Levi Malabuyo
- Listed as
- architect, engineer
- Based in
- Fremont
- On San Francisco permits
- Jul 2005 to Aug 2026
79 permits since 2000 (engineer on 76 permits, architect on 3 permits): 56 completed, 11 in progress, 10 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 26, 2026 | In progress issued Aug 2026 | 44 Montgomery St | M C S Construction Services | 19th fl - deferred mech & elec permit ref pa 202607155049 diffusers, registers, grilles & associated ductwork air balancing. elec new lighting fixtures & associated circuiting/controls, new power & tel.data devices & wiringDetails
19th fl - deferred mech & elec permit ref pa 202607155049 diffusers, registers, grilles & associated ductwork air balancing. elec new lighting fixtures & associated circuiting/controls, new power & tel.data devices & wiring | $300,000 |
| Aug 12, 2026 | In progress issued Sep 2026 | 303 02nd St | Bradshaw Group Inc | ste - n115: ti project, renovation of (e) b occupancy space. no change in occupancy ref bpa: 201603182443 stamp new recive pages ibmDetails
ste - n115: ti project, renovation of (e) b occupancy space. no change in occupancy ref bpa: 201603182443 stamp new recive pages ibm | $140,000 |
| Aug 6, 2026 | Completed final sign-off Sep 2026 | 150 California St | Mayco Commercial Construction Inc | 17th fl - replacement of light fixtures and associated circuiting & controls. add transfer fan. add/relocated diffusers and registers per new layout. relocate thermostats ref pa 202602065382Details
17th fl - replacement of light fixtures and associated circuiting & controls. add transfer fan. add/relocated diffusers and registers per new layout. relocate thermostats ref pa 202602065382 | $110,000 |
| Aug 5, 2026 | In progress filed Aug 2026, not yet issued | 1852 10th Av | expansin on 1st floor to match upper floor footprint to add 3 bedrooms and 2 bathrooms interior remodeling of 2nd floor including relocating 2 stairs and bath and addition of 1/2 bath. proposed (n) stair to back yard from (e) deck proposed roof deck. complete structrual upgrade including (n)Details
expansin on 1st floor to match upper floor footprint to add 3 bedrooms and 2 bathrooms interior remodeling of 2nd floor including relocating 2 stairs and bath and addition of 1/2 bath. proposed (n) stair to back yard from (e) deck proposed roof deck. complete structrual upgrade including (n) | $300,000 | |
| Aug 4, 2026 | In progress filed Aug 2026, not yet issued | 120 Brannan St | convert 120 brannan(previously bayside market) 140 brannan into a daycrare. provide non-structural walls. counter w/ sink & cabinets; office; breakroom; adult restroom; play area fence; children toilets & lavatories; new ceiling, lights,hvac & electrical.Details
convert 120 brannan(previously bayside market) 140 brannan into a daycrare. provide non-structural walls. counter w/ sink & cabinets; office; breakroom; adult restroom; play area fence; children toilets & lavatories; new ceiling, lights,hvac & electrical. | $800,000 | |
| Jul 9, 2026 | In progress filed Jul 2026, not yet issued | 1664 Larkin St | interior remodel including removal of (e) plaster finishes, upgrade of 1-hour fire rated separation walls between units, electrical system upgrades, heating system upgrades & seismic.Details
interior remodel including removal of (e) plaster finishes, upgrade of 1-hour fire rated separation walls between units, electrical system upgrades, heating system upgrades & seismic. | $3,000,000 | |
| Jul 2, 2026 | In progress issued Jul 2026 | 883 Mission St | Xp Construction Llc. | tenant improvement converting (e) pizza shop to sandwich shop. ref bpa: 200810204619Details
tenant improvement converting (e) pizza shop to sandwich shop. ref bpa: 200810204619 | $125,000 |
| Jun 26, 2026 | In progress issued Jul 2026 | 155 05th St | Peacock Construction | revision to 202509165421. clinic: revise exam, treatment, office, storage and support area, reconfigure partitions, doors, ceilings, casework, sinks plumbing fixtures, mdical equip and room functions. asc: revise or, pacu, sterile processing, utility and support areas. reconfigure partitions, doorsDetails
revision to 202509165421. clinic: revise exam, treatment, office, storage and support area, reconfigure partitions, doors, ceilings, casework, sinks plumbing fixtures, mdical equip and room functions. asc: revise or, pacu, sterile processing, utility and support areas. reconfigure partitions, doors | |
| May 20, 2026 | Completed final sign-off Jun 2026 | 595 Market St | R M I Mechanical Contractors | 12/fl- ref 202604018691- add tranfer fan, ceiling supply diffusers and return air grilles, ductwork, relocate thermostats and air balanceDetails
