Block 3719, lot 001
301 Mission St
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
53 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 13, 2009 | Never finaled issued Oct 2009, no final | 301 Mission St | Aquamatic Fire Protection | 31st floor-relocate lower 7 (e) sprinklers due to interior remodel new lowered ceilingDetails
31st floor-relocate lower 7 (e) sprinklers due to interior remodel new lowered ceiling | $1,400 |
| Oct 9, 2009 | Completed final sign-off Jan 2010 | 301 Mission St | 31st floor; unit #31d - remodel kitchen, replace cabinets and appliances in same location.Details
31st floor; unit #31d - remodel kitchen, replace cabinets and appliances in same location. | $7,000 | |
| Sep 30, 2009 | Completed final sign-off Dec 2009 | 301 Mission St | Black Mountain Development | unit 31c drop ceiling - 4" in living/dining area, library, guest & library, guest & master bedrs, lower 7 fire sprinklers for new drop ceiling, replace tile in master bath with slab. replace kitchen fl.add 37 recessed can lights.repair sheetrock, paint throught.fire sprinklers under separate permit.Details
unit 31c drop ceiling - 4" in living/dining area, library, guest & library, guest & master bedrs, lower 7 fire sprinklers for new drop ceiling, replace tile in master bath with slab. replace kitchen fl.add 37 recessed can lights.repair sheetrock, paint throught.fire sprinklers under separate permit. | $44,000 |
| Sep 9, 2009 | Never finaled issued Sep 2009, no final | 301 Mission St | street spaceDetails
street space | ||
| Aug 26, 2009 | Completed final sign-off Mar 2010 | 301 Mission St | Black Mountain Development | #53a -add pocket doors @ office; add steam generator to master bath; locate a/v equip; a/v,tv/wi-fi outlets to kitchen, livign rm, guest, ma. bedrms, master gate; add & relocate power plugs; add cirucits for steam unit & elect toilet in laster bath; repair sheetrock; replace light fixtures.Details
#53a -add pocket doors @ office; add steam generator to master bath; locate a/v equip; a/v,tv/wi-fi outlets to kitchen, livign rm, guest, ma. bedrms, master gate; add & relocate power plugs; add cirucits for steam unit & elect toilet in laster bath; repair sheetrock; replace light fixtures. | $44,000 |
| Aug 3, 2009 | Completed final sign-off Oct 2009 | 301 Mission St | Allied Fire Protection | unit 57b: modification to existing fire sprinkler system to accomodate tenant improvementDetails
unit 57b: modification to existing fire sprinkler system to accomodate tenant improvement | $8,600 |
| Jul 24, 2009 | Never finaled issued Jul 2009, no final | 301 Mission St | Diversified Fire Products | fire alarm ti for rn74 (restaurant) 1st fl. add 1 control relay, 1 duct detector heat pump shutdownDetails
fire alarm ti for rn74 (restaurant) 1st fl. add 1 control relay, 1 duct detector heat pump shutdown | $6,800 |
| Jul 23, 2009 | Completed final sign-off Feb 2010 | 301 Mission St | Pribuss Engineering Inc | fire sprinkler t.i. on 56th floor , unit# 56b ( the millenium) relocated 31 headsDetails
fire sprinkler t.i. on 56th floor , unit# 56b ( the millenium) relocated 31 heads | $6,200 |
| Jul 16, 2009 | Completed final sign-off Aug 2009 | 301 Mission St | Black Mountain Development | install cabinetry in study; install recessed lighting in study, living room & dining rm.; relocate dining rm. pendant; add outlets for motorized shades/blinds; install 2-wall mounted tv's; cabinetry-installe outlets & sconces in study; wall sconces in mst. bedrm. change bath door to mdf & paint...Details
install cabinetry in study; install recessed lighting in study, living room & dining rm.; relocate dining rm. pendant; add outlets for motorized shades/blinds; install 2-wall mounted tv's; cabinetry-installe outlets & sconces in study; wall sconces in mst. bedrm. change bath door to mdf & paint... | $53,000 |
| Jul 16, 2009 | Completed final sign-off Aug 2009 | 301 Mission St | John Bertoldi Incorporated | drywall patching and painting in various places throughout unit 54c due to lighting work. wall instulation r-13Details
drywall patching and painting in various places throughout unit 54c due to lighting work. wall instulation r-13 | $20,000 |
