103 permits since 2000 (architect on 101 permits, authorized agent-others on 1 permit, engineer on 1 permit, lessee on 1 permit): 67 completed, 2 in progress, 21 never finaled, 13 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 103.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 26, 2026 | In progress issued Jul 2026 | 1750 Van Ness Av | Cahill Contractors Llc. | revise issued bpa 202111232980 s2, update profilesof decoratedfinishes, revise lighting design, move louver within main shrine hall, rm 206, east side of level 2.Details
revise issued bpa 202111232980 s2, update profilesof decoratedfinishes, revise lighting design, move louver within main shrine hall, rm 206, east side of level 2. | |
| Sep 16, 2025 | Completed final sign-off Dec 2025 | 300 Clay St | Hathaway Dinwiddie Co. | revision to pa# 202502261091: removing the work on the east entrance from the scope of work.Details
revision to pa# 202502261091: removing the work on the east entrance from the scope of work. | |
| Aug 27, 2025 | Completed final sign-off Dec 2025 | 300 Clay St | Hathaway Dinwiddie Co. | ref ti 202502261091- provide (n) lighting, branch circuiting to (e) panel, (n) power and signal and branch circuit to (e) panel. provide title 24 compliance forms.Details
ref ti 202502261091- provide (n) lighting, branch circuiting to (e) panel, (n) power and signal and branch circuit to (e) panel. provide title 24 compliance forms. | |
| Aug 11, 2025 | In progress issued Aug 2025 | 1750 Van Ness Av | Cahill Contractors Llc. | revise approved app 202111232980, change food service equipment in the kitchen area. wok range, electric fyer and hot water dispenseer.Details
revise approved app 202111232980, change food service equipment in the kitchen area. wok range, electric fyer and hot water dispenseer. | |
| Feb 26, 2025 | Completed final sign-off Dec 2025 | 300 Clay St | Hathaway Dinwiddie Co. | remove existing west entrance door of the bar sprezzatura on plaza level. install a new revolving door with power assist, automated pivot door on west entrance. remove e east entrance door of the bar sprezzatura, new pivot door with power assist.Details
remove existing west entrance door of the bar sprezzatura on plaza level. install a new revolving door with power assist, automated pivot door on west entrance. remove e east entrance door of the bar sprezzatura, new pivot door with power assist. | $492,824 |
| Jan 27, 2025 | Expired or cancelled cancelled Jun 2026 | 1750 Van Ness Av | Cahill Contractors Llc. | revision to pa 2021-1123-2980 s2: remove all finishes, stone cladding, stone cladding support steel and the sawtooth ceiling from the shrine and meditation room. revise the buddha pedestal to gypsum board and paint. revise the lighting design for shrine area.Details
revision to pa 2021-1123-2980 s2: remove all finishes, stone cladding, stone cladding support steel and the sawtooth ceiling from the shrine and meditation room. revise the buddha pedestal to gypsum board and paint. revise the lighting design for shrine area. | |
| Jul 15, 2024 | Completed final sign-off Mar 2025 | 49 South Van Ness Av | Charles Pankow Builders Ltd | revision to 202305268668. added phasing drawings to address fire marchall's comments regarding egress & operation of the smoke control doors being replaced during constructionDetails
revision to 202305268668. added phasing drawings to address fire marchall's comments regarding egress & operation of the smoke control doors being replaced during construction | |
| May 26, 2023 | Completed final sign-off Mar 2025 | 49 South Van Ness Av | Charles Pankow Builders Ltd | revision to pa# 202206085877 to reduce scope of work: remove vestibule prev approved. change to some doors.Details
revision to pa# 202206085877 to reduce scope of work: remove vestibule prev approved. change to some doors. | |
| Sep 28, 2022 | Never finaled issued Nov 2022, no final | 1750 Van Ness Av | Cahill Contractors Llc. | to demolish 1 story, type iii-b, insitution / office building.Details
to demolish 1 story, type iii-b, insitution / office building. | $150,000 |
| Jul 15, 2022 | Expired or cancelled cancelled Jan 2026 | 1 Steuart Ln | Baxter Construction | level 20 unit 2004: remove or relocate the fe and fec located in the front hallway. eliminate it based on the fact that a code requiring to have the fire extinguisher in the location. if elimination is not possible, relocate it, preferably in the laundry room.Details
level 20 unit 2004: remove or relocate the fe and fec located in the front hallway. eliminate it based on the fact that a code requiring to have the fire extinguisher in the location. if elimination is not possible, relocate it, preferably in the laundry room. | $5,000 |
| Jun 8, 2022 | Completed final sign-off Mar 2025 | 49 South Van Ness Av | Charles Pankow Builders Ltd | demolition of (e) doors on levels 1,3, & 10 and to be replaced with new doors and a new vestibule at one location on level 1 and replacement of the walk-off mat with stone.Details