12/fl- ref 202604018691- add tranfer fan, ceiling supply diffusers and return air grilles, ductwork, relocate thermostats and air balance | $10,000 |
| May 7, 2026 | In progress issued Jun 2026 | 847 Sansome St | Level 8 Construction Inc | revision to pa# 202508294225. deferred electrical & plumbing. no mechanical scope.Details
revision to pa# 202508294225. deferred electrical & plumbing. no mechanical scope. | $220,000 |
| Apr 23, 2026 | Completed final sign-off Jul 2026 | 595 Market St | R M I Mechanical Contractors | 20/f: relocate one water cooled heat pump, add one transfer fan, relocate one vav box, add supply diffusers and return air grilles. new ductwork, new condenser water piping, relocate thermostats and air balancing. ref bpa 202602266597Details
20/f: relocate one water cooled heat pump, add one transfer fan, relocate one vav box, add supply diffusers and return air grilles. new ductwork, new condenser water piping, relocate thermostats and air balancing. ref bpa 202602266597 | $200,000 |
| Apr 23, 2026 | Completed final sign-off Jul 2026 | 595 Market St | R M I Mechanical Contractors | 22nd floor add 2 water cooled heat pumps, add 2 transfer fans, relocate on vav box, add supply diffusers & return air grilles. new ductwork, new condenser water piping, new heat pump thermostats, relocate vav thermostats, and air balancing. ref bldg permit # 202602266610.Details
22nd floor add 2 water cooled heat pumps, add 2 transfer fans, relocate on vav box, add supply diffusers & return air grilles. new ductwork, new condenser water piping, new heat pump thermostats, relocate vav thermostats, and air balancing. ref bldg permit # 202602266610. | $250,000 |
| Apr 22, 2026 | Completed final sign-off Jun 2026 | 150 California St | Mayco Commercial Construction Inc | deferred electrical. #650 6th floor: new office ti conference room center: lighting, fixtures, and associated circuiting/controls, power/sigmal, & signal devices w/ associated wiring. (ref 202510016451)Details
deferred electrical. #650 6th floor: new office ti conference room center: lighting, fixtures, and associated circuiting/controls, power/sigmal, & signal devices w/ associated wiring. (ref 202510016451) | $121,554 |
| Apr 22, 2026 | Completed final sign-off Jun 2026 | 150 California St | Mayco Commercial Construction Inc | 9th fl - office tenant retrofit: new and altered lighting layout, circuiting and controls. mechanical ll- add transfer fan. add diffuser and registers with associated duct work. air balance. relocated thermostats ref pa 202602175990Details
9th fl - office tenant retrofit: new and altered lighting layout, circuiting and controls. mechanical ll- add transfer fan. add diffuser and registers with associated duct work. air balance. relocated thermostats ref pa 202602175990 | $31,700 |
| Apr 22, 2026 | Completed final sign-off Jul 2026 | 1155 Market St | Codesign Llc | interior t.i. project within an (e) suite occupying the 6th fl. scope includes modifications to (e) offices and confrence rooms to create additional private offices. construction of conference rooms to create additional private closet. project also includes reconfiguration of (e) open office areasDetails
interior t.i. project within an (e) suite occupying the 6th fl. scope includes modifications to (e) offices and confrence rooms to create additional private offices. construction of conference rooms to create additional private closet. project also includes reconfiguration of (e) open office areas | $200,000 |
| Apr 22, 2026 | Completed final sign-off Sep 2026 | 44 Montgomery St | Peacock Construction | ste 4250 - mechanical only ref pa 202602196146Details
ste 4250 - mechanical only ref pa 202602196146 | $149,000 |
| Apr 22, 2026 | Completed final sign-off Jun 2026 | 150 California St | Mayco Commercial Construction Inc | 6th floor: relocate 1 vav box, add diffusor, registers, return grills, with associated duct work, air balancing, relocate (e) thermostat. (ref 202510016451)Details
6th floor: relocate 1 vav box, add diffusor, registers, return grills, with associated duct work, air balancing, relocate (e) thermostat. (ref 202510016451) | $39,186 |
| Feb 25, 2026 | Completed final sign-off Jun 2026 | 444 Townsend St | Codesign Llc | add light manufacturing use. interior renovation to (e) office space. 2 new conference rooms, new shop spaces for minor repairs to personal transportation vehicles, new accessible shower, new rollup door in (e) opening & minor paint/interior finish replacement. partial change of use to lab on 1st flDetails
