Glenn G. Rescalvo
- Listed as
- architect, attorney, authorized agent-others
- Firm
- Handel Architects,Llp
- Based in
- San Francisco
- On San Francisco permits
- Feb 2001 to Feb 2026
117 permits since 2000 (architect on 114 permits, authorized agent-others on 2 permits, attorney on 1 permit): 86 completed, 3 in progress, 21 never finaled, 7 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 117.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 10, 2026 | In progress filed Feb 2026, not yet issued | 360 05th St | erect type 1a over 4a 21-story 272 unit residential/commerical building.Details
erect type 1a over 4a 21-story 272 unit residential/commerical building. | $40,000,000 | |
| Jan 12, 2026 | Completed final sign-off Jan 2026 | 531 Bryant St | Embarcadero Enterprises Corporation | exterior wall repair to comply w/ nov 202539215 will not affect public right of wayDetails
exterior wall repair to comply w/ nov 202539215 will not affect public right of way | $25,000 |
| Nov 10, 2025 | In progress filed Nov 2025, not yet issued | 1200 California St | interior remodel of level 1 lobby and back of house corridors. replace exterior aluminum storefront panel and glass door with a fixed glazed lite and extended length of (e) planter on jones st.Details
interior remodel of level 1 lobby and back of house corridors. replace exterior aluminum storefront panel and glass door with a fixed glazed lite and extended length of (e) planter on jones st. | $50,000 | |
| Nov 27, 2023 | Completed final sign-off Feb 2024 | 2525 Van Ness Av | Achill Beg Construction Inc | revision to the issued pa# 201712277456: for administrative purposes only- no work is proposed: occupancy on (e) roof deck and lobby have been corrected as well as occupant loads on private terraces at rear. fire extinguisher locations and furniture layouts provided.Details
revision to the issued pa# 201712277456: for administrative purposes only- no work is proposed: occupancy on (e) roof deck and lobby have been corrected as well as occupant loads on private terraces at rear. fire extinguisher locations and furniture layouts provided. | |
| Aug 1, 2023 | Never finaled issued Sep 2023, no final | 301 Mission St | Baxter Construction | 1/f: restore bank of west t.i. space, modify back to original condition pnrior to bpa#202003167141. remove temporary interior sound mitigattion wall/temporary systems to be restored to original entry door on mission st., restore doors/adjust signate to original condition. egress systems to beDetails
1/f: restore bank of west t.i. space, modify back to original condition pnrior to bpa#202003167141. remove temporary interior sound mitigattion wall/temporary systems to be restored to original entry door on mission st., restore doors/adjust signate to original condition. egress systems to be | $140,000 |
| Sep 28, 2022 | Never finaled issued Jan 2023, no final | 301 Mission St | Bcci Construction Company | owners lounge: scope of project limited to interior renovation of selected spaces onlevel 2 of e project. ti spaces are l2 bar, pantry, and private dining door refurbishmentDetails
owners lounge: scope of project limited to interior renovation of selected spaces onlevel 2 of e project. ti spaces are l2 bar, pantry, and private dining door refurbishment | $350,000 |
| Sep 27, 2022 | In progress issued Aug 2026 | 630 Octavia St | erect a type 1-a, 8-story over one basement mixed use building with 40 residential unit, retail and parking spaces.Details
erect a type 1-a, 8-story over one basement mixed use building with 40 residential unit, retail and parking spaces. | $13,500,000 | |
| Aug 10, 2022 | Completed final sign-off Feb 2024 | 2525 Van Ness Av | Achill Beg Construction Inc | rev pa201712277456-s2: level 1 ne retail storefront has been revised to accomodate the revised location of pge transformer vault in s/w.gas meter location and retail storefront entry door were flipped in order to maintain clearance requirements for the revised pg&e vault. relocating storefrontDetails
rev pa201712277456-s2: level 1 ne retail storefront has been revised to accomodate the revised location of pge transformer vault in s/w.gas meter location and retail storefront entry door were flipped in order to maintain clearance requirements for the revised pg&e vault. relocating storefront | |
| May 5, 2022 | Never finaled filed May 2022, never issued | 919 Illinois St | Build Group Inc. | proj-22-0463. port-priority. revision to pa 201911258098 to document 7 stories over basement per definitions of grade plane and story above grade plane in cbc chapter 2.Details
proj-22-0463. port-priority. revision to pa 201911258098 to document 7 stories over basement per definitions of grade plane and story above grade plane in cbc chapter 2. | |
| Mar 10, 2022 | Never finaled filed Mar 2022, never issued | 1320 Washington St | erect a 6 story, 25 dwellings residential with parking. type r-2,s-2,a-3.Details
erect a 6 story, 25 dwellings residential with parking. type r-2,s-2,a-3. | $15,000,000 | |