| Jul 13, 2009 | Completed final sign-off Oct 2009 | 301 Mission St | Thompson Brooks Inc. | lowering of drywall ceilings for new recessed light fixtures on unit 57b ( the millennium )Details
lowering of drywall ceilings for new recessed light fixtures on unit 57b ( the millennium ) | $150,000 |
| Jul 2, 2009 | Completed final sign-off Sep 2009 | 301 Mission St | Muratore Inc | 42-d only - case opening & install pocket doors between living room & den. no other work. work in 42d only. no structural.Details
42-d only - case opening & install pocket doors between living room & den. no other work. work in 42d only. no structural. | $5,000 |
| Jun 2, 2009 | Never finaled issued Jun 2009, no final | 301 Mission St | Allied Fire Protection | selected as built plans fire sprinklers, submitted per request of glen auston. orig app 200210239696, sr, r1Details
selected as built plans fire sprinklers, submitted per request of glen auston. orig app 200210239696, sr, r1 | $5,000 |
| May 27, 2009 | Completed final sign-off Feb 2010 | 301 Mission St | Paul Ryan Associates | revision to p.a.# 200210239696. add walls/partition only, non-structural, new kitchen, new electric, sheetrock, two toilets, two sinks in bathrooms, work on 56th floor, unit b. sprinklers under separte permitDetails
revision to p.a.# 200210239696. add walls/partition only, non-structural, new kitchen, new electric, sheetrock, two toilets, two sinks in bathrooms, work on 56th floor, unit b. sprinklers under separte permit | $326,000 |
| May 22, 2009 | Completed final sign-off Aug 2009 | 301 Mission St | Aquamatic Fire Protection | remove 3 sidewall speaker replace with 3 new pendent sprinkler due to interior remodel installation of new metal framed gyp bd ceilingDetails
remove 3 sidewall speaker replace with 3 new pendent sprinkler due to interior remodel installation of new metal framed gyp bd ceiling | $300 |
| May 22, 2009 | Completed final sign-off Sep 2009 | 301 Mission St | Muratore Inc | work @ unit# 43d only. provide backing in walls & ceiling for light fixtures. no relocation of sprinklers. electrical work on seperate permit. no structural work.Details
work @ unit# 43d only. provide backing in walls & ceiling for light fixtures. no relocation of sprinklers. electrical work on seperate permit. no structural work. | $20,000 |
| May 13, 2009 | Completed final sign-off Oct 2009 | 301 Mission St | Allied Fire Protection | at 42nd fl: relocate 13 fire sprinklers, add 3 fire sprinklers in unit 42c.Details
at 42nd fl: relocate 13 fire sprinklers, add 3 fire sprinklers in unit 42c. | $4,600 |
| May 11, 2009 | Completed final sign-off Aug 2009 | 301 Mission St | Black Mountain Development | add 6" drop ceiling in living/dining area, add partial front and side wall to right of living room seat area, lower 2 hvac vents, 2 fire sprinklers and 1 speaker to dropped ceiling level, add insulation to dropped ceiling,add decorative trim columns in liv rm,remodel mster bath, guest bath,powder.Details
add 6" drop ceiling in living/dining area, add partial front and side wall to right of living room seat area, lower 2 hvac vents, 2 fire sprinklers and 1 speaker to dropped ceiling level, add insulation to dropped ceiling,add decorative trim columns in liv rm,remodel mster bath, guest bath,powder. | $35,000 |
| Apr 3, 2009 | Completed final sign-off Oct 2009 | 301 Mission St | Muratore Inc | work @ unit# 41c only. provide necessary framing & blocking at ceiling to accomodate installation of recessed light fixtures. no structural work.Details
work @ unit# 41c only. provide necessary framing & blocking at ceiling to accomodate installation of recessed light fixtures. no structural work. | $52,000 |
| Mar 18, 2009 | Completed final sign-off Apr 2009 | 301 Mission St | Fire Safety Supply Inc | install fire suppression system in smog hog unit on mezzanine above 1st floor kitchen. kitchen fire system under appl. 200901291059.Details
install fire suppression system in smog hog unit on mezzanine above 1st floor kitchen. kitchen fire system under appl. 200901291059. | $3,500 |
