Hathaway Dinwiddie Co.
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Sep 2026
- Last 24 months
- 111 permits filed
2,989 permits since 2000: 2,253 completed, 59 in progress, 297 never finaled, 380 expired or cancelled.
Of the 297 never-finaled permits, 13 are 3 to 5 years old, 73 are 5 to 10 years old, 211 are over 10 years old. 19 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
132 stairs permits: 103 completed, 10 in progress, 13 never finaled, 6 expired or cancelled. Typically 27 days from filing to permit and 377 days from permit to final inspection.
Showing the 100 most recent of 132.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 11, 2026 | In progress filed Sep 2026, not yet issued | 2801 Geary Bl | construct ext wall at kitchen storage room property line. upgrade accessible restroom demo rear deck stair.Details
construct ext wall at kitchen storage room property line. upgrade accessible restroom demo rear deck stair. | $15,000 |
| Aug 4, 2026 | In progress issued Aug 2026 | 101 California St | revision to 202605010540 and 202605010517. structural drawings to reflect stair framing modification. associated connection and reinforcement details to convenience stairs. no change to architectual scope. (interior only).Details
revision to 202605010540 and 202605010517. structural drawings to reflect stair framing modification. associated connection and reinforcement details to convenience stairs. no change to architectual scope. (interior only). | $3,000 |
| May 22, 2026 | In progress issued Jun 2026 | 101 California St | 12/f: revision to 202512030869. this revision includes updates to structural drawings to reflect landlord-reviewed changes for field inspection coordination. work includes revisions to grand stair framing support & operable partition support, as shown on s2.0 and s2.1Details
12/f: revision to 202512030869. this revision includes updates to structural drawings to reflect landlord-reviewed changes for field inspection coordination. work includes revisions to grand stair framing support & operable partition support, as shown on s2.0 and s2.1 | $15,000 |
| May 1, 2026 | In progress issued Jun 2026 | 101 California St | 13th and 14th flr. new tenant, convenience stairs between 13th & 14th floors, work includes new floor opening, structural supports, associated revisions, ceiling & lighting & finishesDetails
13th and 14th flr. new tenant, convenience stairs between 13th & 14th floors, work includes new floor opening, structural supports, associated revisions, ceiling & lighting & finishes | $399,334 |
| May 1, 2026 | In progress issued Jun 2026 | 101 California St | 11 and 12/fl-(n) ti for convenience stairs between 11th and 12th floors. work include (n) floor, opening, structural supports, associated revisions to partition, ceiling and lighting and finishes. 2-hr separation and smoke controlDetails
11 and 12/fl-(n) ti for convenience stairs between 11th and 12th floors. work include (n) floor, opening, structural supports, associated revisions to partition, ceiling and lighting and finishes. 2-hr separation and smoke control | $399,334 |
| Apr 7, 2026 | In progress issued May 2026 | 101 California St | 13th fl partial non-structural demo for a new horizontal exit separation on the 13th fl & revised smoke narrative for an addition of 2 new convenience stairs on 11th to 12th & 13th & 14thDetails
13th fl partial non-structural demo for a new horizontal exit separation on the 13th fl & revised smoke narrative for an addition of 2 new convenience stairs on 11th to 12th & 13th & 14th | $143,772 |
| Mar 27, 2026 | In progress issued Mar 2026 | 185 Berry St | exterior improvement of entrance stair of an (e) office bldg. reconstruction of entry stair & new integrated planters. no work effect public rowDetails
exterior improvement of entrance stair of an (e) office bldg. reconstruction of entry stair & new integrated planters. no work effect public row | $125,000 |
| Mar 11, 2026 | In progress issued Jun 2026 | 185 Berry St | ti for sierra located on levels 1, 5 & 6. selective demo of portion of (e) floor slabs at levels 5 & 6 to create 3 story, interconnected volume intended for "all-hands" assembly gatherings, work also includes construction of stadium-styled seating & associated stairs between level 4, 5 & communicatiDetails
ti for sierra located on levels 1, 5 & 6. selective demo of portion of (e) floor slabs at levels 5 & 6 to create 3 story, interconnected volume intended for "all-hands" assembly gatherings, work also includes construction of stadium-styled seating & associated stairs between level 4, 5 & communicati | $2,350,400 |
| Dec 8, 2025 | In progress issued Mar 2026 | 101 California St | new tenant stairs on the 12th & 13th floors. work includes structural supports and new finishes and mother's/wellness rooms millwork alterations.Details
new tenant stairs on the 12th & 13th floors. work includes structural supports and new finishes and mother's/wellness rooms millwork alterations. | $1,000,000 |
| Sep 24, 2025 | Completed final sign-off Jul 2026 | 600 Montgomery St | 20th/21st floor: revision to pa#'s 202508203517 and 202808203523 - new interconnecting convenience stair between level 20 and level 21.typical details for small new penetrations and infill of existing penetrations. typical cfs framing. mep equipment anchorage.Details
20th/21st floor: revision to pa#'s 202508203517 and 202808203523 - new interconnecting convenience stair between level 20 and level 21.typical details for small new penetrations and infill of existing penetrations. typical cfs framing. mep equipment anchorage. | $25,000 |
| Aug 6, 2025 | Completed final sign-off Jan 2026 | 301 Howard St | 17th and 18th/fl: tenant improvement to include construction of new inner-connecting stairs between floors 17th and 18th. demolition and installation of new power outlets and tel/data. rework ceilings and lighting in area of new stairs. rework finishes mep deferred.Details
