Christopher Lloyd
- Listed as
- authorized agent-others, engineer
- Based in
- San Francisco
- On San Francisco permits
- Apr 2003 to Dec 2025
58 permits since 2000 (engineer on 57 permits, authorized agent-others on 1 permit): 45 completed, 2 in progress, 7 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 30, 2025 | In progress filed Dec 2025, not yet issued | 333 Market St | replace existing electrical fire pump with new in basement. fp-eor under sep cover as deferred submittal. new pge electrical service with electric gear in a dedicated electrical closet.Details
replace existing electrical fire pump with new in basement. fp-eor under sep cover as deferred submittal. new pge electrical service with electric gear in a dedicated electrical closet. | $600,000 | |
| Sep 25, 2025 | In progress filed Sep 2025, not yet issued | 333 Market St | reconnection of auxiliary system to support the replacement of an existing fire pump. this includes structural attachment of fire pump, mech exhaust reconn,fuel piping reconn, & power reconn. fire pump specification and design shall be deferred submittal.Details
reconnection of auxiliary system to support the replacement of an existing fire pump. this includes structural attachment of fire pump, mech exhaust reconn,fuel piping reconn, & power reconn. fire pump specification and design shall be deferred submittal. | $75,000 | |
| Jul 15, 2024 | Completed final sign-off Aug 2025 | 333 Market St | Skyline Construction | 2nd fl - upgrade all lighting to led. millwork refresh; relocated 7 new hvac with new ceiling areas. new finishes in area of work 1268 sq ft. area of workDetails
2nd fl - upgrade all lighting to led. millwork refresh; relocated 7 new hvac with new ceiling areas. new finishes in area of work 1268 sq ft. area of work | $25,000 |
| Feb 12, 2024 | Completed final sign-off Jul 2024 | 333 Market St | Rudolph Commercial Interiors Inc, Rci | 9th fl remodel of existing office. demo 2 offices, new led lghting in areas of construction only, paint for affected spaces, new furniture where noted. new mechanical & electrical work for affected spaces. duct distribution being modified per new space plan.Details
9th fl remodel of existing office. demo 2 offices, new led lghting in areas of construction only, paint for affected spaces, new furniture where noted. new mechanical & electrical work for affected spaces. duct distribution being modified per new space plan. | $175,000 |
| Oct 5, 2023 | Completed final sign-off Jan 2024 | 1 Lombard St | Matrix Hg Inc | boiler replacement.Details
boiler replacement. | $150,000 |
| Jul 25, 2023 | Expired or cancelled expired Dec 2023 | 1353 Bush St | C B 2 Builders Incorporated | rev bpa#202112224933, revise equipment config @ wouth wall of bar101, convert music studio 110 @ basement to dry storage room, omit ramp/platform @ rm 125, omit display cases @ rm 239/all free standing display cases @ basement-1/f-2/f, document (e)storage rm 100 @2/f/(e) phone nrm @ hallway 301, addDetails
rev bpa#202112224933, revise equipment config @ wouth wall of bar101, convert music studio 110 @ basement to dry storage room, omit ramp/platform @ rm 125, omit display cases @ rm 239/all free standing display cases @ basement-1/f-2/f, document (e)storage rm 100 @2/f/(e) phone nrm @ hallway 301, add | |
| Jun 21, 2023 | Completed final sign-off Dec 2023 | 333 Market St | Rudolph Commercial Interiors Inc, Rci | 5th fl - office remodel consisting of adding 3 (n) offices w/new furniture & finishes & copy area. new lighting & hvac associated to new constructionDetails
5th fl - office remodel consisting of adding 3 (n) offices w/new furniture & finishes & copy area. new lighting & hvac associated to new construction | $125,000 |
| Jun 21, 2023 | Completed final sign-off Jul 2024 | 333 Market St | G L C Construction Company Inc | 1/f annex: new pantry area w/new finishes/lighting, new tv wall @ (e) collaboration area. hvac upgrade for new remodelDetails
1/f annex: new pantry area w/new finishes/lighting, new tv wall @ (e) collaboration area. hvac upgrade for new remodel | $135,000 |
