Principal Builders Inc.

Contractor license
829808
State license record
Based in
San Francisco
On San Francisco permits
Mar 2004 to Oct 2026
Last 24 months
157 permits filed

1,403 permits since 2000: 1,119 completed, 77 in progress, 156 never finaled, 51 expired or cancelled.

Of the 156 never-finaled permits, 14 are 3 to 5 years old, 61 are 5 to 10 years old, 81 are over 10 years old. 2 were filed but never issued.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Stairs permits

AllRoof deck 2Pergola or trellis 1Stairs 63Kitchen remodel 20Bathroom remodel 3

63 stairs permits: 48 completed, 4 in progress, 10 never finaled, 1 expired or cancelled. Typically 15 days from filing to permit and 170 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Sep 18, 2026In progress
issued Sep 2026
850 Brannan Strevision 202608146613 to modification of (e) stair handrail. removal of double doors @ loading dock from scope of work.
Details
Permit
202609188323
Status
issued
Filed
Sep 18, 2026
Permit issued
Sep 22, 2026
Address
850 Brannan St

revision 202608146613 to modification of (e) stair handrail. removal of double doors @ loading dock from scope of work.

Open the permit page

Jul 14, 2026In progress
filed Jul 2026, not yet issued
149 New Montgomery Ststairs commercial tenant improvement between floors 4.5 &6. scope of work includes partial demolition of existing flooring. new interconnecting spiral staircases & associated structural improvements.
Details
Permit
202604240059
Status
filed
Filed
Jul 14, 2026
Declared cost
$1,130,000
Address
149 New Montgomery St

stairs commercial tenant improvement between floors 4.5 &6. scope of work includes partial demolition of existing flooring. new interconnecting spiral staircases & associated structural improvements.

Open the permit page

$1,130,000
Jan 28, 2026Completed
final sign-off Jun 2026
1 Front Ststructural revision on l32 at interconnecting stairs for pa #202507110624 and removal of special inspection item #4
Details
Permit
202601284713
Status
complete
Filed
Jan 28, 2026
Permit issued
Feb 3, 2026
Final sign-off
Jun 10, 2026
Address
1 Front St

structural revision on l32 at interconnecting stairs for pa #202507110624 and removal of special inspection item #4

Open the permit page

Jan 14, 2026In progress
issued Sep 2026
555 California St41/fl- new communicating stair between floors 40 and 41.
Details
Permit
202601143871
Status
issued
Filed
Jan 14, 2026
Permit issued
Sep 9, 2026
Declared cost
$42,600
Address
555 California St

41/fl- new communicating stair between floors 40 and 41.

Open the permit page

$42,600
Jan 14, 2026In progress
issued Sep 2026
555 California St39/fl- removal of (e) communicating stair between floors 39 and 40 and infill opening in 40th floor
Details
Permit
202601143868
Status
issued
Filed
Jan 14, 2026
Permit issued
Sep 11, 2026
Declared cost
$15,000
Address
555 California St

39/fl- removal of (e) communicating stair between floors 39 and 40 and infill opening in 40th floor

Open the permit page

$15,000
Sep 24, 2025Completed
final sign-off Jun 2026
1 Front St31 and 32/fl- deferred submittal 202507110624 for stair pan and connection
Details
Permit
202509246023
Status
complete
Filed
Sep 24, 2025
Permit issued
Sep 25, 2025
Final sign-off
Jun 10, 2026
Address
1 Front St

31 and 32/fl- deferred submittal 202507110624 for stair pan and connection

Open the permit page

Mar 26, 2025Completed
final sign-off Aug 2026
550 Terry A Francois Bllevel 1 thru level 4 & roof only: tenant improvement.new partitions, ceiling, finishes, millwork & lighting. mep included.new communicating stair from level 1 thru 6. with coiling fire door at l1-l2.kitchen/health department scope under separate permit.
Details
Permit
202503172334
Status
complete
Filed
Mar 26, 2025
Permit issued
Sep 12, 2025
Final sign-off
Aug 12, 2026
Declared cost
$41,626,378
Address
550 Terry A Francois Bl

level 1 thru level 4 & roof only: tenant improvement.new partitions, ceiling, finishes, millwork & lighting. mep included.new communicating stair from level 1 thru 6. with coiling fire door at l1-l2.kitchen/health department scope under separate permit.

Open the permit page

$41,626,378
Nov 7, 2024Completed
final sign-off Mar 2025
475 Sansome St16/f: removal of (e) tenant stairs and slab infill. salvage of (e) selected materials if possible.
Details
Permit
202411074617
Status
complete
Filed
Nov 7, 2024
Permit issued
Nov 27, 2024
Final sign-off
Mar 26, 2025
Declared cost
$50,000
Address
475 Sansome St

16/f: removal of (e) tenant stairs and slab infill. salvage of (e) selected materials if possible.

