Permit GraphShortlistSan Francisco building permits since 2000

Ashley Miller

License
C27238
Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
About the two boards
Look the license up with the state (Architects Board)
Look up C27238 at the Board for Professional Engineers
Listed as
architect, authorized agent-others, designer, engineer
Firm
Brereton Architects
Based in
San Francisco
On San Francisco permits
Mar 2001 to Nov 2026

294 permits since 2000 (architect on 284 permits, authorized agent-others on 6 permits, designer on 3 permits, engineer on 3 permits): 230 completed, 24 in progress, 28 never finaled, 12 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the 100 most recent of their permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Peacock Construction (21), Source Planning And Construction Inc (11), Sc Builders, Inc (10), Field Construction Inc. (7), Bevilacqua & Sons (6), C C I Commercial Construction & Improv (5), Clune Construction Company L P (5), Novo Construction Inc (5), Richlen Construction (4), Skyline Construction (3), Arcon Construction Corp (2), Hitt Contracting Inc. (2), Kr Johnston Construction Inc (2), Principal Builders Inc. (2), Ayoob & Peery Plumbing Co Inc, Bcci Construction Company, M C S Construction Services, Paganini Electric Corp(See Signatories), Rossi Builders Inc., Rudolph Commercial Interiors Inc, Rci, San Francisco Commercial Builders Inc
Architects
Michael Castro, Rebecca Swanner
Engineers
Amit Wadhwa (2), Kevin S. Morton (2), Alexander Joseph Pacheco, Bradley Hollub, Edward Rivera, Levi G. Abarte, Stephen Shaffer, Stuart Lowe

Most recent permits

Showing the 100 most recent of 294.

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Nov 10, 2026In progress
filed Nov 2026, not yet issued
350 California Stste 1400: t.i includes interior modifications to (e) suite.demolition and construction of new non-loading bearing partitions. installation of new light fixtures, new millwork and new finishes at areas room 1419 and new glaziing frame at conference room 1402.
Details
Permit
202611100616

ste 1400: t.i includes interior modifications to (e) suite.demolition and construction of new non-loading bearing partitions. installation of new light fixtures, new millwork and new finishes at areas room 1419 and new glaziing frame at conference room 1402.

Open the permit page

$100,000
Oct 26, 2026In progress
issued Oct 2026
475 Sansome StKr Johnston Construction Inc9th floor partial partiton demolition and finishes removal. ab-017 applies. separate ti permit
Details
Permit
202610269906
Permit issued
Oct 26, 2026

9th floor partial partiton demolition and finishes removal. ab-017 applies. separate ti permit

Open the permit page

$23,500
Oct 20, 2026In progress
issued Oct 2026
1 Post StPeacock Constructionrelocation and installation of 10 existing phonebooths at suites 1400,1500, 1600, and 1800. new power and anchoring details. suite 1400, 2 phone booths, suite 1500, 2 phone booths, suite 1600, 2 phone booths, suite 1800 4 phone booths.
Details
Permit
202610209682
Permit issued
Oct 23, 2026

relocation and installation of 10 existing phonebooths at suites 1400,1500, 1600, and 1800. new power and anchoring details. suite 1400, 2 phone booths, suite 1500, 2 phone booths, suite 1600, 2 phone booths, suite 1800 4 phone booths.

Open the permit page

$10,000
Oct 9, 2026In progress
issued Oct 2026
575 Market StField Construction Inc.21/fl- suite 2100- install of 4 (n) phonebooths to include (n) power (2) and anchoring details
Details
Permit
202610099278
Permit issued
Oct 16, 2026

21/fl- suite 2100- install of 4 (n) phonebooths to include (n) power (2) and anchoring details

Open the permit page

$10,000
Oct 8, 2026In progress
issued Oct 2026
1 Post StPeacock Construction20/f suite 2200: installation of (7) new framery phone booths on 20th floor, including anchoring details.
Details
Permit
202610089216
Permit issued
Oct 20, 2026

20/f suite 2200: installation of (7) new framery phone booths on 20th floor, including anchoring details.

Open the permit page

$9,650
Oct 6, 2026In progress
filed Oct 2026, not yet issued
2 Harrison StSc Builders, Inc5th floor: tenant improvement is limited to the gender neutral restrooms and includes modifications to ceiling grid & tile, light fixture relocation, new restroom fixtures, and new finishes.
Details
Permit
202610069092

5th floor: tenant improvement is limited to the gender neutral restrooms and includes modifications to ceiling grid & tile, light fixture relocation, new restroom fixtures, and new finishes.

Open the permit page

$22,000
Sep 23, 2026In progress
issued Oct 2026
150 Spear StPeacock Constructionsuite 1400: modification of existing t.i. to include demo of non-load bearing partitions, ceiling grid and tile, light fixtures & switching, millwork , powder/data, finishes doors, frames & hardware. all work shall comply with federal, state & local codes.
Details
Permit
202609238523
Permit issued
Oct 7, 2026

suite 1400: modification of existing t.i. to include demo of non-load bearing partitions, ceiling grid and tile, light fixtures & switching, millwork , powder/data, finishes doors, frames & hardware. all work shall comply with federal, state & local codes.

Open the permit page

$258,992
Aug 27, 2026In progress
issued Sep 2026
222 Kearny StArcon Construction Corpste. 304-tenant improvement to include selective demo and construction of non load bearing partitions, modifications to ceiling grid and tile, new light fixtures, new office door and frames. salvage and reuse existing selected materials if possible, millwork and new finishes
Details
Permit
202608277292
Permit issued
Sep 14, 2026

ste. 304-tenant improvement to include selective demo and construction of non load bearing partitions, modifications to ceiling grid and tile, new light fixtures, new office door and frames. salvage and reuse existing selected materials if possible, millwork and new finishes

Open the permit page

$107,068
Jul 21, 2026In progress
filed Jul 2026, not yet issued
1001 Front StBcci Construction Companybasement, 1st flr, 2nd floor - demo only permit per ab017
Details
Permit
202607215349

basement, 1st flr, 2nd floor - demo only permit per ab017

Open the permit page

$150,000
Jul 15, 2026In progress
issued Oct 2026
150 Spear StPeacock Constructionste: 1500: installation of 3 phone booths, including anchoring details.
Details
Permit
202607155090
Permit issued
Oct 7, 2026

ste: 1500: installation of 3 phone booths, including anchoring details.

Open the permit page

$50,000
Jul 9, 2026Completed
final sign-off Nov 2026
114 Sansome StSource Planning And Construction Incsuite 1400: installation of two new phone booths, including anchoring details.
Details
Permit
202607094770
Permit issued
Oct 8, 2026
Final sign-off
Nov 16, 2026

suite 1400: installation of two new phone booths, including anchoring details.