| Jun 7, 2023 | Completed final sign-off Jul 2024 | 333 Market St | G L C Construction Company Inc | interior renov of (e) wells fargo bank, exterior walk-up atm/night drop, new interior wall partitions, ext atm wall, millwork/teller line, breakroom, it room, work room, new restroom, new finishes, ceiling fixtures to be installedDetails
interior renov of (e) wells fargo bank, exterior walk-up atm/night drop, new interior wall partitions, ext atm wall, millwork/teller line, breakroom, it room, work room, new restroom, new finishes, ceiling fixtures to be installed | $446,280 |
| Nov 10, 2022 | Expired or cancelled cancelled Jan 2026 | 333 Market St | 18/f: partial tenant improvement. work includes selective demolition, doors, ceilings, finishes, mechanical and electrical. no change of use.Details
18/f: partial tenant improvement. work includes selective demolition, doors, ceilings, finishes, mechanical and electrical. no change of use. | $100,000 | |
| Oct 6, 2022 | Never finaled filed Oct 2022, never issued | 420 Montgomery St | interior t.i. to the 3rd fl. scope of work includes interior demo, partitions, doors, ceilings, mech, elec, plumbing, structural work (no structural demo) kitchenette for employee self use, no outside catering will be provided, no change of useDetails
interior t.i. to the 3rd fl. scope of work includes interior demo, partitions, doors, ceilings, mech, elec, plumbing, structural work (no structural demo) kitchenette for employee self use, no outside catering will be provided, no change of use | $3,120,000 | |
| Sep 26, 2022 | Never finaled filed Sep 2022, never issued | 420 Montgomery St | 2nd fl - partial ti - selective demo, new partitions, door, ceilings, mechanical, electrical and plumbing. also includes a kitchenette for employee self use only. no outside catering will be provided. there is no change of useDetails
2nd fl - partial ti - selective demo, new partitions, door, ceilings, mechanical, electrical and plumbing. also includes a kitchenette for employee self use only. no outside catering will be provided. there is no change of use | $3,120,000 | |
| Aug 5, 2022 | Never finaled issued Nov 2022, no final | 333 Market St | G L C Construction Company Inc | 15th flr - new recording studio 4 editing room w/ (n) lighting fixtures, ceiling, finishes. conversion of (e) offices, finishes; (n) conference, huddle rooms, and focus rooms remodelDetails
15th flr - new recording studio 4 editing room w/ (n) lighting fixtures, ceiling, finishes. conversion of (e) offices, finishes; (n) conference, huddle rooms, and focus rooms remodel | $500,000 |
| Jul 1, 2022 | Expired or cancelled withdrawn Mar 2024 | 333 Market St | 27th fl: join 2 separate suites. remove demising walls and common corridors. conversion of (e) offices/ finishes for (n) conference rooms, huddle, and activity rooms remodel. no ceiling work.Details
27th fl: join 2 separate suites. remove demising walls and common corridors. conversion of (e) offices/ finishes for (n) conference rooms, huddle, and activity rooms remodel. no ceiling work. | $350,000 | |
| May 6, 2022 | Completed final sign-off Mar 2023 | 333 Market St | Rudolph Commercial Interiors Inc, Rci | 25th fl: conversion of existing office & finishes for new conference rooms, huddle, and focus rooms.Details
25th fl: conversion of existing office & finishes for new conference rooms, huddle, and focus rooms. | $150,000 |
| Oct 22, 2021 | Completed final sign-off Mar 2023 | 333 Market St | Skyline Construction | 31st fl - conversion of (e) offices/finishes/lighting; (n) conference rooms, huddle, and focus rooms remodel. upgrade all fixtures to new led lighting. hvac upgrade for new remodelDetails
31st fl - conversion of (e) offices/finishes/lighting; (n) conference rooms, huddle, and focus rooms remodel. upgrade all fixtures to new led lighting. hvac upgrade for new remodel | $1,530,000 |
| Aug 9, 2021 | Completed final sign-off Jun 2022 | 333 Market St | 17/f: non structural interior office remodel. convert select offices to meeting rooms, add large breakroom. update hvac led lighting for affected rooms only.Details