demolition of (e) doors on levels 1,3, & 10 and to be replaced with new doors and a new vestibule at one location on level 1 and replacement of the walk-off mat with stone. | $2,800,000 |
| Jun 3, 2022 | Completed final sign-off Dec 2022 | 255 California St | Richlen Construction | revision to approved pa# 202108257128. demolition of existing doors, millwork and installation of lighting in vacant tenant space. 2nd fl.Details
revision to approved pa# 202108257128. demolition of existing doors, millwork and installation of lighting in vacant tenant space. 2nd fl. | $400,000 |
| Apr 29, 2022 | Completed final sign-off May 2023 | 255 California St | Richlen Construction | 2/f: landscape improvement exterior terrace. replace (1) exterior door w/inswinging door to provide egress from south terraceDetails
2/f: landscape improvement exterior terrace. replace (1) exterior door w/inswinging door to provide egress from south terrace | $750,000 |
| Apr 28, 2022 | Completed final sign-off Jan 2023 | 300 Clay St | Hathaway Dinwiddie Co. | revision to pa# 202111122237. revise havs shaft enclosures to rated enclosures.Details
revision to pa# 202111122237. revise havs shaft enclosures to rated enclosures. | |
| Feb 18, 2022 | Completed final sign-off Jan 2023 | 300 Clay St | Hathaway Dinwiddie Co. | mep for bpa #202111122237Details
mep for bpa #202111122237 | |
| Dec 15, 2021 | Never finaled issued Dec 2021, no final | 300 Clay St | Hathaway Dinwiddie Co. | ventilation system for chemical exhaust for water treatment system in basement. ref 2019 0124 1154.Details
ventilation system for chemical exhaust for water treatment system in basement. ref 2019 0124 1154. | |
| Nov 23, 2021 | Never finaled issued Dec 2022, no final | 1750 Van Ness Av | Cahill Contractors Llc. | erect new 6-story over 1 bsmt, type ib, 40,514 gross sqft bldg for new buddhist temple & accessory bookstore. bsmt lvl of 23,517 sqft for below grade garage w/7 veh. parking, 1 ada, 14 class-1 bike space, storage, mech area. project includes 30 private, no-cost dorm rm for attendees/religious guest.Details
erect new 6-story over 1 bsmt, type ib, 40,514 gross sqft bldg for new buddhist temple & accessory bookstore. bsmt lvl of 23,517 sqft for below grade garage w/7 veh. parking, 1 ada, 14 class-1 bike space, storage, mech area. project includes 30 private, no-cost dorm rm for attendees/religious guest. | $12,000,000 |
| Nov 12, 2021 | Completed final sign-off Jan 2023 | 300 Clay St | Hathaway Dinwiddie Co. | this is an renovation project of the (e) basement, ground, loading dock & plaza level at 300 clay st. demolition of (e) walls, ceilings, finishes, mechanical, electrical & plumbing equipment. construction of (n) restrooms & kitchens, locker rooms, office & dry storage, storage & cooler.Details
this is an renovation project of the (e) basement, ground, loading dock & plaza level at 300 clay st. demolition of (e) walls, ceilings, finishes, mechanical, electrical & plumbing equipment. construction of (n) restrooms & kitchens, locker rooms, office & dry storage, storage & cooler. | $2,682,163 |
| Aug 25, 2021 | Completed final sign-off Aug 2022 | 255 California St | Richlen Construction | interior renovation of the ground and 2nd fl lobby & 2nd fl common areasDetails
interior renovation of the ground and 2nd fl lobby & 2nd fl common areas | $750,000 |
| Feb 8, 2021 | Completed final sign-off Sep 2021 | 255 California St | Richlen Construction | revision to pa 202008312950 (building entrance exterior landing improvement). replace existing terrazzo flooring btw column lines 3 & 6 w/ new terrazzo flooring. replace hose bib btw lines 8 & 9.Details
revision to pa 202008312950 (building entrance exterior landing improvement). replace existing terrazzo flooring btw column lines 3 & 6 w/ new terrazzo flooring. replace hose bib btw lines 8 & 9. | $9,690 |
| Dec 16, 2020 | Completed final sign-off Feb 2022 | 300 Clay St | Hathaway Dinwiddie Co. | structural glass canopy. added exterior glass canopy at clay street entrance.Details
structural glass canopy. added exterior glass canopy at clay street entrance. | $1,434,000 |
| Nov 18, 2020 | Completed final sign-off Feb 2022 | 300 Clay St | Hathaway Dinwiddie Co. | exterior glass & metal wall assembly- exterior glazing added on north side at plaza level for tenant. defferred submittal for pa 201901241154Details
exterior glass & metal wall assembly- exterior glazing added on north side at plaza level for tenant. defferred submittal for pa 201901241154 | |
| Nov 18, 2020 | Never finaled issued Dec 2021, no final | 300 Clay St | Hathaway Dinwiddie Co. | coiling door - a coiling door added on east side between (e) elevator lobby & (n) tenant space for fire & smoke separation.Details
coiling door - a coiling door added on east side between (e) elevator lobby & (n) tenant space for fire & smoke separation. | |