Open the permit page

$2,560
Jun 17, 2026In progress
filed Jun 2026, not yet issued
244 Jackson Stmodification of (e) lobby. new flring finishes. demo (e) foundation plumbing, lighting and head. patch and repair drywall and floor below as needed. new light fixtures throughout. update door hardware and update signage for egress. exterior work include hone (e) stone at exterior walls and flr
Details
Permit
202606173386

modification of (e) lobby. new flring finishes. demo (e) foundation plumbing, lighting and head. patch and repair drywall and floor below as needed. new light fixtures throughout. update door hardware and update signage for egress. exterior work include hone (e) stone at exterior walls and flr

Open the permit page

$208,547
Jun 3, 2026Completed
final sign-off Sep 2026
575 Market StField Construction Inc.level 21:modification of (e) t.i. to include demolition & construction of new non-load bearing partitions. a new demising partition, new doors, frames, & hardware, glazing, modification of (e) ceiling tile & grid system, new light fixtures & switching, new power/data, new millwork & plumbing fixture
Details
Permit
202606032424
Permit issued
Jun 10, 2026
Final sign-off
Sep 30, 2026

level 21:modification of (e) t.i. to include demolition & construction of new non-load bearing partitions. a new demising partition, new doors, frames, & hardware, glazing, modification of (e) ceiling tile & grid system, new light fixtures & switching, new power/data, new millwork & plumbing fixture

Open the permit page

$500,000
Jun 3, 2026Completed
final sign-off Nov 2026
150 Spear StPeacock Constructionste: 1200 - modification to (e) ti. to include selective demo+ construction of non load bearing partitions, new ceiling grid+ tile, new light fixtures+ switching, new break area + coffee bar millwork, new finishes new door frames. deferred mep.
Details
Permit
202606032405
Permit issued
Jun 23, 2026
Final sign-off
Nov 4, 2026

ste: 1200 - modification to (e) ti. to include selective demo+ construction of non load bearing partitions, new ceiling grid+ tile, new light fixtures+ switching, new break area + coffee bar millwork, new finishes new door frames. deferred mep.

Open the permit page

$1,500,000
May 7, 2026Completed
final sign-off Oct 2026
575 Market StRichlen Construction3rd floor: this project involves modification of (e) ti to include construction of new non-load bearing partitions, new door, frames and hardware modification of (e) ceiing tile & grd system, new light fixtures & switching new power/ data and finishes
Details
Permit
202605070841
Permit issued
Jun 3, 2026
Final sign-off
Oct 5, 2026

3rd floor: this project involves modification of (e) ti to include construction of new non-load bearing partitions, new door, frames and hardware modification of (e) ceiing tile & grd system, new light fixtures & switching new power/ data and finishes

Open the permit page

$200,000
May 5, 2026In progress
issued Sep 2026
350 Bush StNovo Construction Incfl: 4 & 5: installation of 6 (e) phone boots and their associated anchoring.
Details
Permit
202605050720
Permit issued
Sep 14, 2026

fl: 4 & 5: installation of 6 (e) phone boots and their associated anchoring.

Open the permit page

$6,500
Apr 27, 2026Completed
final sign-off Jun 2026
350 California StC C I Commercial Construction & Improv18th floor (n) gypsum ceiling in the conference room including new light fixtures.
Details
Permit
202604270182
Permit issued
Apr 28, 2026
Final sign-off
Jun 2, 2026

18th floor (n) gypsum ceiling in the conference room including new light fixtures.

Open the permit page

$90,000
Apr 15, 2026Completed
final sign-off Jul 2026
222 Kearny StArcon Construction Corpmodification of e tenant floor plan layout to include additional lobby vestibule off of main elevator lobby to access existing roof deck and relocation of point of entry to the following rooms: 1df, storage room and wellness room
Details
Permit
202604159532
Permit issued
May 4, 2026
Final sign-off
Jul 14, 2026

modification of e tenant floor plan layout to include additional lobby vestibule off of main elevator lobby to access existing roof deck and relocation of point of entry to the following rooms: 1df, storage room and wellness room

Open the permit page

$200,000
Apr 2, 2026Completed
final sign-off Sep 2026
1 Post StPeacock Construction17/f: demolition and construction of men's restroom walls/lighting providing new toilet partition in men's room only. new power, demolition of minimal set of light fixtures, new light fixtures, new finishes, and structural attachment of 4 existing phone booths.
Details
Permit
202604028794
Permit issued
Apr 15, 2026
Final sign-off
Sep 11, 2026

17/f: demolition and construction of men's restroom walls/lighting providing new toilet partition in men's room only. new power, demolition of minimal set of light fixtures, new light fixtures, new finishes, and structural attachment of 4 existing phone booths.

Open the permit page

$175,000
Mar 13, 2026Completed
final sign-off Oct 2026
114 Sansome StSkyline Constructionoffice ti 7th fl. demo and construct non load bearing partitions, millwork, lighting, ceiling system.
Details
Permit
202603137536
Permit issued
Apr 3, 2026
Final sign-off
Oct 16, 2026

office ti 7th fl. demo and construct non load bearing partitions, millwork, lighting, ceiling system.

Open the permit page

$1,400,000
Mar 10, 2026In progress
issued Mar 2026
3838 California StPaganini Electric Corp(See Signatories)remove of the existing rooftop generator on the existing equipment pad per ab017
Details
Permit
202603107290
Permit issued
Mar 23, 2026

remove of the existing rooftop generator on the existing equipment pad per ab017

Open the permit page

$15,000
Jan 22, 2026In progress
filed Jan 2026, not yet issued
180 Montgomery StBevilacqua & Sons15/f: demo & construction of non-load bearing partitions to create 2 new phone rooms and downsize of (e) serve room. new/relocazted power/data, light fixtures, exit signage, and new paint.
Details
Permit
202601224303

15/f: demo & construction of non-load bearing partitions to create 2 new phone rooms and downsize of (e) serve room. new/relocazted power/data, light fixtures, exit signage, and new paint.

Open the permit page

$100,000
Jan 15, 2026Completed
final sign-off Apr 2026
350 California StC C I Commercial Construction & Improvrevision to pa # 202509115093: change of layout to suite 1500, 1550, 1560.
Details
Permit
202601153921
Permit issued
Jan 21, 2026
Final sign-off
Apr 15, 2026

revision to pa # 202509115093: change of layout to suite 1500, 1550, 1560.

