Permit GraphShortlistSan Francisco building permits since 2000

Clifton Boswell

License
C26963
Look the license up with the state
Listed as
architect, authorized agent-others, engineer, lessee
Firm
Som
Based in
San Francisco
On San Francisco permits
Apr 2004 to Jun 2026

103 permits since 2000 (architect on 101 permits, authorized agent-others on 1 permit, engineer on 1 permit, lessee on 1 permit): 67 completed, 2 in progress, 21 never finaled, 13 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

Showing the 100 most recent of 103.

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jun 26, 2026In progress
issued Jul 2026
1750 Van Ness AvCahill Contractors Llc.revise issued bpa 202111232980 s2, update profilesof decoratedfinishes, revise lighting design, move louver within main shrine hall, rm 206, east side of level 2.
Details
Permit
202606264048
Status
issued
Filed
Jun 26, 2026
Permit issued
Jul 2, 2026
Address
1750 Van Ness Av

revise issued bpa 202111232980 s2, update profilesof decoratedfinishes, revise lighting design, move louver within main shrine hall, rm 206, east side of level 2.

Open the permit page

Sep 16, 2025Completed
final sign-off Dec 2025
300 Clay StHathaway Dinwiddie Co.revision to pa# 202502261091: removing the work on the east entrance from the scope of work.
Details
Permit
202509165351
Status
complete
Filed
Sep 16, 2025
Permit issued
Sep 18, 2025
Final sign-off
Dec 16, 2025
Address
300 Clay St

revision to pa# 202502261091: removing the work on the east entrance from the scope of work.

Open the permit page

Aug 27, 2025Completed
final sign-off Dec 2025
300 Clay StHathaway Dinwiddie Co.ref ti 202502261091- provide (n) lighting, branch circuiting to (e) panel, (n) power and signal and branch circuit to (e) panel. provide title 24 compliance forms.
Details
Permit
202508273987
Status
complete
Filed
Aug 27, 2025
Permit issued
Sep 5, 2025
Final sign-off
Dec 16, 2025
Address
300 Clay St

ref ti 202502261091- provide (n) lighting, branch circuiting to (e) panel, (n) power and signal and branch circuit to (e) panel. provide title 24 compliance forms.

Open the permit page

Aug 11, 2025In progress
issued Aug 2025
1750 Van Ness AvCahill Contractors Llc.revise approved app 202111232980, change food service equipment in the kitchen area. wok range, electric fyer and hot water dispenseer.
Details
Permit
202508112716
Status
issued
Filed
Aug 11, 2025
Permit issued
Aug 19, 2025
Address
1750 Van Ness Av

revise approved app 202111232980, change food service equipment in the kitchen area. wok range, electric fyer and hot water dispenseer.

Open the permit page

Feb 26, 2025Completed
final sign-off Dec 2025
300 Clay StHathaway Dinwiddie Co.remove existing west entrance door of the bar sprezzatura on plaza level. install a new revolving door with power assist, automated pivot door on west entrance. remove e east entrance door of the bar sprezzatura, new pivot door with power assist.
Details
Permit
202502261091
Status
complete
Filed
Feb 26, 2025
Permit issued
May 6, 2025
Final sign-off
Dec 16, 2025
Declared cost
$492,824
Address
300 Clay St

remove existing west entrance door of the bar sprezzatura on plaza level. install a new revolving door with power assist, automated pivot door on west entrance. remove e east entrance door of the bar sprezzatura, new pivot door with power assist.

Open the permit page

$492,824
Jan 27, 2025Expired or cancelled
cancelled Jun 2026
1750 Van Ness AvCahill Contractors Llc.revision to pa 2021-1123-2980 s2: remove all finishes, stone cladding, stone cladding support steel and the sawtooth ceiling from the shrine and meditation room. revise the buddha pedestal to gypsum board and paint. revise the lighting design for shrine area.
Details
Permit
202501279108
Status
cancelled
Filed
Jan 27, 2025
Permit issued
Feb 7, 2025
Address
1750 Van Ness Av

revision to pa 2021-1123-2980 s2: remove all finishes, stone cladding, stone cladding support steel and the sawtooth ceiling from the shrine and meditation room. revise the buddha pedestal to gypsum board and paint. revise the lighting design for shrine area.

Open the permit page

Jul 15, 2024Completed
final sign-off Mar 2025
49 South Van Ness AvCharles Pankow Builders Ltdrevision to 202305268668. added phasing drawings to address fire marchall's comments regarding egress & operation of the smoke control doors being replaced during construction
Details
Permit
202407156444
Status
complete
Filed
Jul 15, 2024
Permit issued
Mar 5, 2025
Final sign-off
Mar 7, 2025
Address
49 South Van Ness Av

revision to 202305268668. added phasing drawings to address fire marchall's comments regarding egress & operation of the smoke control doors being replaced during construction

Open the permit page

May 26, 2023Completed
final sign-off Mar 2025
49 South Van Ness AvCharles Pankow Builders Ltdrevision to pa# 202206085877 to reduce scope of work: remove vestibule prev approved. change to some doors.
Details
Permit
202305268668
Status
complete
Filed
May 26, 2023
Permit issued
Jun 7, 2023
Final sign-off
Mar 7, 2025
Address
49 South Van Ness Av

revision to pa# 202206085877 to reduce scope of work: remove vestibule prev approved. change to some doors.

Open the permit page

Sep 28, 2022Never finaled
issued Nov 2022, no final
1750 Van Ness AvCahill Contractors Llc.to demolish 1 story, type iii-b, insitution / office building.
Details
Permit
202209283273
Status
issued
Filed
Sep 28, 2022
Permit issued
Nov 16, 2022
Declared cost
$150,000
Address
1750 Van Ness Av

to demolish 1 story, type iii-b, insitution / office building.

Open the permit page

$150,000
Jul 15, 2022Expired or cancelled
cancelled Jan 2026
1 Steuart LnBaxter Constructionlevel 20 unit 2004: remove or relocate the fe and fec located in the front hallway. eliminate it based on the fact that a code requiring to have the fire extinguisher in the location. if elimination is not possible, relocate it, preferably in the laundry room.
Details
Permit
202207158617
Status
cancelled
Filed
Jul 15, 2022
Declared cost
$5,000
Address
1 Steuart Ln

level 20 unit 2004: remove or relocate the fe and fec located in the front hallway. eliminate it based on the fact that a code requiring to have the fire extinguisher in the location. if elimination is not possible, relocate it, preferably in the laundry room.

Open the permit page

$5,000
Jun 8, 2022Completed
final sign-off Mar 2025
49 South Van Ness AvCharles Pankow Builders Ltddemolition of (e) doors on levels 1,3, & 10 and to be replaced with new doors and a new vestibule at one location on level 1 and replacement of the walk-off mat with stone.
Details
Permit
202206085877
Status
complete
Filed
Jun 8, 2022
Permit issued
Aug 26, 2022
Final sign-off
Mar 7, 2025
Declared cost
$2,800,000
Address
49 South Van Ness Av

demolition of (e) doors on levels 1,3, & 10 and to be replaced with new doors and a new vestibule at one location on level 1 and replacement of the walk-off mat with stone.