17/f: non structural interior office remodel. convert select offices to meeting rooms, add large breakroom. update hvac led lighting for affected rooms only. | $250,000 | |
| Jul 16, 2021 | Completed final sign-off Nov 2022 | 333 Market St | Rudolph Commercial Interiors Inc, Rci | 20/f: office remodel of new conference rooms, huddle rooms, focus rooms and break room. new furniture and finishes. upgrade all fixtures to new led lighting. hvac upgrade for new remodel. fire alarm and sprinklers under sep permit.Details
20/f: office remodel of new conference rooms, huddle rooms, focus rooms and break room. new furniture and finishes. upgrade all fixtures to new led lighting. hvac upgrade for new remodel. fire alarm and sprinklers under sep permit. | $1,530,000 |
| Apr 19, 2021 | Completed final sign-off Jan 2022 | 333 Market St | Rudolph Commercial Interiors Inc, Rci | 9/f: conversion of (e) offices/finishes/lighting: new conference rooms, huddle, and focus rooms remodel. upgrade fixtures to new led lighting and hvac modification in areas of construction.Details
9/f: conversion of (e) offices/finishes/lighting: new conference rooms, huddle, and focus rooms remodel. upgrade fixtures to new led lighting and hvac modification in areas of construction. | $466,000 |
| Apr 6, 2021 | Completed final sign-off Sep 2021 | 333 Market St | Rudolph Commercial Interiors Inc, Rci | 4th flr: addition of 1 new heat pump for additional power/data for furniture. no new fire smoke dampers are being added. no new lighting work.Details
4th flr: addition of 1 new heat pump for additional power/data for furniture. no new fire smoke dampers are being added. no new lighting work. | $75,000 |
| Feb 23, 2021 | Completed final sign-off Jul 2021 | 333 Market St | G L C Construction Company Inc | 28th fl: add 1 new heat pump for additional power/ data/ wiremolds required for equipment in storage room 2813. no new smoke dampers being added. mechanical & electrical work only.Details
28th fl: add 1 new heat pump for additional power/ data/ wiremolds required for equipment in storage room 2813. no new smoke dampers being added. mechanical & electrical work only. | $27,000 |
| Sep 6, 2019 | Completed final sign-off Jun 2020 | 333 Market St | Rudolph Commercial Interiors Inc, Rci | 14th fl - area of work 14561 sf. office remodel of (n) conference rooms, huddle rooms, focus rooms, breakroom & mother's room. including new finishes. upgrade all light fixtures to new led, hvac upgrade for new remodel. includes mep/mech.Details
14th fl - area of work 14561 sf. office remodel of (n) conference rooms, huddle rooms, focus rooms, breakroom & mother's room. including new finishes. upgrade all light fixtures to new led, hvac upgrade for new remodel. includes mep/mech. | $850,000 |
| Sep 6, 2019 | Completed final sign-off Jun 2020 | 333 Market St | Rudolph Commercial Interiors Inc, Rci | 18th fl - area of work 1614 sf. office remodel of (n) conference rooms, huddle rooms, focus rooms & breakroom & mother's room. including new finishes. upgrade all light fixtures to new led, hvac upgrade for new remodel. incl mep/mech.Details
18th fl - area of work 1614 sf. office remodel of (n) conference rooms, huddle rooms, focus rooms & breakroom & mother's room. including new finishes. upgrade all light fixtures to new led, hvac upgrade for new remodel. incl mep/mech. | $350,000 |
| Aug 26, 2019 | Completed final sign-off Jan 2020 | 601 Market St | Eric F Anderson Incorporated | ref # 2019-0319-5614: add visual display to tenant space .Details
ref # 2019-0319-5614: add visual display to tenant space . | $8,000 |
| Apr 5, 2019 | Completed final sign-off Jun 2020 | 550 California St | Rudolph Commercial Interiors Inc, Rci | 3/f: remodel of (e) office space on 3rd fl with (n) conference rooms, (n) focus rooms, (n) breakroom, (n) finishes and (n) led lighting in affected areas. mep included. maher na.Details
3/f: remodel of (e) office space on 3rd fl with (n) conference rooms, (n) focus rooms, (n) breakroom, (n) finishes and (n) led lighting in affected areas. mep included. maher na. | $1,500,000 |