17th and 18th/fl: tenant improvement to include construction of new inner-connecting stairs between floors 17th and 18th. demolition and installation of new power outlets and tel/data. rework ceilings and lighting in area of new stairs. rework finishes mep deferred. | $378,295 |
| Aug 1, 2024 | Completed final sign-off Aug 2024 | 55 Cyril Magnin St | revision to pa#202112224938. unforseen conditions during construction. basement wall discovered to be higher than expected. stone on top of site stairs at cyril magnin and ellis street. to be removed and replaced with concrete stairs.Details
revision to pa#202112224938. unforseen conditions during construction. basement wall discovered to be higher than expected. stone on top of site stairs at cyril magnin and ellis street. to be removed and replaced with concrete stairs. | |
| Jul 17, 2024 | In progress issued Jan 2025 | 1800 Owens St | scope consists of infrastructure upgrades to(e)bldg systems to support future life science tenants.sector 2:(n)rooftop mech equpment & the addition of(2)(n)shafts from the roof(level 7 to level 2)demo & in-fill for accessory stairs added by previous tenant on level 4.Details
scope consists of infrastructure upgrades to(e)bldg systems to support future life science tenants.sector 2:(n)rooftop mech equpment & the addition of(2)(n)shafts from the roof(level 7 to level 2)demo & in-fill for accessory stairs added by previous tenant on level 4. | $3,091,676 |
| Nov 29, 2023 | Completed final sign-off Jul 2024 | 120 Kearny St | 35/f and 36/f: demolition of existing coummunication stair btwn lvl 35 and 36. infill of slab and new finishes to match existing. accessibility upgrades to 35/f restrooms. drinking fountain omitted from scope of work for this permit. the df requirement will be addressed and included with ti permitDetails
35/f and 36/f: demolition of existing coummunication stair btwn lvl 35 and 36. infill of slab and new finishes to match existing. accessibility upgrades to 35/f restrooms. drinking fountain omitted from scope of work for this permit. the df requirement will be addressed and included with ti permit | $204,000 |
| Jun 12, 2023 | Completed final sign-off Jul 2025 | 415 Mission St | 44 flr and 45 flr: construct temporary 2hr rated partitions and access doors. demo a non-egress interconnecting staircase and infill structure slab. includes ceiling finish and mepDetails
44 flr and 45 flr: construct temporary 2hr rated partitions and access doors. demo a non-egress interconnecting staircase and infill structure slab. includes ceiling finish and mep | $122,000 |
| Jan 26, 2022 | Never finaled issued Apr 2022, no final | 600 Montgomery St | base building improvement for for fl g1,1,2,3. structural and non-structural demo. construction of new communicating stair. construction of 2 elevators. all associated structural work.Details
base building improvement for for fl g1,1,2,3. structural and non-structural demo. construction of new communicating stair. construction of 2 elevators. all associated structural work. | $1,002,978 |
| Dec 14, 2021 | Completed final sign-off Oct 2025 | 600 Montgomery St | 1f: base building improvement. structural and non-structural demo. construction of new communicating stair & 1 exit stair. construction of 2 elevators. demo under pa# 2020104128342 (2nd fl)Details
1f: base building improvement. structural and non-structural demo. construction of new communicating stair & 1 exit stair. construction of 2 elevators. demo under pa# 2020104128342 (2nd fl) | $213,120 |
| Oct 8, 2021 | Never finaled issued Oct 2021, no final | 185 Berry St | replacement of (e) guardrails and handrails @ 4 locations. the stairs are from existing parking garage to plaza level (of stairs)Details
replacement of (e) guardrails and handrails @ 4 locations. the stairs are from existing parking garage to plaza level (of stairs) | $230,000 |
| Sep 14, 2021 | Completed final sign-off May 2022 | 100 Channel | to provide additional ductwork and exhaust louvers to provide proper stairs pressurization relief. no exterior work.Details
to provide additional ductwork and exhaust louvers to provide proper stairs pressurization relief. no exterior work. | $10,000 |
| Aug 20, 2021 | Completed final sign-off May 2022 | 100 Channel | to provide a recessed area (3'-1" back from shared property line) to allow mechanicl relief vent related to stair pressurization requirements. ref app#201912058761.Details
to provide a recessed area (3'-1" back from shared property line) to allow mechanicl relief vent related to stair pressurization requirements. ref app#201912058761. | $5,000 |
| May 7, 2021 | Completed final sign-off Aug 2021 | 1355 Market St | 9th and 10th flrs: revision to pa 202012100770. replacement of light fixtures above the stair, removing (e) light fixures from (e) cove soffit, removing (e) stretch fabric at the ceiling and exposing the (e) gyp bd ceiling above the stair.Details
9th and 10th flrs: revision to pa 202012100770. replacement of light fixtures above the stair, removing (e) light fixures from (e) cove soffit, removing (e) stretch fabric at the ceiling and exposing the (e) gyp bd ceiling above the stair. | |
| Apr 30, 2021 | Completed final sign-off May 2022 | 499 Jackson St | no change of use. no added sq footages. ground floor and basement interior improvements including new ground floor infill. new exit access enclosure to extg exit and new stair to basement. new structural work for floor infill and new stair. spaces to remain vacant until t.i. is issued & t.i. work isDetails
no change of use. no added sq footages. ground floor and basement interior improvements including new ground floor infill. new exit access enclosure to extg exit and new stair to basement. new structural work for floor infill and new stair. spaces to remain vacant until t.i. is issued & t.i. work is | $235,000 |