| Nov 18, 2020 | Completed final sign-off Feb 2022 | 300 Clay St | Hathaway Dinwiddie Co. | glass guardrailing- (e) concrete parapet wall was replaced with glass guardrail & metal panel at plaza level.Details
glass guardrailing- (e) concrete parapet wall was replaced with glass guardrail & metal panel at plaza level. | |
| Nov 18, 2020 | Never finaled issued Dec 2021, no final | 300 Clay St | Hathaway Dinwiddie Co. | precast architectural concrete - (e) precast panels replaced with (n) precast panels at clay street entrance.Details
precast architectural concrete - (e) precast panels replaced with (n) precast panels at clay street entrance. | |
| Oct 22, 2020 | Expired or cancelled cancelled Jan 2026 | 300 Clay St | Hathaway Dinwiddie Co. | deferred approved for installation of radiant in-slab heating & displacement ventilation system until completion of t.i. of cade room. ref to pa # 2019 0124 1154Details
deferred approved for installation of radiant in-slab heating & displacement ventilation system until completion of t.i. of cade room. ref to pa # 2019 0124 1154 | |
| Oct 1, 2020 | Never finaled filed Oct 2020, never issued | 95 Hawthorne St | to erect 42 story, 6 basement, approximately 444' tall, type 1, multi family-mixed use structure, with 412 dwelling units. approximately 4,000 sq feet of ground floor retail.Details
to erect 42 story, 6 basement, approximately 444' tall, type 1, multi family-mixed use structure, with 412 dwelling units. approximately 4,000 sq feet of ground floor retail. | $180,000,000 | |
| Sep 5, 2020 | Completed final sign-off Feb 2022 | 1 Maritime Pz | Hathaway Dinwiddie Co. | modification to (e) coil door in (e) loading dock. replace (e) coiling door with 3 hr swing doorDetails
modification to (e) coil door in (e) loading dock. replace (e) coiling door with 3 hr swing door | $20,000 |
| Aug 31, 2020 | Completed final sign-off Jun 2023 | 255 California St | Richlen Construction | replace existing partially accessible building entrance landing with a new accessible landing. new accessible steps, new accessible sloped walkway and new hand rails.Details
replace existing partially accessible building entrance landing with a new accessible landing. new accessible steps, new accessible sloped walkway and new hand rails. | $700,000 |
| Aug 27, 2020 | Completed final sign-off Mar 2022 | 75 Howard St | Swinerton Builders | revision to addenda 3&4 of issued pa# 201604013681 to document and relabel level b2 & b1 to -2 & -1.delete floor #13 labeling&reassign floor numbers; add water curtain per nfpa13-11.3.3 to2locations on level4&5.rename elevators to elev a/b(fsae a/b)&elev c. relocate fuel oil fillport w/in e sidewalkDetails
revision to addenda 3&4 of issued pa# 201604013681 to document and relabel level b2 & b1 to -2 & -1.delete floor #13 labeling&reassign floor numbers; add water curtain per nfpa13-11.3.3 to2locations on level4&5.rename elevators to elev a/b(fsae a/b)&elev c. relocate fuel oil fillport w/in e sidewalk | |
| Dec 31, 2019 | Completed final sign-off May 2022 | 75 Howard St | Swinerton Builders | ref application # 2016-0401-3681: revise architectural drawing sheet a2.b1 to show correct location of fuel oil room.Details
ref application # 2016-0401-3681: revise architectural drawing sheet a2.b1 to show correct location of fuel oil room. | |
| Dec 6, 2019 | Never finaled filed Dec 2019, never issued | 645 Harrison St | retain the historic 4 story building & construct new 237,750 sf vertical addition above (e) bldg. existing ground floor would feature mixed-use retail space & a basement will be added the (e) office & pdr uses will be retained within the 4 story podium bldg. (r-1,b,m,a-2,a-3) ** maher: n/a **Details
retain the historic 4 story building & construct new 237,750 sf vertical addition above (e) bldg. existing ground floor would feature mixed-use retail space & a basement will be added the (e) office & pdr uses will be retained within the 4 story podium bldg. (r-1,b,m,a-2,a-3) ** maher: n/a ** | $100,000,000 | |
| Dec 6, 2019 | Never finaled filed Dec 2019, never issued | 400 02nd St | to erect 27 stories, 3 basements, type i-a, office, pdr, retail building. (b,m,a-3,s-2)Details
to erect 27 stories, 3 basements, type i-a, office, pdr, retail building. (b,m,a-3,s-2) | $160,000,000 | |
| Dec 3, 2019 | Completed final sign-off Apr 2021 | 49 South Van Ness Av | Charles Pankow Builders Ltd | revision to the issued addendum 4 (architectural) for pa #2016-0620-0387 s4; pavilion updates.Details
revision to the issued addendum 4 (architectural) for pa #2016-0620-0387 s4; pavilion updates. | |
| Nov 19, 2019 | Completed final sign-off Apr 2021 | 500 Folsom St | Balfour Beatty Construction Llc | for record purposes only that pertain to unit reduction. 2 studio units were removed from each floor on levels 39-42 for a total of 8 units removed from the project. (ref pa #2015-0311-0506 s)Details