| Dec 14, 2018 | Completed final sign-off Jun 2023 | 333 Market St | City Building Inc. | upgrade of the existing fuel system. replacement of existing pumps, piping, and day tanks. **maher n/a**Details
upgrade of the existing fuel system. replacement of existing pumps, piping, and day tanks. **maher n/a** | $400,000 |
| Oct 1, 2018 | Completed final sign-off Apr 2019 | 99 Grove St | Svala Construction Inc | install neon artwork along western elevation of bill graham civic auditorium. penetrations limited to existing grout lines. subject to hpc motion no. 0325 and conditions of approval contained therein.Details
install neon artwork along western elevation of bill graham civic auditorium. penetrations limited to existing grout lines. subject to hpc motion no. 0325 and conditions of approval contained therein. | $300,000 |
| May 3, 2018 | Completed final sign-off Nov 2018 | 420 Montgomery St | Rudolph Commercial Interiors Inc, Rci | remodel of 6th floor: huddle room, focus room, upgrade mechanical and electrical of space. n/a for maherDetails
remodel of 6th floor: huddle room, focus room, upgrade mechanical and electrical of space. n/a for maher | $50,000 |
| Mar 7, 2018 | Completed final sign-off Jan 2019 | 1 Taylor St | R.M.R. Construction Company | title 24 electrical hvac upgradeDetails
title 24 electrical hvac upgrade | $50,000 |
| Nov 13, 2017 | Completed final sign-off Feb 2019 | 525 Market St | Swinerton Builders | 12th floor - full floor t.i. including demo, drywall, ceilings, finishes. electrical, mechanical & plumbing.Details
12th floor - full floor t.i. including demo, drywall, ceilings, finishes. electrical, mechanical & plumbing. | $3,438,699 |
| Nov 7, 2017 | Completed final sign-off Feb 2019 | 525 Market St | Swinerton Builders | 10/f- full floor t.i. including demo, drywall, ceilings, finishes, electrical, mechanical, plumbingDetails
10/f- full floor t.i. including demo, drywall, ceilings, finishes, electrical, mechanical, plumbing | $3,438,699 |
| Oct 11, 2017 | Completed final sign-off Nov 2018 | 333 Market St | Swinerton Builders | partial remodel of 10th fl add small converence room, huddle and focus rooms. remodel breakroom. new furniture and finishes. upgrade all lighting to led new mech and elec work for new space maher naDetails
partial remodel of 10th fl add small converence room, huddle and focus rooms. remodel breakroom. new furniture and finishes. upgrade all lighting to led new mech and elec work for new space maher na | $140,000 |
| Aug 22, 2017 | Never finaled issued Oct 2017, no final | 333 Market St | Skyline Construction | 7/f- two (n) focus rooms, (n) finishes, upgrade of lighting to led, (n) mechanical and electrical work for new spaces. n/a ordinance #155-13Details
7/f- two (n) focus rooms, (n) finishes, upgrade of lighting to led, (n) mechanical and electrical work for new spaces. n/a ordinance #155-13 | $225,000 |
| Jun 23, 2017 | Completed final sign-off May 2019 | 333 Market St | T C B Builders Inc | 3/f- amep plans - work to remodel existing offices, add training facilities and meeting rooms for business training purposes. connect core areas with corridor to access toilets and exit stairs. n/a ordinance #155-13, fire under separate permits.Details
3/f- amep plans - work to remodel existing offices, add training facilities and meeting rooms for business training purposes. connect core areas with corridor to access toilets and exit stairs. n/a ordinance #155-13, fire under separate permits. | $1,500,000 |
| Jun 22, 2017 | Completed final sign-off Mar 2019 | 333 Market St | G L C Construction Company Inc | (tower) 11th fl remodel: add (2) new focus rms, 4(n) small conf. rooms, enlarge existing breakroom, (n) furniture and (n) finishes. add 1 (n) drinking fountain. upgrade existing lighting to (n) led lighting. provide (n) electrical, mechanical and plumbing in areas of work.Details
(tower) 11th fl remodel: add (2) new focus rms, 4(n) small conf. rooms, enlarge existing breakroom, (n) furniture and (n) finishes. add 1 (n) drinking fountain. upgrade existing lighting to (n) led lighting. provide (n) electrical, mechanical and plumbing in areas of work. | $195,000 |