| Sep 21, 2021 | Never finaled filed Sep 2021, never issued | 233 Geary St | site permit: adaptive reuse, mixed-use building, with (3) stories of residential units (21 total units) and (5) stories of offices, (3) stories of retail, and (2) levels of basement with retail and storage utilities.Details
site permit: adaptive reuse, mixed-use building, with (3) stories of residential units (21 total units) and (5) stories of offices, (3) stories of retail, and (2) levels of basement with retail and storage utilities. | $70,000,000 | |
| Sep 8, 2021 | Completed final sign-off Jan 2023 | 1001 Van Ness Av | Related California Construction Llc | revision to the issued s2 (arch/mep) ref pa 201607142409. to add clouded noted stating "employee use only bbq kitchen" for outdoors on levels 5, 11 & roof on architectural sheets of residential care facility for elderly. no other work done. bldg occupancy class r2.1Details
revision to the issued s2 (arch/mep) ref pa 201607142409. to add clouded noted stating "employee use only bbq kitchen" for outdoors on levels 5, 11 & roof on architectural sheets of residential care facility for elderly. no other work done. bldg occupancy class r2.1 | |
| Aug 31, 2021 | Completed final sign-off Mar 2022 | 950 Market St | Lend Lease (Us) Construction Inc | exterior building maintenance eq of roof. ref pa# 201602089004Details
exterior building maintenance eq of roof. ref pa# 201602089004 | |
| Jun 9, 2021 | Completed final sign-off Feb 2024 | 531 Bryant St | Granite Excavation & Demolition Inc | demolition of 2-story commercial buildingDetails
demolition of 2-story commercial building | $120,000 |
| Oct 28, 2020 | Never finaled filed Oct 2020, never issued | 321 Florida St | to erect 9 stories, 1 basement, type i-b, 168 residential units with retail & commercial building. (r-2,m,a-3,s-2)Details
to erect 9 stories, 1 basement, type i-b, 168 residential units with retail & commercial building. (r-2,m,a-3,s-2) | $42,000,000 | |
| Aug 28, 2020 | Never finaled issued Apr 2021, no final | 706 Mission St | Webcor Construction Lp | install 1 exterior corner non-illuminated wall marble sign "four seasons private residences 706 mission, san francisco"Details
install 1 exterior corner non-illuminated wall marble sign "four seasons private residences 706 mission, san francisco" | $5,000 |
| Aug 28, 2020 | Never finaled issued Apr 2021, no final | 706 Mission St | Webcor Construction Lp | install 4 exterior wall brass single faced non-illuminated sign "four seasons private residences 706 mission, san francisco"Details
install 4 exterior wall brass single faced non-illuminated sign "four seasons private residences 706 mission, san francisco" | $5,000 |
| Aug 7, 2020 | Completed final sign-off Feb 2023 | 1001 Van Ness Av | Related California Construction Llc | for record purposes only re: approved pa #2016-0714-2409 s: unit count change from 215 to 208. clarifiy building occupancy classification as r-2.1.Details
for record purposes only re: approved pa #2016-0714-2409 s: unit count change from 215 to 208. clarifiy building occupancy classification as r-2.1. | |
| Jul 17, 2020 | Never finaled issued Jul 2021, no final | 531 Bryant St | Swinerton Builders | to erect 6 stories, no basement, type i-b, mixed use office building. (b,m,a-3,s-2) ** maher: exempted - approval from dph attached **Details
to erect 6 stories, no basement, type i-b, mixed use office building. (b,m,a-3,s-2) ** maher: exempted - approval from dph attached ** | $14,000,000 |
| Mar 16, 2020 | Completed final sign-off May 2023 | 301 Mission St | Baxter Construction | suite 00132: install temporary interior sound mitigation walls. new temp entry, reroute secondary exit through residential lobby & relocate atm.Details
suite 00132: install temporary interior sound mitigation walls. new temp entry, reroute secondary exit through residential lobby & relocate atm. | $100,000 |
| Mar 6, 2020 | Completed final sign-off Aug 2021 | 706 Mission St | Webcor Construction Lp | revision to pa# 201312204747-s5 (arch & mep). changes include updates to floor plans @ levels b1, 1,3,4,5,7,14,15,39 & 40. rcp, slab plans: elevations have been updated to cordinate to floor plans. mep updated accordingly. ** maher: n/a **Details
revision to pa# 201312204747-s5 (arch & mep). changes include updates to floor plans @ levels b1, 1,3,4,5,7,14,15,39 & 40. rcp, slab plans: elevations have been updated to cordinate to floor plans. mep updated accordingly. ** maher: n/a ** | |
| Feb 4, 2020 | Completed final sign-off Dec 2020 | 2301 Lombard St | Centrix Builders Inc. | revision to the issued addendum #2 (arch/mep) for pa#2016-12-28-5988; new hoistway smoke detector detail.Details
revision to the issued addendum #2 (arch/mep) for pa#2016-12-28-5988; new hoistway smoke detector detail. | |
| Dec 24, 2019 | Completed final sign-off Aug 2021 | 706 Mission St | Webcor Construction Lp | revision to aronson exterior restoration addendum #4. revison includes updates to the storefronts at 3rd st facade, mission st facade and the corner of 3rd & mission streets. porte cohere & 3rd st canopies. reference #201312204747 -s4Details