for record purposes only that pertain to unit reduction. 2 studio units were removed from each floor on levels 39-42 for a total of 8 units removed from the project. (ref pa #2015-0311-0506 s) | |
| Sep 5, 2019 | Never finaled issued Dec 2022, no final | 350 02nd St | to erect a type 1-a, 14 story with one basement, 299 unit hotel, restaurant/bar and parking.Details
to erect a type 1-a, 14 story with one basement, 299 unit hotel, restaurant/bar and parking. | $90,000,000 | |
| Jul 9, 2019 | Completed final sign-off Apr 2021 | 49 South Van Ness Av | Charles Pankow Builders Ltd | revision to pa 2016-0620-0387 s4 (arch) clarifying location of elevator hoistway fire alarm device access doors.Details
revision to pa 2016-0620-0387 s4 (arch) clarifying location of elevator hoistway fire alarm device access doors. | |
| Apr 3, 2019 | Completed final sign-off Apr 2021 | 345 Montgomery St | Bcci Construction Company | rev to pa# 201712045429; update smoke control damper sequence & schedule include fire smoke dampers and as built due to field conditionsDetails
rev to pa# 201712045429; update smoke control damper sequence & schedule include fire smoke dampers and as built due to field conditions | $1,000 |
| Mar 25, 2019 | Completed final sign-off Nov 2020 | 75 Howard St | Swinerton Builders | as-built modifications to shoring, add bracing, to whalers and additional braces at pg&e vault on north side of excavation. reference shoring permit #201804025214.Details
as-built modifications to shoring, add bracing, to whalers and additional braces at pg&e vault on north side of excavation. reference shoring permit #201804025214. | |
| Mar 11, 2019 | Expired or cancelled cancelled Jan 2026 | 300 Clay St | revision to pa 2018-1004-2342 revised exit sign locations and lockset functions , change door swing, removal requirement of 2 way comm. at elevator lobbyDetails
revision to pa 2018-1004-2342 revised exit sign locations and lockset functions , change door swing, removal requirement of 2 way comm. at elevator lobby | ||
| Feb 7, 2019 | Completed final sign-off Jul 2020 | 1 Maritime Pz | Gci, Inc | 4/f & 5/f: new communicating stair between 4th and 5th floors. ref t.i. pa#201901180717. maher n/a.Details
4/f & 5/f: new communicating stair between 4th and 5th floors. ref t.i. pa#201901180717. maher n/a. | $300,000 |
| Jan 24, 2019 | Never finaled issued Jun 2020, no final | 300 Clay St | Hathaway Dinwiddie Co. | phase 2 of 2. upgrade to existing lobby, new entry canopy and enclosed plaza level space along the builing's edge to locate an additional commercial tenant.Details
phase 2 of 2. upgrade to existing lobby, new entry canopy and enclosed plaza level space along the builing's edge to locate an additional commercial tenant. | $18,000,000 |
| Jan 18, 2019 | Completed final sign-off Jul 2020 | 1 Maritime Pz | Gci, Inc | 4th & 5th fl - new partitions, ceilings & finishes on existing partial 4th & 5th floor. new open stairway between 4th & 5th floorDetails
4th & 5th fl - new partitions, ceilings & finishes on existing partial 4th & 5th floor. new open stairway between 4th & 5th floor | $4,000,000 |
| Dec 20, 2018 | Completed final sign-off Apr 2021 | 345 Montgomery St | Bcci Construction Company | deferred generator and fuel oil. reference pa# 2017-1204-5429 amd 2018-1025-4105.Details
deferred generator and fuel oil. reference pa# 2017-1204-5429 amd 2018-1025-4105. | |
| Oct 4, 2018 | Completed final sign-off Oct 2019 | 300 Clay St | Hathaway Dinwiddie Co. | tenant improvement on basement level (partial), with mep. selective demolition of interior partitions, flooring and ceiling. construction of new interior partitions, flooring, ceiling, lighting, plumbing and mechanicalDetails
tenant improvement on basement level (partial), with mep. selective demolition of interior partitions, flooring and ceiling. construction of new interior partitions, flooring, ceiling, lighting, plumbing and mechanical | $1,373,211 |
| Jul 26, 2018 | Completed final sign-off Dec 2020 | 500 Folsom St | Balfour Beatty Construction Llc | document parking layout from pre-app meeting & da-09. rev to pa#201503110506-s3(arch). maher n/a.Details
document parking layout from pre-app meeting & da-09. rev to pa#201503110506-s3(arch). maher n/a. | |
| Jul 24, 2018 | Completed final sign-off Dec 2019 | 345 California St | Richlen Construction | lobby refresh: scope to include new ceilings, new elevator lobbies ceiling and at elevator cabs, new floor at pel and plaza and arcade lighting. maher n/a.Details
lobby refresh: scope to include new ceilings, new elevator lobbies ceiling and at elevator cabs, new floor at pel and plaza and arcade lighting. maher n/a. | $1,100,000 |
| May 4, 2018 | Expired or cancelled cancelled Jan 2026 | 999 California St | 8th thru 12th floors - (e) guestroom upgrades to refreshing wall coverings, etc. 4 new room per fllor. hallway lighting all new rooms. meps includedDetails