| Jan 20, 2017 | Completed final sign-off Jan 2018 | 525 Market St | Skyline Construction | 9th floor: including demo and structural, mechanical, plumbing and electrical.Details
9th floor: including demo and structural, mechanical, plumbing and electrical. | $1,000,000 |
| Jul 19, 2016 | Completed final sign-off Jul 2017 | 77 Beale St | Swinerton Builders | 3rd fl: tenant improvement of (e) offices & storage, to convert into medical offices, fitness area, and conference room for pg&e employees. life safety deferred. n/a ordinance #155-13Details
3rd fl: tenant improvement of (e) offices & storage, to convert into medical offices, fitness area, and conference room for pg&e employees. life safety deferred. n/a ordinance #155-13 | $1,280,000 |
| Jun 8, 2016 | Completed final sign-off Aug 2017 | 333 Market St | Paradigm General Contractors | open collaboration meeting space for existing retail bank. pantry, meeting rooms at gr and existing mezzanine. revise e stair, provide ada upgrades to restrooms and elevatorDetails
open collaboration meeting space for existing retail bank. pantry, meeting rooms at gr and existing mezzanine. revise e stair, provide ada upgrades to restrooms and elevator | $500,000 |
| Mar 28, 2016 | Completed final sign-off May 2016 | 525 Market St | Paradigm General Contractors | 16/f elevator lobby- revision to pa#201603081441, title 24 & lighting only.Details
16/f elevator lobby- revision to pa#201603081441, title 24 & lighting only. | $4,000 |
| Mar 8, 2016 | Completed final sign-off May 2016 | 525 Market St | Paradigm General Contractors | 16/f elevator lobby- non structural t.i. on 16/f elevator lobby, new floor, wall, lighting & ceiling finishes, existing lobby doors to remain. revision to pa# 201510220531, electrical under seperate permit.Details
16/f elevator lobby- non structural t.i. on 16/f elevator lobby, new floor, wall, lighting & ceiling finishes, existing lobby doors to remain. revision to pa# 201510220531, electrical under seperate permit. | $30,000 |
| Mar 3, 2016 | Completed final sign-off May 2020 | 405 Valencia St | Tot'l Environm'l /Pwer Sym Inc Dba:Teps | install radio equipment on ground floor, electrical hook-up, two ac units on roof. n/a maher ordinance #155-13Details
install radio equipment on ground floor, electrical hook-up, two ac units on roof. n/a maher ordinance #155-13 | $40,000 |
| Jan 15, 2016 | Completed final sign-off Nov 2017 | 45 Fremont St | Rudolph Commercial Interiors Inc, Rci | remodel of 8th fl. add 4 new offices, 3 new conference rooms/focus rooms, 1 new 1df room and 1 new breakroom. new furniture, paint. new mech, plumb, elec for new space. no new toilets. n/a for maher.Details
remodel of 8th fl. add 4 new offices, 3 new conference rooms/focus rooms, 1 new 1df room and 1 new breakroom. new furniture, paint. new mech, plumb, elec for new space. no new toilets. n/a for maher. | $175,000 |
| Nov 16, 2015 | Completed final sign-off Sep 2016 | 678 Portola Dr | Stc Netcom Inc. | verizon wireless propose to install 6 new panel antennas concealed behind (e) steeple in addition add 9 new rru units and 3 new surge suppressors. new equipment cabinets will be located in existing bldg. storage room. remove (e) panel antenna and mount. n/a ordinance #155-13Details
verizon wireless propose to install 6 new panel antennas concealed behind (e) steeple in addition add 9 new rru units and 3 new surge suppressors. new equipment cabinets will be located in existing bldg. storage room. remove (e) panel antenna and mount. n/a ordinance #155-13 | $350,000 |
| Apr 10, 2015 | Completed final sign-off Dec 2015 | 215 Market St | Paradigm General Contractors | mep drawings for pa# 201409176520, hvac and electrical work only. n/a ordinance #155-13Details
mep drawings for pa# 201409176520, hvac and electrical work only. n/a ordinance #155-13 | $80,000 |
| Aug 12, 2014 | Never finaled issued Aug 2014, no final | 222 Kearny St | Richlen Construction | suite 400 hvac modifications for remdol. ref. t.i. appl. 2014.0620.9021.Details
suite 400 hvac modifications for remdol. ref. t.i. appl. 2014.0620.9021. | $8,000 |