revision to aronson exterior restoration addendum #4. revison includes updates to the storefronts at 3rd st facade, mission st facade and the corner of 3rd & mission streets. porte cohere & 3rd st canopies. reference #201312204747 -s4 | |
| Dec 9, 2019 | Expired or cancelled cancelled Jan 2026 | 288 Pacific Av | install new non primary bike entry/exit exterior door at e exterior wall, 8'8" from e door within exterior alvove. extend e low voltage access control wiring. add exit sign, patch plstr. remove e door and cap prior low voltage access control wiringDetails
install new non primary bike entry/exit exterior door at e exterior wall, 8'8" from e door within exterior alvove. extend e low voltage access control wiring. add exit sign, patch plstr. remove e door and cap prior low voltage access control wiring | $6,000 | |
| Nov 25, 2019 | Never finaled filed Nov 2019, never issued | 919 Illinois St | Build Group Inc. | mou proj-19-0285 priority processing.to erect a 6-story, type 1b, 1-basement mixed use building w/ 241 residential units, ground level lobby, retail and commercial space. (port site permit b-2019-0321)Details
mou proj-19-0285 priority processing.to erect a 6-story, type 1b, 1-basement mixed use building w/ 241 residential units, ground level lobby, retail and commercial space. (port site permit b-2019-0321) | $150,000,000 |
| Aug 29, 2019 | Never finaled issued Aug 2019, no final | 2465 Van Ness Av | Webcor Construction Lp | provide all mep stub outs for use of future tenant, including fire sprinkler protectionDetails
provide all mep stub outs for use of future tenant, including fire sprinkler protection | |
| May 20, 2019 | Completed final sign-off Mar 2022 | 950 Market St | Lend Lease (Us) Construction Inc | erect of east temporary tower crane at 950 market st. foundation for east towner carne. reference to site permit application #201602089004s.Details
erect of east temporary tower crane at 950 market st. foundation for east towner carne. reference to site permit application #201602089004s. | $206,500 |
| Apr 11, 2019 | Completed final sign-off Jun 2019 | 735 Market St | Pmn Design Elect Inc Dba Design Elc | 6th fl remodel commercial office space: new lighting, lighting controls, recept, t-24. ref ti #201902072340Details
6th fl remodel commercial office space: new lighting, lighting controls, recept, t-24. ref ti #201902072340 | |
| Apr 11, 2019 | Completed final sign-off Jun 2019 | 735 Market St | Pmn Design Elect Inc Dba Design Elc | 5th fl remodel commercial office space: new lighting, lighting controls, recept, t-24. ref ti #201901311757Details
5th fl remodel commercial office space: new lighting, lighting controls, recept, t-24. ref ti #201901311757 | |
| Jan 31, 2019 | Completed final sign-off May 2019 | 735 Market St | Nibbi Bros Assoc Inc., Build Group Inc. | 6th fl: partial floor ti. new non-bearing partitions, ceilings, finishes, sprinkler, fire alarm & mep under separate permit.Details
6th fl: partial floor ti. new non-bearing partitions, ceilings, finishes, sprinkler, fire alarm & mep under separate permit. | $180,400 |
| Jan 31, 2019 | Completed final sign-off Jun 2019 | 735 Market St | 5th fl: sale office ti non-bearing partitions. ceiling finishes, sprinkler, fire alarm & mep under separate permit.Details
5th fl: sale office ti non-bearing partitions. ceiling finishes, sprinkler, fire alarm & mep under separate permit. | $5,000 | |
| Nov 7, 2018 | Never finaled issued Nov 2018, no final | 735 Market St | Webcor Construction Lp | 6th fl - demo only - north side of floor existing restroom to remain. selective demo of non bearing walls, finishes. maintain sprinkler & fire alarmDetails
6th fl - demo only - north side of floor existing restroom to remain. selective demo of non bearing walls, finishes. maintain sprinkler & fire alarm | $20,000 |
| Oct 5, 2018 | Completed final sign-off Feb 2021 | 706 Mission St | Webcor Construction Lp | minor permit to alter for for exterior lighting at the 706 mission aronson building. ref 2013/1220/4747s ** maher: n/a **Details
minor permit to alter for for exterior lighting at the 706 mission aronson building. ref 2013/1220/4747s ** maher: n/a ** | |
| Sep 10, 2018 | Completed final sign-off Jun 2019 | 735 Market St | Nibbi Bros Assoc Inc. | update finishes on level 5 reception space. constructur new reception space and sales office on level 6 insertion of convience stairs between level 5 & 6. ,ep/sprinklers/fir alarm on sep permitDetails
update finishes on level 5 reception space. constructur new reception space and sales office on level 6 insertion of convience stairs between level 5 & 6. ,ep/sprinklers/fir alarm on sep permit | $700,000 |
| Jul 10, 2018 | Completed final sign-off Aug 2024 | 950 Market St | Lend Lease (Us) Construction Inc | excavation for new 13 story hotel, retail and residential bldg.Details