8th thru 12th floors - (e) guestroom upgrades to refreshing wall coverings, etc. 4 new room per fllor. hallway lighting all new rooms. meps included | $1,483,200 | |
| Feb 28, 2018 | Completed final sign-off Jun 2021 | 101 Vallejo St | Source Planning And Construction Inc | revision to app#201707202428 to correct downspout tie ins. correction notice #201841311. redsign stairs from steel to wood and extend depth of sump pit.Details
revision to app#201707202428 to correct downspout tie ins. correction notice #201841311. redsign stairs from steel to wood and extend depth of sump pit. | |
| Jan 31, 2018 | Completed final sign-off Sep 2018 | 345 California St | Gci, Inc | ti at basement addition of bicycle storage room and 4th floor fitness center with shower and locker rooms for tenant useDetails
ti at basement addition of bicycle storage room and 4th floor fitness center with shower and locker rooms for tenant use | $1,100,000 |
| Dec 28, 2017 | Completed final sign-off Feb 2019 | 350 Mission St | Gci, Inc | floors 6,7,& 8: interior construction including selective demolition, relocation of drinking fountain and construction of wing wall partition. minor mechanical and electrical. n/a for maherDetails
floors 6,7,& 8: interior construction including selective demolition, relocation of drinking fountain and construction of wing wall partition. minor mechanical and electrical. n/a for maher | $120,000 |
| Dec 5, 2017 | Completed final sign-off Oct 2018 | 75 Howard St | Silverado Contractors Inc, Swinerton Builders | to demolish 7 stories, parking garage building. ** maher: n/a **Details
to demolish 7 stories, parking garage building. ** maher: n/a ** | $2,185,000 |
| Jul 20, 2017 | Completed final sign-off Jun 2021 | 101 Vallejo St | revision to pa #201702270176 - construction of new stairways from basement to level 2 mezzanine. installation of new partitions, flooring, interior glazing & ceilings. n/a maher ordinanceDetails
revision to pa #201702270176 - construction of new stairways from basement to level 2 mezzanine. installation of new partitions, flooring, interior glazing & ceilings. n/a maher ordinance | $20,000 | |
| May 23, 2017 | Never finaled issued May 2017, no final | 350 Mission St | administrative permit only: no work. assembly permit only for lobby to document occupancy calculations.Details
administrative permit only: no work. assembly permit only for lobby to document occupancy calculations. | ||
| Jun 20, 2016 | Completed final sign-off Dec 2021 | 1500 Mission St | Charles Pankow Builders Ltd | to erect 16 stories, 2 basement, office building & 39 stories, 2 basement, type ia, 550 residential units building. both buildings are over a shared two level subterranean basement parking garage. (r-2,b,a-3,i-4,s-2)Details
to erect 16 stories, 2 basement, office building & 39 stories, 2 basement, type ia, 550 residential units building. both buildings are over a shared two level subterranean basement parking garage. (r-2,b,a-3,i-4,s-2) | $400,000,000 |
| Apr 1, 2016 | Completed final sign-off Aug 2022 | 75 Howard St | Swinerton Builders | to erect 21 stories, 2 basements, 120 dwelling units with commercial. ** maher: disturbance of at least 50 cu. yd. of soil. route to dph **Details
to erect 21 stories, 2 basements, 120 dwelling units with commercial. ** maher: disturbance of at least 50 cu. yd. of soil. route to dph ** | $146,916,000 |
| Feb 8, 2016 | Expired or cancelled cancelled Jan 2026 | 1 Market St | Dpr Construction | interior signage for plaza level retail shops and tower. maher naDetails
interior signage for plaza level retail shops and tower. maher na | $17,000 |
| Nov 16, 2015 | Never finaled filed Nov 2015, never issued | 1208 Junipero Serra Bl | demolish two story parking garage. refetrence to new building permit application #201510260810s.Details
demolish two story parking garage. refetrence to new building permit application #201510260810s. | $349,900 | |
| Nov 9, 2015 | Never finaled filed Nov 2015, never issued | 55 Chumasero Dr | erect 14-story, type 1-a, 3 basements, 313 dwelling units residentialDetails
erect 14-story, type 1-a, 3 basements, 313 dwelling units residential | $93,402,505 | |
| Jul 31, 2015 | Expired or cancelled cancelled Jan 2026 | 1 Market St | revision to 201402047821. documentation only. revise color finish for storefront system and structural steel. maher not reqDetails
revision to 201402047821. documentation only. revise color finish for storefront system and structural steel. maher not req | ||
| Jul 2, 2015 | Never finaled issued Jul 2015, no final | 1 Market St | Gci, Inc | removal of exterior signs and sign support structure. maher n/a.Details
removal of exterior signs and sign support structure. maher n/a. | $5,000 |
| Jun 22, 2015 | Never finaled issued Jul 2015, no final | 1 Market St | Gci, Inc | ground floor food court area - replace existing flooring with new flooring. replace exisitng ceiling, ceiling light fixtures & air diffuser grilles with new ones.Details