Open the permit page

$2,800,000
Jun 3, 2022Completed
final sign-off Dec 2022
255 California StRichlen Constructionrevision to approved pa# 202108257128. demolition of existing doors, millwork and installation of lighting in vacant tenant space. 2nd fl.
Details
Permit
202206035590
Status
complete
Filed
Jun 3, 2022
Permit issued
Jun 14, 2022
Final sign-off
Dec 28, 2022
Declared cost
$400,000
Address
255 California St

revision to approved pa# 202108257128. demolition of existing doors, millwork and installation of lighting in vacant tenant space. 2nd fl.

Open the permit page

$400,000
Apr 29, 2022Completed
final sign-off May 2023
255 California StRichlen Construction2/f: landscape improvement exterior terrace. replace (1) exterior door w/inswinging door to provide egress from south terrace
Details
Permit
202204293308
Status
complete
Filed
Apr 29, 2022
Permit issued
May 17, 2022
Final sign-off
May 24, 2023
Declared cost
$750,000
Address
255 California St

2/f: landscape improvement exterior terrace. replace (1) exterior door w/inswinging door to provide egress from south terrace

Open the permit page

$750,000
Apr 28, 2022Completed
final sign-off Jan 2023
300 Clay StHathaway Dinwiddie Co.revision to pa# 202111122237. revise havs shaft enclosures to rated enclosures.
Details
Permit
202204283193
Status
complete
Filed
Apr 28, 2022
Permit issued
May 9, 2022
Final sign-off
Jan 26, 2023
Address
300 Clay St

revision to pa# 202111122237. revise havs shaft enclosures to rated enclosures.

Open the permit page

Feb 18, 2022Completed
final sign-off Jan 2023
300 Clay StHathaway Dinwiddie Co.mep for bpa #202111122237
Details
Permit
202202188336
Status
complete
Filed
Feb 18, 2022
Permit issued
Jun 1, 2022
Final sign-off
Jan 26, 2023
Address
300 Clay St

mep for bpa #202111122237

Open the permit page

Dec 15, 2021Never finaled
issued Dec 2021, no final
300 Clay StHathaway Dinwiddie Co.ventilation system for chemical exhaust for water treatment system in basement. ref 2019 0124 1154.
Details
Permit
202112154452
Status
issued
Filed
Dec 15, 2021
Permit issued
Dec 27, 2021
Address
300 Clay St

ventilation system for chemical exhaust for water treatment system in basement. ref 2019 0124 1154.

Open the permit page

Nov 23, 2021Never finaled
issued Dec 2022, no final
1750 Van Ness AvCahill Contractors Llc.erect new 6-story over 1 bsmt, type ib, 40,514 gross sqft bldg for new buddhist temple & accessory bookstore. bsmt lvl of 23,517 sqft for below grade garage w/7 veh. parking, 1 ada, 14 class-1 bike space, storage, mech area. project includes 30 private, no-cost dorm rm for attendees/religious guest.
Details
Permit
202111232980
Status
issued
Filed
Nov 23, 2021
Permit issued
Dec 9, 2022
Declared cost
$12,000,000
Address
1750 Van Ness Av

erect new 6-story over 1 bsmt, type ib, 40,514 gross sqft bldg for new buddhist temple & accessory bookstore. bsmt lvl of 23,517 sqft for below grade garage w/7 veh. parking, 1 ada, 14 class-1 bike space, storage, mech area. project includes 30 private, no-cost dorm rm for attendees/religious guest.

Open the permit page

$12,000,000
Nov 12, 2021Completed
final sign-off Jan 2023
300 Clay StHathaway Dinwiddie Co.this is an renovation project of the (e) basement, ground, loading dock & plaza level at 300 clay st. demolition of (e) walls, ceilings, finishes, mechanical, electrical & plumbing equipment. construction of (n) restrooms & kitchens, locker rooms, office & dry storage, storage & cooler.
Details
Permit
202111122237
Status
complete
Filed
Nov 12, 2021
Permit issued
Feb 18, 2022
Final sign-off
Jan 26, 2023
Declared cost
$2,682,163
Address
300 Clay St

this is an renovation project of the (e) basement, ground, loading dock & plaza level at 300 clay st. demolition of (e) walls, ceilings, finishes, mechanical, electrical & plumbing equipment. construction of (n) restrooms & kitchens, locker rooms, office & dry storage, storage & cooler.

Open the permit page

$2,682,163
Aug 25, 2021Completed
final sign-off Aug 2022
255 California StRichlen Constructioninterior renovation of the ground and 2nd fl lobby & 2nd fl common areas
Details
Permit
202108257128
Status
complete
Filed
Aug 25, 2021
Permit issued
Sep 14, 2021
Final sign-off
Aug 29, 2022
Declared cost
$750,000
Address
255 California St

interior renovation of the ground and 2nd fl lobby & 2nd fl common areas

Open the permit page

$750,000
Feb 8, 2021Completed
final sign-off Sep 2021
255 California StRichlen Constructionrevision to pa 202008312950 (building entrance exterior landing improvement). replace existing terrazzo flooring btw column lines 3 & 6 w/ new terrazzo flooring. replace hose bib btw lines 8 & 9.
Details
Permit
202102084274
Status
complete
Filed
Feb 8, 2021
Permit issued
Apr 27, 2021
Final sign-off
Sep 21, 2021
Declared cost
$9,690
Address
255 California St

revision to pa 202008312950 (building entrance exterior landing improvement). replace existing terrazzo flooring btw column lines 3 & 6 w/ new terrazzo flooring. replace hose bib btw lines 8 & 9.

Open the permit page

$9,690
Dec 16, 2020Completed
final sign-off Feb 2022
300 Clay StHathaway Dinwiddie Co.structural glass canopy. added exterior glass canopy at clay street entrance.
Details
Permit
202012161143
Status
complete
Filed
Dec 16, 2020
Permit issued
Nov 9, 2021
Final sign-off
Feb 15, 2022
Declared cost
$1,434,000
Address
300 Clay St

structural glass canopy. added exterior glass canopy at clay street entrance.

Open the permit page

$1,434,000
Nov 18, 2020Completed
final sign-off Feb 2022
300 Clay StHathaway Dinwiddie Co.exterior glass & metal wall assembly- exterior glazing added on north side at plaza level for tenant. defferred submittal for pa 201901241154
Details
Permit
202011189219
Status
complete
Filed
Nov 18, 2020
Permit issued
Nov 4, 2021
Final sign-off
Feb 15, 2022
Address
300 Clay St

exterior glass & metal wall assembly- exterior glazing added on north side at plaza level for tenant. defferred submittal for pa 201901241154

Open the permit page

Nov 18, 2020Never finaled
issued Dec 2021, no final
300 Clay StHathaway Dinwiddie Co.coiling door - a coiling door added on east side between (e) elevator lobby & (n) tenant space for fire & smoke separation.
Details
Permit
202011189228
Status
issued
Filed
Nov 18, 2020
Permit issued
Dec 16, 2021
Address
300 Clay St

coiling door - a coiling door added on east side between (e) elevator lobby & (n) tenant space for fire & smoke separation.

