Block 0032, lot 001

2291 Stockton St

City’s use
Multi-Family Residential
Built
1968
Stories
3
Units
164
Rooms
164 bathrooms
Building
132,536 sq ft
Lot
56,715 sq ft
Zoning
RM3
Construction type
C

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

135 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jun 12, 2026In progress
issued Jun 2026
2291 Stockton StWise Builders Incunit 4355: remodel kitchen and bathroom in kind, new cabinets for both, all like for like. will pull eletcrical and plumbing seperately. all sheet rock shall be 5/8" type x. kitchen approx. 100 sq ft. bathroom approx. 50 sq ft
Details
Permit
202606123159
Status
issued
Filed
Jun 12, 2026
Permit issued
Jun 15, 2026
Declared cost
$55,000
Address
2291 Stockton St

unit 4355: remodel kitchen and bathroom in kind, new cabinets for both, all like for like. will pull eletcrical and plumbing seperately. all sheet rock shall be 5/8" type x. kitchen approx. 100 sq ft. bathroom approx. 50 sq ft

Open the permit page

$55,000
Jun 11, 2026In progress
issued Jun 2026
245 North Point StWise Builders Incunits 2309,3305,3304: replace kitchen cabinets and fixtures same location, remodel is in kind.
Details
Permit
202606113046
Status
issued
Filed
Jun 11, 2026
Permit issued
Jun 11, 2026
Declared cost
$165,000
Address
245 North Point St

units 2309,3305,3304: replace kitchen cabinets and fixtures same location, remodel is in kind.

Open the permit page

$165,000
Aug 15, 2025Completed
final sign-off Jun 2026
2211 Stockton StWise Builders Incunits 2202, 4201, 4206 & 4253: replace kitchen and bath cabinets. replace fixtures in same location. remodeling in-kind. existing hood to remain.
Details
Permit
202508153153
Status
complete
Filed
Aug 15, 2025
Permit issued
Aug 18, 2025
Final sign-off
Jun 11, 2026
Declared cost
$120,000
Address
2211 Stockton St

units 2202, 4201, 4206 & 4253: replace kitchen and bath cabinets. replace fixtures in same location. remodeling in-kind. existing hood to remain.

Open the permit page

$120,000
Aug 7, 2025In progress
filed Aug 2025, not yet issued
240 Bay Stadministrative permit for record keeping of inspections for new fire alarm system. ref #202311201159 and e202408206365. request by dbi electrical inspection. building b
Details
Permit
202508072545
Status
filed
Filed
Aug 7, 2025
Address
240 Bay St

administrative permit for record keeping of inspections for new fire alarm system. ref #202311201159 and e202408206365. request by dbi electrical inspection. building b

Open the permit page

Aug 7, 2025In progress
filed Aug 2025, not yet issued
2211 Stockton Stadministrative permit for record keeping of inspections for new fire alarm system. ref #202311201159 and e202408206365. request by dbi electrical inspection. building b
Details
Permit
202508072547
Status
filed
Filed
Aug 7, 2025
Address
2211 Stockton St

administrative permit for record keeping of inspections for new fire alarm system. ref #202311201159 and e202408206365. request by dbi electrical inspection. building b

Open the permit page

Feb 10, 2025In progress
filed Feb 2025, not yet issued
2211 Stockton Stfire alarm permit. add heat detectors in units.
Details
Permit
202501309361
Status
approved
Filed
Feb 10, 2025
Declared cost
$50,000
Address
2211 Stockton St

fire alarm permit. add heat detectors in units.

Open the permit page

$50,000
Jun 19, 2024In progress
issued Oct 2024
2211 Stockton StAllied Fire Protectiondisconnect twelve 1" riser stacks from (e) domestic service and reconnect to new piping. poc for (n) piping shall be taken at (e) riser located at level b1. replace all sprinklers in closets to 7/16" orifice and install new head guards
Details
Permit
202405021233
Status
issued
Filed
Jun 19, 2024
Permit issued
Oct 4, 2024
Declared cost
$75,000
Address
2211 Stockton St

disconnect twelve 1" riser stacks from (e) domestic service and reconnect to new piping. poc for (n) piping shall be taken at (e) riser located at level b1. replace all sprinklers in closets to 7/16" orifice and install new head guards

Open the permit page

$75,000
Apr 8, 2024Completed
final sign-off Nov 2024
2291 Stockton StWise Builders Incunit's: 3354,3357, 3358 and 4351. replace kitchen and bath cabinets, countertops, and fixtures in same location. in kind remodel.
Details
Permit
202404089543
Status
complete
Filed
Apr 8, 2024
Permit issued
Apr 8, 2024
Final sign-off
Nov 8, 2024
Declared cost
$120,000
Address
2291 Stockton St

unit's: 3354,3357, 3358 and 4351. replace kitchen and bath cabinets, countertops, and fixtures in same location. in kind remodel.

Open the permit page

$120,000
Nov 20, 2023In progress
issued Sep 2024
245 North Point StCm Electricfire alarm improvements per 2016 oridinance 163-16 and sffc 1103.7.6.1 in sleeping areas. no common areas are in-scope. l/s performance modifications are limited to tenant apartments and electrical or stroage rooms housing new nac panel.
Details
Permit
202311201159
Status
issued
Filed
Nov 20, 2023
Permit issued
Sep 26, 2024
Declared cost
$175,000
Address
245 North Point St

fire alarm improvements per 2016 oridinance 163-16 and sffc 1103.7.6.1 in sleeping areas. no common areas are in-scope. l/s performance modifications are limited to tenant apartments and electrical or stroage rooms housing new nac panel.

Open the permit page

$175,000
Dec 28, 2022Completed
final sign-off Oct 2023
2211 Stockton StWise Builders Incunit's: 2201, 3205, 2206, 4204: one kitchen and one bath in each unit: remove/ replace electrical and plumbing fixtures in same location, cabinets and countertop in sam location in kind. total 4 kitchens and 4 bathrooms.
Details
Permit
202212289308
Status
complete
Filed
Dec 28, 2022
Permit issued
Dec 29, 2022
Final sign-off
Oct 31, 2023
Declared cost
$100,000
Address
2211 Stockton St

unit's: 2201, 3205, 2206, 4204: one kitchen and one bath in each unit: remove/ replace electrical and plumbing fixtures in same location, cabinets and countertop in sam location in kind. total 4 kitchens and 4 bathrooms.

Open the permit page

$100,000
Mar 9, 2022Completed
final sign-off Nov 2022
245 North Point StWise Builders Incunit 3303: kitchen and bath remodel to include remove and replace cabinets with countertop, plumbing, electrical fixtures in same location in existing apartment unit.
Details
Permit
202203099577
Status
complete
Filed
Mar 9, 2022
Permit issued
Mar 9, 2022
Final sign-off
Nov 18, 2022
Declared cost
$25,000
Address
245 North Point St

unit 3303: kitchen and bath remodel to include remove and replace cabinets with countertop, plumbing, electrical fixtures in same location in existing apartment unit.

Open the permit page

$25,000
Dec 14, 2021Completed
final sign-off Nov 2022
240 Bay StWise Builders Incunit #4260 kitchen and bath remodel to include: remove and replace cabinets with countertop, plumbing, electrical fixtures in same location in existing apartment unit.
Details
Permit
202112144376
Status
complete
Filed
Dec 14, 2021
Permit issued
Dec 14, 2021
Final sign-off
Nov 21, 2022
Declared cost
$25,000
Address
240 Bay St

unit #4260 kitchen and bath remodel to include: remove and replace cabinets with countertop, plumbing, electrical fixtures in same location in existing apartment unit.

Open the permit page

$25,000
Dec 14, 2021Completed
final sign-off Nov 2022
2211 Stockton StWise Builders Incunit #4211 kitchen and bath remodel to include: remove and replace cabinets with countertop, plumbing, electrical fixtures in same location in existing apartment unit.
Details
Permit
202112144382
Status
complete
Filed
Dec 14, 2021
Permit issued
Dec 14, 2021
Final sign-off
Nov 21, 2022
Declared cost
$25,000
Address
2211 Stockton St

unit #4211 kitchen and bath remodel to include: remove and replace cabinets with countertop, plumbing, electrical fixtures in same location in existing apartment unit.