Open the permit page

$50,000
Sep 17, 2024Completed
final sign-off Jan 2025
475 Sansome St11/fl- demo (e) gyp board celing, fixtures, finishe in lobby elevator. restroom upgrades. removal of (e) stair and slab infill.
Details
Permit
202409170929
Status
complete
Filed
Sep 17, 2024
Permit issued
Sep 27, 2024
Final sign-off
Jan 9, 2025
Declared cost
$221,074
Address
475 Sansome St

11/fl- demo (e) gyp board celing, fixtures, finishe in lobby elevator. restroom upgrades. removal of (e) stair and slab infill.

Open the permit page

$221,074
May 9, 2024Completed
final sign-off Dec 2024
525 Market Stfloors 31-32 interconnecting stair only
Details
Permit
202405091763
Status
complete
Filed
May 9, 2024
Permit issued
May 16, 2024
Final sign-off
Dec 3, 2024
Declared cost
$100,000
Address
525 Market St

floors 31-32 interconnecting stair only

Open the permit page

$100,000
Mar 5, 2024Completed
final sign-off Aug 2024
525 Market St30/f-31/f: demo & infill (e) stair between floors 30-31. maher n/a.
Details
Permit
202403057128
Status
complete
Filed
Mar 5, 2024
Permit issued
Mar 21, 2024
Final sign-off
Aug 5, 2024
Declared cost
$50,000
Address
525 Market St

30/f-31/f: demo & infill (e) stair between floors 30-31. maher n/a.

Open the permit page

$50,000
Mar 9, 2023Completed
final sign-off Jul 2023
322 Ritch Sttenant improvement to include: minor non-structural demo, 2 new doors to e restrooms on 1/flr, additions to e stair & relocation of 2 e restrooms on 2/flr, demo under permit# 202302091690, new lights & plumbing in 2/flr restrooms.
Details
Permit
202303093333
Status
complete
Filed
Mar 9, 2023
Permit issued
Mar 22, 2023
Final sign-off
Jul 28, 2023
Declared cost
$30,000
Address
322 Ritch St

tenant improvement to include: minor non-structural demo, 2 new doors to e restrooms on 1/flr, additions to e stair & relocation of 2 e restrooms on 2/flr, demo under permit# 202302091690, new lights & plumbing in 2/flr restrooms.

Open the permit page

$30,000
May 25, 2021Completed
final sign-off Aug 2022
575 Florida Sttenant improvement at level 1 and p1; work also includes a change of occupancy for assembly space, non-egress communicating stair from level 1 to level 4, and the build out of library at level 2 and 3.
Details
Permit
202105250928
Status
complete
Filed
May 25, 2021
Permit issued
Jan 18, 2022
Final sign-off
Aug 10, 2022
Declared cost
$2,760,000
Address
575 Florida St

tenant improvement at level 1 and p1; work also includes a change of occupancy for assembly space, non-egress communicating stair from level 1 to level 4, and the build out of library at level 2 and 3.

Open the permit page

$2,760,000
Jan 24, 2020Completed
final sign-off Oct 2021
633 Folsom St1st fl - interior ti including all hands area, connecting stair fromlevel 1 to level 2 and support including 2 unisex restrooms & beverage bar for employee use only (not open to public). finishes, millwork, ceilings & lighting
Details
Permit
202001242753
Status
complete
Filed
Jan 24, 2020
Permit issued
Aug 4, 2020
Final sign-off
Oct 15, 2021
Declared cost
$4,000,000
Address
633 Folsom St

1st fl - interior ti including all hands area, connecting stair fromlevel 1 to level 2 and support including 2 unisex restrooms & beverage bar for employee use only (not open to public). finishes, millwork, ceilings & lighting

Open the permit page

$4,000,000
Dec 23, 2019Completed
final sign-off Oct 2021
633 Folsom Stfloor 2: interior tenant improvement includes office, kitchen, dining area, cafe, and accessory storage areas. mep and structural deferred; fire sprinkler, fire alarm. shafts and openings & level 1-2 comm. stair deferred.
Details
Permit
201912230281
Status
complete
Filed
Dec 23, 2019
Permit issued
Mar 4, 2020
Final sign-off
Oct 15, 2021
Declared cost
$4,000,000
Address
633 Folsom St

floor 2: interior tenant improvement includes office, kitchen, dining area, cafe, and accessory storage areas. mep and structural deferred; fire sprinkler, fire alarm. shafts and openings & level 1-2 comm. stair deferred.

Open the permit page

$4,000,000
Jun 19, 2019Never finaled
issued Jun 2019, no final
315 Montgomery St16th and 17th floors - addition of non-rated stair enclosure and doors at existing interconnecting stair to allow access control between floors 16th & 17th. deferred submittals - mep, life safety & sprinklers
Details
Permit
201906193855
Status
issued
Filed
Jun 19, 2019
Permit issued
Jun 27, 2019
Declared cost
$25,000
Address
315 Montgomery St

16th and 17th floors - addition of non-rated stair enclosure and doors at existing interconnecting stair to allow access control between floors 16th & 17th. deferred submittals - mep, life safety & sprinklers

Open the permit page

$25,000
Nov 13, 2018Never finaled
issued Mar 2019, no final
1800 Owens Stsector 2 level 5: first time ti build out. non load bearing partitions, ceiling, light fixtures, doors & frames, millwork & finishes. work also includes (n) interconnecting stair to 4th floor.
Details
Permit
201811135704
Status
issued
Filed
Nov 13, 2018
Permit issued
Mar 27, 2019
Declared cost
$3,277,300
Address
1800 Owens St

sector 2 level 5: first time ti build out. non load bearing partitions, ceiling, light fixtures, doors & frames, millwork & finishes. work also includes (n) interconnecting stair to 4th floor.