Open the permit page

Jan 6, 2026Completed
final sign-off Apr 2026
685 Market StSc Builders, Inc8th floor: install (5) phone booths. 9th floor: install (5) phone booths. 10th floor: install (5) phone booths. ref#: 202501138213
Details
Permit
202601063283
Permit issued
Jan 13, 2026
Final sign-off
Apr 20, 2026

8th floor: install (5) phone booths. 9th floor: install (5) phone booths. 10th floor: install (5) phone booths. ref#: 202501138213

Open the permit page

$120,000
Dec 23, 2025Completed
final sign-off Sep 2026
345 California StKr Johnston Construction Inc23/fl- expansion and modification of (e) ti to include demo and construction of non load bearing partitions, (n) ceiling grid and tile, (n) light fixtures, office doors/frames, power/data, salvage and reuse of (e) materials, millwork and finishes
Details
Permit
202512232484
Permit issued
Feb 19, 2026
Final sign-off
Sep 2, 2026

23/fl- expansion and modification of (e) ti to include demo and construction of non load bearing partitions, (n) ceiling grid and tile, (n) light fixtures, office doors/frames, power/data, salvage and reuse of (e) materials, millwork and finishes

Open the permit page

$2,700,000
Dec 23, 2025In progress
issued Feb 2026
345 California StSkyline Constructionthis project involves demising one large suite into two smaller suites modification of an (e) t.i. to include demolition and construction of non-load bearing partitions, modification to (e) ceiling grid system to accomodate full ht partition, new power/data and new finishes. 17th fl. suite 1750
Details
Permit
202512232552
Permit issued
Feb 2, 2026

this project involves demising one large suite into two smaller suites modification of an (e) t.i. to include demolition and construction of non-load bearing partitions, modification to (e) ceiling grid system to accomodate full ht partition, new power/data and new finishes. 17th fl. suite 1750

Open the permit page

$12,000
Dec 17, 2025Completed
final sign-off Aug 2026
1 Post StPeacock Construction30/f ste 3000: installation of (6) new phone booths and their associated anchoring. life and safety will be submitted separately.
Details
Permit
202512172031
Permit issued
Dec 23, 2025
Final sign-off
Aug 14, 2026

30/f ste 3000: installation of (6) new phone booths and their associated anchoring. life and safety will be submitted separately.

Open the permit page

$5,500
Dec 11, 2025Completed
final sign-off Feb 2026
350 California StSan Francisco Commercial Builders Incground flr. this t.i. project involves renovation of (e) entry lobby doors including retrofit of (e) stand along mag locs located in head of the door frame. (n) surface mounted mag locks held to the (e) building life safey to fail safe in an emergency.
Details
Permit
202512111487
Permit issued
Dec 30, 2025
Final sign-off
Feb 18, 2026

ground flr. this t.i. project involves renovation of (e) entry lobby doors including retrofit of (e) stand along mag locs located in head of the door frame. (n) surface mounted mag locks held to the (e) building life safey to fail safe in an emergency.

Open the permit page

$6,000
Dec 3, 2025Completed
final sign-off Feb 2026
425 Market StAyoob & Peery Plumbing Co Inc18/f: add (47) relocate (177) fire sprinkler per t.i. job #25-678 ref pa#202508143050
Details
Permit
202511200040
Permit issued
Dec 10, 2025
Final sign-off
Feb 20, 2026

18/f: add (47) relocate (177) fire sprinkler per t.i. job #25-678 ref pa#202508143050

Open the permit page

$139,126
Dec 3, 2025Completed
final sign-off May 2026
180 Montgomery StBevilacqua & Sons19th floor ti: to include selective demo and construction of non-load bearing partitions, light fixture relocation including re-switching, relocated and new office doors and frames, salvage adn reuse of existing selected materials if practical, and new finishes.
Details
Permit
202512030868
Permit issued
Dec 11, 2025
Final sign-off
May 4, 2026

19th floor ti: to include selective demo and construction of non-load bearing partitions, light fixture relocation including re-switching, relocated and new office doors and frames, salvage adn reuse of existing selected materials if practical, and new finishes.

Open the permit page

$110,000
Nov 19, 2025Completed
final sign-off Jan 2026
575 Market StRichlen Construction39/f suite 3950: reduce size of an existing suite, creating 2 smaller suites. modification of (e) tenant improvements to include demolition of door and glazing system, minor ceiling, tile modification, construction of new full height demising partition, and new wall finishes to match existing.
Details
Permit
202511190015
Permit issued
Nov 25, 2025
Final sign-off
Jan 9, 2026

39/f suite 3950: reduce size of an existing suite, creating 2 smaller suites. modification of (e) tenant improvements to include demolition of door and glazing system, minor ceiling, tile modification, construction of new full height demising partition, and new wall finishes to match existing.

Open the permit page

$10,000
Nov 12, 2025Completed
final sign-off May 2026
1 Post StPeacock Construction#1200: installation of 2 (e) phone booths & 4 new phone booths & their associated anchoring. life safety & sprinklers submit separately. all work shall comply w/ federal, state, & local codes including sf building code, cal title 24, & federal ada reg.
Details
Permit
202511129445
Permit issued
Dec 23, 2025
Final sign-off
May 19, 2026

#1200: installation of 2 (e) phone booths & 4 new phone booths & their associated anchoring. life safety & sprinklers submit separately. all work shall comply w/ federal, state, & local codes including sf building code, cal title 24, & federal ada reg.

Open the permit page

$6,500
Nov 7, 2025In progress
issued Jan 2026
333 Pine StSource Planning And Construction Inc1/f suite 100: tenant improvement. change of occupancy from b to m. interior modifications involve selective demolition and construction of new non-load bearing partitions, interior door and glazing system, installation of new light fixtures, new millwork and new finishes.
Details
Permit
202511079210
Permit issued
Jan 12, 2026

1/f suite 100: tenant improvement. change of occupancy from b to m. interior modifications involve selective demolition and construction of new non-load bearing partitions, interior door and glazing system, installation of new light fixtures, new millwork and new finishes.