Open the permit page

$25,000
Nov 20, 2020Completed
final sign-off Dec 2023
2211 Stockton StSaarman Construction,Ltd.revision to 201812219004. changes are at windows and sliding doors including showing operability directions and adding safety glazing, additional interior gypsum wallboard removal at building b. also to document the split of the original permit into 3 permits. this is for building b, block 32/lot 00
Details
Permit
202011209461
Status
complete
Filed
Nov 20, 2020
Permit issued
Mar 29, 2021
Final sign-off
Dec 6, 2023
Address
2211 Stockton St

revision to 201812219004. changes are at windows and sliding doors including showing operability directions and adding safety glazing, additional interior gypsum wallboard removal at building b. also to document the split of the original permit into 3 permits. this is for building b, block 32/lot 00

Open the permit page

Oct 14, 2020Expired or cancelled
withdrawn Nov 2020
2211 Stockton StSaarman Construction,Ltd.revision to 201812219004. administrative permit to separate orig into 3 permits for 3 buildings which will share the plans of the original permit. courtyard upgrades for each building. (wall cladding, concrete walkways, landscaping, windows, doors, waterproofing, balconies) this is for building b
Details
Permit
202010146510
Status
withdrawn
Filed
Oct 14, 2020
Address
2211 Stockton St

revision to 201812219004. administrative permit to separate orig into 3 permits for 3 buildings which will share the plans of the original permit. courtyard upgrades for each building. (wall cladding, concrete walkways, landscaping, windows, doors, waterproofing, balconies) this is for building b

Open the permit page

Jan 29, 2020Never finaled
issued Jan 2020, no final
2211 Stockton Ststreet space
Details
Permit
M1188587
Status
issued
Filed
Jan 29, 2020
Permit issued
Jan 30, 2020
Address
2211 Stockton St

street space

Open the permit page

Jun 25, 2019Never finaled
issued Jun 2019, no final
240 Bay Ststreet space only
Details
Permit
M1100587
Status
issued
Filed
Jun 25, 2019
Permit issued
Jun 25, 2019
Address
240 Bay St

street space only

Open the permit page

Apr 12, 2019Completed
final sign-off May 2019
2211 Stockton StRegency General Contractors Incremodel (1) kitchen and bathroom in-kind in the following unit (2209). kitchen lighting min. 50% wattage high efficiency bathroom light high efficiency controlled or manual or sensor. main light high efficiency, no change to exhaust system, no change on doors and windows.
Details
Permit
201904127849
Status
complete
Filed
Apr 12, 2019
Permit issued
Apr 12, 2019
Final sign-off
May 17, 2019
Declared cost
$32,000
Address
2211 Stockton St

remodel (1) kitchen and bathroom in-kind in the following unit (2209). kitchen lighting min. 50% wattage high efficiency bathroom light high efficiency controlled or manual or sensor. main light high efficiency, no change to exhaust system, no change on doors and windows.

Open the permit page

$32,000
Jan 31, 2019Never finaled
issued Jan 2019, no final
2291 Stockton Ststreet space
Details
Permit
M1033947
Status
issued
Filed
Jan 31, 2019
Permit issued
Jan 31, 2019
Address
2291 Stockton St

street space

Open the permit page

Dec 21, 2018Completed
final sign-off Dec 2023
2211 Stockton StSaarman Construction,Ltd.remove / replace exterior wall cladding, r & r concrete walkway's, curb's & landscaping at base of exterior wall's. remove (e) windows, sliding glass doors & install (n) alum window & doors. install fluid-applied coating on to concrete/masonry. r&r all courtyard steel balconies w/ in-kind, wp mem
Details
Permit
201812219004
Status
complete
Filed
Dec 21, 2018
Permit issued
Dec 12, 2019
Final sign-off
Dec 6, 2023
Declared cost
$9,708,956
Address
2211 Stockton St

remove / replace exterior wall cladding, r & r concrete walkway's, curb's & landscaping at base of exterior wall's. remove (e) windows, sliding glass doors & install (n) alum window & doors. install fluid-applied coating on to concrete/masonry. r&r all courtyard steel balconies w/ in-kind, wp mem

Open the permit page

$9,708,956
Nov 27, 2018Completed
final sign-off Jun 2019
2211 Stockton Stbuilding b: upgrade to the stairwell guardrails by an addition of infill panels in 8 stairway enclosures.
Details
Permit
201811276792
Status
complete
Filed
Nov 27, 2018
Permit issued
Feb 25, 2019
Final sign-off
Jun 25, 2019
Declared cost
$25,000
Address
2211 Stockton St

building b: upgrade to the stairwell guardrails by an addition of infill panels in 8 stairway enclosures.

Open the permit page

$25,000
Nov 6, 2018Never finaled
issued Nov 2018, no final
2291 Stockton StRegency General Contractors Incremodel 1 kitchen and bathroom in kind in unit 2352. kitchen lighting min 50% wattage. high efficiency bath light controlled or manual sensor. main light high efficiency. na change to exhaust system. no change to doors or windows. kitchen, 80 sqft. bathroomm 40 sqft.
Details
Permit
201811065126
Status
issued
Filed
Nov 6, 2018
Permit issued
Nov 6, 2018
Declared cost
$20,000
Address
2291 Stockton St

remodel 1 kitchen and bathroom in kind in unit 2352. kitchen lighting min 50% wattage. high efficiency bath light controlled or manual sensor. main light high efficiency. na change to exhaust system. no change to doors or windows. kitchen, 80 sqft. bathroomm 40 sqft.

Open the permit page

$20,000
Nov 6, 2018Never finaled
issued Nov 2018, no final
240 Bay StRegency General Contractors Incremodel 1 kitchen and bathroom in kind in unit # 2253. kitchen lighting min. 50% wattage. high efficiency bath light controlled or manual sensor. main light high efficiency. no change to exhaust system. no change to doors or windows. kitchen, 80 sqft. bathroom, 40 sqft.
Details
Permit
201811065117
Status
issued
Filed
Nov 6, 2018
Permit issued
Nov 6, 2018
Declared cost
$20,000
Address
240 Bay St

remodel 1 kitchen and bathroom in kind in unit # 2253. kitchen lighting min. 50% wattage. high efficiency bath light controlled or manual sensor. main light high efficiency. no change to exhaust system. no change to doors or windows. kitchen, 80 sqft. bathroom, 40 sqft.

Open the permit page

$20,000
Nov 1, 2018Never finaled
issued Nov 2018, no final
2211 Stockton Ststreet space
Details
Permit
M1001487
Status
issued
Filed
Nov 1, 2018
Permit issued
Nov 5, 2018
Address
2211 Stockton St

street space

Open the permit page

Oct 18, 2018Never finaled
issued Oct 2018, no final
2291 Stockton Ststreet space
Details
Permit
M994987
Status
issued
Filed
Oct 18, 2018
Permit issued
Oct 18, 2018
Address
2291 Stockton St

street space

Open the permit page

Aug 29, 2018Completed
final sign-off Oct 2018
240 Bay StRegency General Contractors Incremodel kitchen and bath in kind unit 3257. kitchen light min 50% high eff. high eff bath ligh on occupancy sensor. main light high eff. noi change to exhaust. no change to doors or windows,no walls moved. layouts unchanged.
Details
Permit
201808298670
Status
complete
Filed
Aug 29, 2018
Permit issued
Aug 29, 2018
Final sign-off
Oct 15, 2018
Declared cost
$20,000
Address
240 Bay St

remodel kitchen and bath in kind unit 3257. kitchen light min 50% high eff. high eff bath ligh on occupancy sensor. main light high eff. noi change to exhaust. no change to doors or windows,no walls moved. layouts unchanged.

Open the permit page

$20,000
Jul 19, 2018Never finaled
issued Jul 2018, no final
2291 Stockton Ststreet space
Details
Permit
M952007
Status
issued
Filed
Jul 19, 2018
Permit issued
Jul 19, 2018
Address
2291 Stockton St

street space

Open the permit page

Jun 20, 2018Completed
final sign-off Aug 2018
240 Bay StRegency General Contractors Incremodel (1) kitchen and (1) bath in-kind in unit (2255). kitchen lighting min. 50% wattage high efficacy, bathroom light high efficency controlled or manual-on sensor. main light high efficency. no change to exhaust system. no change in doors and windows and wall layout.
Details
Permit
201806202413
Status
complete
Filed
Jun 20, 2018
Permit issued
Jun 20, 2018
Final sign-off
Aug 23, 2018
Declared cost
$20,000
Address
240 Bay St

remodel (1) kitchen and (1) bath in-kind in unit (2255). kitchen lighting min. 50% wattage high efficacy, bathroom light high efficency controlled or manual-on sensor. main light high efficency. no change to exhaust system. no change in doors and windows and wall layout.

Open the permit page

$20,000
Jun 20, 2018Completed
final sign-off Aug 2018
245 North Point StRegency General Contractors Incremodel (1) kitchen and (1) bath in-kind in unit (2310). kitchen lighting min. 50% wattage high efficacy, bathroom light high efficency controlled or manual-on sensor. main light high efficency. no change to exhaust system. no change in doors and windows and wall layout.
Details
Permit
201806202411
Status
complete
Filed
Jun 20, 2018
Permit issued
Jun 20, 2018
Final sign-off
Aug 23, 2018
Declared cost
$20,000
Address
245 North Point St

remodel (1) kitchen and (1) bath in-kind in unit (2310). kitchen lighting min. 50% wattage high efficacy, bathroom light high efficency controlled or manual-on sensor. main light high efficency. no change to exhaust system. no change in doors and windows and wall layout.