Open the permit page

$3,277,300
Oct 16, 2018Never finaled
issued Mar 2019, no final
1800 Owens St1st flr. ti, construction of non-structural partitions, (n) ceiling, fixtures, doors, frames, millwork and finishes. work also includes (n) interconnecting stair. maher n/a
Details
Permit
201810163377
Status
issued
Filed
Oct 16, 2018
Permit issued
Mar 22, 2019
Declared cost
$2,650,000
Address
1800 Owens St

1st flr. ti, construction of non-structural partitions, (n) ceiling, fixtures, doors, frames, millwork and finishes. work also includes (n) interconnecting stair. maher n/a

Open the permit page

$2,650,000
Oct 16, 2018Never finaled
issued Mar 2019, no final
1800 Owens Stt.i. of 7th fl. construction of non-structural parttions, (n) ceiling,fixtures, doors, frames, millwork & finishes, work also ncludes cafeteria & (n) inter connecting stair
Details
Permit
201810163374
Status
issued
Filed
Oct 16, 2018
Permit issued
Mar 12, 2019
Declared cost
$2,650,000
Address
1800 Owens St

t.i. of 7th fl. construction of non-structural parttions, (n) ceiling,fixtures, doors, frames, millwork & finishes, work also ncludes cafeteria & (n) inter connecting stair

Open the permit page

$2,650,000
Aug 20, 2018Completed
final sign-off Jan 2020
1 Embarcadero Centercommunication stairs for 31st, 32nd and 33rd floors. ref app#201807305877, 2018-0808-6817, 2018-0814-4241, 2018-0815-7368 n/a for maher
Details
Permit
201808207780
Status
complete
Filed
Aug 20, 2018
Permit issued
Sep 12, 2018
Final sign-off
Jan 30, 2020
Declared cost
$600,000
Address
1 Embarcadero Center

communication stairs for 31st, 32nd and 33rd floors. ref app#201807305877, 2018-0808-6817, 2018-0814-4241, 2018-0815-7368 n/a for maher

Open the permit page

$600,000
Aug 8, 2018Completed
final sign-off Jan 2020
1 Embarcadero Center33rd flr - ti - new non str partitions. new or revised mep. bld fully sprinklered. life safety under sep permit. structural for stair, operable partition work under sep permit
Details
Permit
201808086817
Status
complete
Filed
Aug 8, 2018
Permit issued
Aug 17, 2018
Final sign-off
Jan 30, 2020
Declared cost
$1,900,000
Address
1 Embarcadero Center

33rd flr - ti - new non str partitions. new or revised mep. bld fully sprinklered. life safety under sep permit. structural for stair, operable partition work under sep permit

Open the permit page

$1,900,000
Jul 30, 2018Completed
final sign-off Aug 2019
1 Embarcadero Center31st flr - ti includes new non structural partitions. life safety and sprinklers under sep permit. structural stairs and operable partitions under sep permit maher n a
Details
Permit
201807305877
Status
complete
Filed
Jul 30, 2018
Permit issued
Aug 14, 2018
Final sign-off
Aug 27, 2019
Address
1 Embarcadero Center

31st flr - ti includes new non structural partitions. life safety and sprinklers under sep permit. structural stairs and operable partitions under sep permit maher n a

Open the permit page

Jul 13, 2018Completed
final sign-off Jan 2020
1 Embarcadero Center31st/32nd- interior structural demo of slab between floors 31 and 32 to connect floors under future ti with new communicating stair. space to remain unoccupied under ab-017 construction, mep, sprinklers and fire alarm separate
Details
Permit
201807134529
Status
complete
Filed
Jul 13, 2018
Permit issued
Jul 23, 2018
Final sign-off
Jan 30, 2020
Declared cost
$3,750
Address
1 Embarcadero Center

31st/32nd- interior structural demo of slab between floors 31 and 32 to connect floors under future ti with new communicating stair. space to remain unoccupied under ab-017 construction, mep, sprinklers and fire alarm separate

Open the permit page

$3,750
Jul 3, 2018Completed
final sign-off Jan 2019
350 Bush St12th,13th, & 14th floors: new stair. permit revision for new intumescent paint specification/use at new beams/const. fire proofing. ref app#201804136313. n/a for maher
Details
Permit
201807033598
Status
complete
Filed
Jul 3, 2018
Permit issued
Nov 6, 2018
Final sign-off
Jan 9, 2019
Address
350 Bush St