| Mar 5, 2009 | Completed final sign-off Aug 2009 | 301 Mission St | Webcor Construction Lp | to obtain final inspection for work approved under pa 200510185898. all work has been completed.Details
to obtain final inspection for work approved under pa 200510185898. all work has been completed. | |
| Mar 5, 2009 | Completed final sign-off Sep 2009 | 301 Mission St | Webcor Construction Lp | to obtain final inspection for work approved under pa 200509263869. all work has been completed.Details
to obtain final inspection for work approved under pa 200509263869. all work has been completed. | |
| Mar 5, 2009 | Completed final sign-off Aug 2009 | 301 Mission St | Webcor Construction Lp | to obtain final inspection for work approved under pa 200609263344. all work has been completed.Details
to obtain final inspection for work approved under pa 200609263344. all work has been completed. | |
| Mar 5, 2009 | Completed final sign-off Aug 2009 | 301 Mission St | Webcor Construction Lp | to obtain final inspection for work approved under pa 200605161769. all work has been completed.Details
to obtain final inspection for work approved under pa 200605161769. all work has been completed. | |
| Jan 29, 2009 | Completed final sign-off Apr 2009 | 301 Mission St | Fire Safety Supply Inc | install fire suppression sytem in kitchen hood on 1st floor. ref. appl.200804028583Details
install fire suppression sytem in kitchen hood on 1st floor. ref. appl.200804028583 | $4,000 |
| Jan 22, 2009 | Completed final sign-off Sep 2009 | 301 Mission St | revision to pa# 2007-1107-7502 to delete security fence at below grade-valet parking on all 6 levels per plannings approvalDetails
revision to pa# 2007-1107-7502 to delete security fence at below grade-valet parking on all 6 levels per plannings approval | $500 | |
| Nov 5, 2008 | Completed final sign-off Aug 2009 | 301 Mission St | window washing equipment for east building. nov 200712032-bid.Details
window washing equipment for east building. nov 200712032-bid. | $64,500 | |
| Sep 30, 2008 | Completed final sign-off Apr 2009 | 301 Mission St | Diversified Fire Products | fire alarm for rn74 restaurant l level (1st fl) of mid rise: 1 input module, 1 smoke detector, 10 strobes, 8 sync modules, 1 power supply, 6 spkr/strobes, 7 control relays, 5 speakersDetails
fire alarm for rn74 restaurant l level (1st fl) of mid rise: 1 input module, 1 smoke detector, 10 strobes, 8 sync modules, 1 power supply, 6 spkr/strobes, 7 control relays, 5 speakers | $31,845 |
| Sep 24, 2008 | Never finaled issued Sep 2008, no final | 301 Mission St | non structural sign: press type decal on glass door (2x2)Details
non structural sign: press type decal on glass door (2x2) | $1,000 | |
| Sep 10, 2008 | Completed final sign-off Apr 2009 | 301 Mission St | minor architectural revisions to 200804028583 for rn74 restaurant space.Details
minor architectural revisions to 200804028583 for rn74 restaurant space. | $33,000 | |
| Aug 14, 2008 | Never finaled issued Aug 2008, no final | 301 Mission St | Allied Fire Protection | modification of (e) fire sprinkler system to accomodate tenant improvement (restaurant), new building pa# 2002-1023-9696Details
modification of (e) fire sprinkler system to accomodate tenant improvement (restaurant), new building pa# 2002-1023-9696 | $38,500 |
| Jun 10, 2008 | Completed final sign-off Aug 2009 | 301 Mission St | new fire pit at 2nd floor residential outdoor terrace.Details
new fire pit at 2nd floor residential outdoor terrace. | $30,000 | |
| Jun 5, 2008 | Completed final sign-off Aug 2009 | 301 Mission St | new window washing service system at roof. not visible from streetDetails
new window washing service system at roof. not visible from street | $90,000 | |
| Apr 2, 2008 | Completed final sign-off Apr 2009 | 301 Mission St | first time ti of ground floor restaurant space. new kitchen, dining room and restrooms. fire alarm and sprinklers under separate permit.Details
first time ti of ground floor restaurant space. new kitchen, dining room and restrooms. fire alarm and sprinklers under separate permit. | $1,800,000 | |