| Oct 3, 2019 | Completed final sign-off Dec 2022 | 3 Embarcadero Center | lobby improvement includes new curtain wall & minor slab infill ceilings, partitions & assocated steel structure, floor, wall, elevator cab finsishes, & mep. replacement of glass canopy @ podium court yard & addition of (n) stair from lobby to promenade level. maher n/a**Details
lobby improvement includes new curtain wall & minor slab infill ceilings, partitions & assocated steel structure, floor, wall, elevator cab finsishes, & mep. replacement of glass canopy @ podium court yard & addition of (n) stair from lobby to promenade level. maher n/a** | $2,250,000 |
| Oct 3, 2019 | Completed final sign-off Dec 2022 | 2 Embarcadero Center | lobby improvement includes new curtain wall, minor slab infill, ceilings, partitions & associated steel structure fl wall, elevator cab finishes & mep. replacement of glass canopy @ podium courtyard & addition of (n) stair from lobby to promenade level.**maher n/a**Details
lobby improvement includes new curtain wall, minor slab infill, ceilings, partitions & associated steel structure fl wall, elevator cab finishes & mep. replacement of glass canopy @ podium courtyard & addition of (n) stair from lobby to promenade level.**maher n/a** | $2,250,000 |
| Apr 3, 2019 | Completed final sign-off Mar 2021 | 415 Mission St | rev to pa# 201902041975; remove scope for stair from 43 to 44, remove scope for fl. opening on fl. 44 add guard rail around fl. opening on floor 43Details
rev to pa# 201902041975; remove scope for stair from 43 to 44, remove scope for fl. opening on fl. 44 add guard rail around fl. opening on floor 43 | |
| Apr 3, 2019 | Completed final sign-off Sep 2020 | 415 Mission St | 43rd floor: rev to pa# 201901150409; for revisd communicating stair (seperate permit) by removing flight between floors 43 & 44 revisions include ceiling, mep & smoke controlletterDetails
43rd floor: rev to pa# 201901150409; for revisd communicating stair (seperate permit) by removing flight between floors 43 & 44 revisions include ceiling, mep & smoke controlletter | |
| Apr 3, 2019 | Completed final sign-off Sep 2020 | 415 Mission St | rev to pa# 201901150410; for revisd communicating stair (seperate permit) by removing flight between floors 43 & 44 revisions include ceilings, mep & smoke controlDetails
rev to pa# 201901150410; for revisd communicating stair (seperate permit) by removing flight between floors 43 & 44 revisions include ceilings, mep & smoke control | |
| Apr 3, 2019 | Completed final sign-off Sep 2020 | 415 Mission St | 42nd floor:rev to pa# 201901150407; for revisd communicating stair (seperate permit) by removing flight between floors 43 & 44 revisions include ceiling, mep & smoke controlDetails
42nd floor:rev to pa# 201901150407; for revisd communicating stair (seperate permit) by removing flight between floors 43 & 44 revisions include ceiling, mep & smoke control | |
| Feb 4, 2019 | Completed final sign-off Mar 2021 | 415 Mission St | interconnecting stairs on levels 42,43,44,&45. including handrails, guardrails, bench foffits, sprinkler draft stops. n/a for maherDetails
interconnecting stairs on levels 42,43,44,&45. including handrails, guardrails, bench foffits, sprinkler draft stops. n/a for maher | $120,000 |
| Oct 30, 2018 | Completed final sign-off Oct 2019 | 415 Mission St | demo existing floor slab on 40 & 41 - construct new interconnecting stair between 39-40 and 40-41, including handrails, guardrails, bench, soffits, smoke baffles. maher naDetails
demo existing floor slab on 40 & 41 - construct new interconnecting stair between 39-40 and 40-41, including handrails, guardrails, bench, soffits, smoke baffles. maher na | $94,000 |
| Oct 10, 2018 | Completed final sign-off Jan 2021 | 100 Pine St | ground fl - accessibility upgrade to (e) plaza; maintenance repair to existing finishes. demo of wall and floor finishes, door and frame, replacement of finishes construction of new accessible lift and ramp stairs. no change in use or occupancy. maher n/a.Details
ground fl - accessibility upgrade to (e) plaza; maintenance repair to existing finishes. demo of wall and floor finishes, door and frame, replacement of finishes construction of new accessible lift and ramp stairs. no change in use or occupancy. maher n/a. | $201,884 |
| Aug 27, 2018 | Completed final sign-off Oct 2019 | 415 Mission St | arch & structural work on level 28, 29, 30. demo existing floor slab on 29 & 30 - construction of a new interconnecting stair between 28 & 29 and 29 & 30. including handrails, guardrails, bench, soffits & smoke baffles - interior partitions under sep permit. maher naDetails
arch & structural work on level 28, 29, 30. demo existing floor slab on 29 & 30 - construction of a new interconnecting stair between 28 & 29 and 29 & 30. including handrails, guardrails, bench, soffits & smoke baffles - interior partitions under sep permit. maher na | $9,378,000 |
| Jul 17, 2018 | Completed final sign-off Oct 2019 | 415 Mission St | ti for arch and struc work levels 25,26, 27. work includes demo of slabs floors 26 and 27. new interconnecting stairs between 25, 26, 27th fl includes handrails, guardrails, bench, soffits, smoke bafflesDetails
ti for arch and struc work levels 25,26, 27. work includes demo of slabs floors 26 and 27. new interconnecting stairs between 25, 26, 27th fl includes handrails, guardrails, bench, soffits, smoke baffles | $500,000 |
| Jun 28, 2018 | Completed final sign-off Nov 2020 | 4 Embarcadero Center | demo: remove (e) lobby entry, secondary structure. interior finishes, fixtures, equipment & remove (e) stairs & escalators between level 2 & 3 in podium tower. new work: increase enclose lobby by 1600 sq.ft. new stairs, finishes, lighting system. replace glass canopy, curtain wall, sprinklers, fa onDetails
demo: remove (e) lobby entry, secondary structure. interior finishes, fixtures, equipment & remove (e) stairs & escalators between level 2 & 3 in podium tower. new work: increase enclose lobby by 1600 sq.ft. new stairs, finishes, lighting system. replace glass canopy, curtain wall, sprinklers, fa on | $2,500,000 |