12th,13th, & 14th floors: new stair. permit revision for new intumescent paint specification/use at new beams/const. fire proofing. ref app#201804136313. n/a for maher

Open the permit page

Jun 29, 2018Completed
final sign-off Jan 2020
1 Embarcadero Center34th flr - demo inter-connecting stair btw 33&34. infill slab @34th. no change in occupancy, use or area. mep/fire/life safety under sep permit maher na
Details
Permit
201806293328
Status
complete
Filed
Jun 29, 2018
Permit issued
Jul 5, 2018
Final sign-off
Jan 30, 2020
Declared cost
$190,000
Address
1 Embarcadero Center

34th flr - demo inter-connecting stair btw 33&34. infill slab @34th. no change in occupancy, use or area. mep/fire/life safety under sep permit maher na

Open the permit page

$190,000
Apr 13, 2018Completed
final sign-off Jan 2019
350 Bush St12,13, 14 floor - ti inlcude the design and construction of a new communication stair within single tenant floors 12 thru 14: structural scope of work: selective demo of (e) concrete floor slab & construction of (n) stairs connecting 12, 13 & 14 floors. maher n/a
Details
Permit
201804136313
Status
complete
Filed
Apr 13, 2018
Permit issued
Jun 4, 2018
Final sign-off
Jan 9, 2019
Declared cost
$160,000
Address
350 Bush St

12,13, 14 floor - ti inlcude the design and construction of a new communication stair within single tenant floors 12 thru 14: structural scope of work: selective demo of (e) concrete floor slab & construction of (n) stairs connecting 12, 13 & 14 floors. maher n/a

Open the permit page

$160,000
Oct 20, 2017Expired or cancelled
withdrawn Jan 2019
600 Alabama Stcore & shell upgrades to demo & reconstruct stairs, offices & restrooms in (e) tenant space & create communicating opening to 612-614 alabama street for expansion of tenant space. upgrade ada van parking. ** maher: n/a **
Details
Permit
201710201836
Status
withdrawn
Filed
Oct 20, 2017
Declared cost
$154,000
Address
600 Alabama St

core & shell upgrades to demo & reconstruct stairs, offices & restrooms in (e) tenant space & create communicating opening to 612-614 alabama street for expansion of tenant space. upgrade ada van parking. ** maher: n/a **

Open the permit page

$154,000
Apr 28, 2017Completed
final sign-off Apr 2018
500 Terry A. Francois Bl2&4/f: demo existing slab lvl 3. new steel communicating stair, related handrail/guardrail. smoke baffle, interior finishes, millwork seating. new smoke baffle as required, 0n 4th fl, fire life safety deferred
Details
Permit
201704285150
Status
complete
Filed
Apr 28, 2017
Permit issued
Jul 7, 2017
Final sign-off
Apr 17, 2018
Declared cost
$200,000
Address
500 Terry A. Francois Bl

2&4/f: demo existing slab lvl 3. new steel communicating stair, related handrail/guardrail. smoke baffle, interior finishes, millwork seating. new smoke baffle as required, 0n 4th fl, fire life safety deferred

Open the permit page

$200,000
Dec 22, 2016Completed
final sign-off Jun 2019
100 California Strevision to 201602129534. new non combustible private roof deck with pedestal pavers, glass and metal reailings. structural improvement atthe undersid of roof slab, new steel interior stair, elevator from 14th fl. new elevator machine room 13th fl. elec/plumbing stubouts. 4250 sf area
Details
Permit
201612225779
Status
complete
Filed
Dec 22, 2016
Permit issued
Nov 30, 2017
Final sign-off
Jun 4, 2019
Declared cost
$993,061
Address
100 California St

revision to 201602129534. new non combustible private roof deck with pedestal pavers, glass and metal reailings. structural improvement atthe undersid of roof slab, new steel interior stair, elevator from 14th fl. new elevator machine room 13th fl. elec/plumbing stubouts. 4250 sf area

Open the permit page

$993,061
Oct 31, 2016Completed
final sign-off Apr 2017
1 Montgomery Stinfill of stair spenings to seal off access to above level. stiars removal under previous demo permit 2016-0808-4473. ti to follow. minor demo work. space to remain vacant ab-017
Details
Permit
201610311542
Status
complete
Filed
Oct 31, 2016
Permit issued
Nov 23, 2016
Final sign-off
Apr 19, 2017
Declared cost
$6,000
Address
1 Montgomery St

infill of stair spenings to seal off access to above level. stiars removal under previous demo permit 2016-0808-4473. ti to follow. minor demo work. space to remain vacant ab-017

Open the permit page

$6,000
Sep 13, 2016Completed
final sign-off Mar 2017
1 Embarcadero Center28,29,30,31st floors:demo of 2 extg inter-connecting stairs. build back of floor slab. mep under seperate permit. n/a for maher. ab-017.
Details
Permit
201609137477
Status
complete
Filed
Sep 13, 2016
Permit issued
Sep 27, 2016
Final sign-off
Mar 15, 2017
Declared cost
$190,000
Address
1 Embarcadero Center

28,29,30,31st floors:demo of 2 extg inter-connecting stairs. build back of floor slab. mep under seperate permit. n/a for maher. ab-017.