| Feb 12, 2008 | Completed final sign-off Aug 2009 | 301 Mission St | new deisel generator and fuel oil system.generator located on roof of mid-rise portion behind mechanical screen.Details
new deisel generator and fuel oil system.generator located on roof of mid-rise portion behind mechanical screen. | $410,000 | |
| Feb 1, 2008 | Never finaled issued Feb 2008, no final | 301 Mission St | street space permitDetails
street space permit | ||
| Feb 1, 2008 | Never finaled issued Feb 2008, no final | 301 Mission St | street space.Details
street space. | ||
| Feb 1, 2008 | Never finaled issued Feb 2008, no final | 301 Mission St | street space permitDetails
street space permit | ||
| Feb 1, 2008 | Never finaled issued Feb 2008, no final | 301 Mission St | street space.Details
street space. | ||
| Jan 28, 2008 | Completed final sign-off Aug 2009 | 301 Mission St | new gas burning fireplace at 2nd floor residential lounge. ref. to appl. 200210239696s. no work in residential units.Details
new gas burning fireplace at 2nd floor residential lounge. ref. to appl. 200210239696s. no work in residential units. | $35,000 | |
| Nov 7, 2007 | Completed final sign-off Sep 2009 | 301 Mission St | per planning department. install 6'0" lockable folding metal security gate for valet parking on levels b-2-b-5.Details
per planning department. install 6'0" lockable folding metal security gate for valet parking on levels b-2-b-5. | $40,000 | |
| Sep 12, 2007 | Never finaled issued Sep 2007, no final | 301 Mission St | house number assignmentDetails
house number assignment | ||
| Sep 12, 2007 | Never finaled issued Sep 2007, no final | 301 Mission St | address assignmentDetails
address assignment | ||
| Sep 26, 2006 | Expired or cancelled expired Aug 2009 | 301 Mission St | revision to approved pa# 2002/10/23/9696 s-2. (superstructure)Details
revision to approved pa# 2002/10/23/9696 s-2. (superstructure) | ||
| May 16, 2006 | Completed final sign-off Aug 2009 | 301 Mission St | erect 2 tower cranes for new construction approved under appl#200210239696Details
erect 2 tower cranes for new construction approved under appl#200210239696 | $23,000 | |
| Oct 27, 2005 | Completed final sign-off Aug 2006 | 301 Mission St | install 25 indicator piles for testing (for appl#200210239696)Details
install 25 indicator piles for testing (for appl#200210239696) | $50,000 | |
| Oct 18, 2005 | Expired or cancelled expired Aug 2009 | 301 Mission St | install 8" fire service line.Details
install 8" fire service line. | $25,000 | |
| Sep 26, 2005 | Expired or cancelled expired Sep 2009 | 301 Mission St | temporary shoring and underpinning for new construction approved under pa#2002/10/23/9696Details
temporary shoring and underpinning for new construction approved under pa#2002/10/23/9696 | $250,000 | |
| Feb 28, 2005 | Completed final sign-off May 2006 | 301 Mission St | demolish a officeDetails
demolish a office | ||
| Jan 4, 2005 | Never finaled issued Jan 2005, no final | 301 Mission St | street spaceDetails
street space | ||
| Oct 23, 2002 | Completed final sign-off Aug 2009 | 301 Mission St | erect 58 story 420 residential dwelling unitsDetails
erect 58 story 420 residential dwelling units | $135,000,000 | |
| Nov 15, 2000 | Expired or cancelled expired May 2001 | 301 Mission St | electrical single faced wall signDetails
electrical single faced wall sign | $24,300 | |
| Jul 20, 2000 | Expired or cancelled expired Feb 2001 | 301 Mission St | Service One | renew expired appl # 9908462 construct signDetails
renew expired appl # 9908462 construct sign |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Allied Fire Protection (4), Black Mountain Development (4), Webcor Construction Lp (4), Muratore Inc (3), Aquamatic Fire Protection (2), Diversified Fire Products (2), Fire Safety Supply Inc (2), John Bertoldi Incorporated, Paul Ryan Associates, Pribuss Engineering Inc, Service One, Thompson Brooks Inc.
- Architects
- Glen G Res (6), Ramin Golesorkhi, Ramo
- Engineers
- A. J. Miller, Allied Fire Protection, Derrick Roorda, John Sampson
- Attorneys
- Glen Rescalvo
- Pmt consultant/expediters
- Lloyd Diehl
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.