46 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 24, 2026 | Completed final sign-off Jul 2026 | 1 Steuart Ln | Baxter Construction | unit 1402: revision to bpa: 202508183262 - demo and re-frame 3 non- load bearing walls to fit new cabinetry, new closet interiors for 4 closets. (plumbing safe off for laundry room)Details
unit 1402: revision to bpa: 202508183262 - demo and re-frame 3 non- load bearing walls to fit new cabinetry, new closet interiors for 4 closets. (plumbing safe off for laundry room) | |
| Feb 6, 2026 | Completed final sign-off Feb 2026 | 1 Steuart Ln | Baxter Construction | revision to pa #2025-0226-1137: new wall & soffit in kitchen. new soffit in bedroom & remove bathroom plumbing from scope.Details
revision to pa #2025-0226-1137: new wall & soffit in kitchen. new soffit in bedroom & remove bathroom plumbing from scope. | $78,000 |
| Nov 3, 2025 | In progress filed Nov 2025, not yet issued | 1 Steuart Ln | provide 2 (n) fire pirts at (e) second floor event terrace. provide gas piping with required fittings, and accessories provide gas piping to (2) alternatvie locations with fitting and accessories. propvide (n) gfci recepticles.Details
provide 2 (n) fire pirts at (e) second floor event terrace. provide gas piping with required fittings, and accessories provide gas piping to (2) alternatvie locations with fitting and accessories. propvide (n) gfci recepticles. | $125,000 | |
| Oct 22, 2025 | Completed final sign-off Apr 2026 | 1 Steuart Ln | Baxter Construction | unit #1001: open drywall to accommodate the installation of decorative light fixtures and receptacles. electrical work under separate permit. no relocation of walls or door. non structural partition - max 4'x4' openings in 4 location. patch.Details
unit #1001: open drywall to accommodate the installation of decorative light fixtures and receptacles. electrical work under separate permit. no relocation of walls or door. non structural partition - max 4'x4' openings in 4 location. patch. | $25,000 |
| Sep 4, 2025 | Completed final sign-off Jan 2026 | 1 Steuart Ln | Avm Fire Protection Inc | unit# 1406: tenant improvement- update fire srpinkler layout due to new soffit in kitchen. added 2 pendant sprinklers in soffic and relocated 2 sidwall sprinklers. ref pa# 202502261137Details
unit# 1406: tenant improvement- update fire srpinkler layout due to new soffit in kitchen. added 2 pendant sprinklers in soffic and relocated 2 sidwall sprinklers. ref pa# 202502261137 | $1,500 |
| Aug 18, 2025 | In progress issued Aug 2025 | 1 Steuart Ln | Baxter Construction | unit 1401: remove and replace closet intrior in closet, electrical work for new lighting fixtures to be performed under seperate permit.Details
unit 1401: remove and replace closet intrior in closet, electrical work for new lighting fixtures to be performed under seperate permit. | $15,000 |
| Aug 18, 2025 | Completed final sign-off Jul 2026 | 1 Steuart Ln | Baxter Construction | unit 1402: remove and replace closet interior in four closets. electrical work for lighting fixtures to be performed under speerate permit.Details
unit 1402: remove and replace closet interior in four closets. electrical work for lighting fixtures to be performed under speerate permit. | $15,000 |
| Jun 10, 2025 | Completed final sign-off Dec 2025 | 1 Steuart Ln | Baxter Construction | #1002: replace kitchen countertops and cabinets. replace two toilets, open drywall to accomdate electrical work. install new led recessed lighting. this work will be preformed in the unit only. remodel inkind. reuse all existing appliances and fixtures.Details
#1002: replace kitchen countertops and cabinets. replace two toilets, open drywall to accomdate electrical work. install new led recessed lighting. this work will be preformed in the unit only. remodel inkind. reuse all existing appliances and fixtures. | $7,500 |
| May 19, 2025 | In progress issued Oct 2025 | 1 Steuart Ln | S & H Renovations | installation of lobby door operator.Details
installation of lobby door operator. | $25,000 |
| May 7, 2025 | Completed final sign-off May 2025 | 1 Steuart Ln | Baxter Construction | unit 1701 - revision to pa 202502140386 to include decorative soffit @ kitchen for lightingDetails
unit 1701 - revision to pa 202502140386 to include decorative soffit @ kitchen for lighting | $5,000 |