Open the permit page

$670,500
Oct 21, 2025Completed
final sign-off Jan 2026
150 Spear StPeacock Construction18th fl - installation of 2 new phone booths and associated anchoring of 2 existing phone booths. life safety and sprinkler work are submitted separately. previously permitted and completed ti
Details
Permit
202510217829
Permit issued
Nov 4, 2025
Final sign-off
Jan 12, 2026

18th fl - installation of 2 new phone booths and associated anchoring of 2 existing phone booths. life safety and sprinkler work are submitted separately. previously permitted and completed ti

Open the permit page

$6,000
Oct 16, 2025Completed
final sign-off Jun 2026
150 Spear StPeacock Constructionnon load bearing partitions, new ceiling, new lighting, and mechanical, electrical, and plumbing are deferred submittal. this project involves modification of existing t.i. to include selective demolition & construction of non-bearin partitions, lights, finishes, doors,&ceiling. ref pa #202504285343
Details
Permit
202510167549
Permit issued
Oct 22, 2025
Final sign-off
Jun 24, 2026

non load bearing partitions, new ceiling, new lighting, and mechanical, electrical, and plumbing are deferred submittal. this project involves modification of existing t.i. to include selective demolition & construction of non-bearin partitions, lights, finishes, doors,&ceiling. ref pa #202504285343

Open the permit page

$5,500
Oct 15, 2025Completed
final sign-off Mar 2026
575 Market StRichlen Constructionsuite 2550: t.i.: demo and construction of new non-load bearing partitions, (n) doors, frames and hardware. modification of (e) ceiling and grid system. (n) relocazted light fixtures and switches. (n) power & data, (n) millwork & plumbing fixtures
Details
Permit
202510157452
Permit issued
Oct 20, 2025
Final sign-off
Mar 4, 2026

suite 2550: t.i.: demo and construction of new non-load bearing partitions, (n) doors, frames and hardware. modification of (e) ceiling and grid system. (n) relocazted light fixtures and switches. (n) power & data, (n) millwork & plumbing fixtures

Open the permit page

$426,300
Oct 3, 2025Completed
final sign-off Mar 2026
1 Post StPeacock Constructionsuite 2550: demo and construction of copy room. millwork, demo of existing partitions, finish updates in break area, new wall finishes, new light fixtures and power. area of work is limited to these renovation.
Details
Permit
202510036712
Permit issued
Oct 16, 2025
Final sign-off
Mar 4, 2026

suite 2550: demo and construction of copy room. millwork, demo of existing partitions, finish updates in break area, new wall finishes, new light fixtures and power. area of work is limited to these renovation.

Open the permit page

$76,543
Oct 3, 2025Completed
final sign-off Nov 2025
685 Market StSc Builders, Incinstallation of non structural partition and security door at lower level
Details
Permit
202510036748
Permit issued
Oct 24, 2025
Final sign-off
Nov 12, 2025

installation of non structural partition and security door at lower level

Open the permit page

$19,500
Oct 1, 2025Completed
final sign-off Dec 2025
101 02nd StSource Planning And Construction Inc15th/fl: demolition of non load bearing artitions , ceilings, light fixtures, millwork and finishes.
Details
Permit
202510016514
Permit issued
Oct 2, 2025
Final sign-off
Dec 17, 2025

15th/fl: demolition of non load bearing artitions , ceilings, light fixtures, millwork and finishes.

Open the permit page

$250,000
Sep 11, 2025Completed
final sign-off Apr 2026
350 California StC C I Commercial Construction & Improv15th fl: construction of non-load bearing partitions, doors, glazing and frames, new ceiling tile & grid, new light fixtures, and new finishes.
Details
Permit
202509115093
Permit issued
Nov 10, 2025
Final sign-off
Apr 15, 2026

15th fl: construction of non-load bearing partitions, doors, glazing and frames, new ceiling tile & grid, new light fixtures, and new finishes.

Open the permit page

$1,500,000
Aug 22, 2025In progress
filed Aug 2025, not yet issued
531 Bryant St2/fl- ti (n) partitions, suspended ceilings, lighting, power and break rooms. mep deferred submittal.
Details
Permit
202508223761

2/fl- ti (n) partitions, suspended ceilings, lighting, power and break rooms. mep deferred submittal.

Open the permit page

$816,000
Aug 21, 2025Completed
final sign-off Dec 2025
101 02nd StSource Planning And Construction Inc3rd, 4th & 8th fl- modification of adding a new door to an (e) storage room at public elevator lobby
Details
Permit
202508213649
Permit issued
Aug 25, 2025
Final sign-off
Dec 1, 2025

3rd, 4th & 8th fl- modification of adding a new door to an (e) storage room at public elevator lobby

Open the permit page

$15,000
Aug 8, 2025Completed
final sign-off Sep 2026
180 Montgomery StBevilacqua & Sons#2150: modification of an existing t.i. & common area to include selective demolition & construction of non-load bearing partition, existing modifications to cieling grid & tile , light fixture relocation & new including re-switching, new office dooors & frames, salvage & reuse of exist. mep defer
Details
Permit
202508082625
Permit issued
Aug 11, 2025
Final sign-off
Sep 23, 2026

#2150: modification of an existing t.i. & common area to include selective demolition & construction of non-load bearing partition, existing modifications to cieling grid & tile , light fixture relocation & new including re-switching, new office dooors & frames, salvage & reuse of exist. mep defer

Open the permit page

$245,577
Jul 22, 2025Completed
final sign-off Nov 2025
345 California StPeacock Construction28th/f: office t.i. demo & construction of non load bearing partitions, e) modifications to ceiling grid & tile, new light fixtures, new office doors & frames & mech & electrical. no plumbing fixture change.
Details
Permit
202507221349
Permit issued
Jul 29, 2025
Final sign-off
Nov 18, 2025

28th/f: office t.i. demo & construction of non load bearing partitions, e) modifications to ceiling grid & tile, new light fixtures, new office doors & frames & mech & electrical. no plumbing fixture change.

Open the permit page

$320,000
Jul 16, 2025Completed
final sign-off May 2026
1 Post StPeacock Constructiondemo and construction of 6 new rooms to include (n) partitions, (n) door, frames, hardware & sidelits; (n) power/data, (n) light fixtures/switches and (n) finishes; demo of partial break area millwork & reupholstering of (e) booths; areas of work is limited to these rooms. mep under separate permit
Details
Permit
202507160873
Permit issued
Sep 4, 2025
Final sign-off
May 19, 2026

demo and construction of 6 new rooms to include (n) partitions, (n) door, frames, hardware & sidelits; (n) power/data, (n) light fixtures/switches and (n) finishes; demo of partial break area millwork & reupholstering of (e) booths; areas of work is limited to these rooms. mep under separate permit

Open the permit page

$76,543
Jun 26, 2025Completed
final sign-off Jan 2026
345 California StClune Construction Company L P17th fl- restroom upgrade-new partitions, millwork, finishes, add 2 floor drains, upgrade lighting fixtures. plumbing, electrical & fire life safety are deferred submittals
Details
Permit
202506269602
Permit issued
Jul 14, 2025
Final sign-off
Jan 5, 2026

17th fl- restroom upgrade-new partitions, millwork, finishes, add 2 floor drains, upgrade lighting fixtures. plumbing, electrical & fire life safety are deferred submittals

Open the permit page

$210,000
Jun 24, 2025Completed
final sign-off May 2026
114 Sansome StHitt Contracting Inc.suite 1400; installation of 2 phone booths.
Details
Permit
202506249303
Permit issued
Dec 31, 2025
Final sign-off
May 28, 2026

suite 1400; installation of 2 phone booths.

