Cortland Morgan
- Listed as
- architect, authorized agent-others, pmt consultant/expediter
- Firm
- Cortland Morgan Arch.
- Based in
- Arlington
- On San Francisco permits
- Dec 2004 to Jul 2026
55 permits since 2000 (architect on 52 permits, pmt consultant/expediter on 2 permits, authorized agent-others on 1 permit): 37 completed, 3 in progress, 11 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 29, 2026 | In progress issued Sep 2026 | 274 King St | J C O R Inc | ti of a retail. mech & electrical upgrades. no structural work.Details
ti of a retail. mech & electrical upgrades. no structural work. | $50,000 |
| Jul 17, 2026 | In progress issued Jul 2026 | 101 California St | Bcci Construction Company | 27th floor: renovation of the existing break room layout. 28th floor: new furniture and finishes throughout.Details
27th floor: renovation of the existing break room layout. 28th floor: new furniture and finishes throughout. | $751,283 |
| Feb 21, 2024 | Completed final sign-off May 2024 | 2300 16th St | J C O R Inc | space #255: tenant improvement. (n) hair color, hair care, beauty, nail supply. (this is not a salon service)Details
space #255: tenant improvement. (n) hair color, hair care, beauty, nail supply. (this is not a salon service) | $111,000 |
| Nov 27, 2023 | In progress issued Jan 2024 | 3998 18th St | Sd Design Construction Corp. | interior alterations only: replacement of (e) ceiling; (n) subflooring w/ slab infill work; (n) flooring; (n) finishes; minor repair/replacement of (e) duct system; installation of coolers/freezers; bring unise toilet from ada to requirements; provide (e) electrical panel with (n) service;Details
interior alterations only: replacement of (e) ceiling; (n) subflooring w/ slab infill work; (n) flooring; (n) finishes; minor repair/replacement of (e) duct system; installation of coolers/freezers; bring unise toilet from ada to requirements; provide (e) electrical panel with (n) service; | $225,000 |
| Jun 20, 2023 | Completed final sign-off Nov 2023 | 3251 20th Av | Jason Barber Construction Llc | #155: interior alteration to an (e) tenant space to house retail occup. scope includes new finishes and fixtures, while reusing the (e) walls, stock area, and (1) full access. toilet rm & modifications & extensions of (e) mep systems. no exterior work. no change of use.Details
#155: interior alteration to an (e) tenant space to house retail occup. scope includes new finishes and fixtures, while reusing the (e) walls, stock area, and (1) full access. toilet rm & modifications & extensions of (e) mep systems. no exterior work. no change of use. | $89,000 |
| Apr 27, 2023 | Completed final sign-off Jun 2025 | 901 Market St | A2z Builders Inc | lower lvl/ground flr: interior remodel of existing ross store-work area approx 29,131 sf, install merchndise racks, register counters and fitting rooms. no mep work.Details
lower lvl/ground flr: interior remodel of existing ross store-work area approx 29,131 sf, install merchndise racks, register counters and fitting rooms. no mep work. | $45,000 |
| Dec 22, 2021 | Completed final sign-off Jun 2022 | 90 New Montgomery St | R 3 Builders Inc. | ste 250. new carpet & ceiling grid, relocating heat pump and add new grills. relocate lights and add new occupancy sensors. demo of partition wallDetails
ste 250. new carpet & ceiling grid, relocating heat pump and add new grills. relocate lights and add new occupancy sensors. demo of partition wall | $300,000 |
| Oct 25, 2021 | Completed final sign-off Aug 2022 | 101 California St | Construction One Inc. | 27/f suite 2700: t.i to reduce sq. ft of training room to create a small team room. minor demolition and construction. suite entry/egress doors and egress paths to remain. minor mechanical and electrical. scope on a-101. fire alarm/sprinkler/emer lighting on sep permits.Details
27/f suite 2700: t.i to reduce sq. ft of training room to create a small team room. minor demolition and construction. suite entry/egress doors and egress paths to remain. minor mechanical and electrical. scope on a-101. fire alarm/sprinkler/emer lighting on sep permits. | $280,480 |
| Jan 19, 2021 | Completed final sign-off Jun 2021 | 2056 Fillmore St | Vortex Industries Inc | install security gate at store entrance for "gorjana".Details
install security gate at store entrance for "gorjana". | $4,000 |
| Aug 12, 2020 | Completed final sign-off Mar 2022 | 71 Powell St | Gci, Inc | revision to bpa#201609268771. remove one(non-egress).entry door: new storefront color propose for powell & ellis st. all architecture revisions are solely on powell st. no architectural revisons on ellisDetails