| Apr 17, 2025 | Completed final sign-off Apr 2025 | 1 Steuart Ln | Avm Fire Protection Inc | unit#1701: relocate 1- echsw sprinkler, add 1 ssp in new soffit ref#2025-0214-0386Details
unit#1701: relocate 1- echsw sprinkler, add 1 ssp in new soffit ref#2025-0214-0386 | $4,500 |
| Feb 26, 2025 | Completed final sign-off Feb 2026 | 1 Steuart Ln | Baxter Construction | unit 1406: remodel existing kitchen and remodel guest bath in kind. new plumbing fixtures, appliances, counter tops.Details
unit 1406: remodel existing kitchen and remodel guest bath in kind. new plumbing fixtures, appliances, counter tops. | $78,000 |
| Feb 14, 2025 | Completed final sign-off May 2025 | 1 Steuart Ln | Baxter Construction | unit #1701 open drywall to accomodate install of new recessed light fixtures and track lighting throughout unit. no relocation for doors windows or wallsDetails
unit #1701 open drywall to accomodate install of new recessed light fixtures and track lighting throughout unit. no relocation for doors windows or walls | $25,000 |
| May 31, 2024 | In progress issued May 2024 | 75 Howard St | Baxter Construction | unit 701: to obtain final inspection for work approved under pa#202201055424. all work is complete.Details
unit 701: to obtain final inspection for work approved under pa#202201055424. all work is complete. | |
| Jan 17, 2024 | Completed final sign-off Jun 2024 | 1 Steuart Ln | Aaron Gordon Construction Inc | (unit #1501) revision to pa# 202312082157: to remove an (e) tub and replace w/ shower. unit to meet ca bldg code section 1134.a.Details
(unit #1501) revision to pa# 202312082157: to remove an (e) tub and replace w/ shower. unit to meet ca bldg code section 1134.a. | |
| Dec 8, 2023 | Completed final sign-off Jun 2024 | 1 Steuart Ln | Aaron Gordon Construction Inc | 15/f-unit# 1501: remodel of (e) 3-bedroom condo including new wall finishes, new bathroom fixtures that replace (e) ones, new lighting in the ceiling, and relocated outlets.Details
15/f-unit# 1501: remodel of (e) 3-bedroom condo including new wall finishes, new bathroom fixtures that replace (e) ones, new lighting in the ceiling, and relocated outlets. | $150,000 |
| Jan 27, 2023 | Completed final sign-off May 2023 | 75 Howard St | Baxter Construction | unit# 1401: remove and replace toilet in existing location. install led track light in living room. install (2) led recessed can lights in office.Details
unit# 1401: remove and replace toilet in existing location. install led track light in living room. install (2) led recessed can lights in office. | $15,000 |
| Jan 9, 2023 | Never finaled issued Feb 2023, no final | 75 Howard St | Baxter Construction | unit 2004: revision to no-plan permit 202112094064. remove closet doors and shelving in 4 rooms, replace with new. install new kitchen countertop and new built-in cabinets in 6 rooms with led lighting.Details
unit 2004: revision to no-plan permit 202112094064. remove closet doors and shelving in 4 rooms, replace with new. install new kitchen countertop and new built-in cabinets in 6 rooms with led lighting. | $10,000 |
| Nov 10, 2022 | Completed final sign-off Apr 2023 | 1 Steuart Ln | Baxter Construction | (unit 1106) fire only- remove (e) in-wall fire extinguisher cabinet from unit. provide fire extinguisher in kitchen stored under the sink. (e) 2 fire extinguishers cabinets at the public corridor to remain and comply with cfc 2019 906.5Details
(unit 1106) fire only- remove (e) in-wall fire extinguisher cabinet from unit. provide fire extinguisher in kitchen stored under the sink. (e) 2 fire extinguishers cabinets at the public corridor to remain and comply with cfc 2019 906.5 | $1,500 |
| Sep 30, 2022 | Never finaled issued Oct 2022, no final | 1 Steuart Ln | Black Mountain Development | unit #2001: demo of non-structural partitions, new interior lighting, new interior partitions, installation of new finishes, plumbing fixtures, and new cabinetry. no structural work.Details
unit #2001: demo of non-structural partitions, new interior lighting, new interior partitions, installation of new finishes, plumbing fixtures, and new cabinetry. no structural work. | $80,000 |
| Sep 27, 2022 | Never finaled issued Sep 2022, no final | 75 Howard St | Allied Fire Protection | as built for 202206247016; 1 plug e ssp hall, relocate 1 e sprinkler in game room to be hsw, relocate 2 sprinkler 2 in south for new mech blindsDetails
as built for 202206247016; 1 plug e ssp hall, relocate 1 e sprinkler in game room to be hsw, relocate 2 sprinkler 2 in south for new mech blinds | |