Open the permit page

$2,560
Jun 24, 2025Completed
final sign-off Oct 2025
350 California StField Construction Inc.14th floor, suite 1400. demolition of non-bearing partiions. new light fixtures, new millwork and finishes at break area and new office glazing and frame. mep/life safety deferred.
Details
Permit
202506249354
Permit issued
Jun 27, 2025
Final sign-off
Oct 31, 2025

14th floor, suite 1400. demolition of non-bearing partiions. new light fixtures, new millwork and finishes at break area and new office glazing and frame. mep/life safety deferred.

Open the permit page

$60,000
Jun 3, 2025In progress
filed Jun 2025, not yet issued
531 Bryant St3/fl front of floor ti includes construction of non load bearing partitions, celing and tile, light fixtues, including switching new office doors and frames, breakroom sink , millwork and new finishes, phase 2 will be on separte permit. mep deferred.
Details
Permit
202506037845

3/fl front of floor ti includes construction of non load bearing partitions, celing and tile, light fixtues, including switching new office doors and frames, breakroom sink , millwork and new finishes, phase 2 will be on separte permit. mep deferred.

Open the permit page

$850,000
May 23, 2025Completed
final sign-off Oct 2025
180 Montgomery StBevilacqua & Sonsrevision to 202504023549 for construction of new gyp board soffit at the break area
Details
Permit
202505237160
Permit issued
May 29, 2025
Final sign-off
Oct 8, 2025

revision to 202504023549 for construction of new gyp board soffit at the break area

Open the permit page

$3,500
May 22, 2025Completed
final sign-off Sep 2025
1 Post StClune Construction Company L P(ste 105- basement level) this project involves minor renovations inlcuding combining 2 existing suites. light demolition and new light fixtures, and new finishes in suite 105. deferred electrical.
Details
Permit
202505227060
Permit issued
Jun 16, 2025
Final sign-off
Sep 3, 2025

(ste 105- basement level) this project involves minor renovations inlcuding combining 2 existing suites. light demolition and new light fixtures, and new finishes in suite 105. deferred electrical.

Open the permit page

$150,000
May 15, 2025Completed
final sign-off Aug 2025
101 02nd StC C I Commercial Construction & Improv16th fl suite 1625: selective demolition of non load bearing partitions. new office glazing, frames and new finishes
Details
Permit
202505156522
Permit issued
May 19, 2025
Final sign-off
Aug 27, 2025

16th fl suite 1625: selective demolition of non load bearing partitions. new office glazing, frames and new finishes

Open the permit page

$19,369
May 13, 2025Completed
final sign-off Oct 2025
350 California StField Construction Inc.14th fl suite 1450 & 1460: ti project involves modification of (e) suites to include selective demolition & construction of non load bearing partitions, new and relocated light fixtures, new doors & frames and glazing system and new finishes
Details
Permit
202505136314
Permit issued
Jun 30, 2025
Final sign-off
Oct 31, 2025

14th fl suite 1450 & 1460: ti project involves modification of (e) suites to include selective demolition & construction of non load bearing partitions, new and relocated light fixtures, new doors & frames and glazing system and new finishes

Open the permit page

$478,000
May 13, 2025Completed
final sign-off Aug 2025
1 Post StPeacock Construction, Clune Construction Company L P30th fl suite 3000: renovation including demolition and construction of new partitions. new door frames, ceiling grid, relocated light fixtures and power/data. mechanical, electrical under separate permit
Details
Permit
202505136386
Permit issued
May 20, 2025
Final sign-off
Aug 22, 2025

30th fl suite 3000: renovation including demolition and construction of new partitions. new door frames, ceiling grid, relocated light fixtures and power/data. mechanical, electrical under separate permit

Open the permit page

$180,000
Apr 28, 2025Completed
final sign-off Nov 2025
101 02nd StSource Planning And Construction Inc8th fl suite 825 & 850: revision to pa 2025-0210-0012 scope includes change location of the proposed drinking fountains
Details
Permit
202504285316
Permit issued
Apr 29, 2025
Final sign-off
Nov 18, 2025

8th fl suite 825 & 850: revision to pa 2025-0210-0012 scope includes change location of the proposed drinking fountains

Open the permit page

Apr 28, 2025Completed
final sign-off Jun 2026
150 Spear StPeacock Construction18/f (ste 1800): ti - selective demo, new non load bearing partitions, lighting/switching finishes, door and frames. mech/electrical under seperate permit.
Details
Permit
202504285343
Permit issued
May 1, 2025
Final sign-off
Jun 24, 2026

18/f (ste 1800): ti - selective demo, new non load bearing partitions, lighting/switching finishes, door and frames. mech/electrical under seperate permit.

Open the permit page

$260,000
Apr 28, 2025In progress
issued Apr 2025
101 California StSource Planning And Construction Inc28th fl suite 2800: construction of non-load bearing partitions new under grid glazing partition, new power and signal, minor paint and base upgrades.
Details
Permit
202504285353
Permit issued
Apr 29, 2025

28th fl suite 2800: construction of non-load bearing partitions new under grid glazing partition, new power and signal, minor paint and base upgrades.

Open the permit page

$50,000
Apr 23, 2025In progress
issued Jul 2025
114 Sansome St4th fl suite 400: permitting 5 new phone booths and anchoring details
Details
Permit
202504235033
Permit issued
Jul 1, 2025

4th fl suite 400: permitting 5 new phone booths and anchoring details

Open the permit page

$6,400
Apr 7, 2025Completed
final sign-off Apr 2026
685 Market StSc Builders, Inc10th fl- structural attachments for phone booths
Details
Permit
202504073818
Permit issued
Apr 9, 2025
Final sign-off
Apr 21, 2026

10th fl- structural attachments for phone booths

Open the permit page

$5,000
Apr 7, 2025Completed
final sign-off Apr 2026
685 Market StSc Builders, Inc8th fl- structural attachments for phone booths. ref p.a. 2025-0113-8213
Details
Permit
202504073820
Permit issued
Apr 9, 2025
Final sign-off
Apr 20, 2026

8th fl- structural attachments for phone booths. ref p.a. 2025-0113-8213

Open the permit page

$5,000
Apr 7, 2025Completed
final sign-off Apr 2026
685 Market StSc Builders, Inc9th fl- structural attachments for phone booths. ref pa 2025-0113-8214
Details
Permit
202504073819
Permit issued
Apr 9, 2025
Final sign-off
Apr 21, 2026

