Wilson Lee
- Listed as
- engineer
- Firm
- Acies Engineering
- Based in
- Santa Clara
- On San Francisco permits
- Nov 2004 to Jul 2026
77 permits since 2000 (engineer on 77 permits): 47 completed, 10 in progress, 16 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 23, 2026 | In progress filed Jul 2026, not yet issued | 3251 20th Av | #222: (e) retail store ti converting to new restaurant (chagee tea shop). scope includes arch & mep work. all work is non-structural, new fixtures, finishes, & grease trap.Details
#222: (e) retail store ti converting to new restaurant (chagee tea shop). scope includes arch & mep work. all work is non-structural, new fixtures, finishes, & grease trap. | $350,000 | |
| Jun 24, 2026 | In progress issued Aug 2026 | 1390 Noriega St | Amone Corp | 1/f: interior tenant improvement to convert (e) office space to pharmacy on first floor. scope of work includes but not limited to interior demolition & new construction of partitions, ceilings, lighting, finishes, mep work. change exterior window to door, change storefront door to sliding doorDetails
1/f: interior tenant improvement to convert (e) office space to pharmacy on first floor. scope of work includes but not limited to interior demolition & new construction of partitions, ceilings, lighting, finishes, mep work. change exterior window to door, change storefront door to sliding door | $800,000 |
| Jun 17, 2026 | Completed final sign-off Oct 2026 | 801 Market St | Gray West Construction Inc | revision to bpa#202512040974. revise lighting layout per reflected ceiling plan, update lighting scheduleDetails
revision to bpa#202512040974. revise lighting layout per reflected ceiling plan, update lighting schedule | |
| May 27, 2026 | In progress issued Jul 2026 | 5238 Diamond Heights Bl | Paul Aboumrad General Contractor | non bearing int partitions, doors, hard ceilings, suspended ceilings, elec sub panels, receptacles, switches, light fixtures, mech ducting from e units, restrooms, mop sink, breakroom sink, water heater, millwork, finishes, ada upgradesDetails
non bearing int partitions, doors, hard ceilings, suspended ceilings, elec sub panels, receptacles, switches, light fixtures, mech ducting from e units, restrooms, mop sink, breakroom sink, water heater, millwork, finishes, ada upgrades | $714,756 |
| Dec 22, 2025 | Completed final sign-off Sep 2026 | 3360 Geary Bl | Paul Aboumrad General Contractor | 3/f suite 302: demolish (e) construction to accommodate new construction. work includes new non bearing interior partitions and doors, hard ceiling and modify (e) suspended ceiling, new mep, restrooms, millwork and finishes.Details
3/f suite 302: demolish (e) construction to accommodate new construction. work includes new non bearing interior partitions and doors, hard ceiling and modify (e) suspended ceiling, new mep, restrooms, millwork and finishes. | $372,470 |
| Dec 19, 2025 | In progress issued Feb 2026 | 801 Market St | Gray West Construction Inc | uniqlo: l1-l2 ellectrical upgrades including new lighting, distribution panel, power and signal devices throughout.Details
uniqlo: l1-l2 ellectrical upgrades including new lighting, distribution panel, power and signal devices throughout. | $10,000 |
| Sep 10, 2025 | In progress filed Sep 2025, not yet issued | 895 Ofarrell St | partial demolition of (e) partitions, restrooms etc. reconstruct interior partitions, entertainment area. install elevator, new code compliant exit stairs, new restrooms.Details
partial demolition of (e) partitions, restrooms etc. reconstruct interior partitions, entertainment area. install elevator, new code compliant exit stairs, new restrooms. | $2,500,000 | |
| Aug 28, 2025 | In progress filed Aug 2025, not yet issued | 601 23rd St | erect a one story, type 5b, storage building. see plans for more details.Details
erect a one story, type 5b, storage building. see plans for more details. | $500,000 | |
| Jul 29, 2025 | In progress issued Aug 2025 | 73 Erie St | new generator and associated wiring to support the project operation during power outrage. work inches new 100kw standby back up generator.Details
new generator and associated wiring to support the project operation during power outrage. work inches new 100kw standby back up generator. | $50,000 | |
| Jul 14, 2025 | Completed final sign-off Mar 2026 | 728 Pacific Av | Amone Corp | 2/f: partial ti of existing medical exam room and supporting spaces. 3/f: partial ti to expand open office space and provide conference room and restrooms. new non-bearing partitions, new finishes.Details
2/f: partial ti of existing medical exam room and supporting spaces. 3/f: partial ti to expand open office space and provide conference room and restrooms. new non-bearing partitions, new finishes. | $1,260,912 |