Open the permit page

$20,000
Apr 10, 2018Never finaled
issued Apr 2018, no final
2291 Stockton Ststreet space
Details
Permit
M910427
Status
issued
Filed
Apr 10, 2018
Permit issued
Apr 10, 2018
Address
2291 Stockton St

street space

Open the permit page

Apr 2, 2018Completed
final sign-off May 2018
240 Bay StRegency General Contractors Incunit # 4262: remodel (1) kitchen & bath in kind in unit # 4262. kitchen lighting min. 50% wattage. high efficiency bath ligtht controlled or manual sensor. main light high efficiency. no change to exhaust. no chnage on doors or windows. n/a maher
Details
Permit
201804025224
Status
complete
Filed
Apr 2, 2018
Permit issued
Apr 2, 2018
Final sign-off
May 11, 2018
Declared cost
$20,000
Address
240 Bay St

unit # 4262: remodel (1) kitchen & bath in kind in unit # 4262. kitchen lighting min. 50% wattage. high efficiency bath ligtht controlled or manual sensor. main light high efficiency. no change to exhaust. no chnage on doors or windows. n/a maher

Open the permit page

$20,000
Feb 14, 2018Completed
final sign-off Mar 2018
2291 Stockton StRegency General Contractors Inckitchen and bathroom remodel in unit #3359. kitchen lighting min 50% wattage, high efficiencey iboth lights with controlled or manual sensor, main light high efficiency, no chnage to exhaust system. no change to doors or windows, no rough framing & chnage of (e) layout. maher n/a
Details
Permit
201802141271
Status
complete
Filed
Feb 14, 2018
Permit issued
Feb 14, 2018
Final sign-off
Mar 19, 2018
Declared cost
$20,000
Address
2291 Stockton St

kitchen and bathroom remodel in unit #3359. kitchen lighting min 50% wattage, high efficiencey iboth lights with controlled or manual sensor, main light high efficiency, no chnage to exhaust system. no change to doors or windows, no rough framing & chnage of (e) layout. maher n/a

Open the permit page

$20,000
Jan 17, 2018Never finaled
issued Jan 2018, no final
2211 Stockton Ststreet space
Details
Permit
M877667
Status
issued
Filed
Jan 17, 2018
Permit issued
Jan 17, 2018
Address
2211 Stockton St

street space

Open the permit page

Jan 12, 2018Never finaled
issued Jan 2018, no final
2291 Stockton Ststreet space permit - renewal of permit # m838287
Details
Permit
M876087
Status
issued
Filed
Jan 12, 2018
Permit issued
Jan 12, 2018
Address
2291 Stockton St

street space permit - renewal of permit # m838287

Open the permit page

Jan 9, 2018Completed
final sign-off Mar 2018
245 North Point StRegency General Contractors Incapt 2305: remodel kitchen & bathroom in-kind unit 245-2305: kitchen lighting min 50% voltage h.e. bath light, controll on manual sensor. no hcange to exhaust fans, no change to doors & windows.
Details
Permit
201801098163
Status
complete
Filed
Jan 9, 2018
Permit issued
Jan 9, 2018
Final sign-off
Mar 14, 2018
Declared cost
$20,000
Address
245 North Point St

apt 2305: remodel kitchen & bathroom in-kind unit 245-2305: kitchen lighting min 50% voltage h.e. bath light, controll on manual sensor. no hcange to exhaust fans, no change to doors & windows.

Open the permit page

$20,000
Dec 11, 2017Completed
final sign-off Jan 2018
2291 Stockton StRegency General Contractors Incremodel kitchen & bath in kind in unit #4361. high efficiecy lighting for kitchen & bath - new cabinets, counter top, flooring. no walls moved, removed, added or infilled. all existing layout to remain unchanged.
Details
Permit
201712116137
Status
complete
Filed
Dec 11, 2017
Permit issued
Dec 11, 2017
Final sign-off
Jan 25, 2018
Declared cost
$40,000
Address
2291 Stockton St

remodel kitchen & bath in kind in unit #4361. high efficiecy lighting for kitchen & bath - new cabinets, counter top, flooring. no walls moved, removed, added or infilled. all existing layout to remain unchanged.

Open the permit page

$40,000
Nov 30, 2017Never finaled
issued Nov 2017, no final
2291 Stockton Ststreet space permit
Details
Permit
M860967
Status
issued
Filed
Nov 30, 2017
Permit issued
Nov 30, 2017
Address
2291 Stockton St

street space permit

Open the permit page

Nov 2, 2017Completed
final sign-off Apr 2018
240 Bay StRegency General Contractors Incapt 3260: each unit: remodel 1 bathroom & 1 kitchen; kitchen lights are h.e. bathroom lighting. kitchen on manual, bathroom on sensor, no open walls or ceilings. no change to doors or windows & wall layouts.
Details
Permit
201711022905
Status
complete
Filed
Nov 2, 2017
Permit issued
Nov 2, 2017
Final sign-off
Apr 20, 2018
Declared cost
$20,000
Address
240 Bay St

apt 3260: each unit: remodel 1 bathroom & 1 kitchen; kitchen lights are h.e. bathroom lighting. kitchen on manual, bathroom on sensor, no open walls or ceilings. no change to doors or windows & wall layouts.

Open the permit page

$20,000
Oct 27, 2017Never finaled
issued Oct 2017, no final
2211 Stockton Ststreet space permit
Details
Permit
M848587
Status
issued
Filed
Oct 27, 2017
Permit issued
Oct 27, 2017
Address
2211 Stockton St

street space permit

Open the permit page

Oct 3, 2017Never finaled
issued Oct 2017, no final
2291 Stockton Ststreet space
Details
Permit
M838287
Status
issued
Filed
Oct 3, 2017
Permit issued
Oct 3, 2017
Address
2291 Stockton St

street space

Open the permit page

Sep 18, 2017Completed
final sign-off Dec 2017
240 Bay StRegency General Contractors Inc#2251- remodel (1) kitchen (1) bath in kind, kitchen lighting min. 50% wattage high efficacy, bathroom light high efficacy controlled or manual or sensor, main light high efficacy. no change to exhaust system. no change on doors and windows or walls. n/a ordinance #155-13
Details
Permit
201709188795
Status
complete
Filed
Sep 18, 2017
Permit issued
Sep 18, 2017
Final sign-off
Dec 1, 2017
Declared cost
$20,000
Address
240 Bay St

#2251- remodel (1) kitchen (1) bath in kind, kitchen lighting min. 50% wattage high efficacy, bathroom light high efficacy controlled or manual or sensor, main light high efficacy. no change to exhaust system. no change on doors and windows or walls. n/a ordinance #155-13

Open the permit page

$20,000
Aug 14, 2017Completed
final sign-off Nov 2017
245 North Point StRegency General Contractors Incremodel (1) kitchen (1) bath in kind in the follwoing unit 4306. kitchen lighting min 50% wattage high efficacy. bathroom light ligh efficacy controlled or manuel or sensor main light high efficacy. no change to exhaust system no change on doors and windows or walls.
Details
Permit
201708144692
Status
complete
Filed
Aug 14, 2017
Permit issued
Aug 14, 2017
Final sign-off
Nov 7, 2017
Declared cost
$34,000
Address
245 North Point St

remodel (1) kitchen (1) bath in kind in the follwoing unit 4306. kitchen lighting min 50% wattage high efficacy. bathroom light ligh efficacy controlled or manuel or sensor main light high efficacy. no change to exhaust system no change on doors and windows or walls.

Open the permit page

$34,000
Jul 5, 2017Never finaled
issued Jul 2017, no final
2291 Stockton Ststreet space permit
Details
Permit
M804467
Status
issued
Filed
Jul 5, 2017
Permit issued
Jul 5, 2017
Address
2291 Stockton St

street space permit

Open the permit page

Jun 19, 2017Completed
final sign-off Sep 2017
240 Bay StRegency General Contractors Incremodel (1) kitchen, (1) bath in kind in the following unit (4255). kitchen lighting min. 50% wattage high efficacy, bathroom light high efficacy controlled or manual or sensor, main light high efficacy. no change to exhaust system. no change on door and windows.
Details
Permit
201706199725
Status
complete
Filed
Jun 19, 2017
Permit issued
Jun 19, 2017
Final sign-off
Sep 8, 2017
Declared cost
$35,000
Address
240 Bay St

remodel (1) kitchen, (1) bath in kind in the following unit (4255). kitchen lighting min. 50% wattage high efficacy, bathroom light high efficacy controlled or manual or sensor, main light high efficacy. no change to exhaust system. no change on door and windows.

Open the permit page

$35,000
May 18, 2017Completed
final sign-off Aug 2017
245 North Point StRegency General Contractors Incunit #4310 and #3302: remodel (1) kitchen (1) bath in kind. kitchen lighting min. 50% wattage high effic. bathroom light high effic. manual or sensor. main light high effic. no change to exhaust system. no change on doors and windows.
Details
Permit
201705186984
Status
complete
Filed
May 18, 2017
Permit issued
May 18, 2017
Final sign-off
Aug 3, 2017
Declared cost
$20,000
Address
245 North Point St

unit #4310 and #3302: remodel (1) kitchen (1) bath in kind. kitchen lighting min. 50% wattage high effic. bathroom light high effic. manual or sensor. main light high effic. no change to exhaust system. no change on doors and windows.