Open the permit page

$190,000
Aug 19, 2016Completed
final sign-off Nov 2016
799 Market Ststructural work to install stairs between 6th & 7th floors refer to 2016-0617-0309 maher na. fire alarm and sprinkler deferred.
Details
Permit
201608195577
Status
complete
Filed
Aug 19, 2016
Permit issued
Aug 23, 2016
Final sign-off
Nov 23, 2016
Declared cost
$286,000
Address
799 Market St

structural work to install stairs between 6th & 7th floors refer to 2016-0617-0309 maher na. fire alarm and sprinkler deferred.

Open the permit page

$286,000
Jul 13, 2016Completed
final sign-off Mar 2017
1 Embarcadero Centerpartial floor tenant improvement in existing tenant suite on 30th/31st fl to demo and constuct new partitons, doors, millwork, finishes, ceilings. add 2 hr full height enclosure for 30/31 stairway. mep, fa, sprinklers sep permit.
Details
Permit
201607132253
Status
complete
Filed
Jul 13, 2016
Permit issued
Jul 18, 2016
Final sign-off
Mar 15, 2017
Declared cost
$50,000
Address
1 Embarcadero Center

partial floor tenant improvement in existing tenant suite on 30th/31st fl to demo and constuct new partitons, doors, millwork, finishes, ceilings. add 2 hr full height enclosure for 30/31 stairway. mep, fa, sprinklers sep permit.

Open the permit page

$50,000
Jun 30, 2016Never finaled
issued Aug 2016, no final
3 Embarcadero Centerdemo of (e) interconnecting stair and 7th fl restroom. new fixtures accessories, finishes in restroom. no change in occupancy, use, area maher not req
Details
Permit
201606301332
Status
issued
Filed
Jun 30, 2016
Permit issued
Aug 16, 2016
Declared cost
$190,000
Address
3 Embarcadero Center

demo of (e) interconnecting stair and 7th fl restroom. new fixtures accessories, finishes in restroom. no change in occupancy, use, area maher not req

Open the permit page

$190,000
Jun 17, 2016Completed
final sign-off Dec 2016
799 Market Stflrs: 6&7: partial t.i. to build partitions,doors,millwork & finishes in existing tenant space . mep, communicating stair and fire sprinklers/alarms on separate permits; maher n/a
Details
Permit
201606170309
Status
complete
Filed
Jun 17, 2016
Permit issued
Jun 28, 2016
Final sign-off
Dec 6, 2016
Declared cost
$1,600,000
Address
799 Market St

flrs: 6&7: partial t.i. to build partitions,doors,millwork & finishes in existing tenant space . mep, communicating stair and fire sprinklers/alarms on separate permits; maher n/a

Open the permit page

$1,600,000
Jun 17, 2016Completed
final sign-off Dec 2016
1 Front Stdemolition of existing non structural stairs between 26th/27th floors and infill
Details
Permit
201606170233
Status
complete
Filed
Jun 17, 2016
Permit issued
Aug 4, 2016
Final sign-off
Dec 21, 2016
Declared cost
$95,000
Address
1 Front St

demolition of existing non structural stairs between 26th/27th floors and infill

Open the permit page

$95,000
Apr 15, 2016Never finaled
issued Jul 2016, no final
500 Terry A. Francois Blcommunicating stair between 3rd and 4th flr. n/a for maher.
Details
Permit
201604154923
Status
issued
Filed
Apr 15, 2016
Permit issued
Jul 27, 2016
Declared cost
$150,000
Address
500 Terry A. Francois Bl

communicating stair between 3rd and 4th flr. n/a for maher.

Open the permit page

$150,000
Feb 2, 2016Completed
final sign-off Jun 2016
2 Embarcadero Centerstructural work to remove slab and construct communicating stair between floors 18 and 19. ref. to t.i. pa# 201601076570. n/a ordinance #155-13
Details
Permit
201602028589
Status
complete
Filed
Feb 2, 2016
Permit issued
Mar 22, 2016
Final sign-off
Jun 29, 2016
Declared cost
$317,795
Address
2 Embarcadero Center

structural work to remove slab and construct communicating stair between floors 18 and 19. ref. to t.i. pa# 201601076570. n/a ordinance #155-13

Open the permit page

$317,795
Jan 27, 2016Never finaled
issued Jan 2016, no final
1455 Market Strevision to 201508315648 to reconfigure design of communicating stair between 4th and 5th
Details
Permit
201601278141
Status
issued
Filed
Jan 27, 2016
Permit issued
Jan 27, 2016
Declared cost
$100
Address
1455 Market St

revision to 201508315648 to reconfigure design of communicating stair between 4th and 5th