| Jul 24, 2014 | Never finaled issued Aug 2014, no final | 222 Kearny St | Richlen Construction | suite 200 and 400- electrical - (n) and (r) light fixtures & receptacles.Details
suite 200 and 400- electrical - (n) and (r) light fixtures & receptacles. | $25,000 |
| Jun 27, 2014 | Expired or cancelled cancelled Jan 2026 | 180 Montgomery St | Mcclure Electric Inc | 23rd floor suite 2390 - title 24 work for approval pa #2014.0609.7869.Details
23rd floor suite 2390 - title 24 work for approval pa #2014.0609.7869. | $12,000 |
| Aug 24, 2012 | Completed final sign-off Jun 2014 | 536 Mission St | Metropolitan Electrical Construction | installation of 24 at & t outdoor panel antennas & ancillary equipment to be mounted on (e) penthouse & parapet. 300 sq. ft. at & t equipment racks to be mounted in new equipment shelter on (e) roof. 230 sq. ft. antenna coaxial transmission lines from rru to antennas. power & telephone service to beDetails
installation of 24 at & t outdoor panel antennas & ancillary equipment to be mounted on (e) penthouse & parapet. 300 sq. ft. at & t equipment racks to be mounted in new equipment shelter on (e) roof. 230 sq. ft. antenna coaxial transmission lines from rru to antennas. power & telephone service to be | $300,000 |
| Jan 27, 2012 | Completed final sign-off Sep 2012 | 222 Kearny St | Richlen Construction | ti. 2nd & 4th floors - hvac modification for new walls life safety under sep permit. ref pa #201109013699.Details
ti. 2nd & 4th floors - hvac modification for new walls life safety under sep permit. ref pa #201109013699. | $250,000 |
| Oct 13, 2011 | Completed final sign-off Nov 2011 | 220 Montgomery St | R.M.R. Construction Company | mechanical and electrical work for 201109134448Details
mechanical and electrical work for 201109134448 | $35,000 |
| Aug 19, 2011 | Never finaled issued Nov 2011, no final | 375 Sutter St | Hathaway Dinwiddie Co. | interior remodel all floors new ada rr stairs & elevator. voluntary structural upgrades.Details
interior remodel all floors new ada rr stairs & elevator. voluntary structural upgrades. | $8,534,270 |
| Aug 21, 2009 | Completed final sign-off Jan 2010 | 388 Market St | Richlen Construction | 9th floor relcoation of 16 -2x2 light fixtures. additional recessed, wall scense & cove light fixtures. reference architectural pa #200906261487.Details
9th floor relcoation of 16 -2x2 light fixtures. additional recessed, wall scense & cove light fixtures. reference architectural pa #200906261487. | $3,884 |
| Jan 26, 2009 | Completed final sign-off Aug 2015 | 576 Sacramento St | Stc Netcom Inc. | installation of a wall & 2 access doors in a basement wireless communications lease facility, including the relocation of vertical utilities on the outside of building from the 2nd floor to the roof. installation of hydrogen detection & venting system in basement.Details
installation of a wall & 2 access doors in a basement wireless communications lease facility, including the relocation of vertical utilities on the outside of building from the 2nd floor to the roof. installation of hydrogen detection & venting system in basement. | $40,000 |
| Jul 25, 2008 | Completed final sign-off Sep 2008 | 220 Montgomery St | R.M.R. Construction Company | electrical lighting and power with t-24 calc. bldg. appl#200804230400, no other work this permit.Details
electrical lighting and power with t-24 calc. bldg. appl#200804230400, no other work this permit. | $6,500 |
| Jan 17, 2007 | Completed final sign-off Feb 2008 | 455 Market St | Novo Construction Inc | oti-2 2nd fl el, meDetails
oti-2 2nd fl el, me | $265,000 |
| Sep 28, 2006 | Completed final sign-off Feb 2008 | 2288 Broadway | Bothwell Construction Corp | replacement of existing diesel powered standby auxiliary generator with new one.Details
replacement of existing diesel powered standby auxiliary generator with new one. | $60,000 |
| Feb 16, 2005 | Completed final sign-off Jun 2005 | 333 Market St | Bcci Construction Company | oti-2 30/f el meDetails
oti-2 30/f el me | $150,000 |
| Apr 8, 2003 | Completed final sign-off Dec 2003 | 1401 Broadway | demolish park clubhouseDetails
demolish park clubhouse |