Open the permit page

Nov 18, 2020Completed
final sign-off Feb 2022
300 Clay StHathaway Dinwiddie Co.glass guardrailing- (e) concrete parapet wall was replaced with glass guardrail & metal panel at plaza level.
Details
Permit
202011189226
Status
complete
Filed
Nov 18, 2020
Permit issued
Aug 6, 2021
Final sign-off
Feb 14, 2022
Address
300 Clay St

glass guardrailing- (e) concrete parapet wall was replaced with glass guardrail & metal panel at plaza level.

Open the permit page

Nov 18, 2020Never finaled
issued Dec 2021, no final
300 Clay StHathaway Dinwiddie Co.precast architectural concrete - (e) precast panels replaced with (n) precast panels at clay street entrance.
Details
Permit
202011189232
Status
issued
Filed
Nov 18, 2020
Permit issued
Dec 16, 2021
Address
300 Clay St

precast architectural concrete - (e) precast panels replaced with (n) precast panels at clay street entrance.

Open the permit page

Oct 22, 2020Expired or cancelled
cancelled Jan 2026
300 Clay StHathaway Dinwiddie Co.deferred approved for installation of radiant in-slab heating & displacement ventilation system until completion of t.i. of cade room. ref to pa # 2019 0124 1154
Details
Permit
202010227133
Status
cancelled
Filed
Oct 22, 2020
Address
300 Clay St

deferred approved for installation of radiant in-slab heating & displacement ventilation system until completion of t.i. of cade room. ref to pa # 2019 0124 1154

Open the permit page

Oct 1, 2020Never finaled
filed Oct 2020, never issued
95 Hawthorne Stto erect 42 story, 6 basement, approximately 444' tall, type 1, multi family-mixed use structure, with 412 dwelling units. approximately 4,000 sq feet of ground floor retail.
Details
Permit
202010015608
Status
filed
Filed
Oct 1, 2020
Declared cost
$180,000,000
Address
95 Hawthorne St

to erect 42 story, 6 basement, approximately 444' tall, type 1, multi family-mixed use structure, with 412 dwelling units. approximately 4,000 sq feet of ground floor retail.

Open the permit page

$180,000,000
Sep 5, 2020Completed
final sign-off Feb 2022
1 Maritime PzHathaway Dinwiddie Co.modification to (e) coil door in (e) loading dock. replace (e) coiling door with 3 hr swing door
Details
Permit
202009053624
Status
complete
Filed
Sep 5, 2020
Permit issued
Aug 6, 2021
Final sign-off
Feb 14, 2022
Declared cost
$20,000
Address
1 Maritime Pz

modification to (e) coil door in (e) loading dock. replace (e) coiling door with 3 hr swing door

Open the permit page

$20,000
Aug 31, 2020Completed
final sign-off Jun 2023
255 California StRichlen Constructionreplace existing partially accessible building entrance landing with a new accessible landing. new accessible steps, new accessible sloped walkway and new hand rails.
Details
Permit
202008312950
Status
complete
Filed
Aug 31, 2020
Permit issued
Dec 17, 2020
Final sign-off
Jun 8, 2023
Declared cost
$700,000
Address
255 California St

replace existing partially accessible building entrance landing with a new accessible landing. new accessible steps, new accessible sloped walkway and new hand rails.

Open the permit page

$700,000
Aug 27, 2020Completed
final sign-off Mar 2022
75 Howard StSwinerton Buildersrevision to addenda 3&4 of issued pa# 201604013681 to document and relabel level b2 & b1 to -2 & -1.delete floor #13 labeling&reassign floor numbers; add water curtain per nfpa13-11.3.3 to2locations on level4&5.rename elevators to elev a/b(fsae a/b)&elev c. relocate fuel oil fillport w/in e sidewalk
Details
Permit
202008272801
Status
complete
Filed
Aug 27, 2020
Permit issued
Feb 23, 2021
Final sign-off
Mar 28, 2022
Address
75 Howard St

revision to addenda 3&4 of issued pa# 201604013681 to document and relabel level b2 & b1 to -2 & -1.delete floor #13 labeling&reassign floor numbers; add water curtain per nfpa13-11.3.3 to2locations on level4&5.rename elevators to elev a/b(fsae a/b)&elev c. relocate fuel oil fillport w/in e sidewalk

Open the permit page

Dec 31, 2019Completed
final sign-off May 2022
75 Howard StSwinerton Buildersref application # 2016-0401-3681: revise architectural drawing sheet a2.b1 to show correct location of fuel oil room.
Details
Permit
201912311034
Status
complete
Filed
Dec 31, 2019
Permit issued
Jan 6, 2020
Final sign-off
May 24, 2022
Address
75 Howard St

ref application # 2016-0401-3681: revise architectural drawing sheet a2.b1 to show correct location of fuel oil room.

Open the permit page

Dec 6, 2019Never finaled
filed Dec 2019, never issued
645 Harrison Stretain the historic 4 story building & construct new 237,750 sf vertical addition above (e) bldg. existing ground floor would feature mixed-use retail space & a basement will be added the (e) office & pdr uses will be retained within the 4 story podium bldg. (r-1,b,m,a-2,a-3) ** maher: n/a **
Details
Permit
201912068937
Status
filed
Filed
Dec 6, 2019
Declared cost
$100,000,000
Address
645 Harrison St

retain the historic 4 story building & construct new 237,750 sf vertical addition above (e) bldg. existing ground floor would feature mixed-use retail space & a basement will be added the (e) office & pdr uses will be retained within the 4 story podium bldg. (r-1,b,m,a-2,a-3) ** maher: n/a **

Open the permit page

$100,000,000
Dec 6, 2019Never finaled
filed Dec 2019, never issued
400 02nd Stto erect 27 stories, 3 basements, type i-a, office, pdr, retail building. (b,m,a-3,s-2)
Details
Permit
201912068928
Status
approved
Filed
Dec 6, 2019
Declared cost
$160,000,000
Address
400 02nd St

to erect 27 stories, 3 basements, type i-a, office, pdr, retail building. (b,m,a-3,s-2)

Open the permit page

$160,000,000
Dec 3, 2019Completed
final sign-off Apr 2021
49 South Van Ness AvCharles Pankow Builders Ltdrevision to the issued addendum 4 (architectural) for pa #2016-0620-0387 s4; pavilion updates.
Details
Permit
201912038531
Status
complete
Filed
Dec 3, 2019
Permit issued
Jan 30, 2020
Final sign-off
Apr 22, 2021
Address
49 South Van Ness Av

revision to the issued addendum 4 (architectural) for pa #2016-0620-0387 s4; pavilion updates.

Open the permit page

Nov 19, 2019Completed
final sign-off Apr 2021
500 Folsom StBalfour Beatty Construction Llcfor record purposes only that pertain to unit reduction. 2 studio units were removed from each floor on levels 39-42 for a total of 8 units removed from the project. (ref pa #2015-0311-0506 s)
Details
Permit
201911197696
Status
complete
Filed
Nov 19, 2019
Permit issued
Feb 11, 2020
Final sign-off
Apr 23, 2021
Address
500 Folsom St

for record purposes only that pertain to unit reduction. 2 studio units were removed from each floor on levels 39-42 for a total of 8 units removed from the project. (ref pa #2015-0311-0506 s)

Open the permit page

Sep 5, 2019Never finaled
issued Dec 2022, no final
350 02nd Stto erect a type 1-a, 14 story with one basement, 299 unit hotel, restaurant/bar and parking.
Details
Permit
201909050778
Status
issued
Filed
Sep 5, 2019
Permit issued
Dec 22, 2022
Declared cost
$90,000,000
Address
350 02nd St

to erect a type 1-a, 14 story with one basement, 299 unit hotel, restaurant/bar and parking.