excavation for new 13 story hotel, retail and residential bldg. | |
| Jul 10, 2018 | Completed final sign-off Mar 2022 | 950 Market St | Lend Lease (Us) Construction Inc | shoring for new 13 story hotel, retail, and residential buildingDetails
shoring for new 13 story hotel, retail, and residential building | |
| Dec 1, 2017 | Completed final sign-off Sep 2018 | 950 Tennessee St | Ryan Engineering Inc | to demolish 1 story with mezzanne, industrial, parking lot.Details
to demolish 1 story with mezzanne, industrial, parking lot. | $50,000 |
| Dec 1, 2017 | Completed final sign-off Mar 2021 | 950 Tennessee St | Thompson Builders Corp, Aquamatic Fire Protection | to erect new 4 stories, 1 basement, type i-b, 100 units residential and parking bldg. (r-2,s-2) ** maher: n/a **Details
to erect new 4 stories, 1 basement, type i-b, 100 units residential and parking bldg. (r-2,s-2) ** maher: n/a ** | $35,000,000 |
| Jul 18, 2017 | Never finaled issued Mar 2018, no final | 2358 Fillmore St | Northern Sun Associates | tenant improvement of retail space. no accessibility improvements (under prior permit) scope shown in plans is: (n) finishes (flr, walls), millwork, (n) walls for break room, plumbing, electrical, lighting.Details
tenant improvement of retail space. no accessibility improvements (under prior permit) scope shown in plans is: (n) finishes (flr, walls), millwork, (n) walls for break room, plumbing, electrical, lighting. | $150,000 |
| Jul 14, 2017 | Never finaled issued Jul 2017, no final | 240 Pacific Av | Swinerton Builders | revision to addendum #3 pa #201508134190. fir exterior fire stopping detail at slab edge.Details
revision to addendum #3 pa #201508134190. fir exterior fire stopping detail at slab edge. | |
| Mar 17, 2017 | Never finaled issued Mar 2017, no final | 340 Fremont St | Suffolk Constr Co. Inc. Dba Suffolk-Roel | installation of seismic instrumentation /high dynamic range strong motion acceleragraphs in three locations on level b1,16,& 41Details
installation of seismic instrumentation /high dynamic range strong motion acceleragraphs in three locations on level b1,16,& 41 | $10,000 |
| Feb 28, 2017 | Completed final sign-off May 2018 | 735 Market St | Webcor Construction Lp | add a men's and woman's restroom on the basement level. mep and life safety under separate permitDetails
add a men's and woman's restroom on the basement level. mep and life safety under separate permit | $60,000 |
| Jan 30, 2017 | Expired or cancelled cancelled Mar 2019 | 301 Mission St | Trainor Commercial Construction Inc. | #3a- to comply with nov#201643625, to correct ramps at the following locations: lobby porte cochers, lobby mid-rise, level 2 cl pool and level 2 cl-mid rise. n/a ordinance #155-13Details
#3a- to comply with nov#201643625, to correct ramps at the following locations: lobby porte cochers, lobby mid-rise, level 2 cl pool and level 2 cl-mid rise. n/a ordinance #155-13 | $19,000 |
| Jan 24, 2017 | Expired or cancelled cancelled Mar 2019 | 301 Mission St | Trainor Commercial Construction Inc. | #3a - to comply w/complaint #201647681 - repair ramps on b1 north, b1 south & level 2 cl-1 elevator. maher ord 155-13 naDetails
#3a - to comply w/complaint #201647681 - repair ramps on b1 north, b1 south & level 2 cl-1 elevator. maher ord 155-13 na | $15,000 |
| Dec 28, 2016 | Completed final sign-off Feb 2021 | 2465 Van Ness Av | to erect 7 stories, 1 basement, type i-b, 41 residential units with mixed use building. building on block 0546, lot 001 & 002. (r-2,m,a-3,s-2) ** maher: n/a **Details
to erect 7 stories, 1 basement, type i-b, 41 residential units with mixed use building. building on block 0546, lot 001 & 002. (r-2,m,a-3,s-2) ** maher: n/a ** | $21,000,000 | |
| Dec 28, 2016 | Completed final sign-off May 2021 | 2301 Lombard St | Centrix Builders Inc. | to erect 4 stories, 1 basement, type ii-a, 22 units residential with mix use building. (r-2,m,a-3,s-2) ** maher: n/a **Details
to erect 4 stories, 1 basement, type ii-a, 22 units residential with mix use building. (r-2,m,a-3,s-2) ** maher: n/a ** | $12,000,000 |
| Dec 21, 2016 | Completed final sign-off Jul 2021 | 738 Mission St | Webcor Construction Lp | remove & replace select parking stall striping all levels. demo & repairs to create communicating opening at garage level b2 &b3 to adjacent 706 mission st. relocate (e) b1 level parking attendant booth with associated mep systems. fire alarm, fire protection, life safety on separate permit.Details
remove & replace select parking stall striping all levels. demo & repairs to create communicating opening at garage level b2 &b3 to adjacent 706 mission st. relocate (e) b1 level parking attendant booth with associated mep systems. fire alarm, fire protection, life safety on separate permit. | $125,000 |
| Dec 21, 2016 | Completed final sign-off Jan 2021 | 740 Mission St | Webcor Construction Lp | plaza level-patch and repair paving & water proofing along east portion of plaza. work to include site barricades. and elimination of temporary exit stairs.Details