9th fl- structural attachments for phone booths. ref pa 2025-0113-8214

Open the permit page

$5,000
Apr 2, 2025Completed
final sign-off Oct 2025
180 Montgomery StBevilacqua & Sonssuite 2300: selective demolition and construction of non load bearing partitions, modifications to ceiling grid to tile, light fixtures, new office doors, frames and new finishes (mep deferred)
Details
Permit
202504023549
Permit issued
Apr 9, 2025
Final sign-off
Oct 8, 2025

suite 2300: selective demolition and construction of non load bearing partitions, modifications to ceiling grid to tile, light fixtures, new office doors, frames and new finishes (mep deferred)

Open the permit page

$600,000
Apr 2, 2025Completed
final sign-off May 2025
455 Market StRudolph Commercial Interiors Inc, Rcisuite 700 & 800: anchoring existing furniture phone booths
Details
Permit
202504023545
Permit issued
Apr 17, 2025
Final sign-off
May 6, 2025

suite 700 & 800: anchoring existing furniture phone booths

Open the permit page

$34,560
Apr 1, 2025Completed
final sign-off Nov 2025
188 The EmbarcaderoNovo Construction Incconvert one gender neutral restroom and one mothers room into new accessible shower room. mep included.
Details
Permit
202504013463
Permit issued
Apr 3, 2025
Final sign-off
Nov 7, 2025

convert one gender neutral restroom and one mothers room into new accessible shower room. mep included.

Open the permit page

$300,000
Mar 25, 2025Completed
final sign-off Nov 2025
101 02nd StSource Planning And Construction Inc4/f: modification of an existing elevator lobby and restrooms, including demolition and new soffit ceiling, new light fixtures, new flooring and finished. mep deferred.
Details
Permit
202503252960
Permit issued
Mar 28, 2025
Final sign-off
Nov 18, 2025

4/f: modification of an existing elevator lobby and restrooms, including demolition and new soffit ceiling, new light fixtures, new flooring and finished. mep deferred.

Open the permit page

$224,550
Feb 27, 2025Completed
final sign-off Oct 2025
1 Post StPeacock Construction11/f suite 1100: light demolition and construction of 3 new rooms to include new partitions, new door frame, hardware and side light. new power/data, new light fixtures/switches and finishes. area of work limitedto these new rooms. mep deferred.
Details
Permit
202502271256
Permit issued
Mar 12, 2025
Final sign-off
Oct 21, 2025

11/f suite 1100: light demolition and construction of 3 new rooms to include new partitions, new door frame, hardware and side light. new power/data, new light fixtures/switches and finishes. area of work limitedto these new rooms. mep deferred.

Open the permit page

$76,543
Feb 26, 2025Completed
final sign-off Nov 2025
345 California StSource Planning And Construction Inc24th floor/suite 2400: (e) t.i.: demo and construction of non-loading bearing partitions; (n) partitions (n) ceiling title and grid system; open ceiling condition, led light fixtures and switches, power and signal; (n) doors/frames/hardware, millwork and finishes. include mep. all other required
Details
Permit
202502261111
Permit issued
Mar 3, 2025
Final sign-off
Nov 3, 2025

24th floor/suite 2400: (e) t.i.: demo and construction of non-loading bearing partitions; (n) partitions (n) ceiling title and grid system; open ceiling condition, led light fixtures and switches, power and signal; (n) doors/frames/hardware, millwork and finishes. include mep. all other required

Open the permit page

$891,675
Feb 14, 2025Completed
final sign-off Jul 2025
1 Post StPeacock Constructionsuite 400; minor renovation to existing tenant improvement, new non load bearing partitions, relocated light. fixtures, relocated sink,. mep under separate permit.
Details
Permit
202502140413
Permit issued
Feb 24, 2025
Final sign-off
Jul 30, 2025

suite 400; minor renovation to existing tenant improvement, new non load bearing partitions, relocated light. fixtures, relocated sink,. mep under separate permit.

Open the permit page

$319,000
Feb 13, 2025Completed
final sign-off Jul 2026
1188 Franklin StNovo Construction Incsuite 201- revised scope of work to permit#2024-1118-5224 1) include rated ceiling at entry vestibule 2) confirmation of compliant accessible elevator call button.
Details
Permit
202502130282
Permit issued
Mar 19, 2025
Final sign-off
Jul 8, 2026

suite 201- revised scope of work to permit#2024-1118-5224 1) include rated ceiling at entry vestibule 2) confirmation of compliant accessible elevator call button.

Open the permit page

Feb 10, 2025Completed
final sign-off Nov 2025
101 02nd StSource Planning And Construction Inc8/fl- suite 825 and 850- involves modification of (e) ti to include selective construction and demo of non load bearing partitions. modification to (e) ceiling grid and tile, light fixtures, relocation and (n) inlcuding re switching, (n) office doors, and grames, salvage and reuse of (e) selected
Details
Permit
202502100012
Permit issued
Mar 21, 2025
Final sign-off
Nov 18, 2025

8/fl- suite 825 and 850- involves modification of (e) ti to include selective construction and demo of non load bearing partitions. modification to (e) ceiling grid and tile, light fixtures, relocation and (n) inlcuding re switching, (n) office doors, and grames, salvage and reuse of (e) selected

Open the permit page

$225,000
Feb 7, 2025In progress
issued Feb 2025
600 Montgomery StSkyline Construction5th floor: selective demolition of abandoned mechanical unit, duct work associated infracture and concrete pad.
Details
Permit
202502079908
Permit issued
Feb 28, 2025

5th floor: selective demolition of abandoned mechanical unit, duct work associated infracture and concrete pad.

Open the permit page

$20,000
Jan 13, 2025Completed
final sign-off Apr 2026
685 Market StSc Builders, Inc10th floor: ref demo pa# 202412237315. t.i. const. of non-load bearing partitions. new doors glazing. & hardwhere, new ceilings and lights fixtures. new power data receptacles, new millwork & finishes. modification of existing restrooms. additional of an accessible gender neutral restroom.
Details
Permit
202501138215
Permit issued
Feb 7, 2025
Final sign-off
Apr 21, 2026

10th floor: ref demo pa# 202412237315. t.i. const. of non-load bearing partitions. new doors glazing. & hardwhere, new ceilings and lights fixtures. new power data receptacles, new millwork & finishes. modification of existing restrooms. additional of an accessible gender neutral restroom.