| May 30, 2018 | Completed final sign-off Oct 2020 | 650 Townsend St | this is an atrium improvement project. work includes (n) interior partitions, doors/frames, finishes, ada lifts, stairs, ramp, lighting & mep work. reference pa #2018-0307-3080 for approved exterior work. smoke control update.Details
this is an atrium improvement project. work includes (n) interior partitions, doors/frames, finishes, ada lifts, stairs, ramp, lighting & mep work. reference pa #2018-0307-3080 for approved exterior work. smoke control update. | $2,500,000 |
| Apr 23, 2018 | Completed final sign-off Oct 2019 | 415 Mission St | 22nd, 23rd, & 24th floors:inter connecting stairs. n/a for maherDetails
22nd, 23rd, & 24th floors:inter connecting stairs. n/a for maher | $250,000 |
| Mar 30, 2018 | Completed final sign-off Aug 2018 | 4 Embarcadero Center | demolition of 26th & 27th fl inter-communicating stair and infill floor opening. mep and fire/life safety uner sep. permit.Details
demolition of 26th & 27th fl inter-communicating stair and infill floor opening. mep and fire/life safety uner sep. permit. | $75,000 |
| Mar 7, 2018 | Never finaled issued Jun 2018, no final | 650 Townsend St | modification to a portion of the north (bluxome street) facade for (n) entry doors, windows & ada access ramp. (n) interior stairs, non load bearing partiions & inteiror finishes. no change of use. ** maher: n/a **Details
modification to a portion of the north (bluxome street) facade for (n) entry doors, windows & ada access ramp. (n) interior stairs, non load bearing partiions & inteiror finishes. no change of use. ** maher: n/a ** | $350,000 |
| Feb 20, 2018 | Completed final sign-off Sep 2019 | 415 Mission St | arch & struct for construction of new interconnecting stair between floors 19 & 20 and 20 & 21, including handrails, guardrails, bench, soffits and smoke raffles. all interior partitions are part of sep permit maher naDetails
arch & struct for construction of new interconnecting stair between floors 19 & 20 and 20 & 21, including handrails, guardrails, bench, soffits and smoke raffles. all interior partitions are part of sep permit maher na | $250,000 |
| Jan 19, 2018 | Completed final sign-off Oct 2019 | 1 Embarcadero Center | remodel of (e) elevator lobby. work includes (n)lobby entrance to increase enclosed lobby by 1600 sq ft through (n)curtain wall & minor slab infill. interior work for (n) walls, ceilings,steel structure finishes & mep (e) stairs & escalator between level 2 & 3 to be removed. new stair construction.Details
remodel of (e) elevator lobby. work includes (n)lobby entrance to increase enclosed lobby by 1600 sq ft through (n)curtain wall & minor slab infill. interior work for (n) walls, ceilings,steel structure finishes & mep (e) stairs & escalator between level 2 & 3 to be removed. new stair construction. | $2,250,000 |
| Dec 19, 2017 | Completed final sign-off Oct 2019 | 415 Mission St | comminucating stairs between levels 60 & 61, for single tenamant not part of egress system. maher naDetails
comminucating stairs between levels 60 & 61, for single tenamant not part of egress system. maher na | $250,000 |
| Dec 18, 2017 | Completed final sign-off Aug 2018 | 633 Battery St | inter-connecting stair between 2nd & 3rd flrs: demo scope at 3rd floor at stair location. no change in use, occupancy or area. mep/fire/life safety under sep permit maher naDetails
inter-connecting stair between 2nd & 3rd flrs: demo scope at 3rd floor at stair location. no change in use, occupancy or area. mep/fire/life safety under sep permit maher na | $75,000 |
| Dec 15, 2017 | Completed final sign-off Oct 2019 | 415 Mission St | 16th-18th inter connecting stair between levels 16,17,18Details
16th-18th inter connecting stair between levels 16,17,18 | $240,000 |
| Nov 20, 2017 | Completed final sign-off Oct 2019 | 415 Mission St | floors 4-6 communicating stairs between levels 4 and 6, not part of egress system, demo of (e) floor assembly and construction of (n) stairs, soffit and finishes. maher naDetails
floors 4-6 communicating stairs between levels 4 and 6, not part of egress system, demo of (e) floor assembly and construction of (n) stairs, soffit and finishes. maher na | $50,000 |
| Nov 20, 2017 | Completed final sign-off Oct 2019 | 415 Mission St | 4th flr: single ti entire floor w/accessory assembly & horizontal exits also included are (n) access flooring, partitions, mep, finishes & additional restrooms. communicating stairs, fire alarm & sprinklers under separate permit maher naDetails
4th flr: single ti entire floor w/accessory assembly & horizontal exits also included are (n) access flooring, partitions, mep, finishes & additional restrooms. communicating stairs, fire alarm & sprinklers under separate permit maher na | $2,300,000 |
| Nov 20, 2017 | Completed final sign-off Oct 2019 | 415 Mission St | 6th flr: single ti entire floor w/accessory assembly & horizontal exits also included are (n) access flooring, partitions, mep, finishes & additional restrooms. communicating stairs, fire alarm & sprinklers under separate permit maher naDetails
6th flr: single ti entire floor w/accessory assembly & horizontal exits also included are (n) access flooring, partitions, mep, finishes & additional restrooms. communicating stairs, fire alarm & sprinklers under separate permit maher na | $2,300,000 |
| Nov 3, 2017 | Completed final sign-off Aug 2018 | 633 Battery St | 2/f- non structural partitions, restrooms, cabinetry, lighting, finishes & demo. alter of (e) 3/f stair. no change in occ., use, or area. 4 new exterior window openings on north facade. mep, life safety & sprinklers under seperate permit. communicating stair under seperate permit. n/a for maher.Details