Open the permit page

$100
Jan 7, 2016Completed
final sign-off Jun 2016
2 Embarcadero Centerfloors 18 & 19 tenant improvement to construct new partitions, doors, millwork, finishes & ceiling. mep, sprinklers & fire alarm on separate permit, inter connecting stair on separate structural permit. n/a maher ordinance
Details
Permit
201601076570
Status
complete
Filed
Jan 7, 2016
Permit issued
Jan 29, 2016
Final sign-off
Jun 29, 2016
Declared cost
$6,000,000
Address
2 Embarcadero Center

floors 18 & 19 tenant improvement to construct new partitions, doors, millwork, finishes & ceiling. mep, sprinklers & fire alarm on separate permit, inter connecting stair on separate structural permit. n/a maher ordinance

Open the permit page

$6,000,000
Dec 18, 2015Completed
final sign-off Jan 2016
1 Montgomery Stnon rated enclosure of existing stair to separate tenant space on the 10th and 11th fl. mep, ls, sprinklers, structural on sep permits. existing access stair with draft curtain complying with cbc sec 1009.3, exception 3
Details
Permit
201512185539
Status
complete
Filed
Dec 18, 2015
Permit issued
Jan 6, 2016
Final sign-off
Jan 19, 2016
Declared cost
$140,000
Address
1 Montgomery St

non rated enclosure of existing stair to separate tenant space on the 10th and 11th fl. mep, ls, sprinklers, structural on sep permits. existing access stair with draft curtain complying with cbc sec 1009.3, exception 3

Open the permit page

$140,000
Oct 28, 2015Completed
final sign-off Jul 2016
1244 Sutter Strev. to pa#201509177279 to add gallery space in front attic area to include non structural partitions and relocation of conveniance stair, ceiling & finishes. separate stru. stair permit.
Details
Permit
201510281056
Status
complete
Filed
Oct 28, 2015
Permit issued
Nov 9, 2015
Final sign-off
Jul 27, 2016
Declared cost
$60,000
Address
1244 Sutter St

rev. to pa#201509177279 to add gallery space in front attic area to include non structural partitions and relocation of conveniance stair, ceiling & finishes. separate stru. stair permit.

Open the permit page

$60,000
Oct 14, 2015Never finaled
issued Nov 2015, no final
1455 Market St5th floor: t-24 lighting and mechanical connecting stairs ref pa 2015 0831 5648 maher na
Details
Permit
201510149689
Status
issued
Filed
Oct 14, 2015
Permit issued
Nov 5, 2015
Declared cost
$50,000
Address
1455 Market St

5th floor: t-24 lighting and mechanical connecting stairs ref pa 2015 0831 5648 maher na

Open the permit page

$50,000
Aug 31, 2015Never finaled
issued Sep 2015, no final
1455 Market Strevision to pa#201505065521, construct non-structural partitions/soffits, millwork. construct communication stair, demo (e) concrete slab (stair opening), drywall ceiling. fire sprinkler, life safety, mechanical, slectrical & plumbing to be design build & deferred submittal.
Details
Permit
201508315648
Status
issued
Filed
Aug 31, 2015
Permit issued
Sep 10, 2015
Declared cost
$500,000
Address
1455 Market St

revision to pa#201505065521, construct non-structural partitions/soffits, millwork. construct communication stair, demo (e) concrete slab (stair opening), drywall ceiling. fire sprinkler, life safety, mechanical, slectrical & plumbing to be design build & deferred submittal.

Open the permit page

$500,000
May 20, 2015Never finaled
issued May 2015, no final
3 Embarcadero Center8th flr: demo & construction of non-structural walls, doors, millwork, ceiling and finishes. ti - as well as slab infill of interconnecting stairs proposed for demo. mep/fire/life safety under sep permit. maher na
Details
Permit
201505206826
Status
issued
Filed
May 20, 2015
Permit issued
May 28, 2015
Declared cost
$2,000,000
Address
3 Embarcadero Center

8th flr: demo & construction of non-structural walls, doors, millwork, ceiling and finishes. ti - as well as slab infill of interconnecting stairs proposed for demo. mep/fire/life safety under sep permit. maher na

Open the permit page

$2,000,000
May 6, 2015Completed
final sign-off Oct 2016
1455 Market St5th fl: construct non-structural & structural partitions, doors, framing, hardware, millwork, drywall & acoustic ceiling tile, grid & finishes. fire sprinkler, life safety is design build by g.c. mep, life safety, communicating stair to be deferred submittal. maher not req
Details
Permit
201505065521
Status
complete
Filed
May 6, 2015
Permit issued
May 18, 2015
Final sign-off
Oct 4, 2016
Declared cost
$15,000,000
Address
1455 Market St

5th fl: construct non-structural & structural partitions, doors, framing, hardware, millwork, drywall & acoustic ceiling tile, grid & finishes. fire sprinkler, life safety is design build by g.c. mep, life safety, communicating stair to be deferred submittal. maher not req

