Muthana Ibrahim
- Listed as
- architect
- Firm
- M I Architects, Inc.
- Based in
- Walnut Creek
- On San Francisco permits
- Oct 2004 to Jul 2026
30 permits since 2000 (architect on 30 permits): 19 completed, 4 in progress, 7 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 20, 2026 | In progress issued Sep 2026 | 319 Bay Shore Bl | Town & Country Contractors Inc | revision to pa# 202101273419: add handsink @ cashier area relocated handsink at backrm. add mop back at water heater. remove 2 wheel stops and install 7 bollards in front of store.Details
revision to pa# 202101273419: add handsink @ cashier area relocated handsink at backrm. add mop back at water heater. remove 2 wheel stops and install 7 bollards in front of store. | $1,300 |
| Sep 3, 2025 | In progress issued Oct 2025 | 319 Bay Shore Bl | Town & Country Contractors Inc | revision to permit 202101273419. relocate pg&e proposed subsurface transformer to ground mounted transformer. added street lights and street trees/well per dpw approved civil plans.Details
revision to permit 202101273419. relocate pg&e proposed subsurface transformer to ground mounted transformer. added street lights and street trees/well per dpw approved civil plans. | |
| Sep 19, 2023 | Never finaled issued Sep 2023, no final | 401 Potrero Av | accessible business entrance program per ordinace 51-16 add sign givng directions to path of travel from sidewalk and replace acccessible parking warning sign abe# 201912099512Details
accessible business entrance program per ordinace 51-16 add sign givng directions to path of travel from sidewalk and replace acccessible parking warning sign abe# 201912099512 | $1,200 | |
| Nov 22, 2022 | Completed final sign-off Feb 2023 | 3550 Mission St | Perry Builders | revision to permit 202112204765 & 202210214906 revise heat pump equipment specifications.Details
revision to permit 202112204765 & 202210214906 revise heat pump equipment specifications. | |
| Dec 20, 2021 | Completed final sign-off Feb 2023 | 3550 Mission St | Perry Builders | revision to pa 201912311006. interior remodel. revision include moving the cashier area toward the sales area. reduce the sales area & enlarge the back room. add kkc food equipment at back room, such as electrical fryer, 1 door cooler, 2 door freezer, cooking oil tank, etc & prop sink.Details
revision to pa 201912311006. interior remodel. revision include moving the cashier area toward the sales area. reduce the sales area & enlarge the back room. add kkc food equipment at back room, such as electrical fryer, 1 door cooler, 2 door freezer, cooking oil tank, etc & prop sink. | |
| Jan 27, 2021 | In progress issued Aug 2025 | 319 Bay Shore Bl | Town & Country Contractors Inc | construct gas station and convenience store.(n) 1,385 sf. convenience store and a new 2,856 sf. fueling canopy covering four (4) new fuel dispensers. installing two (2) new underground storage tanks. the site improvements include parking stalls, accessible path of travel to the right-of-wayDetails
construct gas station and convenience store.(n) 1,385 sf. convenience store and a new 2,856 sf. fueling canopy covering four (4) new fuel dispensers. installing two (2) new underground storage tanks. the site improvements include parking stalls, accessible path of travel to the right-of-way | $1,100,000 |
| Jan 27, 2021 | In progress issued Aug 2025 | 319 Bay Shore Bl | Town & Country Contractors Inc | demo gas station and convenience store including canopy.Details
demo gas station and convenience store including canopy. | $1,100 |
| Feb 7, 2020 | Never finaled issued May 2020, no final | 2498 Lombard St | internal remodeling to sales area & backrooms. no exterior work on bldg. [per conditional use authorization no. 2018-003264cua to establish a formula retail use d.b.a. circle k, a formula retail food mart convenience store.]Details
internal remodeling to sales area & backrooms. no exterior work on bldg. [per conditional use authorization no. 2018-003264cua to establish a formula retail use d.b.a. circle k, a formula retail food mart convenience store.] | $45,000 | |
| Dec 31, 2019 | Completed final sign-off Feb 2023 | 3550 Mission St | John W Ellis | interior remodel of the e convenience store. apply stucco finish with paint to match existing on existing structureDetails