2/f- non structural partitions, restrooms, cabinetry, lighting, finishes & demo. alter of (e) 3/f stair. no change in occ., use, or area. 4 new exterior window openings on north facade. mep, life safety & sprinklers under seperate permit. communicating stair under seperate permit. n/a for maher. | $1,078,896 |
| Oct 23, 2017 | Completed final sign-off Oct 2019 | 415 Mission St | work on levels 13,14,& 15: demo of slab on floors 14 & 15. construction of interconnecting stairs between 13 & 14, and 14 & 15, including handrails, guardrails , bench, soffits, & smoke baffles. t.i. work under seperate permits. ref 13th fl app#201710171480/14th fl app#201710171482 n/a for maher.Details
work on levels 13,14,& 15: demo of slab on floors 14 & 15. construction of interconnecting stairs between 13 & 14, and 14 & 15, including handrails, guardrails , bench, soffits, & smoke baffles. t.i. work under seperate permits. ref 13th fl app#201710171480/14th fl app#201710171482 n/a for maher. | $150,000 |
| Sep 15, 2017 | Never finaled issued Jun 2019, no final | 600 Montgomery St | change of occupancy and use from b-office to a-2 assembly on 48th fl for after hours events. scope includes upgrading (1) restroom to fully accessible single user restroom, new signage, water fountain/bottle filler, and increasing headroom at exit access stairDetails
change of occupancy and use from b-office to a-2 assembly on 48th fl for after hours events. scope includes upgrading (1) restroom to fully accessible single user restroom, new signage, water fountain/bottle filler, and increasing headroom at exit access stair | $50,000 |
| Aug 14, 2017 | Completed final sign-off Oct 2019 | 415 Mission St | inter connecting stairs from 10th fl to 12th flDetails
inter connecting stairs from 10th fl to 12th fl | $200,000 |
| Jun 1, 2017 | Completed final sign-off Oct 2019 | 415 Mission St | 7,8,9,11th flr: arch/struct work. demo (e) floor slab to accomodate new interconnecting stair btw 7,8,9 flr as well as handrails, guardrails, bench soffits & smoke baffles. level 11 demo is for future stair opening. all interior prtitions under sep permitDetails
7,8,9,11th flr: arch/struct work. demo (e) floor slab to accomodate new interconnecting stair btw 7,8,9 flr as well as handrails, guardrails, bench soffits & smoke baffles. level 11 demo is for future stair opening. all interior prtitions under sep permit | $150,000 |
| Mar 9, 2017 | Never finaled issued Nov 2017, no final | 222 Sansome St | interior renovation @ hotel lobby, stair, elevator lobby. includes m.e.p. fire alarm separate permit. ** maher: n/a **Details
interior renovation @ hotel lobby, stair, elevator lobby. includes m.e.p. fire alarm separate permit. ** maher: n/a ** | $624,825 |
| Dec 1, 2016 | Completed final sign-off Jan 2017 | 525 Market St | 29th flr: revision to 201609288969 create rating at ceiling of abandone interconnecting stair in lieu of at wallDetails
29th flr: revision to 201609288969 create rating at ceiling of abandone interconnecting stair in lieu of at wall | |
| Nov 16, 2016 | Completed final sign-off Oct 2018 | 505 Brannan St | full tenant build out of 6 story office mid-rise improvements include full service kitchen, communicating stairs, general office space & conference facilities. architectural finishes & mep.Details
full tenant build out of 6 story office mid-rise improvements include full service kitchen, communicating stairs, general office space & conference facilities. architectural finishes & mep. | $26,000,000 |
| Oct 26, 2016 | Completed final sign-off Mar 2017 | 525 Market St | removal and infill of interconnecting stairs between floors 30/31 & 31/32Details
removal and infill of interconnecting stairs between floors 30/31 & 31/32 | $75,000 |
| Sep 28, 2016 | Completed final sign-off May 2017 | 525 Market St | frls: 28 & 29: vacate floor 28, infill interconnecting stairs between 28 and 29 with 2-hr shaft wall.minor demo of finishes,lighting,tenant improvement,new walls offices,meeting rooms,new light fixtures,modify mep to support new workDetails
frls: 28 & 29: vacate floor 28, infill interconnecting stairs between 28 and 29 with 2-hr shaft wall.minor demo of finishes,lighting,tenant improvement,new walls offices,meeting rooms,new light fixtures,modify mep to support new work | $820,000 |
| Jul 27, 2016 | Completed final sign-off Sep 2020 | 350 Mission St | 27/f thru 30/f interior t.i. for single tenant of 4 floors (27/f through 30/f). includes interconnecting stairs between level 27/f thru 30/f.(n) non load bearing partitions,ceiling,floor finishes,hvac,elect/plumbing. food slab cuts and convenience stair shaft walls under separate permitDetails
27/f thru 30/f interior t.i. for single tenant of 4 floors (27/f through 30/f). includes interconnecting stairs between level 27/f thru 30/f.(n) non load bearing partitions,ceiling,floor finishes,hvac,elect/plumbing. food slab cuts and convenience stair shaft walls under separate permit | $6,330,560 |
| Jul 21, 2016 | Never finaled issued Aug 2016, no final | 350 Mission St | 28th-30th floor: structural only new slab penetration cut into level 28,29,30 at pre built stair knock out panel. no tendons are distrurbed during demo roof penetraions for skylights and mechanical (future). life safety deferred.Details
28th-30th floor: structural only new slab penetration cut into level 28,29,30 at pre built stair knock out panel. no tendons are distrurbed during demo roof penetraions for skylights and mechanical (future). life safety deferred. | $100,000 |
| May 16, 2016 | Completed final sign-off Jul 2017 | 350 Mission St | revision to 2016-0505-6678, revise stair railing with cables replacing glass.Details
revision to 2016-0505-6678, revise stair railing with cables replacing glass. | $1,000 |
| May 5, 2016 | Completed final sign-off Sep 2017 | 350 Mission St | 5th and 6th floors: revision to app#201502178417. new detailing at convenience stair between 5th and 6th floor. n/a for maher.Details
5th and 6th floors: revision to app#201502178417. new detailing at convenience stair between 5th and 6th floor. n/a for maher. | |