Open the permit page

$90,000,000
Jul 9, 2019Completed
final sign-off Apr 2021
49 South Van Ness AvCharles Pankow Builders Ltdrevision to pa 2016-0620-0387 s4 (arch) clarifying location of elevator hoistway fire alarm device access doors.
Details
Permit
201907095382
Status
complete
Filed
Jul 9, 2019
Permit issued
Jul 12, 2019
Final sign-off
Apr 22, 2021
Address
49 South Van Ness Av

revision to pa 2016-0620-0387 s4 (arch) clarifying location of elevator hoistway fire alarm device access doors.

Open the permit page

Apr 3, 2019Completed
final sign-off Apr 2021
345 Montgomery StBcci Construction Companyrev to pa# 201712045429; update smoke control damper sequence & schedule include fire smoke dampers and as built due to field conditions
Details
Permit
201904037019
Status
complete
Filed
Apr 3, 2019
Permit issued
Apr 26, 2019
Final sign-off
Apr 7, 2021
Declared cost
$1,000
Address
345 Montgomery St

rev to pa# 201712045429; update smoke control damper sequence & schedule include fire smoke dampers and as built due to field conditions

Open the permit page

$1,000
Mar 25, 2019Completed
final sign-off Nov 2020
75 Howard StSwinerton Buildersas-built modifications to shoring, add bracing, to whalers and additional braces at pg&e vault on north side of excavation. reference shoring permit #201804025214.
Details
Permit
201903256154
Status
complete
Filed
Mar 25, 2019
Permit issued
Mar 25, 2019
Final sign-off
Nov 24, 2020
Address
75 Howard St

as-built modifications to shoring, add bracing, to whalers and additional braces at pg&e vault on north side of excavation. reference shoring permit #201804025214.

Open the permit page

Mar 11, 2019Expired or cancelled
cancelled Jan 2026
300 Clay Strevision to pa 2018-1004-2342 revised exit sign locations and lockset functions , change door swing, removal requirement of 2 way comm. at elevator lobby
Details
Permit
201903114887
Status
cancelled
Filed
Mar 11, 2019
Address
300 Clay St

revision to pa 2018-1004-2342 revised exit sign locations and lockset functions , change door swing, removal requirement of 2 way comm. at elevator lobby

Open the permit page

Feb 7, 2019Completed
final sign-off Jul 2020
1 Maritime PzGci, Inc4/f & 5/f: new communicating stair between 4th and 5th floors. ref t.i. pa#201901180717. maher n/a.
Details
Permit
201902072402
Status
complete
Filed
Feb 7, 2019
Permit issued
Feb 15, 2019
Final sign-off
Jul 20, 2020
Declared cost
$300,000
Address
1 Maritime Pz

4/f & 5/f: new communicating stair between 4th and 5th floors. ref t.i. pa#201901180717. maher n/a.

Open the permit page

$300,000
Jan 24, 2019Never finaled
issued Jun 2020, no final
300 Clay StHathaway Dinwiddie Co.phase 2 of 2. upgrade to existing lobby, new entry canopy and enclosed plaza level space along the builing's edge to locate an additional commercial tenant.
Details
Permit
201901241154
Status
issued
Filed
Jan 24, 2019
Permit issued
Jun 16, 2020
Declared cost
$18,000,000
Address
300 Clay St

phase 2 of 2. upgrade to existing lobby, new entry canopy and enclosed plaza level space along the builing's edge to locate an additional commercial tenant.

Open the permit page

$18,000,000
Jan 18, 2019Completed
final sign-off Jul 2020
1 Maritime PzGci, Inc4th & 5th fl - new partitions, ceilings & finishes on existing partial 4th & 5th floor. new open stairway between 4th & 5th floor
Details
Permit
201901180717
Status
complete
Filed
Jan 18, 2019
Permit issued
Jan 25, 2019
Final sign-off
Jul 23, 2020
Declared cost
$4,000,000
Address
1 Maritime Pz

4th & 5th fl - new partitions, ceilings & finishes on existing partial 4th & 5th floor. new open stairway between 4th & 5th floor

Open the permit page

$4,000,000
Dec 20, 2018Completed
final sign-off Apr 2021
345 Montgomery StBcci Construction Companydeferred generator and fuel oil. reference pa# 2017-1204-5429 amd 2018-1025-4105.
Details
Permit
201812208892
Status
complete
Filed
Dec 20, 2018
Permit issued
Feb 21, 2019
Final sign-off
Apr 21, 2021
Address
345 Montgomery St

deferred generator and fuel oil. reference pa# 2017-1204-5429 amd 2018-1025-4105.

Open the permit page

Oct 4, 2018Completed
final sign-off Oct 2019
300 Clay StHathaway Dinwiddie Co.tenant improvement on basement level (partial), with mep. selective demolition of interior partitions, flooring and ceiling. construction of new interior partitions, flooring, ceiling, lighting, plumbing and mechanical
Details
Permit
201810042342
Status
complete
Filed
Oct 4, 2018
Permit issued
Nov 2, 2018
Final sign-off
Oct 16, 2019
Declared cost
$1,373,211
Address
300 Clay St

tenant improvement on basement level (partial), with mep. selective demolition of interior partitions, flooring and ceiling. construction of new interior partitions, flooring, ceiling, lighting, plumbing and mechanical

Open the permit page

$1,373,211
Jul 26, 2018Completed
final sign-off Dec 2020
500 Folsom StBalfour Beatty Construction Llcdocument parking layout from pre-app meeting & da-09. rev to pa#201503110506-s3(arch). maher n/a.
Details
Permit
201807265647
Status
complete
Filed
Jul 26, 2018
Permit issued
Jul 26, 2018
Final sign-off
Dec 14, 2020
Address
500 Folsom St

document parking layout from pre-app meeting & da-09. rev to pa#201503110506-s3(arch). maher n/a.

Open the permit page

Jul 24, 2018Completed
final sign-off Dec 2019
345 California StRichlen Constructionlobby refresh: scope to include new ceilings, new elevator lobbies ceiling and at elevator cabs, new floor at pel and plaza and arcade lighting. maher n/a.
Details
Permit
201807245441
Status
complete
Filed
Jul 24, 2018
Permit issued
Aug 29, 2018
Final sign-off
Dec 9, 2019
Declared cost
$1,100,000
Address
345 California St

lobby refresh: scope to include new ceilings, new elevator lobbies ceiling and at elevator cabs, new floor at pel and plaza and arcade lighting. maher n/a.