add light manufacturing use. interior renovation to (e) office space. 2 new conference rooms, new shop spaces for minor repairs to personal transportation vehicles, new accessible shower, new rollup door in (e) opening & minor paint/interior finish replacement. partial change of use to lab on 1st fl | $900,000 |
| Feb 11, 2026 | Completed final sign-off Mar 2026 | 595 Market St | R M I Mechanical Contractors | ste 1215-1285 - add 1 transfer fan, add diffusers, add registers & grilles, new ductwork, air balance and relocate thermostat. ref pa 202512171960Details
ste 1215-1285 - add 1 transfer fan, add diffusers, add registers & grilles, new ductwork, air balance and relocate thermostat. ref pa 202512171960 | $45,000 |
| Feb 11, 2026 | Completed final sign-off Mar 2026 | 595 Market St | R M I Mechanical Contractors | ste 1200 - add 1 transfer fan, relocate 1 box, add diffusers, add registers & grilles. new ductwork, air balances and relocate thermostats. ref pa 202512172039Details
ste 1200 - add 1 transfer fan, relocate 1 box, add diffusers, add registers & grilles. new ductwork, air balances and relocate thermostats. ref pa 202512172039 | $22,500 |
| Feb 11, 2026 | Completed final sign-off Mar 2026 | 595 Market St | R M I Mechanical Contractors | ste 1300 - add 1 transfer fan, relocate 1 vav box and add diffusers, add registers & grilles, new ductwork, air balance, and relocate thermostats. ref pa 202512171962Details
ste 1300 - add 1 transfer fan, relocate 1 vav box and add diffusers, add registers & grilles, new ductwork, air balance, and relocate thermostats. ref pa 202512171962 | $35,000 |
| Jan 5, 2026 | Completed final sign-off Mar 2026 | 100 Pine St | Mayco Commercial Construction Inc | 25th fl ref pa #2025-0918-5566: deferred mep. lighting fixtures, power & signal devices. add and relocate diffusers and return air grillsDetails
25th fl ref pa #2025-0918-5566: deferred mep. lighting fixtures, power & signal devices. add and relocate diffusers and return air grills | $85,000 |
| Sep 23, 2025 | Completed final sign-off Dec 2025 | 44 Montgomery St | Peacock Construction | 12/f suite 1250: add ceiling supply grilles and return grilles. relocate 1 vav box, new duct distribution, air balancing. ref permit 202505086056.Details
12/f suite 1250: add ceiling supply grilles and return grilles. relocate 1 vav box, new duct distribution, air balancing. ref permit 202505086056. | $10,000 |
| Aug 10, 2025 | In progress issued Feb 2026 | 2737 Taylor St | Five Rivers Construction | interior tenant improvement to convert vacant space to an ice cream shop. new interior partition, new ada restroom, and new finishes throughout including mep work. fire and life safety will be deferred submittal.Details
interior tenant improvement to convert vacant space to an ice cream shop. new interior partition, new ada restroom, and new finishes throughout including mep work. fire and life safety will be deferred submittal. | $150,000 |
| Aug 5, 2025 | In progress issued Aug 2025 | 2571 Mission St | Maxg Construction Inc (Maxwell M Ghobadi | proposed revision to pa # 2022-1104-5905. change electric to gas for dwelling units.Details
proposed revision to pa # 2022-1104-5905. change electric to gas for dwelling units. | |
| Jul 28, 2025 | Expired or cancelled withdrawn Apr 2026 | 155 05th St | 6/fl- fire sprinkler design as part of ti 202507181191Details
6/fl- fire sprinkler design as part of ti 202507181191 | $20,000 | |
| Jul 18, 2025 | Completed final sign-off Apr 2026 | 155 05th St | Rcp Construction Llc | 6th fl: tenant improvement for uop audiology dept. relocating from the 1st fl to a portion of the 6th fl (10,580 ft). includes room repurposing and internal layout modifications. shared common area to provide access for uop & future tenant. access includes restrooms, electrical room & elevators.Details
6th fl: tenant improvement for uop audiology dept. relocating from the 1st fl to a portion of the 6th fl (10,580 ft). includes room repurposing and internal layout modifications. shared common area to provide access for uop & future tenant. access includes restrooms, electrical room & elevators. | $500,000 |
| May 7, 2025 | Completed final sign-off Sep 2025 | 150 California St | Mayco Commercial Construction Inc | 8th fl- add diffusers, registers and transfer grilles. add 1 vav and 3 transfer fans. modify duct work. air balance deffered mech for arch #2025-0110-8086Details
8th fl- add diffusers, registers and transfer grilles. add 1 vav and 3 transfer fans. modify duct work. air balance deffered mech for arch #2025-0110-8086 | $83,680 |