| Jul 15, 2022 | Completed final sign-off Aug 2022 | 75 Howard St | Allied Fire Protection | relocate 6 existing sprinklers. remove plug (4). apt 1106Details
relocate 6 existing sprinklers. remove plug (4). apt 1106 | $11,500 |
| Jul 15, 2022 | Expired or cancelled cancelled Jan 2026 | 1 Steuart Ln | Baxter Construction | level 20 unit 2004: remove or relocate the fe and fec located in the front hallway. eliminate it based on the fact that a code requiring to have the fire extinguisher in the location. if elimination is not possible, relocate it, preferably in the laundry room.Details
level 20 unit 2004: remove or relocate the fe and fec located in the front hallway. eliminate it based on the fact that a code requiring to have the fire extinguisher in the location. if elimination is not possible, relocate it, preferably in the laundry room. | $5,000 |
| Jun 24, 2022 | Never finaled issued Jun 2022, no final | 75 Howard St | Allied Fire Protection | unit 1904: relocate 6 (e) fire sprinklers to accomodate modified lighting & ceilings. ref t.i. 202112094062. maher n/a.Details
unit 1904: relocate 6 (e) fire sprinklers to accomodate modified lighting & ceilings. ref t.i. 202112094062. maher n/a. | $12,500 |
| Jun 24, 2022 | Never finaled issued Jun 2022, no final | 75 Howard St | Allied Fire Protection | unit 2004: relocate 8 (e) fire sprinklers & add 2 & plug off 1 to accomodate modified lighting & ceilings. ref t.i. 202112094064.maher n/a.Details
unit 2004: relocate 8 (e) fire sprinklers & add 2 & plug off 1 to accomodate modified lighting & ceilings. ref t.i. 202112094064.maher n/a. | $16,750 |
| Jun 17, 2022 | Completed final sign-off Jul 2022 | 75 Howard St | Allied Fire Protection | unit #701: relocate 3 existing fire sprinklers for modified lighting/ceilings.Details
unit #701: relocate 3 existing fire sprinklers for modified lighting/ceilings. | $8,500 |
| Apr 22, 2022 | Completed final sign-off May 2022 | 75 Howard St | to obtain final inspection for work approved under permit application no: 201806192271. all work is complete.Details
to obtain final inspection for work approved under permit application no: 201806192271. all work is complete. | ||
| Apr 21, 2022 | Completed final sign-off Jun 2022 | 75 Howard St | Allied Fire Protection | unit# 1101: relocate four and add 2 fire sprinklers. ref pa 202108206830Details
unit# 1101: relocate four and add 2 fire sprinklers. ref pa 202108206830 | $3,000 |
| Feb 16, 2022 | Completed final sign-off Aug 2022 | 75 Howard St | record permit for submitted for final smoke control report. bpa 201604013681. no work under this permit.Details
record permit for submitted for final smoke control report. bpa 201604013681. no work under this permit. | ||
| Jan 27, 2022 | Completed final sign-off Apr 2023 | 75 Howard St | Baxter Construction | 1 steuart lane: unit 1106: new high efficiency lighting throughout- new finishes in master and guest baths. new built in cabinetry at 2 closets. open and patch drywall for electrical work.Details
1 steuart lane: unit 1106: new high efficiency lighting throughout- new finishes in master and guest baths. new built in cabinetry at 2 closets. open and patch drywall for electrical work. | $75,000 |
| Jan 5, 2022 | Completed final sign-off Sep 2024 | 75 Howard St | Baxter Construction | unit #701: remove (e) pocket door from bedroom to living room & replace with (n) sliding door. remove & replace drywall to accomodate (n) recessed lighting in various locations. all new lighting to be high efficiency.no wall layout changes. no opening size changes.Details
unit #701: remove (e) pocket door from bedroom to living room & replace with (n) sliding door. remove & replace drywall to accomodate (n) recessed lighting in various locations. all new lighting to be high efficiency.no wall layout changes. no opening size changes. | $50,000 |
| Dec 9, 2021 | Completed final sign-off Feb 2023 | 75 Howard St | Baxter Construction | unit 2004: remove closet doors and shelving in 4 rooms: replace with new remove and install new kitchen countertop and new kitchen cabinets. new built in cabinetry in 6 rooms with led lightingDetails
unit 2004: remove closet doors and shelving in 4 rooms: replace with new remove and install new kitchen countertop and new kitchen cabinets. new built in cabinetry in 6 rooms with led lighting | $75,000 |