revision to bpa#201609268771. remove one(non-egress).entry door: new storefront color propose for powell & ellis st. all architecture revisions are solely on powell st. no architectural revisons on ellis | |
| Oct 23, 2019 | Completed final sign-off Aug 2020 | 2219 Chestnut St | J Palmer Construction Inc | barrier removal front entry door access. to comply with accessible business entrance programDetails
barrier removal front entry door access. to comply with accessible business entrance program | $5,000 |
| Apr 15, 2019 | Never finaled issued Apr 2019, no final | 800 Market St | Peacock Construction | revision to pa 2018-0618-2124 and 2019-0304-4279 to reduce scope of workDetails
revision to pa 2018-0618-2124 and 2019-0304-4279 to reduce scope of work | |
| Jan 11, 2019 | Never finaled filed Jan 2019, never issued | 240 Powell St | expose original brickwork under (e) front stucco; removing (e) stucco finish on storefront; replace (e) security gate. maher n/a.Details
expose original brickwork under (e) front stucco; removing (e) stucco finish on storefront; replace (e) security gate. maher n/a. | $40,000 | |
| Jan 11, 2019 | Never finaled filed Jan 2019, never issued | 240 Powell St | 1/f: tenant improvement: minor demo including ceiling, light fixtures, conduit and unised plumbing. new ceiling, lighting, cutwork, finishes.Details
1/f: tenant improvement: minor demo including ceiling, light fixtures, conduit and unised plumbing. new ceiling, lighting, cutwork, finishes. | $425,000 | |
| Sep 5, 2018 | Never finaled issued Jul 2019, no final | 3 Embarcadero Center | Embree Construction Group Inc | unit #3111a: shoe rack permit: removing extg furniture and installing new freestanding fixture being bolted into the ground. just a curved fixture being added. 300 sqftDetails
unit #3111a: shoe rack permit: removing extg furniture and installing new freestanding fixture being bolted into the ground. just a curved fixture being added. 300 sqft | $2,000 |
| Feb 1, 2018 | Completed final sign-off Aug 2018 | 3 Embarcadero Center | Crane Construction Company Inc. | revision to pa 2017-1017-1431 space r3111a, relocate air handling unit, arch, mech & electrical workDetails
revision to pa 2017-1017-1431 space r3111a, relocate air handling unit, arch, mech & electrical work | $300,000 |
| Oct 17, 2017 | Completed final sign-off Aug 2018 | 3 Embarcadero Center | Crane Construction Company Inc. | space # r3111a: t.i. consisting of a build out of an extg mall. improvements include new flooring,wall finishes, new light fixtures, new display fixtures, & new g.w.b. ceilings. please refer to engineer drawing for mech, elec, & plmg scope of work. n/a for maherDetails
space # r3111a: t.i. consisting of a build out of an extg mall. improvements include new flooring,wall finishes, new light fixtures, new display fixtures, & new g.w.b. ceilings. please refer to engineer drawing for mech, elec, & plmg scope of work. n/a for maher | $605,000 |
| Jun 8, 2017 | Expired or cancelled cancelled Jan 2026 | 125 Grant Av | existing exterior signs to be removed including glue on letters, glue on horse logos, pin mounted letters, blade sign & fabric awnings. purposed new signs to be filed under separate applicationDetails
existing exterior signs to be removed including glue on letters, glue on horse logos, pin mounted letters, blade sign & fabric awnings. purposed new signs to be filed under separate application | $10,000 | |
| Jun 8, 2017 | Completed final sign-off Aug 2017 | 125 Grant Av | Alain Hirsch Construction Corp | existing interior tenant build out to be demolished. all egress stairs & fire protection system to remain. no exterior work. ti to be filed under separate permit per ab017Details
existing interior tenant build out to be demolished. all egress stairs & fire protection system to remain. no exterior work. ti to be filed under separate permit per ab017 | $150,000 |
| Apr 7, 2017 | Completed final sign-off Oct 2017 | 2086 Union St | James Agresta Carpentry | interior t/i including new interior partitions, new finishes, new electrical distribution partial replacement of existing hvac system. this follows a formula retail cu approved by motion #19848.Details
interior t/i including new interior partitions, new finishes, new electrical distribution partial replacement of existing hvac system. this follows a formula retail cu approved by motion #19848. | $200,000 |