| Apr 1, 2025 | Completed final sign-off Nov 2025 | 250 Stockton St | Endora Builders | creating new non-bearing partition walls for reception & waiting area, 4 operatories, 1 procedure room, consult rm, photo room, office manager, steri,staff lounge & other support areas. new gyp board ceiling and soffits are proposed. or sinks & service sinks will be installedDetails
creating new non-bearing partition walls for reception & waiting area, 4 operatories, 1 procedure room, consult rm, photo room, office manager, steri,staff lounge & other support areas. new gyp board ceiling and soffits are proposed. or sinks & service sinks will be installed | $350,000 |
| Aug 29, 2024 | Completed final sign-off Dec 2024 | 455 Market St | R M I Mechanical Contractors | add 1 vav with eating coil, add 3 heating coils to existing vavs, add 1 transfer fan, add ceiling and sidewall diffusers, new ductwork and hot water piping, add 1 thermostat and relocate thermostats, and air balance.Details
add 1 vav with eating coil, add 3 heating coils to existing vavs, add 1 transfer fan, add ceiling and sidewall diffusers, new ductwork and hot water piping, add 1 thermostat and relocate thermostats, and air balance. | $150,000 |
| Jul 31, 2024 | Completed final sign-off Nov 2024 | 44 Montgomery St | M C S Construction Services | 37th fl ref pa # 2024-0530-3319 deferred mechanical & electrical add ceiling supply grilles & return grilles. add 1 vav box & transfer fan. new duct dist, air balance, add 1 thermostat & relocate existing thermo stat. lighting fixtures & assoc circuiting/ controls, power & signal devicesDetails
37th fl ref pa # 2024-0530-3319 deferred mechanical & electrical add ceiling supply grilles & return grilles. add 1 vav box & transfer fan. new duct dist, air balance, add 1 thermostat & relocate existing thermo stat. lighting fixtures & assoc circuiting/ controls, power & signal devices | $100,000 |
| Jul 24, 2024 | Completed final sign-off Oct 2024 | 44 Montgomery St | M C S Construction Services | 16th fl: ref pa #2024-0530-3320 deferred electrical & mechanical submittal. add ceiling supply grilles & ceiling return grilles, add 1 vav box. new duct distribution, air balance, add 1 thermostat & relocate existing thermostat. lighting fixtures & associating circuiting controls.Details
16th fl: ref pa #2024-0530-3320 deferred electrical & mechanical submittal. add ceiling supply grilles & ceiling return grilles, add 1 vav box. new duct distribution, air balance, add 1 thermostat & relocate existing thermostat. lighting fixtures & associating circuiting controls. | $100,000 |
| May 14, 2024 | Completed final sign-off Jul 2024 | 601 California St | Peacock Construction | 17/f: mechanical - relocate supply diffusers, relocate return grilles and new ductwork, relocate (e) vav boxes and exhaust fan, (e) thermastate, air balancing. ref pa# 202402286770Details
17/f: mechanical - relocate supply diffusers, relocate return grilles and new ductwork, relocate (e) vav boxes and exhaust fan, (e) thermastate, air balancing. ref pa# 202402286770 | $15,000 |
| Apr 11, 2024 | Completed final sign-off Nov 2025 | 961 Dolores St | Initial Construction | interior remodel for four story two unit building. kitchen, bathroom and bedroom remodel for both units. replace non street facing windows. foundation replacement. replace rear patio door. repair stucco and wood siding.Details
interior remodel for four story two unit building. kitchen, bathroom and bedroom remodel for both units. replace non street facing windows. foundation replacement. replace rear patio door. repair stucco and wood siding. | $450,000 |
| Mar 26, 2024 | Completed final sign-off Jun 2024 | 601 California St | Peacock Construction | 6th fl - new supply diffusers, new retorn grilles & new ductwork; relocated existing thermostats; add new split ac system, air balancing. ref pa 202402095609Details
6th fl - new supply diffusers, new retorn grilles & new ductwork; relocated existing thermostats; add new split ac system, air balancing. ref pa 202402095609 | $50,000 |
| Dec 18, 2023 | Completed final sign-off Aug 2024 | 44 Montgomery St | M C S Construction Services | 10/f-ste# 1000: deferred mechanical and electrical (ref# 202311019942). mechanical- relocate ceiling difusers and return air grilles, provide new ductwork dist and diffusers, relocate (e) thermostats, air balance. electrical- new power and signal devices throughout space. new t24 compliant lightingDetails