| Feb 18, 2016 | Completed final sign-off Mar 2016 | 101 California St | demo of interconnecting stairway on floor 48 to floor 47 below. ceiling buld back, lighting, life safety to be under separate permit. demo work per ab-017. maher not reqDetails
demo of interconnecting stairway on floor 48 to floor 47 below. ceiling buld back, lighting, life safety to be under separate permit. demo work per ab-017. maher not req | $40,000 |
| Jan 22, 2016 | Completed final sign-off Jun 2016 | 600 Montgomery St | tenant improvements new offices and support facilities. new stair to connect to the 20th fl. mep under separate permitDetails
tenant improvements new offices and support facilities. new stair to connect to the 20th fl. mep under separate permit | $685,000 |
| Dec 29, 2015 | Completed final sign-off May 2017 | 1563 Mission St | install/construct (2) staircases, this is deferred from permit 201501286888Details
install/construct (2) staircases, this is deferred from permit 201501286888 | $100,000 |
| Jul 23, 2015 | Completed final sign-off Jan 2016 | 875 Stevenson St | 5th floor -revision to pa #2015.0414.3546: stair shown on original permit is not to be constructed at this time. this work is also associated with structural demo pa #201503160936.Details
5th floor -revision to pa #2015.0414.3546: stair shown on original permit is not to be constructed at this time. this work is also associated with structural demo pa #201503160936. | |
| Jul 22, 2015 | Completed final sign-off Jan 2016 | 875 Stevenson St | revision to 201504093242. stair shown on original permit not to be constructed at this time. this work also associated with structural permit 201503160938Details
revision to 201504093242. stair shown on original permit not to be constructed at this time. this work also associated with structural permit 201503160938 | |
| Jul 22, 2015 | Completed final sign-off Dec 2015 | 875 Stevenson St | revision to 201504083072. minor revision to partition layout new conf 333 and 334, storage 321, 348 conf rm 331 was removed and conf room 382 and 383 added. ddf rm 307 extended to include das cell room 384. stair shwn on orig.permit not constructed. also associated with structural plan 201503160938Details
revision to 201504083072. minor revision to partition layout new conf 333 and 334, storage 321, 348 conf rm 331 was removed and conf room 382 and 383 added. ddf rm 307 extended to include das cell room 384. stair shwn on orig.permit not constructed. also associated with structural plan 201503160938 | $1,000 |
| Jul 20, 2015 | Completed final sign-off Jan 2016 | 875 Stevenson St | 6th floor - revision to pa #201504093243 - stair shown on original permit is not to be constructed at this time. this work was also associated with structural pa #201503160936.Details
6th floor - revision to pa #201504093243 - stair shown on original permit is not to be constructed at this time. this work was also associated with structural pa #201503160936. | $5,000 |
| Jul 20, 2015 | Completed final sign-off Feb 2016 | 875 Stevenson St | 7th & 8th floor - revision to pa #201504103304 - stair shown on original permit is not to be constructed at this time. this work was also associated with structural pa #201503160939.Details
7th & 8th floor - revision to pa #201504103304 - stair shown on original permit is not to be constructed at this time. this work was also associated with structural pa #201503160939. | |
| Apr 29, 2015 | Completed final sign-off Aug 2016 | 5 Embarcadero Center | new accessible loading & walkway & detectable warnings, new automatic revolving door with new swinging doors to replace extg entry, limited regrading & nw curb cuts, nw railing & gates at extg exit stairs from bsmnt. nw landscaping(potted plants), nw decorative lghtg. new signage on seperate permit.Details
new accessible loading & walkway & detectable warnings, new automatic revolving door with new swinging doors to replace extg entry, limited regrading & nw curb cuts, nw railing & gates at extg exit stairs from bsmnt. nw landscaping(potted plants), nw decorative lghtg. new signage on seperate permit. | $1,025,000 |
| Apr 10, 2015 | Completed final sign-off Feb 2016 | 875 Stevenson St | 7th & 8th flr:ti including demo, new dry wall, ceiling, doors, millwork, interior glazing and finishes, a new communicating stair between the 7th & 8th floor. m&e under seperate permitDetails
7th & 8th flr:ti including demo, new dry wall, ceiling, doors, millwork, interior glazing and finishes, a new communicating stair between the 7th & 8th floor. m&e under seperate permit | $2,480,030 |
| Apr 9, 2015 | Completed final sign-off Jan 2016 | 875 Stevenson St | interior tenant improvement on 6/f include demo, new drywall, ceilings, doors, millwork, interior glazing and finishes. a new communicating stair between 5th and 6th floor. mech. and elec. under seperate permit.Details
interior tenant improvement on 6/f include demo, new drywall, ceilings, doors, millwork, interior glazing and finishes. a new communicating stair between 5th and 6th floor. mech. and elec. under seperate permit. | $2,293,016 |
| Mar 16, 2015 | Expired or cancelled cancelled Dec 2015 | 875 Stevenson St | demo portiton of slab to accomodeate a stair for a soon to be permitted ti. floor is in shell condition and unoccupied. this work under ab-017. no occupancyDetails
demo portiton of slab to accomodeate a stair for a soon to be permitted ti. floor is in shell condition and unoccupied. this work under ab-017. no occupancy | $40,000 |
| Mar 16, 2015 | Completed final sign-off Dec 2015 | 875 Stevenson St | demo portion of slab to accommodate a stair for a soon to be permitted ti. floor is in shell condition and unoccupied. this work under ab-017. no occupancyDetails
demo portion of slab to accommodate a stair for a soon to be permitted ti. floor is in shell condition and unoccupied. this work under ab-017. no occupancy | $40,000 |