Open the permit page

$15,000,000
Nov 12, 2014Completed
final sign-off May 2015
1455 Market Strevision to 201406259488 to show new demo and opening for non egress stair to the 11th fl. 11th fl cutout and structural plans included, and additional partitions and doors on 10/f. n/a ordinance #155-13
Details
Permit
201411121277
Status
complete
Filed
Nov 12, 2014
Permit issued
Nov 21, 2014
Final sign-off
May 12, 2015
Declared cost
$250,000
Address
1455 Market St

revision to 201406259488 to show new demo and opening for non egress stair to the 11th fl. 11th fl cutout and structural plans included, and additional partitions and doors on 10/f. n/a ordinance #155-13

Open the permit page

$250,000
Oct 10, 2014Completed
final sign-off May 2015
1455 Market Stnew t.i. on 11/f to construct non-structural and structural partitions, doors, frames, hardware, millwork, drywall, ceilings and finishes. mep. sprinklers, life safety and communicating stair under seperate permit. n/a ordinance #155-13
Details
Permit
201410108617
Status
complete
Filed
Oct 10, 2014
Permit issued
Oct 24, 2014
Final sign-off
May 12, 2015
Declared cost
$2,000,000
Address
1455 Market St

new t.i. on 11/f to construct non-structural and structural partitions, doors, frames, hardware, millwork, drywall, ceilings and finishes. mep. sprinklers, life safety and communicating stair under seperate permit. n/a ordinance #155-13

Open the permit page

$2,000,000
May 14, 2014Completed
final sign-off Nov 2014
650 California St24th & 25th floor- construct interconnecting stair (non-egress) between 24th & 25th floor tenant space. ref to pa #2014.0513.5630 for t.i. work.
Details
Permit
201405145768
Status
complete
Filed
May 14, 2014
Permit issued
May 23, 2014
Final sign-off
Nov 18, 2014
Declared cost
$331,162
Address
650 California St

24th & 25th floor- construct interconnecting stair (non-egress) between 24th & 25th floor tenant space. ref to pa #2014.0513.5630 for t.i. work.

Open the permit page

$331,162
Feb 20, 2014Completed
final sign-off Aug 2014
984 Mission Stbasement, 1st floor & mezz - construction of non-structural partition, doors/frame/hardward, millwork, finishes, stairs. mep is design build & life safety under separate permit.
Details
Permit
201402208944
Status
complete
Filed
Feb 20, 2014
Permit issued
Mar 13, 2014
Final sign-off
Aug 5, 2014
Declared cost
$400,000
Address
984 Mission St

basement, 1st floor & mezz - construction of non-structural partition, doors/frame/hardward, millwork, finishes, stairs. mep is design build & life safety under separate permit.

Open the permit page

$400,000
Dec 13, 2013Completed
final sign-off Jul 2014
77 Geary St5th and 6th floors:structural installation of communicating stair between 5th and 6th floor in ti space. sprinkler/life safety under separate permit, stairs design build.
Details
Permit
201312134119
Status
complete
Filed
Dec 13, 2013
Permit issued
Jan 10, 2014
Final sign-off
Jul 15, 2014
Declared cost
$125,000
Address
77 Geary St

5th and 6th floors:structural installation of communicating stair between 5th and 6th floor in ti space. sprinkler/life safety under separate permit, stairs design build.

Open the permit page

$125,000
Aug 6, 2013Completed
final sign-off Dec 2013
1 Front St26th floor - to enclose (e) communicating stair with tenant of 27/f with rated partition; sprinkler under separate permit.
Details
Permit
201308063658
Status
complete
Filed
Aug 6, 2013
Permit issued
Aug 16, 2013
Final sign-off
Dec 27, 2013
Declared cost
$50,000
Address
1 Front St

26th floor - to enclose (e) communicating stair with tenant of 27/f with rated partition; sprinkler under separate permit.

Open the permit page

$50,000
Jul 17, 2013Completed
final sign-off Jan 2014
1 Front St28th floor-new communcation stairway at 28th floor, interior only. interior t.i remodel, accessibility previously approved under pa# 2013-0402-3563
Details
Permit
201307172031
Status
complete
Filed
Jul 17, 2013
Permit issued
Aug 16, 2013
Final sign-off
Jan 22, 2014
Declared cost
$125,000
Address
1 Front St

28th floor-new communcation stairway at 28th floor, interior only. interior t.i remodel, accessibility previously approved under pa# 2013-0402-3563

Open the permit page

$125,000
May 21, 2013Completed
final sign-off Jul 2013
500 Terry A. Francois Blref. to pa# 201303212737: installation of stair railing between 4th and 5th floor interconnecting stairs.
Details
Permit
201305217499
Status
complete
Filed
May 21, 2013
Permit issued
May 29, 2013
Final sign-off
Jul 9, 2013
Address
500 Terry A. Francois Bl

ref. to pa# 201303212737: installation of stair railing between 4th and 5th floor interconnecting stairs.