10/f-ste# 1000: deferred mechanical and electrical (ref# 202311019942). mechanical- relocate ceiling difusers and return air grilles, provide new ductwork dist and diffusers, relocate (e) thermostats, air balance. electrical- new power and signal devices throughout space. new t24 compliant lighting | $110,000 |
| Oct 24, 2023 | Completed final sign-off Sep 2024 | 575 Market St | Peacock Construction | 20/f: mechanical - relocate 1 transfer fan, add a relocated ceiling diffusers, new ductwork, relocate thermastats, air balancing,; lighting fixtures & associcated circuiting/ controls, power & signal & wiring. ref pa# 202308154413.Details
20/f: mechanical - relocate 1 transfer fan, add a relocated ceiling diffusers, new ductwork, relocate thermastats, air balancing,; lighting fixtures & associcated circuiting/ controls, power & signal & wiring. ref pa# 202308154413. | $75,000 |
| Oct 19, 2023 | Completed final sign-off Dec 2023 | 655 Montgomery St | M C S Construction Services | 17th fl, ste 1710 - deferred mechanical & electrical ref pa 2022-1208-7898 mechanical new supply diffusers, return grilles & ductwork distribution. add new & relocate thermostat, add new split ac unit. air balance; electrical l- lighting fixtures & associated circuit/controls, poiewr signal devicesDetails
17th fl, ste 1710 - deferred mechanical & electrical ref pa 2022-1208-7898 mechanical new supply diffusers, return grilles & ductwork distribution. add new & relocate thermostat, add new split ac unit. air balance; electrical l- lighting fixtures & associated circuit/controls, poiewr signal devices | $75,000 |
| Sep 18, 2023 | Completed final sign-off May 2024 | 44 Montgomery St | M C S Construction Services | (ste 4010) deferred mep permit - ref bpa# 202305248479: (mech add transfer fan, relocate av boxes, new ductwork dist, relocate throuhout, and air balance). (elec lighting and fixtures, associated circuiting/controls, power and signal devices and associated wiring).Details
(ste 4010) deferred mep permit - ref bpa# 202305248479: (mech add transfer fan, relocate av boxes, new ductwork dist, relocate throuhout, and air balance). (elec lighting and fixtures, associated circuiting/controls, power and signal devices and associated wiring). | $100,000 |
| Jun 29, 2023 | Completed final sign-off Oct 2023 | 150 California St | Team Commercial Construction Inc. | 11/f: add 2-vav box & 3-transfer fans, modify & add new duct work, relocate thermostats, ref pa# 202212228926.Details
11/f: add 2-vav box & 3-transfer fans, modify & add new duct work, relocate thermostats, ref pa# 202212228926. | $175,000 |
| Apr 26, 2023 | Completed final sign-off Jun 2023 | 100 Pine St | Team Commercial Construction Inc. | 7th f/ ste 700: add 1 new hvac & 1 transfer fan, add ceiling diffusers add/ relocate thermostals. ref 2022 1129 7292Details
7th f/ ste 700: add 1 new hvac & 1 transfer fan, add ceiling diffusers add/ relocate thermostals. ref 2022 1129 7292 | $44,318 |
| Apr 12, 2023 | Completed final sign-off Jun 2023 | 425 Bush St | Commercial Interior Builders Inc | instlal new ductwork and exhaust fan as shown on m2.1. no new fire smoke dampers, new opwer and signal devices in restrooms and new 2019 t24 compliant lighting and controls. ref pa# 202212228980 for arch work.Details
instlal new ductwork and exhaust fan as shown on m2.1. no new fire smoke dampers, new opwer and signal devices in restrooms and new 2019 t24 compliant lighting and controls. ref pa# 202212228980 for arch work. | $24,104 |
| Mar 7, 2023 | Completed final sign-off May 2023 | 100 Pine St | Team Commercial Construction Inc. | 17th fl (east) - add 1 vav & heat pump. add/relocate diffusers and r/h grills ref pa 2022-1102-5762Details
17th fl (east) - add 1 vav & heat pump. add/relocate diffusers and r/h grills ref pa 2022-1102-5762 | $73,545 |
| Nov 22, 2022 | Completed final sign-off Feb 2023 | 3550 Mission St | Perry Builders | revision to permit 202112204765 & 202210214906 revise heat pump equipment specifications.Details
revision to permit 202112204765 & 202210214906 revise heat pump equipment specifications. | |
| Nov 21, 2022 | Completed final sign-off Oct 2023 | 3371 16th St | Ps2 Inc | remedol kitchen w/update ktichen equipment , finishes update plumbing, electrical fixtures.Details
remedol kitchen w/update ktichen equipment , finishes update plumbing, electrical fixtures. | $175,000 |
| Nov 4, 2022 | Never finaled issued Dec 2022, no final | 100 Pine St | Team Commercial Construction Inc. | 1700: add diffuser, registers, return grilles and new ductwork. relocate thermostats. ref 202205063673.Details