plaza level-patch and repair paving & water proofing along east portion of plaza. work to include site barricades. and elimination of temporary exit stairs. | $80,000 |
| Dec 21, 2016 | Completed final sign-off Aug 2021 | 60 03rd St | Webcor Construction Lp | plaza level-new landscape wall to south & east of hotel. new paving and water proofing along north side of 706 mission to match (e) and adjoining plaza above jessie st. garage. maher not required.Details
plaza level-new landscape wall to south & east of hotel. new paving and water proofing along north side of 706 mission to match (e) and adjoining plaza above jessie st. garage. maher not required. | $100,000 |
| Dec 16, 2016 | Expired or cancelled cancelled Mar 2024 | 1601 Mission St | Granite Excavation & Demolition Inc | to erect 13 stories, 1 basement, type i-a, 220 residential units with retail & parking. (r-2,m,a-3,s-2)Details
to erect 13 stories, 1 basement, type i-a, 220 residential units with retail & parking. (r-2,m,a-3,s-2) | $75,000,000 |
| Nov 28, 2016 | Completed final sign-off Mar 2019 | 974 Market St | Ampco North Inc, Lend Lease (Us) Construction Inc, A & B Construction | demolish retail/commercial 3-story buildingDetails
demolish retail/commercial 3-story building | $100,000 |
| Nov 28, 2016 | Completed final sign-off Mar 2019 | 966 Market St | Ampco North Inc, Lend Lease (Us) Construction Inc, A & B Construction | demolish 3-story retail/office/commercial buildingDetails
demolish 3-story retail/office/commercial building | $100,000 |
| Nov 28, 2016 | Completed final sign-off Mar 2019 | 972 Market St | Ampco North Inc, Lend Lease (Us) Construction Inc, A & B Construction | demolish 3-story retail/commercial buildingDetails
demolish 3-story retail/commercial building | $100,000 |
| Oct 31, 2016 | Expired or cancelled withdrawn Aug 2019 | 235 Myrtle St | Charles Pankow Builders Ltd | to erect 3 stories, 1 basement, 6 units townhouse.Details
to erect 3 stories, 1 basement, 6 units townhouse. | $3,000,000 |
| Oct 28, 2016 | Never finaled issued Feb 2020, no final | 556 27th St | Linea Built Inc. | construct a new 4 story bldg over 3-story basement of type 1b, for 7 dwelling units and parking garageDetails
construct a new 4 story bldg over 3-story basement of type 1b, for 7 dwelling units and parking garage | $3,500,000 |
| Oct 24, 2016 | Never finaled issued Feb 2017, no final | 338 Potrero Av | Build Group Inc. | revision to pa #201311202405-s: owner improvement for condominium sales in grd flr commercial space; install paint, carpet, millwork, furniture & lighting in. n/a maher ordinanceDetails
revision to pa #201311202405-s: owner improvement for condominium sales in grd flr commercial space; install paint, carpet, millwork, furniture & lighting in. n/a maher ordinance | $60,000 |
| Jul 21, 2016 | Completed final sign-off Apr 2020 | 1001 Van Ness Av | Ampco North Inc, Charles Pankow Builders Ltd | to demolish 4 stoires, commercial office building.Details
to demolish 4 stoires, commercial office building. | $1,800,000 |
| Jul 14, 2016 | Completed final sign-off Jan 2023 | 1001 Van Ness Av | Related California Construction Llc, Charles Pankow Builders Ltd | to erect 13 stories, no basement, type 1-a, 215 units residential care facility for the elderly, retail, parking building.Details
to erect 13 stories, no basement, type 1-a, 215 units residential care facility for the elderly, retail, parking building. | $93,600,000 |
| Jun 13, 2016 | Completed final sign-off Aug 2016 | 340 Fremont St | Suffolk Constr Co. Inc. Dba Suffolk-Roel | revision to pa 2005-0919-3271s5 to include occupancy of 5th floor roof terrace.Details
revision to pa 2005-0919-3271s5 to include occupancy of 5th floor roof terrace. | |
| Apr 13, 2016 | Never finaled issued Apr 2016, no final | 450 Hayes St | revision to pa 201306260573(s3), provide finishes and details as stated in future bulletin in approved addenda.no changes to walls on approved addenda; maher n/aDetails
revision to pa 201306260573(s3), provide finishes and details as stated in future bulletin in approved addenda.no changes to walls on approved addenda; maher n/a | ||
| Apr 13, 2016 | Completed final sign-off Feb 2021 | 706 Mission St | Webcor Construction Lp | installation of underground fire service 2-8 inch fire service off 12 inch main on mission st.because the basmt of the bldg is located under the sidewall, all work to install the 2 fire services with the new 8-ich isolation valve in the city main located between fire services is done by the puc.Details
installation of underground fire service 2-8 inch fire service off 12 inch main on mission st.because the basmt of the bldg is located under the sidewall, all work to install the 2 fire services with the new 8-ich isolation valve in the city main located between fire services is done by the puc. | $60,000 |
| Feb 12, 2016 | Never finaled issued Feb 2016, no final | 450 Hayes St | Cannon Constructors North Inc | revision to 2013-0626-0573s3, relocation of rated wall in basement mechanical plumbing room, equipment. maher naDetails