Open the permit page

$20,000
May 18, 2017Completed
final sign-off Aug 2017
2291 Stockton StRegency General Contractors Incunit #1351: remodel (1) kitchen (1) bath. kitchen lighting min. 50% wattage high effic. bathroom light high effic. manual or sensor. main light high effic. no change to exhaust system. no change on doors and windows.
Details
Permit
201705186981
Status
complete
Filed
May 18, 2017
Permit issued
May 18, 2017
Final sign-off
Aug 3, 2017
Declared cost
$20,000
Address
2291 Stockton St

unit #1351: remodel (1) kitchen (1) bath. kitchen lighting min. 50% wattage high effic. bathroom light high effic. manual or sensor. main light high effic. no change to exhaust system. no change on doors and windows.

Open the permit page

$20,000
Feb 8, 2017Never finaled
issued Feb 2017, no final
2291 Stockton Ststreet space permit
Details
Permit
M759607
Status
issued
Filed
Feb 8, 2017
Permit issued
Feb 8, 2017
Address
2291 Stockton St

street space permit

Open the permit page

Feb 8, 2017Completed
final sign-off Jul 2018
245 North Point StRegency General Contractors Incremodel (1) kitchen abd 1 bath in-kind in the following unit: 2306 and 4207 kitchen lighting min. 50% wattage high effficacy, bathroom light high efficacy controlled or manual or sensor. main light high efficacy. no change to exhaust system. no change on doors and windows.
Details
Permit
201702088907
Status
complete
Filed
Feb 8, 2017
Permit issued
Feb 8, 2017
Final sign-off
Jul 16, 2018
Declared cost
$40,000
Address
245 North Point St

remodel (1) kitchen abd 1 bath in-kind in the following unit: 2306 and 4207 kitchen lighting min. 50% wattage high effficacy, bathroom light high efficacy controlled or manual or sensor. main light high efficacy. no change to exhaust system. no change on doors and windows.

Open the permit page

$40,000
Jan 12, 2017Completed
final sign-off Feb 2017
240 Bay StRegency General Contractors Incapt 4257: remodel (1) kitchen & (1) bathroom in-kind. kitchen lighting min 50% wattage h.e. bathroom light h.e. controlled or manual sensor, main light h.e. no change to exhaust system, no change to doors, windows or walls.
Details
Permit
201701127024
Status
complete
Filed
Jan 12, 2017
Permit issued
Jan 12, 2017
Final sign-off
Feb 16, 2017
Declared cost
$20,000
Address
240 Bay St

apt 4257: remodel (1) kitchen & (1) bathroom in-kind. kitchen lighting min 50% wattage h.e. bathroom light h.e. controlled or manual sensor, main light h.e. no change to exhaust system, no change to doors, windows or walls.

Open the permit page

$20,000
Nov 30, 2016Never finaled
issued Nov 2016, no final
2291 Stockton Ststreet space
Details
Permit
M742387
Status
issued
Filed
Nov 30, 2016
Permit issued
Nov 30, 2016
Address
2291 Stockton St

street space

Open the permit page

Sep 20, 2016Never finaled
issued Sep 2016, no final
2291 Stockton Ststreet space permit
Details
Permit
M723768
Status
issued
Filed
Sep 20, 2016
Permit issued
Sep 20, 2016
Address
2291 Stockton St

street space permit

Open the permit page

Aug 2, 2016Never finaled
issued Aug 2016, no final
2291 Stockton Ststreet spce permit
Details
Permit
M710247
Status
issued
Filed
Aug 2, 2016
Permit issued
Aug 2, 2016
Address
2291 Stockton St

street spce permit

Open the permit page

Aug 2, 2016Completed
final sign-off Nov 2016
245 North Point StRegency General Contractors Incremodel 4 kitchen and 4 bath in kind in the following units: (245-2304), (245 - 2311), (2211-3240), (2211-4209) , kitchen lighting min 50% wattage high-efficacy. bathroom lighting high efficacy
Details
Permit
201608023970
Status
complete
Filed
Aug 2, 2016
Permit issued
Aug 2, 2016
Final sign-off
Nov 8, 2016
Declared cost
$80,000
Address
245 North Point St

remodel 4 kitchen and 4 bath in kind in the following units: (245-2304), (245 - 2311), (2211-3240), (2211-4209) , kitchen lighting min 50% wattage high-efficacy. bathroom lighting high efficacy

Open the permit page

$80,000
Apr 28, 2016Never finaled
issued Apr 2016, no final
2211 Stockton Ststreet space
Details
Permit
M685287
Status
issued
Filed
Apr 28, 2016
Permit issued
Apr 28, 2016
Address
2211 Stockton St

street space

Open the permit page

Apr 19, 2016Never finaled
issued Apr 2016, no final
2291 Stockton Ststreet space
Details
Permit
M682167
Status
issued
Filed
Apr 19, 2016
Permit issued
Apr 19, 2016
Address
2291 Stockton St

street space

Open the permit page

Apr 19, 2016Completed
final sign-off Aug 2016
240 Bay StRegency General Contractors Incapt 3262: remodel 1 kitchen & 1 bathroom in-kind. kitchen lightingmin 50% wattage h.e, bathroom lighting h.e. controller or manual or sensor & main light h.e.. no change to exhaust sytem, no change in doors or windows. no walls or ceilings opened.
Details
Permit
201604195113
Status
complete
Filed
Apr 19, 2016
Permit issued
Apr 19, 2016
Final sign-off
Aug 3, 2016
Declared cost
$20,000
Address
240 Bay St

apt 3262: remodel 1 kitchen & 1 bathroom in-kind. kitchen lightingmin 50% wattage h.e, bathroom lighting h.e. controller or manual or sensor & main light h.e.. no change to exhaust sytem, no change in doors or windows. no walls or ceilings opened.

Open the permit page

$20,000
Jan 27, 2016Never finaled
issued Jan 2016, no final
2291 Stockton Ststreet space
Details
Permit
M658427
Status
issued
Filed
Jan 27, 2016
Permit issued
Jan 27, 2016
Address
2291 Stockton St

street space

Open the permit page

Dec 22, 2015Never finaled
issued Dec 2015, no final
2211 Stockton StRichard Joseph Construction Increplace windows at courtyard. (e) courtyard windows are aluminum single pane being replace with double pane vinyl windows. no change to size or location. not visible from street.
Details
Permit
201512225699
Status
issued
Filed
Dec 22, 2015
Permit issued
Dec 22, 2015
Declared cost
$350,000
Address
2211 Stockton St

replace windows at courtyard. (e) courtyard windows are aluminum single pane being replace with double pane vinyl windows. no change to size or location. not visible from street.

Open the permit page

$350,000
Nov 2, 2015Never finaled
issued Nov 2015, no final
2291 Stockton Ststreet space
Details
Permit
M634487
Status
issued
Filed
Nov 2, 2015
Permit issued
Nov 2, 2015
Address
2291 Stockton St

street space

Open the permit page

Oct 29, 2015Completed
final sign-off Jan 2016
2211 Stockton StRegency General Contractors Inc2211-4212 & 2291-4358: remodel (2 units): kitchen & bathroom in-kind. kitchen lighting min 50% wattage high efficency , bathrom lighting high efficiency or controlled manuel on sensor & main light h.e. no change to exhaust system, no change to doors, window openings or wall locations.
Details
Permit
201510291127
Status
complete
Filed
Oct 29, 2015
Permit issued
Oct 29, 2015
Final sign-off
Jan 19, 2016
Declared cost
$40,000
Address
2211 Stockton St

2211-4212 & 2291-4358: remodel (2 units): kitchen & bathroom in-kind. kitchen lighting min 50% wattage high efficency , bathrom lighting high efficiency or controlled manuel on sensor & main light h.e. no change to exhaust system, no change to doors, window openings or wall locations.

Open the permit page

$40,000
Sep 24, 2015Completed
final sign-off Nov 2015
2211 Stockton StRegency General Contractors Incwork in unit 3203: remodel 1 unit kitchen and one bath in-kind. kitchewn lighting min. 50% wattage high efficacy, bathroom lighting high efficacy. no change to exhaust system, no change to walls, doors, windows opning layout. maintain 1-hour separating between units.
Details
Permit
201509247985
Status
complete
Filed
Sep 24, 2015
Permit issued
Sep 24, 2015
Final sign-off
Nov 19, 2015
Declared cost
$20,000
Address
2211 Stockton St

work in unit 3203: remodel 1 unit kitchen and one bath in-kind. kitchewn lighting min. 50% wattage high efficacy, bathroom lighting high efficacy. no change to exhaust system, no change to walls, doors, windows opning layout. maintain 1-hour separating between units.

Open the permit page

$20,000
May 8, 2015Completed
final sign-off Nov 2015
2211 Stockton Stto obtain final inspection for work approved under pa 201305151536; all work is complete.
Details
Permit
201505085757
Status
complete
Filed
May 8, 2015
Permit issued
May 8, 2015
Final sign-off
Nov 25, 2015
Address
2211 Stockton St

to obtain final inspection for work approved under pa 201305151536; all work is complete.