1700: add diffuser, registers, return grilles and new ductwork. relocate thermostats. ref 202205063673. | $35,302 |
| Oct 14, 2022 | Completed final sign-off May 2023 | 250 Montgomery St | R M I Mechanical Contractors | ste 200. add one vav box, add supply and return air registers, add new ductwork and heating water piping, add and relocate (e) thermostates. ref pa# 202207259238Details
ste 200. add one vav box, add supply and return air registers, add new ductwork and heating water piping, add and relocate (e) thermostates. ref pa# 202207259238 | $20,000 |
| Sep 12, 2022 | Completed final sign-off Jan 2023 | 180 Montgomery St | R M I Mechanical Contractors | 12th fl. ste 1250. add 7 vav boxes and transfer fan, add ceiling diffusers and grilles, new ductwork, new thermostats and air balance. ref 202206216683.Details
12th fl. ste 1250. add 7 vav boxes and transfer fan, add ceiling diffusers and grilles, new ductwork, new thermostats and air balance. ref 202206216683. | $35,000 |
| Aug 23, 2022 | Never finaled issued Oct 2022, no final | 150 California St | Team Commercial Construction Inc. | 10/f: relocate 1 vav box and add 3 transfer fans. add idffusers, registeres & transfer grilles. modifty and add a new dutwork, relocate (e) thermostats, add fsd. ref ti 202106243169, 202204071782, 202205204677, 202201145998.Details
10/f: relocate 1 vav box and add 3 transfer fans. add idffusers, registeres & transfer grilles. modifty and add a new dutwork, relocate (e) thermostats, add fsd. ref ti 202106243169, 202204071782, 202205204677, 202201145998. | $57,401 |
| Aug 11, 2022 | Completed final sign-off Dec 2022 | 180 Montgomery St | R M I Mechanical Contractors | ste 1520: add 5 vav boxes aadd ceiling supply difusers and grilles, new duct work add 5 thermostats, and air balanceDetails
ste 1520: add 5 vav boxes aadd ceiling supply difusers and grilles, new duct work add 5 thermostats, and air balance | $27,500 |
| Jul 22, 2022 | Completed final sign-off Nov 2022 | 180 Montgomery St | R M I Mechanical Contractors | suite 1950: add (8) vav boxes, add ceiling diffusers & grilles, new ductwork, new thermostats, & air balanceDetails
suite 1950: add (8) vav boxes, add ceiling diffusers & grilles, new ductwork, new thermostats, & air balance | $40,000 |
| Jun 16, 2022 | Never finaled issued Jun 2022, no final | 100 Montgomery St | R M I Mechanical Contractors | 14th fl: add 2 transfer fans, relocate ceiling diffusers, relocate thermostats, and air balance. ref pa# 202204132090.Details
14th fl: add 2 transfer fans, relocate ceiling diffusers, relocate thermostats, and air balance. ref pa# 202204132090. | $8,000 |
| Jun 15, 2022 | Never finaled issued Mar 2023, no final | 641 Irving St | Greenberg Construction Co | partial cafe remodel at service/ dining area. new cabinetry, lighting, equipment, ada upgrades, exterior tile. electrical & plumbing, hvac & lighting upgrade. replace front to meet ada & new signage.Details
partial cafe remodel at service/ dining area. new cabinetry, lighting, equipment, ada upgrades, exterior tile. electrical & plumbing, hvac & lighting upgrade. replace front to meet ada & new signage. | $120,000 |
| May 18, 2022 | Completed final sign-off Feb 2023 | 214 Grant Av | R M I Mechanical Contractors | 4th fl: add a transfer fan, new ductwork, new ceiling diffusers and grilles. relocate thermostats, and air balancing. ref pa# 202201125838.Details
4th fl: add a transfer fan, new ductwork, new ceiling diffusers and grilles. relocate thermostats, and air balancing. ref pa# 202201125838. | $30,000 |
| Jan 20, 2022 | Completed final sign-off Apr 2022 | 44 Montgomery St | Peacock Construction | 31/f: mechanical, add (2) new dual inlet vav box, add & relocate ceiling diffusers, new duct work, new thermostat, air balancingDetails
31/f: mechanical, add (2) new dual inlet vav box, add & relocate ceiling diffusers, new duct work, new thermostat, air balancing | $15,000 |
| Dec 20, 2021 | In progress issued Dec 2024 | 382 Ivy St | Ulloa Construction | to construct a 3-story, type v-b, mixed used residential & commercial building. 3 residential units.Details
to construct a 3-story, type v-b, mixed used residential & commercial building. 3 residential units. | $1,500,000 |
| Nov 9, 2021 | Completed final sign-off Dec 2021 | 100 Montgomery St | R M I Mechanical Contractors | add 10 vav boxes, 5 transfer fans. new ductwork, new diffusers, thermostates for new & (e) vav boxes, relocate thermostates for perimeter induction units, air balance, ref t.i. 2020 0113 1756Details
add 10 vav boxes, 5 transfer fans. new ductwork, new diffusers, thermostates for new & (e) vav boxes, relocate thermostates for perimeter induction units, air balance, ref t.i. 2020 0113 1756 | $110,000 |