revision to 2013-0626-0573s3, relocation of rated wall in basement mechanical plumbing room, equipment. maher na | $1,000 |
| Feb 8, 2016 | Completed final sign-off Aug 2024 | 950 Market St | Lend Lease (Us) Construction Inc | to erect 13 stories, 2 basements, type i-a, 470 units residential, hotel, retail building. (r-2,r-1,m)Details
to erect 13 stories, 2 basements, type i-a, 470 units residential, hotel, retail building. (r-2,r-1,m) | $114,272,000 |
| Dec 23, 2015 | Never finaled issued Mar 2016, no final | 738 Mission St | demo of existing stair enclosure and stairs from level bo to jessie sq plaza. infil opening on plaza. install new temporary stair, vextibule and stair enclosure from level b0 to jessie sq plazaDetails
demo of existing stair enclosure and stairs from level bo to jessie sq plaza. infil opening on plaza. install new temporary stair, vextibule and stair enclosure from level b0 to jessie sq plaza | $80,000 | |
| Dec 23, 2015 | Completed final sign-off Jan 2021 | 60 03rd St | Webcor Construction Lp | construct new below grade storage room. work includes excavation, removal of soldier pier as needed, new shoring, and waterproofing, install foundation slab, basement walls, roof slab, cut opening on south retaining wall and install chain link fence and sliding gate. maher naDetails
construct new below grade storage room. work includes excavation, removal of soldier pier as needed, new shoring, and waterproofing, install foundation slab, basement walls, roof slab, cut opening on south retaining wall and install chain link fence and sliding gate. maher na | $100,000 |
| Nov 20, 2015 | Completed final sign-off May 2016 | 530 Bush St | Allsite Corp Goods/Services Construction | update to finishes and electrical on the 8th fl of high rise. addition of new wall and tear down and update of 1 non structural wallDetails
update to finishes and electrical on the 8th fl of high rise. addition of new wall and tear down and update of 1 non structural wall | $100,000 |
| Oct 22, 2015 | Completed final sign-off Jan 2017 | 390 Fremont St | alter interior space, t.i. work to add partitions to create additional office. n/a ordinance #155-13.Details
alter interior space, t.i. work to add partitions to create additional office. n/a ordinance #155-13. | $15,000 | |
| Aug 13, 2015 | Completed final sign-off Jul 2018 | 240 Pacific Av | Swinerton Builders | site permit: to erect 7 stories, 1 basement, 33 units residential, retail, parking & lobby. ** maher: compliance with ordinance no# 155-13 required; route to dph **Details
site permit: to erect 7 stories, 1 basement, 33 units residential, retail, parking & lobby. ** maher: compliance with ordinance no# 155-13 required; route to dph ** | $21,300,000 |
| Aug 3, 2015 | Completed final sign-off Dec 2022 | 72 Ellis St | Webcor Construction Lp | to erect 13 stories, 1 basement, 195 hotel room & retail building. (r-1,m,b,a-2,a-3) ** maher: compliance with ordinance no# 155-13 required **Details
to erect 13 stories, 1 basement, 195 hotel room & retail building. (r-1,m,b,a-2,a-3) ** maher: compliance with ordinance no# 155-13 required ** | $30,000,000 |
| Mar 9, 2015 | Never finaled issued May 2016, no final | 8 10th St | Swinerton Builders | assembly permits. the locations/areas are: gym, 3rd flr terrace, 11th floor terace, 24th floor terrace interim controlsDetails
assembly permits. the locations/areas are: gym, 3rd flr terrace, 11th floor terace, 24th floor terrace interim controls | |
| Sep 9, 2014 | Completed final sign-off Aug 2016 | 3450 Washington St | Matarozzi/Pelsinger Builders Inc. | add 241 sq. ft. addition to the rear of the (e) single family residence to expand family room & open it to the backyard. ** maher: compliance with ordinance no# 155-13 not required **Details
add 241 sq. ft. addition to the rear of the (e) single family residence to expand family room & open it to the backyard. ** maher: compliance with ordinance no# 155-13 not required ** | $300,000 |
| Jul 23, 2014 | Completed final sign-off Feb 2017 | 2155 Webster St | Plant Construction Company Lp | hard demo include demo portions of (e) concrete wall & for new openings through the (e) 4 slabs. removal of mechanical penthouse above (e) roof. removal of portions of concrete cover on (e) columns & removal of column bracing @ 2nd floor level for 6 columns. removal of exterior cladding.Details
hard demo include demo portions of (e) concrete wall & for new openings through the (e) 4 slabs. removal of mechanical penthouse above (e) roof. removal of portions of concrete cover on (e) columns & removal of column bracing @ 2nd floor level for 6 columns. removal of exterior cladding. | $1,200,000 |
| Jul 18, 2014 | Completed final sign-off Jul 2016 | 3450 Washington St | Matarozzi/Pelsinger Builders Inc. | voluntary seismic upgrade on residential sfh building lateral force resisting system will be upgraded with plywood shear walls & a 2 story simpson moment frame. ** maher: compliance with ordinance no# 155-13 not required **Details