Open the permit page

May 8, 2015Completed
final sign-off Nov 2015
240 Bay StSwinerton Buildersto obtain final inspection for work approved under pa#201303051543. all work is complete. courtyard ab
Details
Permit
201505085761
Status
complete
Filed
May 8, 2015
Permit issued
May 8, 2015
Final sign-off
Nov 25, 2015
Address
240 Bay St

to obtain final inspection for work approved under pa#201303051543. all work is complete. courtyard ab

Open the permit page

Apr 22, 2015Never finaled
issued Apr 2015, no final
245 North Point Ststreet space
Details
Permit
M579888
Status
issued
Filed
Apr 22, 2015
Permit issued
Apr 22, 2015
Address
245 North Point St

street space

Open the permit page

Apr 21, 2015Never finaled
issued May 2015, no final
2291 Stockton StSabah International Incorporated(bldg b) voluntary like for like replaement of existing fire alarm system per csfm code interpretation 12-001 and csfm bulletin dated 9/4/08. job #11313-b reference permit #201412304730. there's no record plan or ul certificate for the (e) f/a system.(maher ordinance #155-13 not applicable)
Details
Permit
201504214178
Status
issued
Filed
Apr 21, 2015
Permit issued
May 6, 2015
Declared cost
$100,000
Address
2291 Stockton St

(bldg b) voluntary like for like replaement of existing fire alarm system per csfm code interpretation 12-001 and csfm bulletin dated 9/4/08. job #11313-b reference permit #201412304730. there's no record plan or ul certificate for the (e) f/a system.(maher ordinance #155-13 not applicable)

Open the permit page

$100,000
Apr 17, 2015Never finaled
issued Apr 2015, no final
2291 Stockton StSwinerton Buildersstreet space
Details
Permit
M578587
Status
issued
Filed
Apr 17, 2015
Permit issued
Apr 17, 2015
Address
2291 Stockton St

street space

Open the permit page

Mar 4, 2015Expired or cancelled
withdrawn May 2015
2211 Stockton StSwinerton Buildersdemo (e) roll down smoke door in type i-b praking lot maher - not req'd
Details
Permit
201503049957
Status
withdrawn
Filed
Mar 4, 2015
Declared cost
$9,000
Address
2211 Stockton St

demo (e) roll down smoke door in type i-b praking lot maher - not req'd

Open the permit page

$9,000
Jan 23, 2015Never finaled
issued Jan 2015, no final
245 North Point Ststreet space
Details
Permit
M552967
Status
issued
Filed
Jan 23, 2015
Permit issued
Jan 23, 2015
Address
245 North Point St

street space

Open the permit page

Jan 13, 2015Completed
final sign-off Apr 2015
240 Bay StRegency General Contractors Incremodel 5 units kitchen & bath in kind unit 301 (240 bay), unit 312 & 314 (245 north point), unit 301 (2211 stockton), unit 412 (2291 stockton); lighting to comply with cec 150k no change to exhaust system, no change to strutural doors and windows
Details
Permit
201501135576
Status
complete
Filed
Jan 13, 2015
Permit issued
Jan 13, 2015
Final sign-off
Apr 23, 2015
Declared cost
$75,000
Address
240 Bay St

remodel 5 units kitchen & bath in kind unit 301 (240 bay), unit 312 & 314 (245 north point), unit 301 (2211 stockton), unit 412 (2291 stockton); lighting to comply with cec 150k no change to exhaust system, no change to strutural doors and windows

Open the permit page

$75,000
Dec 31, 2014Expired or cancelled
withdrawn Jan 2015
2211 Stockton StPacific Coast Trane Service Co.replacement of 4 fire dampers at lower garage exhaust shaft point of connection ref 201409247224
Details
Permit
201412314776
Status
withdrawn
Filed
Dec 31, 2014
Declared cost
$50,000
Address
2211 Stockton St

replacement of 4 fire dampers at lower garage exhaust shaft point of connection ref 201409247224

Open the permit page

$50,000
Oct 23, 2014Never finaled
issued Oct 2014, no final
245 North Point Ststreetspace
Details
Permit
M530387
Status
issued
Filed
Oct 23, 2014
Permit issued
Oct 23, 2014
Address
245 North Point St

streetspace

Open the permit page

Oct 15, 2014Never finaled
issued Oct 2014, no final
2291 Stockton Ststreet space
Details
Permit
M527567
Status
issued
Filed
Oct 15, 2014
Permit issued
Oct 15, 2014
Address
2291 Stockton St

street space

Open the permit page

Oct 6, 2014Completed
final sign-off Apr 2015
240 Bay StRegency General Contractors Incremodel (1 unit) kitchen and bath in kind in the following unit: (240-310) lighting to comply with cec 150k. no change to exhaust system. no change to structural, doors and windows. n/a maher ordinance 155-13
Details
Permit
201410068169
Status
complete
Filed
Oct 6, 2014
Permit issued
Oct 6, 2014
Final sign-off
Apr 1, 2015
Declared cost
$15,000
Address
240 Bay St

remodel (1 unit) kitchen and bath in kind in the following unit: (240-310) lighting to comply with cec 150k. no change to exhaust system. no change to structural, doors and windows. n/a maher ordinance 155-13

Open the permit page

$15,000
Sep 24, 2014Completed
final sign-off Dec 2015
2211 Stockton StPacific Coast Trane Service Co.bldg c: removal of 4 exhaust fans from roof. install 4 new exhaust fans, vfds and exhaust plenums in garage area, ductwork modification at new garage poc and roof vents; n/a for the maher ordinance #155-13
Details
Permit
201409247224
Status
complete
Filed
Sep 24, 2014
Permit issued
Oct 7, 2014
Final sign-off
Dec 18, 2015
Declared cost
$701,815
Address
2211 Stockton St

bldg c: removal of 4 exhaust fans from roof. install 4 new exhaust fans, vfds and exhaust plenums in garage area, ductwork modification at new garage poc and roof vents; n/a for the maher ordinance #155-13

Open the permit page

$701,815
Aug 15, 2014Never finaled
issued Aug 2014, no final
2211 Stockton Ststreet space permit
Details
Permit
M511111
Status
issued
Filed
Aug 15, 2014
Permit issued
Aug 15, 2014
Address
2211 Stockton St

street space permit

Open the permit page

Aug 13, 2014Completed
final sign-off Apr 2015
245 North Point StRegency General Contractors Incunit 402: remodel (1 - unit) kitchen & bathroom in-kind in the following unit. lighting to comply with cec 150k,m no change to exhaust system, no change to structural, doors & windows. compliance with ord 155-13 not required
Details
Permit
201408133712
Status
complete
Filed
Aug 13, 2014
Permit issued
Aug 13, 2014
Final sign-off
Apr 1, 2015
Declared cost
$15,000
Address
245 North Point St

unit 402: remodel (1 - unit) kitchen & bathroom in-kind in the following unit. lighting to comply with cec 150k,m no change to exhaust system, no change to structural, doors & windows. compliance with ord 155-13 not required

Open the permit page

$15,000
Aug 4, 2014Completed
final sign-off Apr 2015
240 Bay StRegency General Contractors Incremodel(5 units) kitchen & bath in-kind in the following units: 240-204, 2291-404, 2291-307, 245-408, 245-212. lighting to comply with cec 150k. no change to exhaust system. no change to structural, doors & windows.
Details
Permit
201408042932
Status
complete
Filed
Aug 4, 2014
Permit issued
Aug 4, 2014
Final sign-off
Apr 1, 2015
Declared cost
$75,000
Address
240 Bay St

remodel(5 units) kitchen & bath in-kind in the following units: 240-204, 2291-404, 2291-307, 245-408, 245-212. lighting to comply with cec 150k. no change to exhaust system. no change to structural, doors & windows.