| Nov 30, 2016 | Completed final sign-off Jul 2017 | 2060 Chestnut St | R T Stevens Construction Inc | blue mercury retail cosmetics store. non-structural interior tenant improvement including (n) partitions, finishes, mechanical system, power plant lighting. n/a for maher ordinance no.155-13.Details
blue mercury retail cosmetics store. non-structural interior tenant improvement including (n) partitions, finishes, mechanical system, power plant lighting. n/a for maher ordinance no.155-13. | $140,000 |
| Nov 17, 2016 | Completed final sign-off Dec 2016 | 303 02nd St | Gci, Inc | suite s-137 - revision to pa #201607253274 - modify sheet a5 (equipment plan) to indicate accessible seating areas at two loctions & clearance between shelving racks.Details
suite s-137 - revision to pa #201607253274 - modify sheet a5 (equipment plan) to indicate accessible seating areas at two loctions & clearance between shelving racks. | |
| Sep 26, 2016 | Never finaled issued Nov 2017, no final | 71 Powell St | ground flr, exterior alterations to (e) storefront. replace (e) 1st flr. exterior finishes with (n) panelized style facade, inserting (n) glazing system within (e) window openingsDetails
ground flr, exterior alterations to (e) storefront. replace (e) 1st flr. exterior finishes with (n) panelized style facade, inserting (n) glazing system within (e) window openings | $100,000 | |
| Jul 12, 2016 | Completed final sign-off Nov 2016 | 303 02nd St | Gci, Inc | ste s-137 - demolish (e) non-load bearing walls, drop ceilings, (e) toilet room fixtures & finish ceramic tiles. remove mortar bed at & around (e) toilet room tile floors to (e) conc. slab in grade (per ab-017). space to remain vacantDetails
ste s-137 - demolish (e) non-load bearing walls, drop ceilings, (e) toilet room fixtures & finish ceramic tiles. remove mortar bed at & around (e) toilet room tile floors to (e) conc. slab in grade (per ab-017). space to remain vacant | $10,000 |
| Dec 8, 2015 | Completed final sign-off Apr 2016 | 333 Jefferson St | Ryan Contractors Inc | non structural demolition, new drywall partitions, new flooring, new nc accessible ramp, new drywall ceiling, new mopsink with wh, new lighting and power. n/a for maher.Details
non structural demolition, new drywall partitions, new flooring, new nc accessible ramp, new drywall ceiling, new mopsink with wh, new lighting and power. n/a for maher. | $170,000 |
| Sep 16, 2014 | Completed final sign-off Dec 2014 | 3251 20th Av | T D S Commercial Constr. Inc. | space #150: minor non-structurarl demo, new drywall partitions, new acoustic ceiling in stock room, new lighting, relocate hvac ducting, after existing restrooms to conform with title 24 disability access, doors, cabinetry, new flooring, stock room shelving.Details
space #150: minor non-structurarl demo, new drywall partitions, new acoustic ceiling in stock room, new lighting, relocate hvac ducting, after existing restrooms to conform with title 24 disability access, doors, cabinetry, new flooring, stock room shelving. | $100,000 |
| Jul 16, 2014 | Never finaled filed Jul 2014, never issued | 1355 Market St | Terra Nova Industries | revision to pa# 2012/11/08/3877. build mezzanine for office & storage space on ground floor. mep under separate permit. ** maher: compliance with ordinance no# 155-13 not required **Details
revision to pa# 2012/11/08/3877. build mezzanine for office & storage space on ground floor. mep under separate permit. ** maher: compliance with ordinance no# 155-13 not required ** | $134,000 |
| May 5, 2014 | Completed final sign-off Feb 2015 | 1355 Market St | Terra Nova Industries | interior non-structural demolition at ground floor. t.i #2014.0128.7280. compliance with ordinance #155-13 not requiredDetails
interior non-structural demolition at ground floor. t.i #2014.0128.7280. compliance with ordinance #155-13 not required | $5,000 |
| Jan 28, 2014 | Completed final sign-off Feb 2015 | 1355 Market St | W. Wong Construction Co. Inc. | ground floor interior remodel to include select areas of demolition, general retail tenant improvement, new handicap accessible toilet room. exterior & mep work under separate permits. ** maher: compliance with ordinance no# 155-13 not required **Details
ground floor interior remodel to include select areas of demolition, general retail tenant improvement, new handicap accessible toilet room. exterior & mep work under separate permits. ** maher: compliance with ordinance no# 155-13 not required ** | $1,200,000 |
| Jan 28, 2014 | Expired or cancelled cancelled Mar 2020 | 1355 Market St | exterior remodel to include (e) storefront (removal) between column lines, addition of (n) double doors at storefront, & addition of (n) fresh air intake at storefront. compliance with ordinance 3155-13 not required.Details