voluntary seismic upgrade on residential sfh building lateral force resisting system will be upgraded with plywood shear walls & a 2 story simpson moment frame. ** maher: compliance with ordinance no# 155-13 not required ** | $400,000 |
| Jun 10, 2014 | Completed final sign-off Apr 2015 | 2155 Webster St | Plant Construction Company Lp | interior non-structural (soft demo) on all floors.Details
interior non-structural (soft demo) on all floors. | $875,000 |
| Jun 5, 2014 | Completed final sign-off Nov 2016 | 2458 Sacramento St | Plant Construction Co, Lp | (townhouse #1) to erect 3 stories, no basement, 4 units townhouse building.Details
(townhouse #1) to erect 3 stories, no basement, 4 units townhouse building. | $2,000,000 |
| Jun 5, 2014 | Completed final sign-off Sep 2016 | 2468 Sacramento St | Plant Construction Company Lp, Plant Construction Co, Lp | (townhouse# 2) to erect 3 stories, no basement, 3 units townhouse building.Details
(townhouse# 2) to erect 3 stories, no basement, 3 units townhouse building. | $1,500,000 |
| Jun 5, 2014 | Completed final sign-off Sep 2016 | 2471 Clay St | Plant Construction Co, Lp | (townhouse# 3) to erect 3 stories, no basement, 3 units townhouse building.Details
(townhouse# 3) to erect 3 stories, no basement, 3 units townhouse building. | $1,500,000 |
| Apr 17, 2014 | Completed final sign-off Feb 2015 | 1411 Market St | revision to pa#200903234623-s3-r3, revising (12) 2-bedroom units into (6) 3 bedroom units and (6) 1-bedroom units on floors 33-35 in the norht tower.Details
revision to pa#200903234623-s3-r3, revising (12) 2-bedroom units into (6) 3 bedroom units and (6) 1-bedroom units on floors 33-35 in the norht tower. | $30,000 | |
| Dec 20, 2013 | Completed final sign-off Sep 2021 | 706 Mission St | Webcor Construction Lp | (n) 46-story tower addition to the (e) historic 10-story bldg. (r-2,m,a-2,a-3,s-1,s-2,h-3)Details
(n) 46-story tower addition to the (e) historic 10-story bldg. (r-2,m,a-2,a-3,s-1,s-2,h-3) | $210,000,000 |
| Jun 26, 2013 | Completed final sign-off Nov 2016 | 450 Hayes St | to erect 4 stories, 1 basements, 41 residential condo, retail & parking.Details
to erect 4 stories, 1 basements, 41 residential condo, retail & parking. | $9,000,000 | |
| Jun 20, 2013 | Completed final sign-off Mar 2015 | 1411 Market St | Swinerton Builders | the temporary leasing center with a waiting room has been designed as owner fit-out in exisitng retail space. sprinkler and fire alarm under separate permit. revision to application #200607207084 and #200903234623. (work on temporary office only)Details
the temporary leasing center with a waiting room has been designed as owner fit-out in exisitng retail space. sprinkler and fire alarm under separate permit. revision to application #200607207084 and #200903234623. (work on temporary office only) | $2,000 |
| Apr 1, 2013 | Completed final sign-off Mar 2015 | 1411 Market St | Swinerton Builders | revise south lobby, north lobby & business center provide leasing center mailbox numbering, finish schedule, door schedule, stairs s3, n8 and n4 have been revised. men's and women's lockers changed into additional storage ref 200607207084Details
revise south lobby, north lobby & business center provide leasing center mailbox numbering, finish schedule, door schedule, stairs s3, n8 and n4 have been revised. men's and women's lockers changed into additional storage ref 200607207084 | $350,000 |
| Aug 3, 2012 | Expired or cancelled withdrawn Oct 2013 | 340 Fremont St | to erect 40 stories, 3 basement, 345 units of residential with commercial office, assembly, storage & parking.Details
to erect 40 stories, 3 basement, 345 units of residential with commercial office, assembly, storage & parking. | $110,000,000 | |
| Dec 28, 2010 | Completed final sign-off May 2012 | 301 Mission St | Van Acker Const Assoc Inc | interior renovation of shell space gphb. grand penthouse b on 58th fl. work includes n partitoiins, finishes, mech, elec, telecomm, plumbing. no exterior changes. fire protection separate permitDetails
interior renovation of shell space gphb. grand penthouse b on 58th fl. work includes n partitoiins, finishes, mech, elec, telecomm, plumbing. no exterior changes. fire protection separate permit | $710,000 |
| Apr 8, 2010 | Completed final sign-off Oct 2011 | 301 Mission St | Paul Ryan Associates | level 58 - first time build-out of (e) shell space in high-rise residential bldg. work includes construction of a kitchen, (3) bathrooms, (2) bedrooms, & living sapce. permit for plumbing work alreadu issued.Details
level 58 - first time build-out of (e) shell space in high-rise residential bldg. work includes construction of a kitchen, (3) bathrooms, (2) bedrooms, & living sapce. permit for plumbing work alreadu issued. | $1,200,000 |
| Jan 22, 2009 | Completed final sign-off Sep 2009 | 301 Mission St | revision to pa# 2007-1107-7502 to delete security fence at below grade-valet parking on all 6 levels per plannings approvalDetails