ground floor food court area - replace existing flooring with new flooring. replace exisitng ceiling, ceiling light fixtures & air diffuser grilles with new ones. | $500,000 |
| Jan 15, 2015 | Completed final sign-off Jul 2015 | 1127 Market St | header hanger frame for av display art wall. install av display panels. n/a for the intrim. reference to t.i. permit appl. #201212115890 for deferred submittal item.Details
header hanger frame for av display art wall. install av display panels. n/a for the intrim. reference to t.i. permit appl. #201212115890 for deferred submittal item. | $100,000 | |
| Oct 31, 2014 | Completed final sign-off Sep 2015 | 747 Howard St | Webcor Construction Lp | this work will include the moving of an mdf (server) room from 3rd and folsom sts. to 3rd and howard sts. including fiber pbx system and misc. low voltage systems. installation of an fm-200 and pre-action system, with 2 crac-hvac units. for parallel plan ck. pa 2014/0623/9136 2010 cec entitlements.Details
this work will include the moving of an mdf (server) room from 3rd and folsom sts. to 3rd and howard sts. including fiber pbx system and misc. low voltage systems. installation of an fm-200 and pre-action system, with 2 crac-hvac units. for parallel plan ck. pa 2014/0623/9136 2010 cec entitlements. | $6,000,000 |
| Oct 23, 2014 | Never finaled issued Feb 2015, no final | 1 Market St | Dpr Construction | revision to pa 201402188751 changes to interior store fronts, changing occupant load, finishes in retails space, changed lights in banner area, mechanical system, and lighting as required. box car layout. sprinklers and fire alarm sep permits. sffd asembly permit requiredDetails
revision to pa 201402188751 changes to interior store fronts, changing occupant load, finishes in retails space, changed lights in banner area, mechanical system, and lighting as required. box car layout. sprinklers and fire alarm sep permits. sffd asembly permit required | $1,000 |
| Oct 20, 2014 | Never finaled issued Feb 2015, no final | 1 Market St | Dpr Construction | revision to 2009-04-27-7112: exterior canopies and entries replacement of exsting storefront entry canopy of canopy lighting at mission street. maher not reqDetails
revision to 2009-04-27-7112: exterior canopies and entries replacement of exsting storefront entry canopy of canopy lighting at mission street. maher not req | $1,000 |
| Jun 23, 2014 | Completed final sign-off Mar 2021 | 747 Howard St | Webcor Construction Lp | renov(e)moscone north & south bldg,increase gross sq footage of moscone n & s combined facility fr approx 1.2 million gsf to 1.5 million gsf.wk incl lower level(exhibit hall renov,addition of 3 stories at moscone south&renov moscone north lobby,plus 2 connecting bridges over howard st. maher req.Details
renov(e)moscone north & south bldg,increase gross sq footage of moscone n & s combined facility fr approx 1.2 million gsf to 1.5 million gsf.wk incl lower level(exhibit hall renov,addition of 3 stories at moscone south&renov moscone north lobby,plus 2 connecting bridges over howard st. maher req. | $340,000,000 |
| Apr 1, 2014 | Completed final sign-off Nov 2014 | 125 03rd St | Marchetti Construction Inc. | 21/f- add 2 gates for security in stairwells. (interior only)Details
21/f- add 2 gates for security in stairwells. (interior only) | $20,000 |
| Feb 4, 2014 | Completed final sign-off Feb 2016 | 1 Market St | Dpr Construction | replace entries & add canopies to entries on mission street, spear street and steuart street. revision to pa#2009.0427.7112. compliance with ordinance #155-13 not required.Details
replace entries & add canopies to entries on mission street, spear street and steuart street. revision to pa#2009.0427.7112. compliance with ordinance #155-13 not required. | $250,000 |
| Dec 17, 2013 | Expired or cancelled withdrawn Jul 2025 | 1979 Mission St | erect 10-story mixed-use new building.Details
erect 10-story mixed-use new building. | $82,125,960 | |
| Mar 25, 2013 | Completed final sign-off Mar 2017 | 350 Mission St | Webcor Construction Lp | altered site permit for record purposes only to issued site permit 2011-08-01-1461/s - additional 3 stories from 27 to 30.Details
altered site permit for record purposes only to issued site permit 2011-08-01-1461/s - additional 3 stories from 27 to 30. | $7,500,000 |
| Mar 21, 2013 | Completed final sign-off Nov 2015 | 350 Mission St | Webcor Construction Lp | erect temporary construction crane for new building authorized under pa# 2011/08/01/1461.Details
erect temporary construction crane for new building authorized under pa# 2011/08/01/1461. | $120,000 |
| Dec 11, 2012 | Never finaled issued Jul 2013, no final | 1127 Market St | Plant Construction Company Lp | renovation and conversion of (e) theater (movies and live performance) into a live performance theater. work includes sidewalk improvements, preservation of histonic facade, seismic retrofit, interior renovation, replacement of (e) mep systems, new sprinker system, new elevator, roof replacement.Details