Open the permit page

$2,288,400
Jan 13, 2025Completed
final sign-off Apr 2026
685 Market StSc Builders, Inc9th floor: ref demo pa# 202412237315. t.i. const. of non-load bearing partitions. new doors glazing. & hardwhere, new ceilings and lights fixtures. new power data receptacles, new millwork & finishes. modification of existing restrooms. additional of an accessible gender neutral restroom.
Details
Permit
202501138214
Permit issued
Feb 7, 2025
Final sign-off
Apr 21, 2026

9th floor: ref demo pa# 202412237315. t.i. const. of non-load bearing partitions. new doors glazing. & hardwhere, new ceilings and lights fixtures. new power data receptacles, new millwork & finishes. modification of existing restrooms. additional of an accessible gender neutral restroom.

Open the permit page

$2,288,400
Jan 13, 2025Completed
final sign-off Apr 2026
685 Market StSc Builders, Inc8th floor: ref demo pa# 202412237315. t.i. const. of non-load bearing partitions. new doors glazing. & hardwhere, new ceilings and lights fixtures. new power data receptacles, new millwork & finishes. modification of existing restrooms. additional of an accessible gender neutral restroom.
Details
Permit
202501138213
Permit issued
Feb 19, 2025
Final sign-off
Apr 20, 2026

8th floor: ref demo pa# 202412237315. t.i. const. of non-load bearing partitions. new doors glazing. & hardwhere, new ceilings and lights fixtures. new power data receptacles, new millwork & finishes. modification of existing restrooms. additional of an accessible gender neutral restroom.

Open the permit page

$2,288,400
Dec 23, 2024Completed
final sign-off Apr 2026
685 Market StSc Builders, Inc8-10/fl- soft demo plan for (e) mep infrastructure, ceilings, floor and walls only. ti will be on separte permit.
Details
Permit
202412237315
Permit issued
Jan 9, 2025
Final sign-off
Apr 20, 2026

8-10/fl- soft demo plan for (e) mep infrastructure, ceilings, floor and walls only. ti will be on separte permit.

Open the permit page

$274,608
Dec 18, 2024Completed
final sign-off Dec 2024
114 Sansome StRossi Builders Inc.ste 1000 & 1100 work include permitting existing phone booths with anchorage
Details
Permit
202412187040
Permit issued
Dec 20, 2024
Final sign-off
Dec 26, 2024

ste 1000 & 1100 work include permitting existing phone booths with anchorage

Open the permit page

$8,500
Dec 12, 2024Completed
final sign-off Mar 2025
101 02nd StSource Planning And Construction Inc3rd/f revision to 202410314097: modification of drinking fountain location
Details
Permit
202412126677
Permit issued
Dec 16, 2024
Final sign-off
Mar 17, 2025

3rd/f revision to 202410314097: modification of drinking fountain location

Open the permit page

Dec 11, 2024Completed
final sign-off Apr 2025
350 California StField Construction Inc.19th fl- ti involves modification of (e) tenant suite to include selective demo & construction of non load bearing partitions, new & relocated light fixtures, new doors/frames & glazing system. new & relocated millwork & new finishes. mep submittal deferred.(e) ste 1900 to be divided into 2 offices.
Details
Permit
202412116571
Permit issued
Dec 12, 2024
Final sign-off
Apr 22, 2025

19th fl- ti involves modification of (e) tenant suite to include selective demo & construction of non load bearing partitions, new & relocated light fixtures, new doors/frames & glazing system. new & relocated millwork & new finishes. mep submittal deferred.(e) ste 1900 to be divided into 2 offices.

Open the permit page

$620,000
Nov 22, 2024Completed
final sign-off Jul 2025
150 Spear StPeacock Construction16th floor: phone booths with structural support.four (4)new phone booths. life safety &sprinkler work submitted separately. prefabricated phone booths
Details
Permit
202411225591
Permit issued
Mar 14, 2025
Final sign-off
Jul 25, 2025

16th floor: phone booths with structural support.four (4)new phone booths. life safety &sprinkler work submitted separately. prefabricated phone booths

Open the permit page

$98,576
Nov 18, 2024Completed
final sign-off Jul 2026
1188 Franklin StNovo Construction Incsuite 201; expansion of existing suite including new non-bearing portiions, lighting, suspended ceiling electrical and finishes. mech and electrical work under separate permit.
Details
Permit
202411185224
Permit issued
Nov 22, 2024
Final sign-off
Jul 8, 2026

suite 201; expansion of existing suite including new non-bearing portiions, lighting, suspended ceiling electrical and finishes. mech and electrical work under separate permit.

Open the permit page

$320,000
Nov 7, 2024Completed
final sign-off Mar 2025
475 Sansome StPrincipal Builders Inc.16/f: removal of (e) tenant stairs and slab infill. salvage of (e) selected materials if possible.
Details
Permit
202411074617
Permit issued
Nov 27, 2024
Final sign-off
Mar 26, 2025

16/f: removal of (e) tenant stairs and slab infill. salvage of (e) selected materials if possible.

Open the permit page

$50,000
Oct 31, 2024Completed
final sign-off Mar 2025
101 02nd StSource Planning And Construction Inc3rd fl ti: construction of non load bearing partitions. modification of (e) ceiling grid & tile, new light fixtures & relocation. new office doors & frames, millwork, finishes & sinks. life safety sep permits. mep deferred. ref demo permit 202410152909
Details
Permit
202410314097
Permit issued
Nov 4, 2024
Final sign-off
Mar 17, 2025

3rd fl ti: construction of non load bearing partitions. modification of (e) ceiling grid & tile, new light fixtures & relocation. new office doors & frames, millwork, finishes & sinks. life safety sep permits. mep deferred. ref demo permit 202410152909

Open the permit page

$750,000
Oct 7, 2024Completed
final sign-off Jan 2025
350 California StField Construction Inc.revision to 202408229227: removal of 1 exit door of the e) suite
Details
Permit
202410072422
Permit issued
Oct 9, 2024
Final sign-off
Jan 3, 2025

revision to 202408229227: removal of 1 exit door of the e) suite

Open the permit page

Oct 3, 2024Completed
final sign-off Jun 2025
1 Post StM C S Construction Services21st/f: minor renavation of e) tenant ste 2100 included new rooms, suspended ceiling, lighting, & mech. mep under separate permit
Details
Permit
202410032281
Permit issued
Oct 11, 2024
Final sign-off
Jun 2, 2025

21st/f: minor renavation of e) tenant ste 2100 included new rooms, suspended ceiling, lighting, & mech. mep under separate permit

Open the permit page

$387,000
Sep 17, 2024Completed
final sign-off Jan 2025
475 Sansome StPrincipal Builders Inc.11/fl- demo (e) gyp board celing, fixtures, finishe in lobby elevator. restroom upgrades. removal of (e) stair and slab infill.
Details
Permit
202409170929
Permit issued
Sep 27, 2024
Final sign-off
Jan 9, 2025

11/fl- demo (e) gyp board celing, fixtures, finishe in lobby elevator. restroom upgrades. removal of (e) stair and slab infill.

