Walton Engineering Inc.
- Based in
- West Sacramento
- On San Francisco permits
- Jul 2009 to Jan 2015
- Last 24 months
- 0 permits filed
13 permits since 2000: 10 completed, 3 never finaled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 27, 2015 | Completed final sign-off Mar 2015 | 2301 19th Av | remove & replace underground fuel piping, disconnect & reconnect electrical at tanks & dispensers; remove & reinstall existing fuel dispensers; maher n/aDetails
remove & replace underground fuel piping, disconnect & reconnect electrical at tanks & dispensers; remove & reinstall existing fuel dispensers; maher n/a | $54,622 |
| Mar 25, 2014 | Completed final sign-off Jun 2014 | 2690 03rd St | removal of two underground compartmented (2 compartments each) fuel tanks and associated fuel piping. backfill to grade. need compliance with ordinance# 155-13Details
removal of two underground compartmented (2 compartments each) fuel tanks and associated fuel piping. backfill to grade. need compliance with ordinance# 155-13 | $58,622 |
| Oct 17, 2012 | Never finaled issued Oct 2012, no final | 1800 Lombard St | shoring permit only: install sheet pile into a 27'-6 1/2" x 36'-2" x 16' deep excavation.Details
shoring permit only: install sheet pile into a 27'-6 1/2" x 36'-2" x 16' deep excavation. | $15,000 |
| Sep 10, 2012 | Never finaled issued Sep 2012, no final | 1800 Lombard St | replace 2 existing fuel canopy structuresDetails
replace 2 existing fuel canopy structures | $60,000 |
| Jan 23, 2012 | Completed final sign-off Oct 2012 | 3550 Mission St | fuel system upgrade to (e) gas station, scope include remove underground storage tanks (ust). single wall piping, dispensers & tank trims & replace with new double wall (ust), piping & dispenser & tank trim.Details
fuel system upgrade to (e) gas station, scope include remove underground storage tanks (ust). single wall piping, dispensers & tank trims & replace with new double wall (ust), piping & dispenser & tank trim. | $210,000 |
| Jan 23, 2012 | Never finaled issued Oct 2012, no final | 1800 Lombard St | remove (e) fuel system (underground tanks & piping & dispensers). replace with double wall ust & piping & new dispensers including tank trims. this project include fuel system upgrade to (e) gas station.Details
remove (e) fuel system (underground tanks & piping & dispensers). replace with double wall ust & piping & new dispensers including tank trims. this project include fuel system upgrade to (e) gas station. | $210,000 |
| Jan 23, 2012 | Completed final sign-off Sep 2012 | 551 03rd St | fuel system upgrade to (e) gas station. scope include remove the underground storage tanks/ust. single wall piping, dispensers & tank trim & replace with new double wall ust & tank trims, double wall piping, new dispensers.Details
fuel system upgrade to (e) gas station. scope include remove the underground storage tanks/ust. single wall piping, dispensers & tank trim & replace with new double wall ust & tank trims, double wall piping, new dispensers. | $210,000 |
| Mar 31, 2011 | Completed final sign-off Apr 2011 | 2301 19th Av | remove & replace 3 (e) fuel dispensers. remove (e) healy vapor tank & replace with vapor canister unit. note: fuel dispensers are all the same size & same locationDetails
remove & replace 3 (e) fuel dispensers. remove (e) healy vapor tank & replace with vapor canister unit. note: fuel dispensers are all the same size & same location | $16,462 |
| Jul 9, 2009 | Completed final sign-off Aug 2009 | 2000 19th Av | existing cas/evr intalled to comply with sffd violation 5277Details
existing cas/evr intalled to comply with sffd violation 5277 | $33,000 |
| Jul 9, 2009 | Completed final sign-off Aug 2009 | 3300 Cesar Chavez St | existing clean air separator ( cas) / enhanced vapor recovery ( epr) installed to comply with sffd violation # 5349 by adding rated enclosure and bollards per cfc 312.2 # 5 and cfc 312.2 #2.Details
existing clean air separator ( cas) / enhanced vapor recovery ( epr) installed to comply with sffd violation # 5349 by adding rated enclosure and bollards per cfc 312.2 # 5 and cfc 312.2 #2. | $33,000 |
| Jul 9, 2009 | Completed final sign-off Aug 2009 | 200 Toland St | existing cas/evr installed to comply with sffd violation # 5348Details
existing cas/evr installed to comply with sffd violation # 5348 | $33,000 |
| Jul 9, 2009 | Completed final sign-off Sep 2009 | 2301 19th Av | existing cas/evr installed. need to make complaint per sffd violation # 5278 by adding rated enclosure.Details
existing cas/evr installed. need to make complaint per sffd violation # 5278 by adding rated enclosure. | $33,000 |
| Jul 9, 2009 | Completed final sign-off Aug 2009 | 2690 03rd St | clear fire dept. violation #5279 by installing bollards to comply with sffd vapor recovery checklist dated 07/24/2008.Details
clear fire dept. violation #5279 by installing bollards to comply with sffd vapor recovery checklist dated 07/24/2008. | $33,000 |