exterior remodel to include (e) storefront (removal) between column lines, addition of (n) double doors at storefront, & addition of (n) fresh air intake at storefront. compliance with ordinance 3155-13 not required. | $30,000 | |
| Oct 30, 2013 | Completed final sign-off Jun 2014 | 77 Beale St | Paradigm General Contractors | plumbing electric scope f/(e) approved architectural, permit arch 201304184830. gr fl cafeDetails
plumbing electric scope f/(e) approved architectural, permit arch 201304184830. gr fl cafe | $40,000 |
| Sep 18, 2013 | Completed final sign-off Dec 2013 | 201 Mission St | Richlen Construction | 12th floor t.i.:make 7 offices from open area. finishes, paint, allocate lights, add 3 new lights and one heat pump added.includes mep- sprinkler and fire alarm separate permitsDetails
12th floor t.i.:make 7 offices from open area. finishes, paint, allocate lights, add 3 new lights and one heat pump added.includes mep- sprinkler and fire alarm separate permits | $102,000 |
| Jul 9, 2013 | Completed final sign-off Dec 2013 | 58 Geary St | Brodson Construction Inc | t.i.include: new ceilings & partitions, new electrical including light fixtures, new floor ceiling finish, selective demo, new hvac, new plumbing, new ada lift, any exterior storefront change subject to minor permit to alter (historic planning) structural support framing for hvac will be underDetails
t.i.include: new ceilings & partitions, new electrical including light fixtures, new floor ceiling finish, selective demo, new hvac, new plumbing, new ada lift, any exterior storefront change subject to minor permit to alter (historic planning) structural support framing for hvac will be under | $415,000 |
| Apr 18, 2013 | Completed final sign-off Jun 2014 | 77 Beale St | Paradigm General Contractors | lobby. remodel (e) vacant cafe space within main lobby of pg & e building. project will entail minimal new drywall partitions, new millwork package, plumbing & electrical for coffee equipment & lightingDetails
lobby. remodel (e) vacant cafe space within main lobby of pg & e building. project will entail minimal new drywall partitions, new millwork package, plumbing & electrical for coffee equipment & lighting | $101,848 |
| Feb 22, 2013 | Completed final sign-off Dec 2014 | 240 Powell St | X S Industries Inc | erect/change a electric wall single faced sign.Details
erect/change a electric wall single faced sign. | $2,000 |
| Jun 13, 2012 | Completed final sign-off Nov 2012 | 201 Mission St | Richlen Construction | t.i.- 12/fl: new/reloc lighting&basic elec. hvac:35 new supplys. 27 new interior return airgrills, vav boxes, 2-5 ion ac unit w/thermostat. plumbing:drinking fountain, plumbing. restroom: 2 new ada toilets, cosmetic renovates new finishes thruout. sprinklers and fire alarmDetails
t.i.- 12/fl: new/reloc lighting&basic elec. hvac:35 new supplys. 27 new interior return airgrills, vav boxes, 2-5 ion ac unit w/thermostat. plumbing:drinking fountain, plumbing. restroom: 2 new ada toilets, cosmetic renovates new finishes thruout. sprinklers and fire alarm | $920,000 |
| Mar 2, 2011 | Completed final sign-off Jun 2011 | 101 Geary St | Teel Construction Inc. | swatch +. install two illuminated channel letters wall sign.Details
swatch +. install two illuminated channel letters wall sign. | $10,000 |
| Dec 27, 2010 | Completed final sign-off Nov 2011 | 350 Post St | Shawmut Woodworking & Supply Inc | minor remodel of a section of ti on 2nd floor in office area. partition,door jewerly case grab bars, ceiling, duct work & minor electricalDetails
minor remodel of a section of ti on 2nd floor in office area. partition,door jewerly case grab bars, ceiling, duct work & minor electrical | $110,000 |
| Sep 2, 2010 | Never finaled issued Apr 2011, no final | 101 Geary St | Teel Construction Inc. | interior ti of existing retail spaceDetails
interior ti of existing retail space | $65,000 |
| Jul 23, 2010 | Completed final sign-off Oct 2010 | 846 Market St | Jkt Construction Inc Dba Corcon | interior remodel of existing retail store. work to include partition walls, plumbing, mechanical , electrical, sales fixtures, drywall, carpet and paint, and remodel for ada restroom. fire sprinkler and fire alarm under separate permit.Details
interior remodel of existing retail store. work to include partition walls, plumbing, mechanical , electrical, sales fixtures, drywall, carpet and paint, and remodel for ada restroom. fire sprinkler and fire alarm under separate permit. | $120,000 |