| Dec 9, 2021 | Completed final sign-off Sep 2024 | 75 Howard St | Baxter Construction | unit 1904: install built in cabinets at office and laundryroom: open drywall for electrical work in office that includes new led lighting- new track lighting at guest bedroom and livingroom. no change in room designations.Details
unit 1904: install built in cabinets at office and laundryroom: open drywall for electrical work in office that includes new led lighting- new track lighting at guest bedroom and livingroom. no change in room designations. | $60,000 |
| Aug 20, 2021 | Completed final sign-off Jun 2022 | 75 Howard St | Baxter Construction | unit 1101: one kitchen remodel: replace counter top at kitchen island - install new appliances, replace counter top at existing wet bar - install new cabinet open drywall to run power for new motorized shadesDetails
unit 1101: one kitchen remodel: replace counter top at kitchen island - install new appliances, replace counter top at existing wet bar - install new cabinet open drywall to run power for new motorized shades | $25,000 |
| Aug 19, 2021 | Completed final sign-off May 2022 | 75 Howard St | Baxter Construction | unit#610: remodel master bathroom. remodel in-kind.Details
unit#610: remodel master bathroom. remodel in-kind. | $35,000 |
| Apr 15, 2021 | Completed final sign-off Apr 2022 | 75 Howard St | Thomas Swan Sign Co Inc | install evacuation maps for basement and levels 1-21 (96 signs total)Details
install evacuation maps for basement and levels 1-21 (96 signs total) | $25,000 |
| Jan 29, 2021 | Never finaled issued Feb 2021, no final | 1 Steuart Ln | per approved by sffd and sfpd, add address for pa #201604013681 at block 3741, lot 045 as; 1 steuart lane.Details
per approved by sffd and sfpd, add address for pa #201604013681 at block 3741, lot 045 as; 1 steuart lane. | ||
| Aug 27, 2020 | Completed final sign-off Mar 2022 | 75 Howard St | Swinerton Builders | revision to addenda 3&4 of issued pa# 201604013681 to document and relabel level b2 & b1 to -2 & -1.delete floor #13 labeling&reassign floor numbers; add water curtain per nfpa13-11.3.3 to2locations on level4&5.rename elevators to elev a/b(fsae a/b)&elev c. relocate fuel oil fillport w/in e sidewalkDetails
revision to addenda 3&4 of issued pa# 201604013681 to document and relabel level b2 & b1 to -2 & -1.delete floor #13 labeling&reassign floor numbers; add water curtain per nfpa13-11.3.3 to2locations on level4&5.rename elevators to elev a/b(fsae a/b)&elev c. relocate fuel oil fillport w/in e sidewalk | |
| Aug 20, 2020 | Never finaled issued Oct 2020, no final | 75 Howard St | installation of grey water treatment system. reference pa #2016-0401-3681Details
installation of grey water treatment system. reference pa #2016-0401-3681 | ||
| Jul 2, 2020 | Expired or cancelled cancelled Jan 2026 | 75 Howard St | Sun Light & Power | install a closed loop domestic hot water system with (70) aka tec sol vario 1000 df collectors & (2) 2500gal water storage tanks.to be tied with 201604013681-s12. maher n/a.Details
install a closed loop domestic hot water system with (70) aka tec sol vario 1000 df collectors & (2) 2500gal water storage tanks.to be tied with 201604013681-s12. maher n/a. | $543,000 |
| Jun 18, 2020 | Never finaled issued Jun 2020, no final | 75 Howard St | street spaceDetails
street space | ||
| Dec 31, 2019 | Completed final sign-off May 2022 | 75 Howard St | Swinerton Builders | ref application # 2016-0401-3681: revise architectural drawing sheet a2.b1 to show correct location of fuel oil room.Details
ref application # 2016-0401-3681: revise architectural drawing sheet a2.b1 to show correct location of fuel oil room. | |
| Dec 4, 2019 | Never finaled issued Dec 2019, no final | 75 Howard St | street spaceDetails
street space | ||
| Jun 11, 2019 | Never finaled issued Jun 2019, no final | 75 Howard St | street spaceDetails
street space | ||
| Mar 25, 2019 | Completed final sign-off Nov 2020 | 75 Howard St | Swinerton Builders | as-built modifications to shoring, add bracing, to whalers and additional braces at pg&e vault on north side of excavation. reference shoring permit #201804025214.Details
as-built modifications to shoring, add bracing, to whalers and additional braces at pg&e vault on north side of excavation. reference shoring permit #201804025214. | |
| Nov 26, 2018 | Never finaled issued Dec 2018, no final | 75 Howard St | Swinerton Builders | street spaceDetails
street space |