| Oct 12, 2021 | Never finaled issued Oct 2021, no final | 100 Pine St | Team Commercial Construction Inc. | ste 3050, 30th fl - add 1 diffuser fan; add 5 ceiling diffusers & relocate ceiling diffusers. relocate (e) thermostats induction unit thermostats. air balance. ref pa 2021-0809-6056Details
ste 3050, 30th fl - add 1 diffuser fan; add 5 ceiling diffusers & relocate ceiling diffusers. relocate (e) thermostats induction unit thermostats. air balance. ref pa 2021-0809-6056 | $9,020 |
| Aug 10, 2021 | Completed final sign-off Dec 2021 | 655 Montgomery St | Bevilacqua & Sons | 20/f: add linear diffusers at wood slat ceiling. replace all ceiling supply diffusers and return air/exhaust grilles with new per plans. provide sheet metal ductwork and insulation on new ductwork only. add 3 ddc thermostats and control wiring for (e) hvac system. final air balance for space.Details
20/f: add linear diffusers at wood slat ceiling. replace all ceiling supply diffusers and return air/exhaust grilles with new per plans. provide sheet metal ductwork and insulation on new ductwork only. add 3 ddc thermostats and control wiring for (e) hvac system. final air balance for space. | $40,000 |
| Jun 1, 2021 | Completed final sign-off Sep 2021 | 100 Pine St | Team Commercial Construction Inc. | suite 2250 & common areas: add ceiling diffusers & sidewall diffusers. relocate (e) vav thermostats & relocate in thermostats air balancing.Details
suite 2250 & common areas: add ceiling diffusers & sidewall diffusers. relocate (e) vav thermostats & relocate in thermostats air balancing. | $10,223 |
| Feb 17, 2021 | Completed final sign-off Jul 2021 | 33 New Montgomery St | Peacock Construction | suite 1900: mechanical- add 1 transfer fans, relocate 1 vav box add diffusers, provide new duct ref pa# 2020-1119-9339Details
suite 1900: mechanical- add 1 transfer fans, relocate 1 vav box add diffusers, provide new duct ref pa# 2020-1119-9339 | |
| Feb 17, 2021 | Completed final sign-off Jul 2021 | 33 New Montgomery St | Peacock Construction | suite 1090: add 1 transfer fan, add diffusers & return air grille, provide new ductwork, relocate thermostats & air balance. ref 202011199286. maher n/a.Details
suite 1090: add 1 transfer fan, add diffusers & return air grille, provide new ductwork, relocate thermostats & air balance. ref 202011199286. maher n/a. | |
| Mar 29, 2018 | Completed final sign-off Oct 2018 | 33 New Montgomery St | Peacock Construction | 8/f: t-24 mechanical for work under pa #201708185218 and 201801128511, includes electrical t-24. maher naDetails
8/f: t-24 mechanical for work under pa #201708185218 and 201801128511, includes electrical t-24. maher na | $28,000 |
| Mar 29, 2018 | Never finaled issued Apr 2018, no final | 301 Howard St | Peacock Construction | 20/f & 21/f: t-24 mechanical for work under pa #201712045372 and 201712045370. maher naDetails
20/f & 21/f: t-24 mechanical for work under pa #201712045372 and 201712045370. maher na | $113,000 |
| Mar 29, 2018 | Completed final sign-off Jun 2018 | 301 Howard St | Peacock Construction | 3/f: t-24 mechanical for work under pa #201711274771. maher ord 155-13 naDetails
3/f: t-24 mechanical for work under pa #201711274771. maher ord 155-13 na | $13,000 |
| Oct 27, 2017 | Completed final sign-off Nov 2017 | 44 Montgomery St | R M I Mechanical Contractors | 9th floor suite 960 - install & relcoating ceiling diffusers, relcoate thermostats, relcoate ceiling fan & air balance. ref 201708144781. n/a maher ordinance.Details
9th floor suite 960 - install & relcoating ceiling diffusers, relcoate thermostats, relcoate ceiling fan & air balance. ref 201708144781. n/a maher ordinance. | $7,000 |
| Oct 27, 2017 | Completed final sign-off Nov 2017 | 44 Montgomery St | R M I Mechanical Contractors | 34th floor suite 3450 - add 2 van boxes, relcoate (e) vav boxes, & one ceiling fan & relcoate ceiling fans, add & relocate ceiling diffusers, add & relcoate thermostats, new sheet metal ductwork, & air balance. ref 201708144783. n/a maher ordinance.Details
34th floor suite 3450 - add 2 van boxes, relcoate (e) vav boxes, & one ceiling fan & relcoate ceiling fans, add & relocate ceiling diffusers, add & relcoate thermostats, new sheet metal ductwork, & air balance. ref 201708144783. n/a maher ordinance. | $60,000 |
| Oct 27, 2017 | Completed final sign-off Nov 2017 | 44 Montgomery St | R M I Mechanical Contractors | 29th floor suite 2920 - install ceiling diffusers, install new ceiling fan, relcoate thermostats, & air balance, new sheet metal ductwork. ref 201708144782. n/a maher ordinance.Details