Open the permit page

$1,100,000
May 4, 2018Expired or cancelled
cancelled Jan 2026
999 California St8th thru 12th floors - (e) guestroom upgrades to refreshing wall coverings, etc. 4 new room per fllor. hallway lighting all new rooms. meps included
Details
Permit
201805048302
Status
cancelled
Filed
May 4, 2018
Declared cost
$1,483,200
Address
999 California St

8th thru 12th floors - (e) guestroom upgrades to refreshing wall coverings, etc. 4 new room per fllor. hallway lighting all new rooms. meps included

Open the permit page

$1,483,200
Feb 28, 2018Completed
final sign-off Jun 2021
101 Vallejo StSource Planning And Construction Increvision to app#201707202428 to correct downspout tie ins. correction notice #201841311. redsign stairs from steel to wood and extend depth of sump pit.
Details
Permit
201802282480
Status
complete
Filed
Feb 28, 2018
Permit issued
Aug 10, 2018
Final sign-off
Jun 9, 2021
Address
101 Vallejo St

revision to app#201707202428 to correct downspout tie ins. correction notice #201841311. redsign stairs from steel to wood and extend depth of sump pit.

Open the permit page

Jan 31, 2018Completed
final sign-off Sep 2018
345 California StGci, Incti at basement addition of bicycle storage room and 4th floor fitness center with shower and locker rooms for tenant use
Details
Permit
201801310073
Status
complete
Filed
Jan 31, 2018
Permit issued
Feb 9, 2018
Final sign-off
Sep 14, 2018
Declared cost
$1,100,000
Address
345 California St

ti at basement addition of bicycle storage room and 4th floor fitness center with shower and locker rooms for tenant use

Open the permit page

$1,100,000
Dec 28, 2017Completed
final sign-off Feb 2019
350 Mission StGci, Incfloors 6,7,& 8: interior construction including selective demolition, relocation of drinking fountain and construction of wing wall partition. minor mechanical and electrical. n/a for maher
Details
Permit
201712287541
Status
complete
Filed
Dec 28, 2017
Permit issued
Jan 11, 2018
Final sign-off
Feb 15, 2019
Declared cost
$120,000
Address
350 Mission St

floors 6,7,& 8: interior construction including selective demolition, relocation of drinking fountain and construction of wing wall partition. minor mechanical and electrical. n/a for maher

Open the permit page

$120,000
Dec 5, 2017Completed
final sign-off Oct 2018
75 Howard StSilverado Contractors Inc, Swinerton Buildersto demolish 7 stories, parking garage building. ** maher: n/a **
Details
Permit
201712055478
Status
complete
Filed
Dec 5, 2017
Permit issued
Jan 11, 2018
Final sign-off
Oct 26, 2018
Declared cost
$2,185,000
Address
75 Howard St

to demolish 7 stories, parking garage building. ** maher: n/a **

Open the permit page

$2,185,000
Jul 20, 2017Completed
final sign-off Jun 2021
101 Vallejo Strevision to pa #201702270176 - construction of new stairways from basement to level 2 mezzanine. installation of new partitions, flooring, interior glazing & ceilings. n/a maher ordinance
Details
Permit
201707202428
Status
complete
Filed
Jul 20, 2017
Permit issued
Sep 26, 2017
Final sign-off
Jun 9, 2021
Declared cost
$20,000
Address
101 Vallejo St

revision to pa #201702270176 - construction of new stairways from basement to level 2 mezzanine. installation of new partitions, flooring, interior glazing & ceilings. n/a maher ordinance

Open the permit page

$20,000
May 23, 2017Never finaled
issued May 2017, no final
350 Mission Stadministrative permit only: no work. assembly permit only for lobby to document occupancy calculations.
Details
Permit
201705237387
Status
issued
Filed
May 23, 2017
Permit issued
May 23, 2017
Address
350 Mission St

administrative permit only: no work. assembly permit only for lobby to document occupancy calculations.

Open the permit page

Jun 20, 2016Completed
final sign-off Dec 2021
1500 Mission StCharles Pankow Builders Ltdto erect 16 stories, 2 basement, office building & 39 stories, 2 basement, type ia, 550 residential units building. both buildings are over a shared two level subterranean basement parking garage. (r-2,b,a-3,i-4,s-2)
Details
Permit
201606200387
Status
complete
Filed
Jun 20, 2016
Permit issued
Oct 3, 2017
Final sign-off
Dec 8, 2021
Declared cost
$400,000,000
Address
1500 Mission St

to erect 16 stories, 2 basement, office building & 39 stories, 2 basement, type ia, 550 residential units building. both buildings are over a shared two level subterranean basement parking garage. (r-2,b,a-3,i-4,s-2)

Open the permit page

$400,000,000
Apr 1, 2016Completed
final sign-off Aug 2022
75 Howard StSwinerton Buildersto erect 21 stories, 2 basements, 120 dwelling units with commercial. ** maher: disturbance of at least 50 cu. yd. of soil. route to dph **
Details
Permit
201604013681
Status
complete
Filed
Apr 1, 2016
Permit issued
Oct 25, 2017
Final sign-off
Aug 17, 2022
Declared cost
$146,916,000
Address
75 Howard St

to erect 21 stories, 2 basements, 120 dwelling units with commercial. ** maher: disturbance of at least 50 cu. yd. of soil. route to dph **

Open the permit page

$146,916,000
Feb 8, 2016Expired or cancelled
cancelled Jan 2026
1 Market StDpr Constructioninterior signage for plaza level retail shops and tower. maher na
Details
Permit
201602089077
Status
cancelled
Filed
Feb 8, 2016
Declared cost
$17,000
Address
1 Market St

interior signage for plaza level retail shops and tower. maher na

Open the permit page

$17,000
Nov 16, 2015Never finaled
filed Nov 2015, never issued
1208 Junipero Serra Bldemolish two story parking garage. refetrence to new building permit application #201510260810s.
Details
Permit
201511162757
Status
approved
Filed
Nov 16, 2015
Declared cost
$349,900
Address
1208 Junipero Serra Bl

demolish two story parking garage. refetrence to new building permit application #201510260810s.

Open the permit page

$349,900
Nov 9, 2015Never finaled
filed Nov 2015, never issued
55 Chumasero Drerect 14-story, type 1-a, 3 basements, 313 dwelling units residential
Details
Permit
201511092111
Status
approved
Filed
Nov 9, 2015
Declared cost
$93,402,505
Address
55 Chumasero Dr

erect 14-story, type 1-a, 3 basements, 313 dwelling units residential

Open the permit page

$93,402,505
Jul 31, 2015Expired or cancelled
cancelled Jan 2026
1 Market Strevision to 201402047821. documentation only. revise color finish for storefront system and structural steel. maher not req
Details
Permit
201507313084
Status
cancelled
Filed
Jul 31, 2015
Address
1 Market St

revision to 201402047821. documentation only. revise color finish for storefront system and structural steel. maher not req

Open the permit page

Jul 2, 2015Never finaled
issued Jul 2015, no final
1 Market StGci, Incremoval of exterior signs and sign support structure. maher n/a.
Details
Permit
201507020582
Status
issued
Filed
Jul 2, 2015
Permit issued
Jul 23, 2015
Declared cost
$5,000
Address
1 Market St

removal of exterior signs and sign support structure. maher n/a.