Open the permit page

Mar 21, 2013Completed
final sign-off Jul 2013
500 Terry A. Francois Bl4th & 5th floors, installation on communication stairs between 4th & 5th floors & opening with glass railing.
Details
Permit
201303212737
Status
complete
Filed
Mar 21, 2013
Permit issued
Mar 22, 2013
Final sign-off
Jul 9, 2013
Declared cost
$150,000
Address
500 Terry A. Francois Bl

4th & 5th floors, installation on communication stairs between 4th & 5th floors & opening with glass railing.

Open the permit page

$150,000
Mar 12, 2013Completed
final sign-off Jul 2013
500 Terry A. Francois Bl4th floor:t.i. of extg space. minor demo and construction of non bearing partitions. construction of 2 hour area seperation wall. convenience stairs, fire alarm and sprinkler on seperate permit.
Details
Permit
201303122021
Status
complete
Filed
Mar 12, 2013
Permit issued
Mar 26, 2013
Final sign-off
Jul 9, 2013
Declared cost
$4,500,000
Address
500 Terry A. Francois Bl

4th floor:t.i. of extg space. minor demo and construction of non bearing partitions. construction of 2 hour area seperation wall. convenience stairs, fire alarm and sprinkler on seperate permit.

Open the permit page

$4,500,000
Feb 25, 2013Completed
final sign-off Jul 2013
500 Terry A. Francois Bl5th fl t.i. (e) space. minor demo of non-structural partitions, (e) restrooms to be upgraded. mep, fire alarm & fire sprinklers on separated permit floor opening & convenience stairs under separate permit.
Details
Permit
201302250884
Status
complete
Filed
Feb 25, 2013
Permit issued
Mar 8, 2013
Final sign-off
Jul 9, 2013
Declared cost
$2,000,000
Address
500 Terry A. Francois Bl

5th fl t.i. (e) space. minor demo of non-structural partitions, (e) restrooms to be upgraded. mep, fire alarm & fire sprinklers on separated permit floor opening & convenience stairs under separate permit.

Open the permit page

$2,000,000
Nov 1, 2011Completed
final sign-off Aug 2012
1 Market Stinfill existing inter-connecting stair between floors 5 & 6.
Details
Permit
201111018020
Status
complete
Filed
Nov 1, 2011
Permit issued
Nov 10, 2011
Final sign-off
Aug 6, 2012
Declared cost
$59,600
Address
1 Market St

infill existing inter-connecting stair between floors 5 & 6.

Open the permit page

$59,600
Aug 10, 2011Completed
final sign-off Sep 2011
1 Market St5th & 6th floors-box in interconnecting stairwell between floors. enclosing convenience stairs
Details
Permit
201108102206
Status
complete
Filed
Aug 10, 2011
Permit issued
Aug 31, 2011
Final sign-off
Sep 29, 2011
Declared cost
$30,000
Address
1 Market St

5th & 6th floors-box in interconnecting stairwell between floors. enclosing convenience stairs

Open the permit page

$30,000
Aug 20, 2008Completed
final sign-off Mar 2009
1 Front Stexpansion of existing interconnecting floor (stairs) from 33rd floor to 32nd floor.
Details
Permit
200808209617
Status
complete
Filed
Aug 20, 2008
Permit issued
Aug 29, 2008
Final sign-off
Mar 17, 2009
Declared cost
$85,000
Address
1 Front St

expansion of existing interconnecting floor (stairs) from 33rd floor to 32nd floor.

Open the permit page

$85,000
Jun 18, 2008Completed
final sign-off Jul 2008
2 Harrison Stconstruction of a 2-hr rated enclosure at ex. convenience stair to separate 6th and 7th floor tenants. required mep and fire protection modifications will be design-built and under a separate permit
Details
Permit
200806184733
Status
complete
Filed
Jun 18, 2008
Permit issued
Jul 1, 2008
Final sign-off
Jul 31, 2008
Declared cost
$60,000
Address
2 Harrison St

construction of a 2-hr rated enclosure at ex. convenience stair to separate 6th and 7th floor tenants. required mep and fire protection modifications will be design-built and under a separate permit

Open the permit page

$60,000
Sep 13, 2007Completed
final sign-off Jul 2008
555 California Stfull floor tenant improvement on the 38th floor. non-load bearing partitions, ceilings, new finishes inter-connecting stairs between 38th and 39th floors
Details
Permit
200709132528
Status
complete
Filed
Sep 13, 2007
Permit issued
Dec 3, 2007
Final sign-off
Jul 22, 2008
Declared cost
$2,500,000
Address
555 California St

full floor tenant improvement on the 38th floor. non-load bearing partitions, ceilings, new finishes inter-connecting stairs between 38th and 39th floors

Open the permit page

$2,500,000
Jul 2, 2004Completed
final sign-off Dec 2004
201 Post Stinstall interior stair & pantry area, between 2nd & 3rd fl.
Details
Permit
200407027967
Status
complete
Filed
Jul 2, 2004
Permit issued
Sep 13, 2004
Final sign-off
Dec 21, 2004
Declared cost
$75,000
Address
201 Post St

install interior stair & pantry area, between 2nd & 3rd fl.

Open the permit page

$75,000