Open the permit page

$75,000
May 22, 2014Never finaled
issued May 2014, no final
2291 Stockton Ststreet space permit
Details
Permit
M490367
Status
issued
Filed
May 22, 2014
Permit issued
May 22, 2014
Address
2291 Stockton St

street space permit

Open the permit page

Apr 23, 2014Completed
final sign-off Jun 2015
2211 Stockton StSwinerton Builderscourtyard b. open a slab to drop debris. slab will be filled after work completion. n/a for the maher ordinance #155-13
Details
Permit
201404234004
Status
complete
Filed
Apr 23, 2014
Permit issued
Aug 14, 2014
Final sign-off
Jun 26, 2015
Declared cost
$100,000
Address
2211 Stockton St

courtyard b. open a slab to drop debris. slab will be filled after work completion. n/a for the maher ordinance #155-13

Open the permit page

$100,000
Apr 23, 2014Completed
final sign-off Jun 2015
240 Bay StSwinerton Builderscourtyard ab. open a slab to drop debris. slab will be filled after work completion. n/a for the maher ordinance #155-13
Details
Permit
201404234001
Status
complete
Filed
Apr 23, 2014
Permit issued
Sep 9, 2014
Final sign-off
Jun 26, 2015
Declared cost
$100,000
Address
240 Bay St

courtyard ab. open a slab to drop debris. slab will be filled after work completion. n/a for the maher ordinance #155-13

Open the permit page

$100,000
Mar 20, 2014Never finaled
issued Mar 2014, no final
2291 Stockton Ststreet space
Details
Permit
M472727
Status
issued
Filed
Mar 20, 2014
Permit issued
Mar 20, 2014
Address
2291 Stockton St

street space

Open the permit page

Mar 13, 2014Never finaled
issued Mar 2014, no final
2291 Stockton Ststreet space
Details
Permit
M470527
Status
issued
Filed
Mar 13, 2014
Permit issued
Mar 13, 2014
Address
2291 Stockton St

street space

Open the permit page

Feb 14, 2014Completed
final sign-off May 2014
240 Bay StRegency General Contractors Incunit 209 - kitchen and bath remodel - to comply with cec150(k) 8 & 10 - no change to exhaust system, structural, doors and windows; (e) wall to remain as it is.
Details
Permit
201402148551
Status
complete
Filed
Feb 14, 2014
Permit issued
Feb 14, 2014
Final sign-off
May 1, 2014
Declared cost
$15,000
Address
240 Bay St

unit 209 - kitchen and bath remodel - to comply with cec150(k) 8 & 10 - no change to exhaust system, structural, doors and windows; (e) wall to remain as it is.

Open the permit page

$15,000
Jan 8, 2014Never finaled
issued Jan 2014, no final
2291 Stockton Ststreet space
Details
Permit
M456207
Status
issued
Filed
Jan 8, 2014
Permit issued
Jan 8, 2014
Address
2291 Stockton St

street space

Open the permit page

Nov 14, 2013Never finaled
issued Nov 2013, no final
2291 Stockton Ststreet space
Details
Permit
M444007
Status
issued
Filed
Nov 14, 2013
Permit issued
Nov 14, 2013
Address
2291 Stockton St

street space

Open the permit page

Nov 14, 2013Completed
final sign-off Feb 2014
2211 Stockton StRegency General Contractors Incremodel kitchen and bath in following units (2291- #210), (2211-#310), lighting to comply with cec 150k 8-10, no change, to exhaust system, no changes to structural doors and windows (2 bathrooms and 2 kitchen)
Details
Permit
201311141896
Status
complete
Filed
Nov 14, 2013
Permit issued
Nov 14, 2013
Final sign-off
Feb 12, 2014
Declared cost
$60,000
Address
2211 Stockton St

remodel kitchen and bath in following units (2291- #210), (2211-#310), lighting to comply with cec 150k 8-10, no change, to exhaust system, no changes to structural doors and windows (2 bathrooms and 2 kitchen)

Open the permit page

$60,000
Oct 30, 2013Completed
final sign-off Jan 2014
240 Bay StRegency General Contractors Inc240 bay street unit #212 & 245 north point unit # 206: remodel kitchen and bath; lighting to comply with cec 150(k) 8 - 10, no change to exhaust system, no changes to structural, doors and windows. kitchen size (9'x10'), bath = (6'x8')
Details
Permit
201310300712
Status
complete
Filed
Oct 30, 2013
Permit issued
Oct 30, 2013
Final sign-off
Jan 2, 2014
Declared cost
$60,000
Address
240 Bay St

240 bay street unit #212 & 245 north point unit # 206: remodel kitchen and bath; lighting to comply with cec 150(k) 8 - 10, no change to exhaust system, no changes to structural, doors and windows. kitchen size (9'x10'), bath = (6'x8')

Open the permit page

$60,000
Oct 30, 2013Completed
final sign-off Jan 2014
2211 Stockton StRegency General Contractors Inc2211 stockton street unit #307 & 2291 stockton street unit #411: remodel kitchen and bath; lighting to comply with cec 150(k) 8 - 10, no change to exhaust system, no changes to structural, doors and windows. kitchen size (9'x10'), bath = (6'x8')
Details
Permit
201310300716
Status
complete
Filed
Oct 30, 2013
Permit issued
Oct 30, 2013
Final sign-off
Jan 2, 2014
Declared cost
$60,000
Address
2211 Stockton St

2211 stockton street unit #307 & 2291 stockton street unit #411: remodel kitchen and bath; lighting to comply with cec 150(k) 8 - 10, no change to exhaust system, no changes to structural, doors and windows. kitchen size (9'x10'), bath = (6'x8')

Open the permit page

$60,000
Aug 27, 2013Never finaled
issued Aug 2013, no final
2211 Stockton Ststreet space
Details
Permit
M421287
Status
issued
Filed
Aug 27, 2013
Permit issued
Aug 27, 2013
Address
2211 Stockton St

street space

Open the permit page

Aug 19, 2013Never finaled
issued Aug 2013, no final
2291 Stockton Ststreet space
Details
Permit
M418627
Status
issued
Filed
Aug 19, 2013
Permit issued
Aug 19, 2013
Address
2291 Stockton St

street space

Open the permit page

Jul 19, 2013Completed
final sign-off Oct 2013
2291 Stockton StRegency General Contractors Incremodel kitchen & bath in kind; (2291-#406) lighting to comply with cec 150k, no change to exhaust system, no chane to structural, door & windows
Details
Permit
201307192293
Status
complete
Filed
Jul 19, 2013
Permit issued
Jul 19, 2013
Final sign-off
Oct 1, 2013
Declared cost
$15,000
Address
2291 Stockton St

remodel kitchen & bath in kind; (2291-#406) lighting to comply with cec 150k, no change to exhaust system, no chane to structural, door & windows

Open the permit page

$15,000
Jun 21, 2013Completed
final sign-off Aug 2013
2291 Stockton StRegency General Contractors Incunit #310: remodel kitchen and bath in kind, lighting to comply with cec 150k, no change to exhaust system, no change to structural doors and windows
Details
Permit
201306210187
Status
complete
Filed
Jun 21, 2013
Permit issued
Jun 21, 2013
Final sign-off
Aug 23, 2013
Declared cost
$15,000
Address
2291 Stockton St

unit #310: remodel kitchen and bath in kind, lighting to comply with cec 150k, no change to exhaust system, no change to structural doors and windows

Open the permit page

$15,000
Jun 20, 2013Never finaled
issued Jun 2013, no final
2211 Stockton Ststreet space permit
Details
Permit
M402987
Status
issued
Filed
Jun 20, 2013
Permit issued
Jun 20, 2013
Address
2211 Stockton St

street space permit

Open the permit page

May 30, 2013Never finaled
issued May 2013, no final
2291 Stockton Ststreet space permit
Details
Permit
M398367
Status
issued
Filed
May 30, 2013
Permit issued
May 30, 2013
Address
2291 Stockton St

street space permit

Open the permit page

May 21, 2013Never finaled
issued May 2013, no final
2291 Stockton Ststreet space
Details
Permit
M396167
Status
issued
Filed
May 21, 2013
Permit issued
May 21, 2013
Address
2291 Stockton St

street space

Open the permit page

Apr 18, 2013Completed
final sign-off Aug 2013
245 North Point StRegency General Contractors Incremodel 3 units-kitchens & bathrooms in kind in the following 245-311, 245-405, 245-406-lighting will comply with cec 150k. no change to exhaust system. no change on structural, doors or walls
Details
Permit
201304184914
Status
complete
Filed
Apr 18, 2013
Permit issued
Apr 18, 2013
Final sign-off
Aug 6, 2013
Declared cost
$87,588
Address
245 North Point St

remodel 3 units-kitchens & bathrooms in kind in the following 245-311, 245-405, 245-406-lighting will comply with cec 150k. no change to exhaust system. no change on structural, doors or walls

Open the permit page

$87,588
Mar 25, 2013Never finaled
issued Mar 2013, no final
2211 Stockton Strevision to pa# 2012-0228-5041, replace metal mech walls not new concrete infills.
Details
Permit
201303252987
Status
issued
Filed
Mar 25, 2013
Permit issued
Mar 28, 2013
Declared cost
$3,500
Address
2211 Stockton St

revision to pa# 2012-0228-5041, replace metal mech walls not new concrete infills.

Open the permit page

$3,500
Mar 19, 2013Completed
final sign-off Jul 2013
245 North Point StRegency General Contractors Incremodel kitchen & bath in kind in the following 6 units: 240-#410, #407, 245-#301, 407, 2211-#303, #305. lighting to comply with cec 150k. no change to exhaust system, no changes on structural doors & windows.
Details
Permit
201303192482
Status
complete
Filed
Mar 19, 2013
Permit issued
Mar 19, 2013
Final sign-off
Jul 16, 2013
Declared cost
$90,000
Address
245 North Point St

remodel kitchen & bath in kind in the following 6 units: 240-#410, #407, 245-#301, 407, 2211-#303, #305. lighting to comply with cec 150k. no change to exhaust system, no changes on structural doors & windows.

