Cm Electric
- Based in
- Middletown
- On San Francisco permits
- Nov 2023 to Apr 2024
- Last 24 months
- 0 permits filed
2 permits since 2000: 1 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 4, 2024 | Completed final sign-off Jul 2025 | 165 North Point St | building c: fire alarm life safety system improvements motivated by sffd 2016 ordinance 163-16 + sf fire code section 1103.7.6.1 to achieve complaint occupation notification within sleeping areas. replace 86 existing smoke detectors.Details
building c: fire alarm life safety system improvements motivated by sffd 2016 ordinance 163-16 + sf fire code section 1103.7.6.1 to achieve complaint occupation notification within sleeping areas. replace 86 existing smoke detectors. | $20,000 |
| Nov 20, 2023 | In progress issued Sep 2024 | 245 North Point St | fire alarm improvements per 2016 oridinance 163-16 and sffc 1103.7.6.1 in sleeping areas. no common areas are in-scope. l/s performance modifications are limited to tenant apartments and electrical or stroage rooms housing new nac panel.Details
fire alarm improvements per 2016 oridinance 163-16 and sffc 1103.7.6.1 in sleeping areas. no common areas are in-scope. l/s performance modifications are limited to tenant apartments and electrical or stroage rooms housing new nac panel. | $175,000 |