Open the permit page

$5,000
Jun 22, 2015Never finaled
issued Jul 2015, no final
1 Market StGci, Incground floor food court area - replace existing flooring with new flooring. replace exisitng ceiling, ceiling light fixtures & air diffuser grilles with new ones.
Details
Permit
201506229541
Status
issued
Filed
Jun 22, 2015
Permit issued
Jul 23, 2015
Declared cost
$500,000
Address
1 Market St

ground floor food court area - replace existing flooring with new flooring. replace exisitng ceiling, ceiling light fixtures & air diffuser grilles with new ones.

Open the permit page

$500,000
Jan 15, 2015Completed
final sign-off Jul 2015
1127 Market Stheader hanger frame for av display art wall. install av display panels. n/a for the intrim. reference to t.i. permit appl. #201212115890 for deferred submittal item.
Details
Permit
201501155879
Status
complete
Filed
Jan 15, 2015
Permit issued
Jan 16, 2015
Final sign-off
Jul 30, 2015
Declared cost
$100,000
Address
1127 Market St

header hanger frame for av display art wall. install av display panels. n/a for the intrim. reference to t.i. permit appl. #201212115890 for deferred submittal item.

Open the permit page

$100,000
Oct 31, 2014Completed
final sign-off Sep 2015
747 Howard StWebcor Construction Lpthis work will include the moving of an mdf (server) room from 3rd and folsom sts. to 3rd and howard sts. including fiber pbx system and misc. low voltage systems. installation of an fm-200 and pre-action system, with 2 crac-hvac units. for parallel plan ck. pa 2014/0623/9136 2010 cec entitlements.
Details
Permit
201410310411
Status
complete
Filed
Oct 31, 2014
Permit issued
Jan 21, 2015
Final sign-off
Sep 16, 2015
Declared cost
$6,000,000
Address
747 Howard St

this work will include the moving of an mdf (server) room from 3rd and folsom sts. to 3rd and howard sts. including fiber pbx system and misc. low voltage systems. installation of an fm-200 and pre-action system, with 2 crac-hvac units. for parallel plan ck. pa 2014/0623/9136 2010 cec entitlements.

Open the permit page

$6,000,000
Oct 23, 2014Never finaled
issued Feb 2015, no final
1 Market StDpr Constructionrevision to pa 201402188751 changes to interior store fronts, changing occupant load, finishes in retails space, changed lights in banner area, mechanical system, and lighting as required. box car layout. sprinklers and fire alarm sep permits. sffd asembly permit required
Details
Permit
201410239729
Status
issued
Filed
Oct 23, 2014
Permit issued
Feb 9, 2015
Declared cost
$1,000
Address
1 Market St

revision to pa 201402188751 changes to interior store fronts, changing occupant load, finishes in retails space, changed lights in banner area, mechanical system, and lighting as required. box car layout. sprinklers and fire alarm sep permits. sffd asembly permit required

Open the permit page

$1,000
Oct 20, 2014Never finaled
issued Feb 2015, no final
1 Market StDpr Constructionrevision to 2009-04-27-7112: exterior canopies and entries replacement of exsting storefront entry canopy of canopy lighting at mission street. maher not req
Details
Permit
201410209378
Status
issued
Filed
Oct 20, 2014
Permit issued
Feb 9, 2015
Declared cost
$1,000
Address
1 Market St

revision to 2009-04-27-7112: exterior canopies and entries replacement of exsting storefront entry canopy of canopy lighting at mission street. maher not req

Open the permit page

$1,000
Jun 23, 2014Completed
final sign-off Mar 2021
747 Howard StWebcor Construction Lprenov(e)moscone north & south bldg,increase gross sq footage of moscone n & s combined facility fr approx 1.2 million gsf to 1.5 million gsf.wk incl lower level(exhibit hall renov,addition of 3 stories at moscone south&renov moscone north lobby,plus 2 connecting bridges over howard st. maher req.
Details
Permit
201406239136
Status
complete
Filed
Jun 23, 2014
Permit issued
Apr 22, 2015
Final sign-off
Mar 5, 2021
Declared cost
$340,000,000
Address
747 Howard St

renov(e)moscone north & south bldg,increase gross sq footage of moscone n & s combined facility fr approx 1.2 million gsf to 1.5 million gsf.wk incl lower level(exhibit hall renov,addition of 3 stories at moscone south&renov moscone north lobby,plus 2 connecting bridges over howard st. maher req.

Open the permit page

$340,000,000
Apr 1, 2014Completed
final sign-off Nov 2014
125 03rd StMarchetti Construction Inc.21/f- add 2 gates for security in stairwells. (interior only)
Details
Permit
201404012187
Status
complete
Filed
Apr 1, 2014
Permit issued
May 5, 2014
Final sign-off
Nov 24, 2014
Declared cost
$20,000
Address
125 03rd St

21/f- add 2 gates for security in stairwells. (interior only)

Open the permit page

$20,000
Feb 4, 2014Completed
final sign-off Feb 2016
1 Market StDpr Constructionreplace entries & add canopies to entries on mission street, spear street and steuart street. revision to pa#2009.0427.7112. compliance with ordinance #155-13 not required.
Details
Permit
201402047822
Status
complete
Filed
Feb 4, 2014
Permit issued
Apr 30, 2014
Final sign-off
Feb 16, 2016
Declared cost
$250,000
Address
1 Market St

replace entries & add canopies to entries on mission street, spear street and steuart street. revision to pa#2009.0427.7112. compliance with ordinance #155-13 not required.

Open the permit page

$250,000
Dec 17, 2013Expired or cancelled
withdrawn Jul 2025
1979 Mission Sterect 10-story mixed-use new building.
Details
Permit
201312174382
Status
withdrawn
Filed
Dec 17, 2013
Declared cost
$82,125,960
Address
1979 Mission St

erect 10-story mixed-use new building.

Open the permit page

$82,125,960
Mar 25, 2013Completed
final sign-off Mar 2017
350 Mission StWebcor Construction Lpaltered site permit for record purposes only to issued site permit 2011-08-01-1461/s - additional 3 stories from 27 to 30.
Details
Permit
201303252972
Status
complete
Filed
Mar 25, 2013
Permit issued
Jan 10, 2014
Final sign-off
Mar 23, 2017
Declared cost
$7,500,000
Address
350 Mission St

altered site permit for record purposes only to issued site permit 2011-08-01-1461/s - additional 3 stories from 27 to 30.

Open the permit page

$7,500,000
Mar 21, 2013Completed
final sign-off Nov 2015
350 Mission StWebcor Construction Lperect temporary construction crane for new building authorized under pa# 2011/08/01/1461.
Details
Permit
201303212758
Status
complete
Filed
Mar 21, 2013
Permit issued
May 16, 2013
Final sign-off
Nov 5, 2015
Declared cost
$120,000
Address
350 Mission St

erect temporary construction crane for new building authorized under pa# 2011/08/01/1461.