| Jul 1, 2025 | Completed final sign-off May 2026 | 1455 Stockton St | G Swanson Constr. Inc. | interior modification to an existing financial center modification teller line, addition and modification offices, finishes, furniture, and equipment. no changes to use, occupancy or floor area.Details
interior modification to an existing financial center modification teller line, addition and modification offices, finishes, furniture, and equipment. no changes to use, occupancy or floor area. | $435,000 |
| Jun 9, 2025 | In progress issued Jul 2025 | 73 Erie St | Bcci Construction Company | the scope of work includes a proposed type v, 1 story pre-fabricated trailer by others- plan approval #mac-cm 10067 along with associated flatwork. flatwork improvements including grading of onsite concrete and asphalt areas surrounding the building & the accessible paths of travel fromDetails
the scope of work includes a proposed type v, 1 story pre-fabricated trailer by others- plan approval #mac-cm 10067 along with associated flatwork. flatwork improvements including grading of onsite concrete and asphalt areas surrounding the building & the accessible paths of travel from | $70,000 |
| Dec 6, 2024 | Completed final sign-off Jan 2026 | 1 California St | Clune Construction Company L P | revision to permit 202406114142 revised restroom layout on ground and second floors. additional floor cores for low voltage stub-upsDetails
revision to permit 202406114142 revised restroom layout on ground and second floors. additional floor cores for low voltage stub-ups | $75,000 |
| May 31, 2024 | Completed final sign-off Feb 2025 | 111 Pine St | Turner Construction Co | revision to permit 202402075406. revision will be on 1/f and cellar interiorDetails
revision to permit 202402075406. revision will be on 1/f and cellar interior | |
| May 31, 2024 | Completed final sign-off Mar 2025 | 4098 24th St | G Swanson Constr. Inc. | alteration level 2: interior reconfiguration of office area, csr area, and back of house areas including wellness room, atm, and work room with new ceiling layout, finishes, and furniture.Details
alteration level 2: interior reconfiguration of office area, csr area, and back of house areas including wellness room, atm, and work room with new ceiling layout, finishes, and furniture. | $430,000 |
| Mar 25, 2024 | Completed final sign-off Jul 2026 | 121 07th St | E & C Builders Inc | floors 3-4 bldg a. install (n) temporary heaters and prvid power connectionsDetails
floors 3-4 bldg a. install (n) temporary heaters and prvid power connections | $266,000 |
| Mar 25, 2024 | Completed final sign-off Jul 2026 | 121 07th St | E & C Builders Inc | floors 1-2 bldg a. install (n) temporary heaters and provide power connections. max. 180 days per cbc 108Details
floors 1-2 bldg a. install (n) temporary heaters and provide power connections. max. 180 days per cbc 108 | $133,000 |
| Mar 19, 2024 | Completed final sign-off Aug 2024 | 3251 20th Av | Pacific Wide Builders Inc. | suite 116 pop mart - interior tenant fit out within existing space; work includes partitions/walls, wall fixtures, flooring, ceiling, light fixtures, mechanical & electricalDetails
suite 116 pop mart - interior tenant fit out within existing space; work includes partitions/walls, wall fixtures, flooring, ceiling, light fixtures, mechanical & electrical | $300,000 |
| Mar 18, 2024 | Completed final sign-off Oct 2025 | 2310 Fillmore St | Clune Construction Company L P | interior and exterior tenant improvement of (e) building. trades include ameps. storefront remodel associated with new tenant, citibank. no change of use, sq footage, or building height. no impacts to (e) egress. this permit is associated with 2023-007557 prj/cua.Details
interior and exterior tenant improvement of (e) building. trades include ameps. storefront remodel associated with new tenant, citibank. no change of use, sq footage, or building height. no impacts to (e) egress. this permit is associated with 2023-007557 prj/cua. | $2,000,000 |
| Jan 11, 2024 | Completed final sign-off Nov 2025 | 245 Winston Dr | Mid America Contracting Inc | (e) 1 story 4208 sq ft bank of america branch within stonestown galleria mall- ti: partial demo of interior spaces, new finishes, partions, mechanical, electrical, and plumbing equipment. no change of egress of occupancy.Details
(e) 1 story 4208 sq ft bank of america branch within stonestown galleria mall- ti: partial demo of interior spaces, new finishes, partions, mechanical, electrical, and plumbing equipment. no change of egress of occupancy. | $135,000 |