interior remodel of the e convenience store. apply stucco finish with paint to match existing on existing structure | $135,000 |
| Jan 6, 2017 | Completed final sign-off Jul 2017 | 2501 California St | Savidge Construction Inc. | revision to pa 201508043239/s-r1 with updated civil plans/site plan & landscape plans. maher naDetails
revision to pa 201508043239/s-r1 with updated civil plans/site plan & landscape plans. maher na | |
| Jan 6, 2017 | Completed final sign-off Jul 2017 | 2501 California St | Savidge Construction Inc. | for health department review only - construct convenience store. other reviews under pa #201508043239s. maher naDetails
for health department review only - construct convenience store. other reviews under pa #201508043239s. maher na | |
| Nov 16, 2016 | Completed final sign-off Feb 2025 | 377 06th St | demolish 1-story, type 5, gas station. maher n/a.Details
demolish 1-story, type 5, gas station. maher n/a. | $15,000 | |
| Aug 25, 2015 | Completed final sign-off Jul 2017 | 2501 California St | Savidge Construction Inc. | canopy. demo an (e) gas station: canopy, dispenser island. three underground tanks are to be removed under a separate permit. yes for maher ordinance.Details
canopy. demo an (e) gas station: canopy, dispenser island. three underground tanks are to be removed under a separate permit. yes for maher ordinance. | $20,000 |
| Aug 25, 2015 | Never finaled issued Jul 2016, no final | 2501 California St | service bays. demo an (e) gas station: service bays. three underground tanks are to be removed under a separate permit. yes for maher ordinance.Details
service bays. demo an (e) gas station: service bays. three underground tanks are to be removed under a separate permit. yes for maher ordinance. | $5,000 | |
| Aug 4, 2015 | Completed final sign-off Jul 2017 | 2501 California St | Savidge Construction Inc. | canopy. erect 1 story, type 5-b canopy for shell gas station. gas station sits in 3 lots, will be merge into 1 lot. will use 2501 california st for the address.Details
canopy. erect 1 story, type 5-b canopy for shell gas station. gas station sits in 3 lots, will be merge into 1 lot. will use 2501 california st for the address. | $200,000 |
| Aug 4, 2015 | Completed final sign-off Jul 2017 | 2501 California St | Savidge Construction Inc. | convenience store. erect 1 story, type 5-b convenience store for shell gas station. gas station sits in 3 lots, will be merge into 1 lot. will use 2501 california st for the address.Details
convenience store. erect 1 story, type 5-b convenience store for shell gas station. gas station sits in 3 lots, will be merge into 1 lot. will use 2501 california st for the address. | $900,000 |
| May 1, 2015 | Never finaled issued Jul 2017, no final | 401 Potrero Av | Armer/Norman & Associates | remodel (e) snack shop and 2 bay structure into 1,483 sf convenience store. remodel (e) fuel canopy to include (n) 572 sf. canopy extension covering (2) fuel dispenser and canopy column. maher ordinance 155-13 not requiredDetails
remodel (e) snack shop and 2 bay structure into 1,483 sf convenience store. remodel (e) fuel canopy to include (n) 572 sf. canopy extension covering (2) fuel dispenser and canopy column. maher ordinance 155-13 not required | $350,000 |
| Jan 31, 2014 | Completed final sign-off Sep 2014 | 1759 Lincoln Wy | Savidge Construction Inc. | demolish 1 story, type 2, gas station's canopy building.Details
demolish 1 story, type 2, gas station's canopy building. | $4,000 |
| Jan 31, 2014 | Completed final sign-off Sep 2014 | 1759 Lincoln Wy | Savidge Construction Inc. | demolish 1 story, type 2, gas station building.Details
demolish 1 story, type 2, gas station building. | $5,000 |
| Aug 28, 2013 | Completed final sign-off Oct 2014 | 1759 Lincoln Wy | Savidge Construction Inc. | erect a one story gas station with car washDetails
erect a one story gas station with car wash | $1,100,000 |
| Jun 21, 2013 | Completed final sign-off Nov 2013 | 2200 Alemany Bl | remove (3) underground storage tanks, underground piping & (2) fuel dispensers. install new double-wall underground storage tanks, underground piping & (2) new gasoline & diesel fuel dispensers. (e) evr equirment to remain.Details