| Mar 16, 2015 | Expired or cancelled cancelled Dec 2015 | 875 Stevenson St | demo portiton of slab to accomodeate a stair for a soon to be permitted ti. floor is in shell condition and unoccupied. this work under ab-017. no occupancy until the ti is complete.Details
demo portiton of slab to accomodeate a stair for a soon to be permitted ti. floor is in shell condition and unoccupied. this work under ab-017. no occupancy until the ti is complete. | $40,000 |
| Feb 26, 2015 | Never finaled issued Jun 2015, no final | 500 Pine St | revision to pa# 200011024683s for stair location, adjusted & door locations on ground floor for 500 pine street site permit.Details
revision to pa# 200011024683s for stair location, adjusted & door locations on ground floor for 500 pine street site permit. | |
| Feb 17, 2015 | Completed final sign-off Sep 2017 | 350 Mission St | 5th & 6th floors. 1st time tenant in (n) life safety high rise 5th & 6th floors tenant improvement for both floors. non-bearing partitions, (n) ceilings, finishes (n) elec,mech,plumbin. horizontal exiting for both floor. (n) convenience stairs between 5th & 6th floors.Details
5th & 6th floors. 1st time tenant in (n) life safety high rise 5th & 6th floors tenant improvement for both floors. non-bearing partitions, (n) ceilings, finishes (n) elec,mech,plumbin. horizontal exiting for both floor. (n) convenience stairs between 5th & 6th floors. | $1,726,400 |
| Jan 28, 2015 | Completed final sign-off Jun 2017 | 1563 Mission St | seismic retrofit of light industrial bldg. north window, west window and south window replacement. minor interior work including exit stairs and elevators.Details
seismic retrofit of light industrial bldg. north window, west window and south window replacement. minor interior work including exit stairs and elevators. | $12,500,000 |
| Sep 16, 2014 | Completed final sign-off Sep 2016 | 50 Fremont St | demo only, remove section of floor slab on level 12 and 14 (no 13th fl) for convenience stairs. maher not requiredDetails
demo only, remove section of floor slab on level 12 and 14 (no 13th fl) for convenience stairs. maher not required | $22,000 |
| Aug 29, 2014 | Completed final sign-off Sep 2016 | 50 Fremont St | flrs: 11 -14 - new 3 level convenience stairs from 11th-14th flr, no change in use, exist stairs, and elevator; maher n/aDetails
flrs: 11 -14 - new 3 level convenience stairs from 11th-14th flr, no change in use, exist stairs, and elevator; maher n/a | $1,389,225 |
| Aug 15, 2014 | Completed final sign-off Mar 2018 | 50 Fremont St | 14th flr: full floor t.i. for single tenant of 42 story building. new non-load bearing partitions, ceilings, finishes. new mep work. building has no 13th flr, convenience stairs under separate permit; maher n/aDetails
14th flr: full floor t.i. for single tenant of 42 story building. new non-load bearing partitions, ceilings, finishes. new mep work. building has no 13th flr, convenience stairs under separate permit; maher n/a | $1,389,225 |
| Aug 15, 2014 | Completed final sign-off Mar 2018 | 50 Fremont St | 12th floor: full floor t.i. for single tenant on 12th floor of 42 story bldg. new non-load bearing partitions, ceilings and finishes.new mech, elect, and plmg work. bldg has no 13th floor. convenience stairs under seperate pemit.n/a for the maher.Details
12th floor: full floor t.i. for single tenant on 12th floor of 42 story bldg. new non-load bearing partitions, ceilings and finishes.new mech, elect, and plmg work. bldg has no 13th floor. convenience stairs under seperate pemit.n/a for the maher. | $1,900,000 |
| Aug 15, 2014 | Completed final sign-off Mar 2018 | 50 Fremont St | 11th flr: full floor interior tenant improvement for single tenant on 42 story building, new non-load bearing partitions, ceilings & finishes, new mep work, building has no 13th flr, new convenience stairs from 11th 14th flr, filed under separate permit. maher n/aDetails
11th flr: full floor interior tenant improvement for single tenant on 42 story building, new non-load bearing partitions, ceilings & finishes, new mep work, building has no 13th flr, new convenience stairs from 11th 14th flr, filed under separate permit. maher n/a | $1,389,225 |
| Jul 3, 2014 | Completed final sign-off Jan 2015 | 901 Rankin St | installation of 6 stairs including rails and landing. 4 interior stairs and 2 exterior stair. each stair is from the ground floor (first floor) to the second floor. refernce permit 2013-0404-3755. maher-compliance with ordinance no.155-13. not required.Details
installation of 6 stairs including rails and landing. 4 interior stairs and 2 exterior stair. each stair is from the ground floor (first floor) to the second floor. refernce permit 2013-0404-3755. maher-compliance with ordinance no.155-13. not required. | $200,000 |
| Jun 27, 2014 | Completed final sign-off Feb 2015 | 600 Montgomery St | general contractor to remove abandoned existing stairway with associated drywall partitons. new structural steel beams, structural metal deck floor with concrete slab. reconstruct full height drywall partitionon 21st fl. maher not req 155-13Details
general contractor to remove abandoned existing stairway with associated drywall partitons. new structural steel beams, structural metal deck floor with concrete slab. reconstruct full height drywall partitionon 21st fl. maher not req 155-13 | $136,890 |
| Jan 13, 2014 | Completed final sign-off Feb 2016 | 55 02nd St | 12th & 14th flr structural for project under pa #2014.0113.6092 - existing communicaiton stair being replaced. (da checklist under #2012.0418.8562) compliance with ordinance #155-13 not required. excavation <50 cu yd.Details
12th & 14th flr structural for project under pa #2014.0113.6092 - existing communicaiton stair being replaced. (da checklist under #2012.0418.8562) compliance with ordinance #155-13 not required. excavation <50 cu yd. | $47,000 |