Open the permit page

$120,000
Dec 11, 2012Never finaled
issued Jul 2013, no final
1127 Market StPlant Construction Company Lprenovation and conversion of (e) theater (movies and live performance) into a live performance theater. work includes sidewalk improvements, preservation of histonic facade, seismic retrofit, interior renovation, replacement of (e) mep systems, new sprinker system, new elevator, roof replacement.
Details
Permit
201212115890
Status
issued
Filed
Dec 11, 2012
Permit issued
Jul 31, 2013
Declared cost
$10,000,000
Address
1127 Market St

renovation and conversion of (e) theater (movies and live performance) into a live performance theater. work includes sidewalk improvements, preservation of histonic facade, seismic retrofit, interior renovation, replacement of (e) mep systems, new sprinker system, new elevator, roof replacement.

Open the permit page

$10,000,000
Mar 27, 2012Never finaled
issued Aug 2012, no final
50 Fremont StCharles Pankow Builders Ltdremodel of level one & mezzanne of an (e) 43 story office tower, include replace main lobby finishes, replace perimeter storefront glazing, rerouting of tower stair exit, replace entrance marquee, replace exterior corner beacons & related modification to mep & lighting systems.
Details
Permit
201203276927
Status
issued
Filed
Mar 27, 2012
Permit issued
Aug 29, 2012
Declared cost
$5,850,000
Address
50 Fremont St

remodel of level one & mezzanne of an (e) 43 story office tower, include replace main lobby finishes, replace perimeter storefront glazing, rerouting of tower stair exit, replace entrance marquee, replace exterior corner beacons & related modification to mep & lighting systems.

Open the permit page

$5,850,000
Mar 27, 2012Never finaled
filed Mar 2012, never issued
370 Drumm Sterect 12 story of type 1b construction .
Details
Permit
201203276954
Status
filed
Filed
Mar 27, 2012
Declared cost
$155,000,000
Address
370 Drumm St

erect 12 story of type 1b construction .

Open the permit page

$155,000,000
Mar 27, 2012Expired or cancelled
cancelled Jul 2015
99 Jackson Sterect 1 story of type 3 construction for health club/cafe.
Details
Permit
201203276949
Status
cancelled
Filed
Mar 27, 2012
Declared cost
$9,000,000
Address
99 Jackson St

erect 1 story of type 3 construction for health club/cafe.

Open the permit page

$9,000,000
Aug 1, 2011Completed
final sign-off Mar 2017
350 Mission Stto erect 27 stories, office, retail & parking building.
Details
Permit
201108011461
Status
complete
Filed
Aug 1, 2011
Permit issued
Sep 5, 2012
Final sign-off
Mar 23, 2017
Declared cost
$84,130,000
Address
350 Mission St

to erect 27 stories, office, retail & parking building.

Open the permit page

$84,130,000
Mar 16, 2010Completed
final sign-off Sep 2010
101 02nd StHathaway Dinwiddie Co.fin on building to be removed & touch up fire proofing as required.
Details
Permit
201003168277
Status
complete
Filed
Mar 16, 2010
Permit issued
May 27, 2010
Final sign-off
Sep 9, 2010
Declared cost
$60,000
Address
101 02nd St

fin on building to be removed & touch up fire proofing as required.

Open the permit page

$60,000
Jun 2, 2008Completed
final sign-off Nov 2008
150 Font BlBrayer Electric Companytower 16 - revision to 200712180788: install generator at tower 16.
Details
Permit
200806023392
Status
complete
Filed
Jun 2, 2008
Permit issued
Jul 23, 2008
Final sign-off
Nov 21, 2008
Address
150 Font Bl

tower 16 - revision to 200712180788: install generator at tower 16.

Open the permit page

Jun 2, 2008Completed
final sign-off Oct 2008
310 Arballo DrBrayer Electric Companytower 40 - revision to 200712180792: install generator at tower 40.
Details
Permit
200806023395
Status
complete
Filed
Jun 2, 2008
Permit issued
Jul 23, 2008
Final sign-off
Oct 15, 2008
Address
310 Arballo Dr

tower 40 - revision to 200712180792: install generator at tower 40.

Open the permit page

Jun 2, 2008Completed
final sign-off Oct 2008
350 Arballo DrBrayer Electric Companytower 39 - revision to 200712180789: install generator at tower 39.
Details
Permit
200806023402
Status
complete
Filed
Jun 2, 2008
Permit issued
Jul 23, 2008
Final sign-off
Oct 15, 2008
Address
350 Arballo Dr

tower 39 - revision to 200712180789: install generator at tower 39.

Open the permit page

Jun 2, 2008Completed
final sign-off Nov 2008
125 Cambon DrBrayer Electric Companytower 14 - revision to 200712180794, install generator at tower 14.
Details
Permit
200806023394
Status
complete
Filed
Jun 2, 2008
Permit issued
Jul 23, 2008
Final sign-off
Nov 21, 2008
Address
125 Cambon Dr

tower 14 - revision to 200712180794, install generator at tower 14.

Open the permit page

Jun 2, 2008Completed
final sign-off Nov 2008
100 Font BlBrayer Electric Companytower 15 - revision to 200712180796: install generator at tower 15.
Details
Permit
200806023393
Status
complete
Filed
Jun 2, 2008
Permit issued
Jul 23, 2008
Final sign-off
Nov 21, 2008
Address
100 Font Bl

tower 15 - revision to 200712180796: install generator at tower 15.

Open the permit page

Jun 2, 2008Completed
final sign-off Oct 2008
810 Gonzalez DrBrayer Electric Companytower 27 - revision to 200712180793: installation of generator at tower 27.
Details
Permit
200806023405
Status
complete
Filed
Jun 2, 2008
Permit issued
Jul 23, 2008
Final sign-off
Oct 14, 2008
Address
810 Gonzalez Dr

tower 27 - revision to 200712180793: installation of generator at tower 27.

Open the permit page

Jun 2, 2008Completed
final sign-off Oct 2008
355 Serrano DrBrayer Electric Companytower 46 - revision to 200712180801: installation of generator at tower 46.
Details
Permit
200806023408
Status
complete
Filed
Jun 2, 2008
Permit issued
Jul 23, 2008
Final sign-off
Oct 10, 2008
Address
355 Serrano Dr

tower 46 - revision to 200712180801: installation of generator at tower 46.

Open the permit page

Jun 2, 2008Completed
final sign-off Nov 2008
50 Chumasero DrBrayer Electric Companytower 18 - revision to 200712180797: install generator at tower 18.
Details
Permit
200806023375
Status
complete
Filed
Jun 2, 2008
Permit issued
Jul 23, 2008
Final sign-off
Nov 21, 2008
Address
50 Chumasero Dr

tower 18 - revision to 200712180797: install generator at tower 18.

Open the permit page

Jun 2, 2008Never finaled
issued Jul 2008, no final
55 Chumasero DrBrayer Electric Companytower 17 - revision to 200712180799: install generator at tower 17.
Details
Permit
200806023391
Status
issued
Filed
Jun 2, 2008
Permit issued
Jul 23, 2008
Address
55 Chumasero Dr

tower 17 - revision to 200712180799: install generator at tower 17.

Open the permit page

Jun 2, 2008Completed
final sign-off Oct 2008
405 Serrano DrBrayer Electric Companytower 47 - revision to 200712180787: installation of generator at tower 47.
Details
Permit
200806023407
Status
complete
Filed
Jun 2, 2008
Permit issued
Jul 23, 2008
Final sign-off
Oct 14, 2008
Address
405 Serrano Dr

tower 47 - revision to 200712180787: installation of generator at tower 47.