remove (3) underground storage tanks, underground piping & (2) fuel dispensers. install new double-wall underground storage tanks, underground piping & (2) new gasoline & diesel fuel dispensers. (e) evr equirment to remain. | $210,000 | |
| Mar 8, 2013 | Completed final sign-off Oct 2013 | 2890 03rd St | Savidge Construction Inc. | revision to appl#201208217913-revise canopy structure inc to be installed on grade. revise canopy hat to 56 ftx 45 ft.Details
revision to appl#201208217913-revise canopy structure inc to be installed on grade. revise canopy hat to 56 ftx 45 ft. | |
| Jan 24, 2013 | Completed final sign-off Oct 2013 | 2890 03rd St | revision to pa# 2012/01/09/1881s. relocate trash enclosure, add stair for mezzanine (private office). add electrical service entrance on south elevation. add " loop" sign & internally illuminated facade, new lcd screen. add led indirect lighting strip, redesign the interior of convenience store.Details
revision to pa# 2012/01/09/1881s. relocate trash enclosure, add stair for mezzanine (private office). add electrical service entrance on south elevation. add " loop" sign & internally illuminated facade, new lcd screen. add led indirect lighting strip, redesign the interior of convenience store. | $20,000 | |
| Sep 10, 2012 | Never finaled issued Sep 2012, no final | 1800 Lombard St | Walton Engineering Inc. | replace 2 existing fuel canopy structuresDetails
replace 2 existing fuel canopy structures | $60,000 |
| Jan 23, 2012 | Completed final sign-off Sep 2012 | 551 03rd St | Walton Engineering Inc. | fuel system upgrade to (e) gas station. scope include remove the underground storage tanks/ust. single wall piping, dispensers & tank trim & replace with new double wall ust & tank trims, double wall piping, new dispensers.Details
fuel system upgrade to (e) gas station. scope include remove the underground storage tanks/ust. single wall piping, dispensers & tank trim & replace with new double wall ust & tank trims, double wall piping, new dispensers. | $210,000 |
| Jan 23, 2012 | Completed final sign-off Oct 2012 | 3550 Mission St | Walton Engineering Inc. | fuel system upgrade to (e) gas station, scope include remove underground storage tanks (ust). single wall piping, dispensers & tank trims & replace with new double wall (ust), piping & dispenser & tank trim.Details
fuel system upgrade to (e) gas station, scope include remove underground storage tanks (ust). single wall piping, dispensers & tank trims & replace with new double wall (ust), piping & dispenser & tank trim. | $210,000 |
| Jan 23, 2012 | Never finaled issued Oct 2012, no final | 1800 Lombard St | Walton Engineering Inc. | remove (e) fuel system (underground tanks & piping & dispensers). replace with double wall ust & piping & new dispensers including tank trims. this project include fuel system upgrade to (e) gas station.Details
remove (e) fuel system (underground tanks & piping & dispensers). replace with double wall ust & piping & new dispensers including tank trims. this project include fuel system upgrade to (e) gas station. | $210,000 |
| Jan 9, 2012 | Completed final sign-off Oct 2013 | 2890 03rd St | Savidge Construction Inc. | demolish 1 story, type 5, convenience store & fuel station.Details
demolish 1 story, type 5, convenience store & fuel station. | $19,000 |
| Jan 27, 2009 | Never finaled issued Jan 2009, no final | 3750 03rd St | install veeder-root vapor polisher per executive orders v4203/204. install vapor flow meters at dispensers (typ 5). install pressure sensor at dispenser (typ 1) install 2 hr fire rated enclosure on vapor polisher. evr phase 2 upgrade.Details
install veeder-root vapor polisher per executive orders v4203/204. install vapor flow meters at dispensers (typ 5). install pressure sensor at dispenser (typ 1) install 2 hr fire rated enclosure on vapor polisher. evr phase 2 upgrade. | $10,000 | |
| Oct 19, 2004 | Completed final sign-off Jan 2005 | 375 Alabama St | remove non-bearing partition walls. prepare site for new tenant improv on ground fl &3rd fl.Details
remove non-bearing partition walls. prepare site for new tenant improv on ground fl &3rd fl. | $8,000 |