Permit GraphShortlistSan Francisco building permits since 2000

Lloyd Diehl

License
E9547
Look the license up with the state
Listed as
authorized agent-others, designer, engineer, pmt consultant/expediter
Firm
Weco Electric
Based in
Concord
On San Francisco permits
Jan 2005 to Dec 2016

14 permits since 2000 (authorized agent-others on 7 permits, engineer on 4 permits, pmt consultant/expediter on 2 permits, designer on 1 permit): 11 completed, 3 never finaled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Dec 6, 2016Completed
final sign-off Sep 2017
1201 Tennessee StPmn Design Elect Inc Dba Design Elc, Devcon Constructionrevise previously approved electrical plans under app#201312234917 to resolve discrepancies with fire/smoke detectors between prevously approved mechanical plans requester by fire department. revise addendum #5
Details
Permit
201612064302
Status
complete
Filed
Dec 6, 2016
Permit issued
Dec 8, 2016
Final sign-off
Sep 27, 2017
Address
1201 Tennessee St

revise previously approved electrical plans under app#201312234917 to resolve discrepancies with fire/smoke detectors between prevously approved mechanical plans requester by fire department. revise addendum #5

Open the permit page

Jul 8, 2015Never finaled
issued Jul 2015, no final
1161 Mission StMeyerz Wirez Inclights, upgrade service, plugs, recepticals, title 24, wire elec ti, conduit, sub panels. ref #201506037950. compliance with maher ordinance no 155-13 not required.
Details
Permit
201507080941
Status
issued
Filed
Jul 8, 2015
Permit issued
Jul 9, 2015
Declared cost
$68,000
Address
1161 Mission St

lights, upgrade service, plugs, recepticals, title 24, wire elec ti, conduit, sub panels. ref #201506037950. compliance with maher ordinance no 155-13 not required.

Open the permit page

$68,000
Jul 8, 2015Never finaled
issued Jul 2015, no final
1161 Mission StMeyerz Wirez Incelectrical, title 24, plugs, switches, lights, wire, conduit, sub panel, panel upgrade. ref #201506017583. compliance with maher ordinance no 155-13 not required.
Details
Permit
201507080942
Status
issued
Filed
Jul 8, 2015
Permit issued
Jul 9, 2015
Declared cost
$27,000
Address
1161 Mission St

electrical, title 24, plugs, switches, lights, wire, conduit, sub panel, panel upgrade. ref #201506017583. compliance with maher ordinance no 155-13 not required.

Open the permit page

$27,000
Jan 13, 2012Never finaled
issued Jan 2012, no final
101 Montgomery StFire Detection Unlimited(e) high rise bldg is provided with an existing ul listed @ the fire control panel. provide smoke detection by the remote power supply. replace (e) duct detector with a new duct detector for the existing air handling unit. provide audible visual speaker devices in t.i. area
Details
Permit
201201132189
Status
issued
Filed
Jan 13, 2012
Permit issued
Jan 13, 2012
Declared cost
$8,254
Address
101 Montgomery St

(e) high rise bldg is provided with an existing ul listed @ the fire control panel. provide smoke detection by the remote power supply. replace (e) duct detector with a new duct detector for the existing air handling unit. provide audible visual speaker devices in t.i. area

Open the permit page

$8,254
Oct 28, 2010Completed
final sign-off Dec 2011
442 Post StPac Integrations Increplacement of (e) fire alarm system on all floors. 2-way fire fighter communication system is required to be installed by may 1, 2012 on a separate permit.
Details
Permit
201010283953
Status
complete
Filed
Oct 28, 2010
Permit issued
Sep 22, 2011
Final sign-off
Dec 7, 2011
Declared cost
$25,000
Address
442 Post St

replacement of (e) fire alarm system on all floors. 2-way fire fighter communication system is required to be installed by may 1, 2012 on a separate permit.

Open the permit page

$25,000
Oct 26, 2010Completed
final sign-off Mar 2011
625 Sutter StHathaway Dinwiddie Co.barrier removal work. correct egress doors and add/relocate accessible drinking foundations.
Details
Permit
201010263774
Status
complete
Filed
Oct 26, 2010
Permit issued
Nov 5, 2010
Final sign-off
Mar 3, 2011
Declared cost
$60,000
Address
625 Sutter St

barrier removal work. correct egress doors and add/relocate accessible drinking foundations.