renovation and conversion of (e) theater (movies and live performance) into a live performance theater. work includes sidewalk improvements, preservation of histonic facade, seismic retrofit, interior renovation, replacement of (e) mep systems, new sprinker system, new elevator, roof replacement. | $10,000,000 |
| Mar 27, 2012 | Never finaled issued Aug 2012, no final | 50 Fremont St | Charles Pankow Builders Ltd | remodel of level one & mezzanne of an (e) 43 story office tower, include replace main lobby finishes, replace perimeter storefront glazing, rerouting of tower stair exit, replace entrance marquee, replace exterior corner beacons & related modification to mep & lighting systems.Details
remodel of level one & mezzanne of an (e) 43 story office tower, include replace main lobby finishes, replace perimeter storefront glazing, rerouting of tower stair exit, replace entrance marquee, replace exterior corner beacons & related modification to mep & lighting systems. | $5,850,000 |
| Mar 27, 2012 | Never finaled filed Mar 2012, never issued | 370 Drumm St | erect 12 story of type 1b construction .Details
erect 12 story of type 1b construction . | $155,000,000 | |
| Mar 27, 2012 | Expired or cancelled cancelled Jul 2015 | 99 Jackson St | erect 1 story of type 3 construction for health club/cafe.Details
erect 1 story of type 3 construction for health club/cafe. | $9,000,000 | |
| Aug 1, 2011 | Completed final sign-off Mar 2017 | 350 Mission St | to erect 27 stories, office, retail & parking building.Details
to erect 27 stories, office, retail & parking building. | $84,130,000 | |
| Mar 16, 2010 | Completed final sign-off Sep 2010 | 101 02nd St | Hathaway Dinwiddie Co. | fin on building to be removed & touch up fire proofing as required.Details
fin on building to be removed & touch up fire proofing as required. | $60,000 |
| Jun 2, 2008 | Completed final sign-off Nov 2008 | 150 Font Bl | Brayer Electric Company | tower 16 - revision to 200712180788: install generator at tower 16.Details
tower 16 - revision to 200712180788: install generator at tower 16. | |
| Jun 2, 2008 | Completed final sign-off Oct 2008 | 310 Arballo Dr | Brayer Electric Company | tower 40 - revision to 200712180792: install generator at tower 40.Details
tower 40 - revision to 200712180792: install generator at tower 40. | |
| Jun 2, 2008 | Completed final sign-off Oct 2008 | 350 Arballo Dr | Brayer Electric Company | tower 39 - revision to 200712180789: install generator at tower 39.Details
tower 39 - revision to 200712180789: install generator at tower 39. | |
| Jun 2, 2008 | Completed final sign-off Nov 2008 | 125 Cambon Dr | Brayer Electric Company | tower 14 - revision to 200712180794, install generator at tower 14.Details
tower 14 - revision to 200712180794, install generator at tower 14. | |
| Jun 2, 2008 | Completed final sign-off Nov 2008 | 100 Font Bl | Brayer Electric Company | tower 15 - revision to 200712180796: install generator at tower 15.Details
tower 15 - revision to 200712180796: install generator at tower 15. | |
| Jun 2, 2008 | Completed final sign-off Oct 2008 | 810 Gonzalez Dr | Brayer Electric Company | tower 27 - revision to 200712180793: installation of generator at tower 27.Details
tower 27 - revision to 200712180793: installation of generator at tower 27. | |
| Jun 2, 2008 | Completed final sign-off Oct 2008 | 355 Serrano Dr | Brayer Electric Company | tower 46 - revision to 200712180801: installation of generator at tower 46.Details
tower 46 - revision to 200712180801: installation of generator at tower 46. | |
| Jun 2, 2008 | Completed final sign-off Nov 2008 | 50 Chumasero Dr | Brayer Electric Company | tower 18 - revision to 200712180797: install generator at tower 18.Details
tower 18 - revision to 200712180797: install generator at tower 18. | |
| Jun 2, 2008 | Never finaled issued Jul 2008, no final | 55 Chumasero Dr | Brayer Electric Company | tower 17 - revision to 200712180799: install generator at tower 17.Details
tower 17 - revision to 200712180799: install generator at tower 17. | |
| Jun 2, 2008 | Completed final sign-off Oct 2008 | 405 Serrano Dr | Brayer Electric Company | tower 47 - revision to 200712180787: installation of generator at tower 47.Details
tower 47 - revision to 200712180787: installation of generator at tower 47. | |
| Jun 2, 2008 | Completed final sign-off Oct 2008 | 750 Gonzalez Dr | Brayer Electric Company | tower 26 - revision to 200712180783: installation of generator at tower 26.Details
tower 26 - revision to 200712180783: installation of generator at tower 26. | |
| May 16, 2008 | Completed final sign-off Nov 2008 | 1 Front St | Hathaway Dinwiddie Co. | new partitions,countertops,electric outlets, relocation of light fixtures on 25th floor. demo work under application 200805091772.Details