29th floor suite 2920 - install ceiling diffusers, install new ceiling fan, relcoate thermostats, & air balance, new sheet metal ductwork. ref 201708144782. n/a maher ordinance. | $21,000 |
| Aug 7, 2017 | Completed final sign-off Jan 2019 | 2340 Clay St | Herrero Builders Incorporated, Derry Casey Builders | 2nd, 3rd & 7th floors only - voluntary access barriers removal in common areas.Details
2nd, 3rd & 7th floors only - voluntary access barriers removal in common areas. | $100,000 |
| Oct 13, 2016 | Completed final sign-off Oct 2017 | 2333 Buchanan St | Herrero Builders Incorporated | 1/f & 4/f- voluntary access barriers removal, provide accessible signs, remodel exam. rooms & offices #104,114,115,116,151 to be fully accessible, remodel unisex toilet room 119 to be fully accessible, remove barries to access with floor office, modify sacremento street entrance & registration countDetails
1/f & 4/f- voluntary access barriers removal, provide accessible signs, remodel exam. rooms & offices #104,114,115,116,151 to be fully accessible, remodel unisex toilet room 119 to be fully accessible, remove barries to access with floor office, modify sacremento street entrance & registration count | $750,000 |
| Oct 13, 2016 | Completed final sign-off Jul 2017 | 2100 Webster St | Derry Casey Builders | 4/f #404: voluntary access barriers removal, provide accessible signs, remodel exam. room to fully accessible exam. room, install automatic door operator, lower service counter.Details
4/f #404: voluntary access barriers removal, provide accessible signs, remodel exam. room to fully accessible exam. room, install automatic door operator, lower service counter. | $80,000 |
| Oct 6, 2016 | Never finaled issued Oct 2016, no final | 500 Washington St | Team Commercial Construction Inc. | 4th floor - mechanical & electrical work from deferred pa #201608034058.Details
4th floor - mechanical & electrical work from deferred pa #201608034058. | $22,000 |
| Mar 3, 2014 | Completed final sign-off Oct 2014 | 1 Shrader St | Peacock Construction | installation of 2 fan coil units & a condensing unit to provide supplemental cooling to two rooms in womens center.Details
installation of 2 fan coil units & a condensing unit to provide supplemental cooling to two rooms in womens center. | $40,000 |
| Sep 4, 2013 | Completed final sign-off Jul 2014 | 2100 Webster St | Herrero Builders Incorporated | replace (3) fancoil units, add condensing unit @ 1st floor & concrete pad - w/refrigesant pipingDetails
replace (3) fancoil units, add condensing unit @ 1st floor & concrete pad - w/refrigesant piping | $30,000 |
| Jul 2, 2009 | Never finaled issued Jul 2009, no final | 450 Stanyan St | approx. 330 linear feet of direct bury piping-(2) 4" chilled water lines & (2) 3" heating/hot water lines to be installed below (e) driveways w/ connections to (e) stub-outs outside of (e) buildings.Details
approx. 330 linear feet of direct bury piping-(2) 4" chilled water lines & (2) 3" heating/hot water lines to be installed below (e) driveways w/ connections to (e) stub-outs outside of (e) buildings. | $160,000 | |
| Jan 30, 2009 | Never finaled issued Feb 2009, no final | 3330 Geary Bl | Quality Plus Construction Inc | 1st fl - this is a modification to work under issued permit# 2008-0902-0605. addition of new accessible concrete ramp in (e) carport on ground floor.Details
1st fl - this is a modification to work under issued permit# 2008-0902-0605. addition of new accessible concrete ramp in (e) carport on ground floor. | $11,000 |
| Mar 6, 2008 | Completed final sign-off Jun 2008 | 684 Ellis St | D.F.P.F Corp Dba Fine Line Construction | as built mechanival plans.minor revisions to mechanical. refer to permit # 2006.04.10.8584Details
as built mechanival plans.minor revisions to mechanical. refer to permit # 2006.04.10.8584 | $460 |
| Aug 15, 2006 | Expired or cancelled expired Oct 2012 | 139 06th St | new heating and ventilatioin system: new boiler, hhw plumps, hhw piping system, radiators, t'stats, controller/timer, toilet exhaust fans, ductwork, fan coils.Details
new heating and ventilatioin system: new boiler, hhw plumps, hhw piping system, radiators, t'stats, controller/timer, toilet exhaust fans, ductwork, fan coils. | $105,000 | |
| Jul 15, 2005 | Never finaled issued Oct 2005, no final | 1760 Bush St | 1 hour enclosure for stand by generator. standby generator installation.Details
1 hour enclosure for stand by generator. standby generator installation. | $150,000 |