Open the permit page

$60,000
Sep 30, 2010Completed
final sign-off Jan 2011
865 Market Stnew 49 square foot data room on 8th floor
Details
Permit
201009301991
Status
complete
Filed
Sep 30, 2010
Permit issued
Oct 8, 2010
Final sign-off
Jan 25, 2011
Declared cost
$10,000
Address
865 Market St

new 49 square foot data room on 8th floor

Open the permit page

$10,000
Sep 21, 2010Completed
final sign-off Feb 2012
2211 Stockton Stsmoke tower improvements at roof level. not visible from street.
Details
Permit
201009211312
Status
complete
Filed
Sep 21, 2010
Permit issued
Nov 4, 2010
Final sign-off
Feb 3, 2012
Declared cost
$26,000
Address
2211 Stockton St

smoke tower improvements at roof level. not visible from street.

Open the permit page

$26,000
Aug 30, 2010Completed
final sign-off Dec 2011
2375 Golden Gate AvSwinerton Buildersenclose (e) outdoor patio on the e.side grnd fl of uc bldg w/ new 1 story steel&glass struc. add a new dr & ext. stairwy into the landing of an (e) stair on the so.side of uc, btn the grnd & 2nd fl, add a new wheelchair accesible path into the patio encl. on no.side.provide lounge seating,gas fp.
Details
Permit
201008309863
Status
complete
Filed
Aug 30, 2010
Permit issued
Apr 19, 2011
Final sign-off
Dec 15, 2011
Declared cost
$355,000
Address
2375 Golden Gate Av

enclose (e) outdoor patio on the e.side grnd fl of uc bldg w/ new 1 story steel&glass struc. add a new dr & ext. stairwy into the landing of an (e) stair on the so.side of uc, btn the grnd & 2nd fl, add a new wheelchair accesible path into the patio encl. on no.side.provide lounge seating,gas fp.

Open the permit page

$355,000
Jun 25, 2010Completed
final sign-off Oct 2010
455 Mission Bay Blvd SouthTruebeck Constructionrevision to 200704279921. changes to roof framing and minor structural changes. (structural work only)
Details
Permit
201006255331
Status
complete
Filed
Jun 25, 2010
Permit issued
Jun 28, 2010
Final sign-off
Oct 26, 2010
Declared cost
$76,000
Address
455 Mission Bay Blvd South

revision to 200704279921. changes to roof framing and minor structural changes. (structural work only)

Open the permit page

$76,000
Dec 24, 2009Completed
final sign-off Sep 2010
1500 Owens StDome Construction Corp4th floor tenant improvement for ucsf pharmaceutical packaging. new interior finishes, equipment & m. e.p., sprinkler & fire alarm under separate permit.
Details
Permit
200912243831
Status
complete
Filed
Dec 24, 2009
Permit issued
Mar 18, 2010
Final sign-off
Sep 13, 2010
Declared cost
$3,800,000
Address
1500 Owens St

4th floor tenant improvement for ucsf pharmaceutical packaging. new interior finishes, equipment & m. e.p., sprinkler & fire alarm under separate permit.

Open the permit page

$3,800,000
Nov 5, 2008Completed
final sign-off Aug 2009
301 Mission Stwindow washing equipment for east building. nov 200712032-bid.
Details
Permit
200811055888
Status
complete
Filed
Nov 5, 2008
Permit issued
Nov 17, 2008
Final sign-off
Aug 27, 2009
Declared cost
$64,500
Address
301 Mission St

window washing equipment for east building. nov 200712032-bid.

Open the permit page

$64,500
Jun 12, 2008Completed
final sign-off Dec 2008
127 Ellis Strevision to appv'd pa# 2007-0911-2357. guestroom bathroom venting shafts on all floops and units
Details
Permit
200806124290
Status
complete
Filed
Jun 12, 2008
Permit issued
Jun 13, 2008
Final sign-off
Dec 11, 2008
Declared cost
$86,000
Address
127 Ellis St

revision to appv'd pa# 2007-0911-2357. guestroom bathroom venting shafts on all floops and units

Open the permit page

$86,000
Jan 25, 2005Completed
final sign-off Jun 2006
865 Market Stdemolition of (e) tenant construction including toilet room. addition of entrance at bldg exterior
Details
Permit
200501253958
Status
complete
Filed
Jan 25, 2005
Permit issued
May 18, 2005
Final sign-off
Jun 8, 2006
Declared cost
$150,000
Address
865 Market St

demolition of (e) tenant construction including toilet room. addition of entrance at bldg exterior

Open the permit page

$150,000