Open the permit page

$90,000
Mar 5, 2013Never finaled
issued Apr 2013, no final
2211 Stockton Streplacing waterproofing courtyard, water is infiltrating the concrete slab & causing structural damage. install new water feature equipment
Details
Permit
201303051536
Status
issued
Filed
Mar 5, 2013
Permit issued
Apr 15, 2013
Declared cost
$30,000
Address
2211 Stockton St

replacing waterproofing courtyard, water is infiltrating the concrete slab & causing structural damage. install new water feature equipment

Open the permit page

$30,000
Mar 5, 2013Never finaled
issued Apr 2013, no final
240 Bay StSwinerton Buildersreplacing waterproofing courtyard, water is infiltrating the concrete slab & causing structural damage. install new water feature equipment
Details
Permit
201303051543
Status
issued
Filed
Mar 5, 2013
Permit issued
Apr 17, 2013
Declared cost
$30,000
Address
240 Bay St

replacing waterproofing courtyard, water is infiltrating the concrete slab & causing structural damage. install new water feature equipment

Open the permit page

$30,000
Feb 7, 2013Never finaled
issued Feb 2013, no final
2211 Stockton Ststreet space
Details
Permit
M370347
Status
issued
Filed
Feb 7, 2013
Permit issued
Feb 7, 2013
Address
2211 Stockton St

street space

Open the permit page

Jan 31, 2013Completed
final sign-off Apr 2013
245 North Point StRegency General Contractors Incunits @ 245 north point st: #404, #208 & units @ 2291 stockton st: #206, #207, #311 - remodel (5) kitchens & (5) bathrooms in kind. no structural change, no doors & no windows, lighting to comply with cec 150k, no change to exhaust system.
Details
Permit
201301319175
Status
complete
Filed
Jan 31, 2013
Permit issued
Jan 31, 2013
Final sign-off
Apr 10, 2013
Declared cost
$75,000
Address
245 North Point St

units @ 245 north point st: #404, #208 & units @ 2291 stockton st: #206, #207, #311 - remodel (5) kitchens & (5) bathrooms in kind. no structural change, no doors & no windows, lighting to comply with cec 150k, no change to exhaust system.

Open the permit page

$75,000
Dec 10, 2012Never finaled
issued Dec 2012, no final
2211 Stockton Ststreet space permit (201202285041)
Details
Permit
M361747
Status
issued
Filed
Dec 10, 2012
Permit issued
Dec 10, 2012
Address
2211 Stockton St

street space permit (201202285041)

Open the permit page

Nov 28, 2012Never finaled
issued May 2013, no final
2211 Stockton Sterect one electric,single faced wall sign.
Details
Permit
201211285058
Status
issued
Filed
Nov 28, 2012
Permit issued
May 8, 2013
Declared cost
$1,000
Address
2211 Stockton St

erect one electric,single faced wall sign.

Open the permit page

$1,000
Nov 13, 2012Never finaled
issued Nov 2012, no final
2291 Stockton Ststreet space
Details
Permit
M357790
Status
issued
Filed
Nov 13, 2012
Permit issued
Nov 13, 2012
Address
2291 Stockton St

street space

Open the permit page

Nov 7, 2012Never finaled
issued Nov 2012, no final
2291 Stockton Ststreet space
Details
Permit
M357028
Status
issued
Filed
Nov 7, 2012
Permit issued
Nov 7, 2012
Address
2291 Stockton St

street space

Open the permit page

Oct 30, 2012Completed
final sign-off Jan 2013
2211 Stockton StRegency General Contractors Incremodel 4 kitchen & 4 bathrooms in kind in the following units, 403 410 306 210 , no change in opening and wall layout, min 50% kitchen wattge permanten lighting high efficiency permanent bathroom lighting high efficiency or controlled by manual occupancy sensor, lighting to comply with cec 8.10 150
Details
Permit
201210303165
Status
complete
Filed
Oct 30, 2012
Permit issued
Oct 30, 2012
Final sign-off
Jan 3, 2013
Declared cost
$60,000
Address
2211 Stockton St

remodel 4 kitchen & 4 bathrooms in kind in the following units, 403 410 306 210 , no change in opening and wall layout, min 50% kitchen wattge permanten lighting high efficiency permanent bathroom lighting high efficiency or controlled by manual occupancy sensor, lighting to comply with cec 8.10 150

Open the permit page

$60,000
Oct 24, 2012Completed
final sign-off Dec 2012
240 Bay StRegency General Contractors Incremodel 5 kitchen, 5 bathrooms in kind in the following units: 402, 302, 314, 202, 208. lighting to comply with cec 8.10 150k. no change to exhaust system.
Details
Permit
201210242712
Status
complete
Filed
Oct 24, 2012
Permit issued
Oct 24, 2012
Final sign-off
Dec 26, 2012
Declared cost
$75,000
Address
240 Bay St

remodel 5 kitchen, 5 bathrooms in kind in the following units: 402, 302, 314, 202, 208. lighting to comply with cec 8.10 150k. no change to exhaust system.

Open the permit page

$75,000
Oct 12, 2012Completed
final sign-off Dec 2012
2291 Stockton Stremodel 5 kitchens & baths in kind in the following units, 407,212, 409,309,214, lighting to comply with cec 8,10 150k no change to exhaust system
Details
Permit
201210121924
Status
complete
Filed
Oct 12, 2012
Permit issued
Oct 12, 2012
Final sign-off
Dec 20, 2012
Declared cost
$75,000
Address
2291 Stockton St

remodel 5 kitchens & baths in kind in the following units, 407,212, 409,309,214, lighting to comply with cec 8,10 150k no change to exhaust system

Open the permit page

$75,000
Oct 3, 2012Completed
final sign-off Nov 2012
240 Bay StRegency General Contractors Incremodel 5 kitchens & baths in kind in the following units: 240 bay- 403,304,205 and 260 bay- 406,309 no structural work, lighting to comply with cec 150k no change to exhaust system
Details
Permit
201210031186
Status
complete
Filed
Oct 3, 2012
Permit issued
Oct 3, 2012
Final sign-off
Nov 19, 2012
Declared cost
$75,000
Address
240 Bay St

remodel 5 kitchens & baths in kind in the following units: 240 bay- 403,304,205 and 260 bay- 406,309 no structural work, lighting to comply with cec 150k no change to exhaust system

Open the permit page

$75,000
Sep 24, 2012Never finaled
issued Sep 2012, no final
2211 Stockton Stto erect single faced signs
Details
Permit
201209240491
Status
issued
Filed
Sep 24, 2012
Permit issued
Sep 25, 2012
Declared cost
$600
Address
2211 Stockton St

to erect single faced signs

Open the permit page

$600
Sep 13, 2012Expired or cancelled
withdrawn Apr 2013
2211 Stockton Stnew signage on new awning electric, single faced.
Details
Permit
201209139693
Status
withdrawn
Filed
Sep 13, 2012
Declared cost
$10,000
Address
2211 Stockton St

new signage on new awning electric, single faced.

Open the permit page

$10,000
Sep 13, 2012Never finaled
issued Sep 2012, no final
2211 Stockton Stto erect electric wall sign
Details
Permit
201209139700
Status
issued
Filed
Sep 13, 2012
Permit issued
Sep 25, 2012
Declared cost
$5,000
Address
2211 Stockton St

to erect electric wall sign

Open the permit page

$5,000
Sep 13, 2012Expired or cancelled
withdrawn Apr 2013
2211 Stockton Stto erect non electric sign, double faced
Details
Permit
201209139696
Status
withdrawn
Filed
Sep 13, 2012
Declared cost
$1,200
Address
2211 Stockton St

to erect non electric sign, double faced

Open the permit page

$1,200
Sep 13, 2012Expired or cancelled
withdrawn Apr 2013
2211 Stockton Stnew canopy structure
Details
Permit
201209139694
Status
withdrawn
Filed
Sep 13, 2012
Declared cost
$10,000
Address
2211 Stockton St

new canopy structure

Open the permit page

$10,000
Sep 12, 2012Completed
final sign-off Oct 2012
245 North Point StRegency General Contractors Inc#412- remodel 1 kitchen & bath in kind. lighting to comply cec8,10 150k, no change to exhaust system.
Details
Permit
201209129495
Status
complete
Filed
Sep 12, 2012
Permit issued
Sep 12, 2012
Final sign-off
Oct 25, 2012
Declared cost
$15,000
Address
245 North Point St

#412- remodel 1 kitchen & bath in kind. lighting to comply cec8,10 150k, no change to exhaust system.

Open the permit page

$15,000
Sep 12, 2012Completed
final sign-off Oct 2012
2211 Stockton StRegency General Contractors Inc2211 stockton #408, 207/ 2291 stockton #205, 208, 209- remodel 5 kitchens & baths in above 5 units. lighting to comply cec8,10 150k, no change to exhaust system.
Details
Permit
201209129497
Status
complete
Filed
Sep 12, 2012
Permit issued
Sep 12, 2012
Final sign-off
Oct 25, 2012
Declared cost
$75,000
Address
2211 Stockton St

2211 stockton #408, 207/ 2291 stockton #205, 208, 209- remodel 5 kitchens & baths in above 5 units. lighting to comply cec8,10 150k, no change to exhaust system.