new partitions,countertops,electric outlets, relocation of light fixtures on 25th floor. demo work under application 200805091772. | $50,000 |
| May 16, 2008 | Completed final sign-off Nov 2008 | 1 Front St | Hathaway Dinwiddie Co. | 24th floor: construction of non-structural partition walls, countertops and light fixtures over countertops in area inside existing tenant space.Details
24th floor: construction of non-structural partition walls, countertops and light fixtures over countertops in area inside existing tenant space. | $50,000 |
| Dec 18, 2007 | Completed final sign-off Nov 2008 | 150 Font Bl | Brayer Electric Company | build structural concrete pad to support new generator. install new electrical conduit/wiring to (e) building panel board located in basement of building being served. generator installation under separate permit.Details
build structural concrete pad to support new generator. install new electrical conduit/wiring to (e) building panel board located in basement of building being served. generator installation under separate permit. | $50,000 |
| Dec 18, 2007 | Completed final sign-off Oct 2008 | 750 Gonzalez Dr | Brayer Electric Company | build structural concrete pad to support new generator. install new electrical conduit/wiring to (e) building panel board located in basement of building being served. generator installation under separate permit.Details
build structural concrete pad to support new generator. install new electrical conduit/wiring to (e) building panel board located in basement of building being served. generator installation under separate permit. | $50,000 |
| Dec 18, 2007 | Completed final sign-off Oct 2008 | 810 Gonzalez Dr | Brayer Electric Company | build structural concrete pad to support new generator. install new electrical conduit/wiring to (e) building panel board located in basement of building being served. generator installation under separate permit.Details
build structural concrete pad to support new generator. install new electrical conduit/wiring to (e) building panel board located in basement of building being served. generator installation under separate permit. | $50,000 |
| Dec 18, 2007 | Completed final sign-off Oct 2008 | 405 Serrano Dr | Brayer Electric Company | build structural concrete pad to support new generator. install new electrical conduit/wiring to (e) building panel board located in basement of building being served. generator installation under separate permit.Details
build structural concrete pad to support new generator. install new electrical conduit/wiring to (e) building panel board located in basement of building being served. generator installation under separate permit. | $50,000 |
| Dec 18, 2007 | Completed final sign-off Oct 2008 | 350 Arballo Dr | Brayer Electric Company | build structural concrete pad to support new generator. install new electrical conduit/wiring to (e) building panel board located in basement of building being served. generator installation under separate permit.Details
build structural concrete pad to support new generator. install new electrical conduit/wiring to (e) building panel board located in basement of building being served. generator installation under separate permit. | $50,000 |
| Dec 18, 2007 | Completed final sign-off Oct 2008 | 310 Arballo Dr | Brayer Electric Company | build structural concrete pad to support new generator. install new electrical conduit/wiring to (e) building panel board located in basement of building being served. generator installation under separate permit.Details
build structural concrete pad to support new generator. install new electrical conduit/wiring to (e) building panel board located in basement of building being served. generator installation under separate permit. | $50,000 |
| Dec 3, 2007 | Completed final sign-off Jun 2014 | 680 Folsom St | Plant Construction Company Lp | total building renovation including seismic upgrade horizontal & 2 story vertical additon to existing building. work includes new exterior cladding, new toilet rooms, elevators, mep fire & life safety systems. building to be leed certified "gold".Details
total building renovation including seismic upgrade horizontal & 2 story vertical additon to existing building. work includes new exterior cladding, new toilet rooms, elevators, mep fire & life safety systems. building to be leed certified "gold". | $82,500,000 |
| Aug 17, 2005 | Expired or cancelled cancelled Dec 2006 | 125 03rd St | Webcor Construction Lp | construct a gilass wind screen on 4th floor terrace. glass windscreen is 6'-8" in height.Details
construct a gilass wind screen on 4th floor terrace. glass windscreen is 6'-8" in height. | $75,000 |
| May 16, 2005 | Expired or cancelled expired May 2006 | 125 03rd St | Webcor Construction Lp | revision of fire alarm panel. ref: app#200008309233 & 200503097151.Details
revision of fire alarm panel. ref: app#200008309233 & 200503097151. |