| Oct 31, 2023 | Completed final sign-off Aug 2024 | 303 02nd St | Hp Build | suite# 135 - t.i. of (e) space consisting of cafe kitchen and boh remodel w/ new kitchen, new partition walls. mep distribution modification.Details
suite# 135 - t.i. of (e) space consisting of cafe kitchen and boh remodel w/ new kitchen, new partition walls. mep distribution modification. | $250,000 |
| Oct 27, 2023 | In progress issued Mar 2024 | 121 07th St | E & C Builders Inc | electrical only new distribution panels & feeders. upgrade (e) electrical panel boards.Details
electrical only new distribution panels & feeders. upgrade (e) electrical panel boards. | $25,000 |
| Jul 11, 2023 | Never finaled issued Sep 2023, no final | 940 Sutter St | E & C Builders Inc | 7/f & 8/f: building mep upgrades. no architectural work. new roof equpment. (entire building upgrade in separate permits)Details
7/f & 8/f: building mep upgrades. no architectural work. new roof equpment. (entire building upgrade in separate permits) | $198,000 |
| Jul 11, 2023 | Never finaled issued Sep 2023, no final | 940 Sutter St | E & C Builders Inc | 5/f & 6/f: mep upgrades. no architectural work.Details
5/f & 6/f: mep upgrades. no architectural work. | $198,000 |
| Jul 6, 2023 | Completed final sign-off Oct 2024 | 1601 Mariposa St | K Bali Construction | tenant improvement new customer area, kitchen and equipment finishes, ceiling and lighting (first time tenant)Details
tenant improvement new customer area, kitchen and equipment finishes, ceiling and lighting (first time tenant) | $55,000 |
| Jul 5, 2023 | Never finaled issued Jul 2023, no final | 170 Maiden Ln | Sajo, Inc. | 4/f: partial remodel hvac design, of existing multi tenant bldg, work includes an additional fan coil unit and relocation of energy recovery ventilator. work also included relocation of electrical & mechanical equipment in the electrical room, minor flr plan and equipment rev per pa# 202212218908.Details
4/f: partial remodel hvac design, of existing multi tenant bldg, work includes an additional fan coil unit and relocation of energy recovery ventilator. work also included relocation of electrical & mechanical equipment in the electrical room, minor flr plan and equipment rev per pa# 202212218908. | $8,000 |
| Apr 4, 2023 | Completed final sign-off Nov 2023 | 1905 Union St | M C S Construction Services | revision to pa# 202211176757, adding opening into wall- needed structural plans & calculations,Details
revision to pa# 202211176757, adding opening into wall- needed structural plans & calculations, | |
| Nov 30, 2022 | Completed final sign-off Jun 2023 | 2252 Fillmore St | Castillo Builders Inc | ti: 1st/flr- remodel of former retail space to boba drink shop located on the 1st flr of a 4-story commercial bldg. scope includes 1-ada compliant restroom, new partitions, new doors, food service equip., casework, hvac, lighting & plumbing.Details
ti: 1st/flr- remodel of former retail space to boba drink shop located on the 1st flr of a 4-story commercial bldg. scope includes 1-ada compliant restroom, new partitions, new doors, food service equip., casework, hvac, lighting & plumbing. | $300,000 |
| Nov 7, 2022 | Never finaled issued Jul 2023, no final | 1528 Pine St | Gray West Construction Inc | 1/f & mezzanine - tenant improvement including new partitions, doors, ceilings, lighting, millwork, finishes & mep.Details
1/f & mezzanine - tenant improvement including new partitions, doors, ceilings, lighting, millwork, finishes & mep. | $500,000 |
| Nov 7, 2022 | Never finaled issued Jul 2023, no final | 1528 Pine St | Gray West Construction Inc | roof - tenant improvement including new electrical & mechanical systems.Details
roof - tenant improvement including new electrical & mechanical systems. | $100,000 |
| Nov 7, 2022 | Never finaled issued Jul 2023, no final | 1528 Pine St | Gray West Construction Inc | 2/f: t.i., new partitions, doors, ceiling, lighting, millwork, finishes, & mep. on the second floor, existing car lifts to be replaced with new lifts, weight to match existing equipment weight. structural work at second floor only.Details
2/f: t.i., new partitions, doors, ceiling, lighting, millwork, finishes, & mep. on the second floor, existing car lifts to be replaced with new lifts, weight to match existing equipment weight. structural work at second floor only. | $350,000 |
| Nov 7, 2022 | Never finaled issued Jul 2023, no final | 1528 Pine St | Gray West Construction Inc | basement t.i., new floor finishes, new interior wall finishes, electrical system, mechanical & plumbingDetails
basement t.i., new floor finishes, new interior wall finishes, electrical system, mechanical & plumbing | $150,000 |
| Nov 3, 2022 | Never finaled issued Dec 2022, no final | 3251 20th Av | Deb Construction Llc | minor changes to mep. ref pa# 202201316962.Details