Open the permit page

$75,000
Aug 8, 2012Never finaled
issued Aug 2012, no final
2291 Stockton Ststreet space
Details
Permit
M341467
Status
issued
Filed
Aug 8, 2012
Permit issued
Aug 8, 2012
Address
2291 Stockton St

street space

Open the permit page

Jul 9, 2012Completed
final sign-off Aug 2012
2211 Stockton StRegency General Contractors Incremodel 5 kitchen and bath in kind in the following units, 2211 stockton unit #402,201,202,206; 2291 stockton unit #308; lighting to comply with cfc 150k; no change to exhaust system
Details
Permit
201207094321
Status
complete
Filed
Jul 9, 2012
Permit issued
Jul 9, 2012
Final sign-off
Aug 15, 2012
Declared cost
$75,000
Address
2211 Stockton St

remodel 5 kitchen and bath in kind in the following units, 2211 stockton unit #402,201,202,206; 2291 stockton unit #308; lighting to comply with cfc 150k; no change to exhaust system

Open the permit page

$75,000
May 9, 2012Never finaled
issued May 2012, no final
2291 Stockton Ststreet space.
Details
Permit
M320067
Status
issued
Filed
May 9, 2012
Permit issued
May 10, 2012
Address
2291 Stockton St

street space.

Open the permit page

May 4, 2012Never finaled
issued May 2012, no final
2291 Stockton Ststreet space
Details
Permit
M318867
Status
issued
Filed
May 4, 2012
Permit issued
May 4, 2012
Address
2291 Stockton St

street space

Open the permit page

Apr 12, 2012Completed
final sign-off May 2012
245 North Point StRegency General Contractors Incremodel 2 kitchen and bath in kind in the following units: 245 northpoint st. unit #306, 403, 411
Details
Permit
201204128179
Status
complete
Filed
Apr 12, 2012
Permit issued
Apr 12, 2012
Final sign-off
May 18, 2012
Declared cost
$45,000
Address
245 North Point St

remodel 2 kitchen and bath in kind in the following units: 245 northpoint st. unit #306, 403, 411

Open the permit page

$45,000
Apr 12, 2012Completed
final sign-off May 2012
2291 Stockton StRegency General Contractors Incremodel 2 kitchen and bath in kind in the following units: 2291 stockton st. unit #309, 401. lighting to comply with cec 150 (k), no change to exhaust system.
Details
Permit
201204128137
Status
complete
Filed
Apr 12, 2012
Permit issued
Apr 12, 2012
Final sign-off
May 18, 2012
Declared cost
$30,000
Address
2291 Stockton St

remodel 2 kitchen and bath in kind in the following units: 2291 stockton st. unit #309, 401. lighting to comply with cec 150 (k), no change to exhaust system.

Open the permit page

$30,000
Mar 14, 2012Completed
final sign-off Apr 2012
2211 Stockton StRegency General Contractors Incremodel 6 kitchens & bath in kind in the following units: 2211-205,2211-214,2211-405,2211-414,240-404,240-415: lighting to comply with cbc 150k no change to exhaust systems
Details
Permit
201203146043
Status
complete
Filed
Mar 14, 2012
Permit issued
Mar 14, 2012
Final sign-off
Apr 24, 2012
Declared cost
$90,000
Address
2211 Stockton St

remodel 6 kitchens & bath in kind in the following units: 2211-205,2211-214,2211-405,2211-414,240-404,240-415: lighting to comply with cbc 150k no change to exhaust systems

Open the permit page

$90,000
Feb 28, 2012Never finaled
issued Mar 2012, no final
2211 Stockton Streplacement of exterior gates, wall railings and balcony railing. new concrete infill walls and metal dividersbetween the infill walls and metal dividers between the top of existing conrete wall and bottom of bay window slabs. new metal lid ceilings to gate enclosures
Details
Permit
201202285041
Status
issued
Filed
Feb 28, 2012
Permit issued
Mar 13, 2012
Declared cost
$50,000
Address
2211 Stockton St

replacement of exterior gates, wall railings and balcony railing. new concrete infill walls and metal dividersbetween the infill walls and metal dividers between the top of existing conrete wall and bottom of bay window slabs. new metal lid ceilings to gate enclosures

Open the permit page

$50,000
Jan 17, 2012Completed
final sign-off Mar 2012
2211 Stockton StRegency General Contractors Incremodel (6) kitchen and bath in kind. studio units in the following units: 2211-311, 2291-202, 2291-302, 240-312, 240-409, 245-307. lighting to comply with cec 150k. no change to exhaust system.
Details
Permit
201201172367
Status
complete
Filed
Jan 17, 2012
Permit issued
Jan 17, 2012
Final sign-off
Mar 21, 2012
Declared cost
$90,000
Address
2211 Stockton St

remodel (6) kitchen and bath in kind. studio units in the following units: 2211-311, 2291-202, 2291-302, 240-312, 240-409, 245-307. lighting to comply with cec 150k. no change to exhaust system.

Open the permit page

$90,000
Nov 9, 2011Never finaled
issued Nov 2011, no final
2211 Stockton Ststreet space
Details
Permit
M288168
Status
issued
Filed
Nov 9, 2011
Permit issued
Nov 9, 2011
Address
2211 Stockton St

street space

Open the permit page

Oct 7, 2011Never finaled
issued Oct 2011, no final
2211 Stockton Ststreet space permit.
Details
Permit
M283207
Status
issued
Filed
Oct 7, 2011
Permit issued
Oct 7, 2011
Address
2211 Stockton St

street space permit.

Open the permit page

May 12, 2011Never finaled
issued May 2011, no final
2211 Stockton Ststreet space
Details
Permit
M260906
Status
issued
Filed
May 12, 2011
Permit issued
May 12, 2011
Address
2211 Stockton St

street space

Open the permit page

Dec 31, 2010Never finaled
issued Dec 2010, no final
2211 Stockton Ststreet space & sidewalk permit
Details
Permit
M235006
Status
issued
Filed
Dec 31, 2010
Permit issued
Dec 31, 2010
Address
2211 Stockton St

street space & sidewalk permit

Open the permit page

Sep 21, 2010Completed
final sign-off Feb 2012
2211 Stockton Stsmoke tower improvements at roof level. not visible from street.
Details
Permit
201009211312
Status
complete
Filed
Sep 21, 2010
Permit issued
Nov 4, 2010
Final sign-off
Feb 3, 2012
Declared cost
$26,000
Address
2211 Stockton St

smoke tower improvements at roof level. not visible from street.

Open the permit page

$26,000
Nov 16, 2009Expired or cancelled
cancelled Jan 2026
2211 Stockton Strepairs due to water damage from back up waste lines from street. multiple apts, fitness center & hallways affected, insulation, derywall, painting & flooring repairs needed base & casing as well. all demo & remediation is completed
Details
Permit
200911161304
Status
cancelled
Filed
Nov 16, 2009
Declared cost
$50,000
Address
2211 Stockton St

repairs due to water damage from back up waste lines from street. multiple apts, fitness center & hallways affected, insulation, derywall, painting & flooring repairs needed base & casing as well. all demo & remediation is completed

Open the permit page

$50,000
Nov 16, 2009Completed
final sign-off Jan 2010
2211 Stockton StAmerican Technologies Increpairs due to water damage from backed up waste lines from st. multiple apartments, fitness center and hallways affected. insulation, drywall, painting and flooring repairs needed, base and casing as well. all demo and remediation is completed
Details
Permit
200911161312
Status
complete
Filed
Nov 16, 2009
Permit issued
Nov 16, 2009
Final sign-off
Jan 8, 2010
Declared cost
$50,000
Address
2211 Stockton St

repairs due to water damage from backed up waste lines from st. multiple apartments, fitness center and hallways affected. insulation, drywall, painting and flooring repairs needed, base and casing as well. all demo and remediation is completed

Open the permit page

$50,000
Oct 9, 2008Never finaled
issued Oct 2008, no final
240 Bay Ststreet space & sidewalk permit only.
Details
Permit
M136609
Status
issued
Filed
Oct 9, 2008
Permit issued
Oct 9, 2008
Address
240 Bay St

street space & sidewalk permit only.

Open the permit page

Oct 9, 2008Never finaled
issued Oct 2008, no final
245 North Point Ststreet space & sidewalk permit only.
Details
Permit
M136607
Status
issued
Filed
Oct 9, 2008
Permit issued
Oct 9, 2008
Address
245 North Point St

street space & sidewalk permit only.

Open the permit page

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Regency General Contractors Inc (45), Wise Builders Inc (8), Swinerton Builders (6), Saarman Construction,Ltd. (3), Pacific Coast Trane Service Co. (2), Allied Fire Protection, American Technologies Inc, Cm Electric, Richard Joseph Construction Inc, Sabah International Incorporated
Architects
John Mcnulty (4)
Engineers
Sven Fagerstrom (2), Lars Fagerstrom
Authorized agent-otherss
Jeff Saarman, Lloyd Diehl

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.