053357
Permit issued
Aug 28, 2015

selective interior non-structural demo, (n) non structural partitions, doors, ceilings, lights, millwork, finishes, electrical, plumbing & hvac. no change in occupancy and no change in floor area. providing horizontal exits. n/a ordinance #155-13

Open the permit page

$1,300,000
Jan 16, 2015Completed
final sign-off Aug 2015
50 California StRichlen Construction32nd floor - remove hazardous material from current unoccupied space full floor and includes demo of non-sturctural partitions, power/data, millwork, plumbing and ceiling. new work consists of restroom build back and elevator enclosure. space remain unoccupied. t.i.under sep. permit.maher n/a.
Details
Permit
201501165960
Permit issued
Feb 18, 2015
Final sign-off
Aug 21, 2015

32nd floor - remove hazardous material from current unoccupied space full floor and includes demo of non-sturctural partitions, power/data, millwork, plumbing and ceiling. new work consists of restroom build back and elevator enclosure. space remain unoccupied. t.i.under sep. permit.maher n/a.

Open the permit page

$1,100,000
Dec 18, 2014Completed
final sign-off Aug 2015
50 California StSkyline Construction26th flr: new non-structural partitions, doors ceiling, lights, millwork & finishes, mep, life safety & fire sprinkler under sep permit; maher n/a
Details
Permit
201412184046
Permit issued
Dec 29, 2014
Final sign-off
Aug 24, 2015

26th flr: new non-structural partitions, doors ceiling, lights, millwork & finishes, mep, life safety & fire sprinkler under sep permit; maher n/a

Open the permit page

$744,102
May 28, 2014Completed
final sign-off Nov 2015
1 South ParkBcci Construction Companyground floor commercial t.i. of office space including demo/construction of non structural partitions, new millwork, lighting & finishes. this project does not change use or occupancy. mep under separate permit. n/a maher ordinance
Details
Permit
201405286823
Permit issued
May 28, 2014
Final sign-off
Nov 12, 2015

ground floor commercial t.i. of office space including demo/construction of non structural partitions, new millwork, lighting & finishes. this project does not change use or occupancy. mep under separate permit. n/a maher ordinance

Open the permit page

$350,000
Feb 13, 2014Completed
final sign-off May 2014
50 California StSkyline Construction#2500- tenant improvement including construction of new non-structural partitions, new doors, frames, side lights, power/data electrical, lighting and finishes. compliance with ordinance #155-13 not required.
Details
Permit
201402138445
Permit issued
Feb 24, 2014
Final sign-off
May 6, 2014

#2500- tenant improvement including construction of new non-structural partitions, new doors, frames, side lights, power/data electrical, lighting and finishes. compliance with ordinance #155-13 not required.

Open the permit page

$455,620
Sep 27, 2013Completed
final sign-off Apr 2014
50 California StRichlen Constructiontenant improvement including new demising wall, partial demolition of existing non-structural partitions, construct new non-structural partitions, new doors, frames, power/data electrical, mill work and finishes. m.e.p. under seperate permit. work for suite 2540 only under this permit
Details
Permit
201309277968
Permit issued
Oct 7, 2013
Final sign-off
Apr 4, 2014

tenant improvement including new demising wall, partial demolition of existing non-structural partitions, construct new non-structural partitions, new doors, frames, power/data electrical, mill work and finishes. m.e.p. under seperate permit. work for suite 2540 only under this permit

Open the permit page

$120,500
Apr 15, 2013Completed
final sign-off Dec 2013
615 Battery StHathaway Dinwiddie Co.5th floor:provide/install an intercommunicating stair between the fourth and fifth floor of 615 battery st.
Details
Permit
201304154545
Permit issued
Apr 24, 2013
Final sign-off
Dec 16, 2013

5th floor:provide/install an intercommunicating stair between the fourth and fifth floor of 615 battery st.

Open the permit page

$45,000
Apr 24, 2012Never finaled
issued Apr 2012, no final
615 Battery StHathaway Dinwiddie Co.4th fl-demo of (e) non-struct inter. partitions, doors, millwork, flring, electrical, ceiling & lighting. space shall remain vacant. future occupancy under seperate permit, per ab-017. no req to provide disable accesss for vacant space disabled access will be addressed @time of const. for future t.i
Details
Permit
201204248939
Permit issued
Apr 27, 2012

4th fl-demo of (e) non-struct inter. partitions, doors, millwork, flring, electrical, ceiling & lighting. space shall remain vacant. future occupancy under seperate permit, per ab-017. no req to provide disable accesss for vacant space disabled access will be addressed @time of const. for future t.i

Open the permit page

$15,000
Dec 28, 2011Completed
final sign-off Apr 2012
50 California StSkyline Construction4th floor-(e) space recently abated under pa# 2011-0916-4854- included build out of new accessicle restrooms. new construction consists of common corridor, elevator lobby finishes, tenant demising walls. spaces will remain unoccupied after this project, future occupancy/build outs under seperate pe
Details
Permit
201112281410
Permit issued
Jan 5, 2012
Final sign-off
Apr 3, 2012

4th floor-(e) space recently abated under pa# 2011-0916-4854- included build out of new accessicle restrooms. new construction consists of common corridor, elevator lobby finishes, tenant demising walls. spaces will remain unoccupied after this project, future occupancy/build outs under seperate pe

Open the permit page

$150,000
Jan 13, 2009Completed
final sign-off Jan 2010
275 Battery StTurner Construction Co14th floor full floor tenant improvement including new finishes, light fixtures & hvac, rooms include server room, offices, conf rooms & relocation of high density shelving.
Details
Permit
200901130080
Permit issued
Mar 3, 2009
Final sign-off
Jan 21, 2010

14th floor full floor tenant improvement including new finishes, light fixtures & hvac, rooms include server room, offices, conf rooms & relocation of high density shelving.

Open the permit page

$350,000
May 1, 2007Completed
final sign-off Apr 2008
3921 Geary BlZion Construction Companyinterior renovation, change in use from b to m, ada upgrades, reconfigureation & new finishes throughout. minor exterior grading & glazing replacement. mechanicalwork under seperate permit.
Details
Permit
200705010172
Permit issued
Nov 16, 2007
Final sign-off
Apr 7, 2008

interior renovation, change in use from b to m, ada upgrades, reconfigureation & new finishes throughout. minor exterior grading & glazing replacement. mechanicalwork under seperate permit.

Open the permit page

$300,000
Apr 6, 2005Completed
final sign-off Nov 2007
1500 Valencia StAssociated Buildersrevision to permitted & approved seismic grade beams.
Details
Permit
200504069318
Permit issued
May 4, 2005
Final sign-off
Nov 16, 2007

revision to permitted & approved seismic grade beams.

Open the permit page