| Jan 13, 2014 | Completed final sign-off Feb 2016 | 55 02nd St | 12th & 14th flr t.i. includes (n) offices, open office areas, break area, meeting room etc. (n) elevator lobby upgrade, restrm upgrades, replace stair. all mech,elec,plbg,struct under separate permits. (demo under 2013.1211.3864). compliance with ordinance #155-13 not required. excavation <50 cu yd.Details
12th & 14th flr t.i. includes (n) offices, open office areas, break area, meeting room etc. (n) elevator lobby upgrade, restrm upgrades, replace stair. all mech,elec,plbg,struct under separate permits. (demo under 2013.1211.3864). compliance with ordinance #155-13 not required. excavation <50 cu yd. | $1,200,000 |
| Nov 12, 2013 | Completed final sign-off Oct 2014 | 50 Fremont St | new convenience stairs connecting floors 8, 9 and 10. ti under separate permitDetails
new convenience stairs connecting floors 8, 9 and 10. ti under separate permit | $65,386 |
| Nov 4, 2013 | Completed final sign-off Oct 2014 | 50 Fremont St | 9th & 10th floors-interior non structural demo-structural demo of 9th & 10th floors slab for future convenience stairs shown for reference only, scope of work filed under seperate permit. all work to comply with ab-017Details
9th & 10th floors-interior non structural demo-structural demo of 9th & 10th floors slab for future convenience stairs shown for reference only, scope of work filed under seperate permit. all work to comply with ab-017 | $200,000 |
| Oct 30, 2013 | Completed final sign-off Mar 2015 | 50 Fremont St | full floor tenant improvement on 8th fl mep and non load bearing partitions and ceiling. sprinkler and fire alarm and communicating stair on separate permitDetails
full floor tenant improvement on 8th fl mep and non load bearing partitions and ceiling. sprinkler and fire alarm and communicating stair on separate permit | $1,389,225 |
| Oct 30, 2013 | Completed final sign-off Mar 2015 | 50 Fremont St | full floor tenant improvement on 7 fl mep and non load bearing partitions and ceiling. sprinkler and fire alarm and communicating stair on separate permitDetails
full floor tenant improvement on 7 fl mep and non load bearing partitions and ceiling. sprinkler and fire alarm and communicating stair on separate permit | $1,389,225 |
| Aug 1, 2013 | Completed final sign-off Oct 2014 | 50 Fremont St | new convenient stairs for floors 5-7Details
new convenient stairs for floors 5-7 | $960,000 |
| Apr 26, 2013 | Completed final sign-off Oct 2014 | 50 Fremont St | 5th/6th/7th/8th floors-demo only floors 5, 6, 7, 8. all work to comply with ab-017. interior non structural demo. demo for convienience stairs on seperate permit-floor 7Details
5th/6th/7th/8th floors-demo only floors 5, 6, 7, 8. all work to comply with ab-017. interior non structural demo. demo for convienience stairs on seperate permit-floor 7 | $160,000 |
| Apr 15, 2013 | Completed final sign-off Dec 2013 | 615 Battery St | 5th floor:provide/install an intercommunicating stair between the fourth and fifth floor of 615 battery st.Details
5th floor:provide/install an intercommunicating stair between the fourth and fifth floor of 615 battery st. | $45,000 |
| Jan 23, 2013 | Completed final sign-off Jul 2014 | 60 Spear St | 3rd/4th/5th/6th floors-interior stair development including new floor openings & new stair compenents (floors 3 thru 6)Details
3rd/4th/5th/6th floors-interior stair development including new floor openings & new stair compenents (floors 3 thru 6) | $200,000 |
| Jan 15, 2013 | Never finaled issued Mar 2013, no final | 1355 Sansome St | partial demolition of floor slab at 4th floor. addition of new stair, not part of primary egress system, connecting floors 1,2,3,& 4th (pe cbc 2010708.2 ex 2 and ex 2.1, a shaft enclosure is not required). sprinklers and fire alarm separate permit.Details
partial demolition of floor slab at 4th floor. addition of new stair, not part of primary egress system, connecting floors 1,2,3,& 4th (pe cbc 2010708.2 ex 2 and ex 2.1, a shaft enclosure is not required). sprinklers and fire alarm separate permit. | $650,000 |
| Jan 14, 2013 | Completed final sign-off Oct 2014 | 50 Fremont St | installation of convenience stairs between floors levels 25 and 26. fire alarm submittal to reprogram 25 & 26 as a single zone.Details
installation of convenience stairs between floors levels 25 and 26. fire alarm submittal to reprogram 25 & 26 as a single zone. | $126,000 |
| Nov 20, 2012 | Completed final sign-off May 2013 | 1 Market St | renovation of existing interconnecting stair including new, non-structural walls & finishes and associated demolition.Details
renovation of existing interconnecting stair including new, non-structural walls & finishes and associated demolition. | $50,000 |
| Oct 3, 2012 | Completed final sign-off Jun 2014 | 50 Fremont St | 35th/36th/37th floors-new convenient stairs. ref. pa# 201207195289 & 201210031207Details
35th/36th/37th floors-new convenient stairs. ref. pa# 201207195289 & 201210031207 | $960,000 |
| Sep 21, 2012 | Completed final sign-off Aug 2013 | 615 Battery St | partial demoltion of an (e) inter communication stair enclosure, new work includes construction/upgrades of new 1 hour walls & 90 min rated doors frames & hardware to achieve 2 hour shaft enclosure around the existing stair. the stair is a convenience stair and not a compon of the exit.Details
partial demoltion of an (e) inter communication stair enclosure, new work includes construction/upgrades of new 1 hour walls & 90 min rated doors frames & hardware to achieve 2 hour shaft enclosure around the existing stair. the stair is a convenience stair and not a compon of the exit. | $31,000 |
| Jul 13, 2012 | Completed final sign-off Jun 2014 | 50 Fremont St | 32nd/33rd/34th floors-new convenient stairs for floors 32nd to 34th- sprinklers, mechanical and fire alarm separate permit- all three floors to become one zone-Details
32nd/33rd/34th floors-new convenient stairs for floors 32nd to 34th- sprinklers, mechanical and fire alarm separate permit- all three floors to become one zone- | $126,000 |