revision to pa# 2007-1107-7502 to delete security fence at below grade-valet parking on all 6 levels per plannings approval | $500 | |
| Jan 6, 2009 | Completed final sign-off Apr 2009 | 1 Yerba Buena Ln | revisions to approved pa # 200809111317 to delete stair, relocate elevator machine room and associated architectural and structural details. new 5" topping slab, modify mechanical platform and ladder & modify steel beam @elevator shaft. mep, sprinkler & fire alarm under separate permit.Details
revisions to approved pa # 200809111317 to delete stair, relocate elevator machine room and associated architectural and structural details. new 5" topping slab, modify mechanical platform and ladder & modify steel beam @elevator shaft. mep, sprinkler & fire alarm under separate permit. | $10,000 | |
| Sep 11, 2008 | Completed final sign-off Apr 2009 | 1 Yerba Buena Ln | revision to appl #200805212587 - minor architectural & structural revision & new stair added to scope of work.Details
revision to appl #200805212587 - minor architectural & structural revision & new stair added to scope of work. | $200,000 | |
| Sep 10, 2008 | Completed final sign-off Apr 2009 | 301 Mission St | minor architectural revisions to 200804028583 for rn74 restaurant space.Details
minor architectural revisions to 200804028583 for rn74 restaurant space. | $33,000 | |
| Jun 24, 2008 | Completed final sign-off Apr 2009 | 631 Folsom St | rev. to appl. 200505021326 s-3. revise parking plans according to approved motion no. 17597 by planning commission. additional 52 off st. parking spaces to previously approved 64 off st. parking spaces have been created by increasing amount of mechanical stackers within (e) parking garage.Details
rev. to appl. 200505021326 s-3. revise parking plans according to approved motion no. 17597 by planning commission. additional 52 off st. parking spaces to previously approved 64 off st. parking spaces have been created by increasing amount of mechanical stackers within (e) parking garage. | ||
| Jun 10, 2008 | Completed final sign-off Aug 2009 | 301 Mission St | new fire pit at 2nd floor residential outdoor terrace.Details
new fire pit at 2nd floor residential outdoor terrace. | $30,000 | |
| Apr 2, 2008 | Completed final sign-off Apr 2009 | 301 Mission St | first time ti of ground floor restaurant space. new kitchen, dining room and restrooms. fire alarm and sprinklers under separate permit.Details
first time ti of ground floor restaurant space. new kitchen, dining room and restrooms. fire alarm and sprinklers under separate permit. | $1,800,000 | |
| Feb 12, 2008 | Completed final sign-off Aug 2009 | 301 Mission St | new deisel generator and fuel oil system.generator located on roof of mid-rise portion behind mechanical screen.Details
new deisel generator and fuel oil system.generator located on roof of mid-rise portion behind mechanical screen. | $410,000 | |
| Jan 28, 2008 | Completed final sign-off Aug 2009 | 301 Mission St | new gas burning fireplace at 2nd floor residential lounge. ref. to appl. 200210239696s. no work in residential units.Details
new gas burning fireplace at 2nd floor residential lounge. ref. to appl. 200210239696s. no work in residential units. | $35,000 | |
| Nov 7, 2007 | Completed final sign-off Sep 2009 | 301 Mission St | per planning department. install 6'0" lockable folding metal security gate for valet parking on levels b-2-b-5.Details
per planning department. install 6'0" lockable folding metal security gate for valet parking on levels b-2-b-5. | $40,000 | |
| Jul 13, 2007 | Completed final sign-off Dec 2008 | 740 Mission St | build-out of public plaza at street level of 4 level underground parking structure per redevelopment agency master plan.Details
build-out of public plaza at street level of 4 level underground parking structure per redevelopment agency master plan. | $3,500,000 | |
| May 23, 2007 | Completed final sign-off Jul 2008 | 747 Market St | new elevator to serve 1st floor and b1 levels for future retail tenant - new 1 hour demising wall on b1 level mep, fire alarm and sprinkler under seperate permit.Details
new elevator to serve 1st floor and b1 levels for future retail tenant - new 1 hour demising wall on b1 level mep, fire alarm and sprinkler under seperate permit. | $190,000 | |
| May 17, 2007 | Completed final sign-off Nov 2007 | 450 Mission St | interior non-structural demo of ground fl tenant space.Details
interior non-structural demo of ground fl tenant space. | $20,000 | |
| Feb 22, 2007 | Completed final sign-off Nov 2007 | 450 Mission St | remodel partial 2nd floor office suite approx 1500, new lighting and paritions, no exterior workDetails
remodel partial 2nd floor office suite approx 1500, new lighting and paritions, no exterior work | $27,000 | |
| Jan 18, 2007 | Completed final sign-off Mar 2010 | 1066 Guerrero St | to erect 4 stories, 2 family dwelling units.Details
to erect 4 stories, 2 family dwelling units. | $450,000 |