Open the permit page

$221,074
Sep 5, 2024Expired or cancelled
expired Jul 2026
1188 Franklin StNovo Construction Inc2nd fl - expansion of existing office including new suite entry, non bearing partitions, new doors & exit signs
Details
Permit
202409050136
Permit issued
Sep 25, 2024

2nd fl - expansion of existing office including new suite entry, non bearing partitions, new doors & exit signs

Open the permit page

$98,000
Sep 5, 2024Completed
final sign-off Dec 2024
114 Sansome StPeacock Constructionsuite 500: installing 9 (e) furniture phone booths and anchoring on the 5th floor.
Details
Permit
202409050158
Permit issued
Dec 13, 2024
Final sign-off
Dec 30, 2024

suite 500: installing 9 (e) furniture phone booths and anchoring on the 5th floor.

Open the permit page

$11,520
Jul 22, 2024Expired or cancelled
expired May 2026
114 Sansome StHitt Contracting Inc.14th fl: permitting two (e) furniture phone rooms & anchoring details on the 14th floor.
Details
Permit
202407227025
Permit issued
Sep 17, 2024

14th fl: permitting two (e) furniture phone rooms & anchoring details on the 14th floor.

Open the permit page

$2,560
Jun 12, 2024Completed
final sign-off Aug 2024
150 Post Stto comply with complaint: 202424527. 7th floor ste 740. replace ceiling tile, new countertops. replace led lighting in kind.
Details
Permit
202406124314
Permit issued
Jun 21, 2024
Final sign-off
Aug 16, 2024

to comply with complaint: 202424527. 7th floor ste 740. replace ceiling tile, new countertops. replace led lighting in kind.

Open the permit page

$25,000
Jun 12, 2024In progress
filed Jun 2024, not yet issued
150 Post Stat gr floor: modification of existing tenant space to health spa. to include selective demo, construction of non load bearing partitions. new office door, frames, millwork, new sinks, finishes. mep deferred
Details
Permit
202406124281

at gr floor: modification of existing tenant space to health spa. to include selective demo, construction of non load bearing partitions. new office door, frames, millwork, new sinks, finishes. mep deferred

Open the permit page

$210,000
Jun 10, 2024Completed
final sign-off Dec 2024
55 Green Stelevator vestiblles for floor 2, 3, and 4. small drop soffits, new doors, relocate exist signs.
Details
Permit
202406104034
Permit issued
Jun 18, 2024
Final sign-off
Dec 20, 2024

elevator vestiblles for floor 2, 3, and 4. small drop soffits, new doors, relocate exist signs.

Open the permit page

$43,500
Jun 5, 2024Completed
final sign-off Jul 2025
101 California StClune Construction Company L P21st fl full floor ti mep upgrades included
Details
Permit
202406053739
Permit issued
Jul 16, 2024
Final sign-off
Jul 3, 2025

21st fl full floor ti mep upgrades included

Open the permit page

$8,789,816
May 29, 2024Completed
final sign-off Nov 2024
345 California StRichlen Construction11th floor: demo and construction of toilet partitions, new plumbing, and new finishes salvage and reuse of existing selected materials. core restrooms 11th floor
Details
Permit
202405293214
Permit issued
Jun 3, 2024
Final sign-off
Nov 6, 2024

11th floor: demo and construction of toilet partitions, new plumbing, and new finishes salvage and reuse of existing selected materials. core restrooms 11th floor

Open the permit page

$300,000
May 23, 2024Completed
final sign-off Sep 2024
1 Post StPeacock Constructionminor remodel to existing tenant improvement, new partitions, doors/frames, lighting and elec. mech/elec deferred. all 16/f: work on the 16th floor.
Details
Permit
202405232837
Permit issued
Jun 18, 2024
Final sign-off
Sep 23, 2024

minor remodel to existing tenant improvement, new partitions, doors/frames, lighting and elec. mech/elec deferred. all 16/f: work on the 16th floor.

Open the permit page

$49,000
May 15, 2024Completed
final sign-off Sep 2024
685 Market StC C I Commercial Construction & Improvto document furniture clearance for previously completed teant improvement permit 2022-0405-1561
Details
Permit
202405152193
Permit issued
Jul 19, 2024
Final sign-off
Sep 19, 2024

to document furniture clearance for previously completed teant improvement permit 2022-0405-1561

Open the permit page

May 2, 2024Completed
final sign-off Jun 2024
101 California StClune Construction Company L P21/f- soft demo to remove partitions, fixtures and finishes
Details
Permit
202405021268
Permit issued
May 8, 2024
Final sign-off
Jun 28, 2024

21/f- soft demo to remove partitions, fixtures and finishes

Open the permit page

$125,000
Apr 25, 2024Completed
final sign-off Sep 2024
1 Post StPeacock Construction27/f suite 2700: revision to permit 202312223036, deletion of card reader in elevator lobby and revised door swing.
Details
Permit
202404250768
Permit issued
May 8, 2024
Final sign-off
Sep 23, 2024

27/f suite 2700: revision to permit 202312223036, deletion of card reader in elevator lobby and revised door swing.

Open the permit page

Apr 16, 2024In progress
issued Apr 2024
578 Jackson Staddition of new roll-up security door at one of the entrances. all inteior ti scope of work is performed under permit. rev to 202301190407
Details
Permit
202404160055
Permit issued
Apr 30, 2024

addition of new roll-up security door at one of the entrances. all inteior ti scope of work is performed under permit. rev to 202301190407

Open the permit page

$12,000
Apr 11, 2024Completed
final sign-off Jun 2024
350 California StField Construction Inc.16/f: rev 202401113782 - application for infeasibility request to the existing ada stall in women's restroom.
Details
Permit
202404119811
Permit issued
Apr 30, 2024
Final sign-off
Jun 26, 2024

16/f: rev 202401113782 - application for infeasibility request to the existing ada stall in women's restroom.

Open the permit page

Apr 11, 2024Completed
final sign-off Sep 2024
180 Montgomery StBevilacqua & Sons19/f suite 1950: modification of existing tenant with selective demolition and construction of non-load bearing partitions. relocate office doors and frames, relocation of light fixture, and new finishes. mep deferred.
Details
Permit
202404119824
Permit issued
Apr 23, 2024
Final sign-off
Sep 4, 2024

19/f suite 1950: modification of existing tenant with selective demolition and construction of non-load bearing partitions. relocate office doors and frames, relocation of light fixture, and new finishes. mep deferred.

Open the permit page

$100,238