Open the permit page

Jun 2, 2008Completed
final sign-off Oct 2008
750 Gonzalez DrBrayer Electric Companytower 26 - revision to 200712180783: installation of generator at tower 26.
Details
Permit
200806023406
Status
complete
Filed
Jun 2, 2008
Permit issued
Jul 23, 2008
Final sign-off
Oct 14, 2008
Address
750 Gonzalez Dr

tower 26 - revision to 200712180783: installation of generator at tower 26.

Open the permit page

May 16, 2008Completed
final sign-off Nov 2008
1 Front StHathaway Dinwiddie Co.new partitions,countertops,electric outlets, relocation of light fixtures on 25th floor. demo work under application 200805091772.
Details
Permit
200805162276
Status
complete
Filed
May 16, 2008
Permit issued
May 22, 2008
Final sign-off
Nov 4, 2008
Declared cost
$50,000
Address
1 Front St

new partitions,countertops,electric outlets, relocation of light fixtures on 25th floor. demo work under application 200805091772.

Open the permit page

$50,000
May 16, 2008Completed
final sign-off Nov 2008
1 Front StHathaway Dinwiddie Co.24th floor: construction of non-structural partition walls, countertops and light fixtures over countertops in area inside existing tenant space.
Details
Permit
200805162273
Status
complete
Filed
May 16, 2008
Permit issued
May 22, 2008
Final sign-off
Nov 4, 2008
Declared cost
$50,000
Address
1 Front St

24th floor: construction of non-structural partition walls, countertops and light fixtures over countertops in area inside existing tenant space.

Open the permit page

$50,000
Dec 18, 2007Completed
final sign-off Nov 2008
150 Font BlBrayer Electric Companybuild structural concrete pad to support new generator. install new electrical conduit/wiring to (e) building panel board located in basement of building being served. generator installation under separate permit.
Details
Permit
200712180788
Status
complete
Filed
Dec 18, 2007
Permit issued
Dec 20, 2007
Final sign-off
Nov 21, 2008
Declared cost
$50,000
Address
150 Font Bl

build structural concrete pad to support new generator. install new electrical conduit/wiring to (e) building panel board located in basement of building being served. generator installation under separate permit.

Open the permit page

$50,000
Dec 18, 2007Completed
final sign-off Oct 2008
750 Gonzalez DrBrayer Electric Companybuild structural concrete pad to support new generator. install new electrical conduit/wiring to (e) building panel board located in basement of building being served. generator installation under separate permit.
Details
Permit
200712180783
Status
complete
Filed
Dec 18, 2007
Permit issued
Dec 20, 2007
Final sign-off
Oct 14, 2008
Declared cost
$50,000
Address
750 Gonzalez Dr

build structural concrete pad to support new generator. install new electrical conduit/wiring to (e) building panel board located in basement of building being served. generator installation under separate permit.

Open the permit page

$50,000
Dec 18, 2007Completed
final sign-off Oct 2008
810 Gonzalez DrBrayer Electric Companybuild structural concrete pad to support new generator. install new electrical conduit/wiring to (e) building panel board located in basement of building being served. generator installation under separate permit.
Details
Permit
200712180793
Status
complete
Filed
Dec 18, 2007
Permit issued
Dec 20, 2007
Final sign-off
Oct 14, 2008
Declared cost
$50,000
Address
810 Gonzalez Dr

build structural concrete pad to support new generator. install new electrical conduit/wiring to (e) building panel board located in basement of building being served. generator installation under separate permit.

Open the permit page

$50,000
Dec 18, 2007Completed
final sign-off Oct 2008
405 Serrano DrBrayer Electric Companybuild structural concrete pad to support new generator. install new electrical conduit/wiring to (e) building panel board located in basement of building being served. generator installation under separate permit.
Details
Permit
200712180787
Status
complete
Filed
Dec 18, 2007
Permit issued
Dec 20, 2007
Final sign-off
Oct 14, 2008
Declared cost
$50,000
Address
405 Serrano Dr

build structural concrete pad to support new generator. install new electrical conduit/wiring to (e) building panel board located in basement of building being served. generator installation under separate permit.

Open the permit page

$50,000
Dec 18, 2007Completed
final sign-off Oct 2008
350 Arballo DrBrayer Electric Companybuild structural concrete pad to support new generator. install new electrical conduit/wiring to (e) building panel board located in basement of building being served. generator installation under separate permit.
Details
Permit
200712180789
Status
complete
Filed
Dec 18, 2007
Permit issued
Dec 20, 2007
Final sign-off
Oct 15, 2008
Declared cost
$50,000
Address
350 Arballo Dr

build structural concrete pad to support new generator. install new electrical conduit/wiring to (e) building panel board located in basement of building being served. generator installation under separate permit.

Open the permit page

$50,000
Dec 18, 2007Completed
final sign-off Oct 2008
310 Arballo DrBrayer Electric Companybuild structural concrete pad to support new generator. install new electrical conduit/wiring to (e) building panel board located in basement of building being served. generator installation under separate permit.
Details
Permit
200712180792
Status
complete
Filed
Dec 18, 2007
Permit issued
Dec 20, 2007
Final sign-off
Oct 15, 2008
Declared cost
$50,000
Address
310 Arballo Dr

build structural concrete pad to support new generator. install new electrical conduit/wiring to (e) building panel board located in basement of building being served. generator installation under separate permit.

Open the permit page

$50,000
Dec 3, 2007Completed
final sign-off Jun 2014
680 Folsom StPlant Construction Company Lptotal building renovation including seismic upgrade horizontal & 2 story vertical additon to existing building. work includes new exterior cladding, new toilet rooms, elevators, mep fire & life safety systems. building to be leed certified "gold".
Details
Permit
200712039403
Status
complete
Filed
Dec 3, 2007
Permit issued
Nov 12, 2010
Final sign-off
Jun 13, 2014
Declared cost
$82,500,000
Address
680 Folsom St

total building renovation including seismic upgrade horizontal & 2 story vertical additon to existing building. work includes new exterior cladding, new toilet rooms, elevators, mep fire & life safety systems. building to be leed certified "gold".

Open the permit page

$82,500,000
Aug 17, 2005Expired or cancelled
cancelled Dec 2006
125 03rd StWebcor Construction Lpconstruct a gilass wind screen on 4th floor terrace. glass windscreen is 6'-8" in height.
Details
Permit
200508170563
Status
cancelled
Filed
Aug 17, 2005
Declared cost
$75,000
Address
125 03rd St

construct a gilass wind screen on 4th floor terrace. glass windscreen is 6'-8" in height.

Open the permit page

$75,000
May 16, 2005Expired or cancelled
expired May 2006
125 03rd StWebcor Construction Lprevision of fire alarm panel. ref: app#200008309233 & 200503097151.
Details
Permit
200505162566
Status
expired
Filed
May 16, 2005
Permit issued
Jun 9, 2005
Address
125 03rd St

revision of fire alarm panel. ref: app#200008309233 & 200503097151.

Open the permit page