| Jul 18, 2007 | Completed final sign-off Nov 2007 | 865 Market St | tenant improvement: interior remodeling of an existing retail tenant space at san francisco centre (westfield mall).Details
tenant improvement: interior remodeling of an existing retail tenant space at san francisco centre (westfield mall). | $75,000 | |
| Jul 5, 2006 | Completed final sign-off Aug 2006 | 22 04th St | interior improvement of e office space: partial demolition, new partition, new doors, new ceiling. mech/elec and fire alarm and sprinkler modifications to existing. under sep permitDetails
interior improvement of e office space: partial demolition, new partition, new doors, new ceiling. mech/elec and fire alarm and sprinkler modifications to existing. under sep permit | $81,242 | |
| Jun 7, 2006 | Completed final sign-off Jan 2007 | 845 Market St | A & E Construction Co | cti-1, 2nd floor, el, me, ls, sp. martin & osa, #249.Details
cti-1, 2nd floor, el, me, ls, sp. martin & osa, #249. | $500,000 |
| May 25, 2006 | Completed final sign-off Jan 2007 | 845 Market St | cti-1, "j crew", #245, 2nd level, el, me, ls, sp.Details
cti-1, "j crew", #245, 2nd level, el, me, ls, sp. | $242,325 | |
| May 24, 2006 | Never finaled issued Mar 2007, no final | 150 Stockton St | finish work and lighting for vendor areas on lower level (gucci) and 1st floor (chole & channel)new lighting for existing display windows on 1st floor. also vendors fendi, dior, guerlain.Details
finish work and lighting for vendor areas on lower level (gucci) and 1st floor (chole & channel)new lighting for existing display windows on 1st floor. also vendors fendi, dior, guerlain. | $67,500 | |
| Feb 28, 2006 | Completed final sign-off Dec 2006 | 845 Market St | James M Barb Construction Co | space# 422. cti-1, 4th floor, el, me, ls, sp. tenant improvement/store front, sprinkler modification, paint, metal fixtures and lighting/Details
space# 422. cti-1, 4th floor, el, me, ls, sp. tenant improvement/store front, sprinkler modification, paint, metal fixtures and lighting/ | $22,000 |
| Feb 28, 2006 | Completed final sign-off Dec 2006 | 845 Market St | sunglass hut. cti-2, 4th floor, el, me.Details
sunglass hut. cti-2, 4th floor, el, me. | $30,750 | |
| Feb 10, 2006 | Never finaled issued Feb 2006, no final | 22 04th St | interior remodel, add 3 new offices incl partiton ceiling, doors and finishes. new storage include partitions, doors, ceilings, finishesDetails
interior remodel, add 3 new offices incl partiton ceiling, doors and finishes. new storage include partitions, doors, ceilings, finishes | $51,424 | |
| Sep 27, 2005 | Completed final sign-off Jun 2006 | 150 Stockton St | remodel of mens shoes area on basement level only. no structural work. interior work only.Details
remodel of mens shoes area on basement level only. no structural work. interior work only. | $60,000 | |
| Aug 4, 2005 | Completed final sign-off Sep 2005 | 77 Battery St | interior remodel of (e) office spaces at 2nd & 3rd floor. new partitions as indicated, doors.Details
interior remodel of (e) office spaces at 2nd & 3rd floor. new partitions as indicated, doors. | $97,000 | |
| Aug 4, 2005 | Completed final sign-off Jun 2006 | 150 Stockton St | phase v vendor improvement on lower level for loro piana & armani.vendor improvement on 2/f forDetails
phase v vendor improvement on lower level for loro piana & armani.vendor improvement on 2/f for | $65,000 | |
| Jul 12, 2005 | Never finaled issued Jul 2005, no final | 3251 20th Av | Hardesty And Associates | interior non structural demolition only. handicapped access issues to comply with administrativeDetails
interior non structural demolition only. handicapped access issues to comply with administrative | $5,000 |
| Jul 1, 2005 | Never finaled issued Jul 2005, no final | 2829 Mission St | Fisher Development Inc | remove (e)perimeter wall/shewing standard in retail area.remove (e)fl finish.install new perimeterDetails
remove (e)perimeter wall/shewing standard in retail area.remove (e)fl finish.install new perimeter | $45,000 |
| Apr 7, 2005 | Expired or cancelled expired Jun 2006 | 150 Stockton St | phase iii vendor finish work on 3rd fl for carolina herrera& chanel chanel handbags, donna karen,...Details
phase iii vendor finish work on 3rd fl for carolina herrera& chanel chanel handbags, donna karen,... | $45,000 | |
| Dec 10, 2004 | Expired or cancelled expired Aug 2006 | 100 Bush St | interior remodel suite 1550. interior walls installation, entry door to suite instal. coabinet, **Details
interior remodel suite 1550. interior walls installation, entry door to suite instal. coabinet, ** | $60,000 |