minor changes to mep. ref pa# 202201316962. | $35,000 |
| Oct 28, 2022 | Completed final sign-off Nov 2023 | 2270 Jerrold Av | Ferma Corporation | demolition of type v, 1-story office.Details
demolition of type v, 1-story office. | $60,000 |
| Oct 19, 2022 | In progress issued Dec 2023 | 140 14th St | Richlen Construction | install 20 ev chargers for 40 vehicles. convert from vehicle storage lot to fleet charging use.Details
install 20 ev chargers for 40 vehicles. convert from vehicle storage lot to fleet charging use. | $500,000 |
| Oct 11, 2022 | Expired or cancelled cancelled Jan 2025 | 445 Sutter St | change of use from (e) mercantile to (n) limited restaurant. interior t.i., no exterior work. demo of non-structural walls, partitions & finishes. new mep, including cooking equipment, hood, floor sinks, hvac & lighting. new ada bathroom.Details
change of use from (e) mercantile to (n) limited restaurant. interior t.i., no exterior work. demo of non-structural walls, partitions & finishes. new mep, including cooking equipment, hood, floor sinks, hvac & lighting. new ada bathroom. | $177,810 | |
| Sep 20, 2022 | Never finaled issued Oct 2022, no final | 300 Post St | Sajo, Inc., Shawmut Woodworking & Supply Inc | 2/f: remodel of existing center. work includes non structural partitions, ceiling, furniture, finishes and related hvac, electrical and plumbing work. remodel of 3/f existing tenant open work area, including voluntary ada restroom. upgrade, storage, furniture and related hvac, elec. and plumbing.Details
2/f: remodel of existing center. work includes non structural partitions, ceiling, furniture, finishes and related hvac, electrical and plumbing work. remodel of 3/f existing tenant open work area, including voluntary ada restroom. upgrade, storage, furniture and related hvac, elec. and plumbing. | $104,180 |
| Jun 10, 2022 | Completed final sign-off Feb 2025 | 945 Market St | Skyline Construction | 2021/1220/revision to pa# 202112204753 & pa# 202202027170. scope of work includes revised egress path, revision to mep sheets & to add food service, please see memorandum attached to form 3 for details. ** maher: n/a **Details
2021/1220/revision to pa# 202112204753 & pa# 202202027170. scope of work includes revised egress path, revision to mep sheets & to add food service, please see memorandum attached to form 3 for details. ** maher: n/a ** | $775,996 |
| Mar 3, 2022 | Completed final sign-off Sep 2023 | 680 Folsom St | Novo Construction Inc | 12th fl: tenant improvement of an (e) space. removal of interior non-load bearing partitions, millwork, & flooring. new millwork, minor electrical & lighting changer, new finishes & furniture.Details
12th fl: tenant improvement of an (e) space. removal of interior non-load bearing partitions, millwork, & flooring. new millwork, minor electrical & lighting changer, new finishes & furniture. | $300,000 |
| Mar 3, 2022 | Completed final sign-off Sep 2023 | 680 Folsom St | Novo Construction Inc | 11th fl: tenant improvement of an (e) space. removal of millwork, minor electrical & lighting changer, new finishes & furniture.Details
11th fl: tenant improvement of an (e) space. removal of millwork, minor electrical & lighting changer, new finishes & furniture. | $250,000 |
| Jan 31, 2022 | Completed final sign-off Apr 2023 | 3251 20th Av | Deb Construction Llc | op190: change occupancy from restaurant to lending institution. t.i. including exterior storefront with structural columns & headers, interior non-bearing partitions, millwork, & interior finishes. mechanical, electrical power & lighting. plumbing fixtures. deferred fire & signage.Details
op190: change occupancy from restaurant to lending institution. t.i. including exterior storefront with structural columns & headers, interior non-bearing partitions, millwork, & interior finishes. mechanical, electrical power & lighting. plumbing fixtures. deferred fire & signage. | $812,000 |
| Jan 28, 2022 | Completed final sign-off Jun 2022 | 728 Pacific Av | Amone Corp | suite 115: revision to permit 202108045808. update layout.Details
suite 115: revision to permit 202108045808. update layout. | $10,000 |
| Dec 15, 2021 | Completed final sign-off Nov 2022 | 1798 19th Av | Transworld Construction | 1st floor. partial floor interior ti for a new ambulatory medical facility on g/f. selective demo, partitions, ceilings, lighting, mep, & limited structural limited to new slab infill.Details
1st floor. partial floor interior ti for a new ambulatory medical facility on g/f. selective demo, partitions, ceilings, lighting, mep, & limited structural limited to new slab infill. | $256,800 |
| Oct 18, 2021 | Completed final sign-off Jun 2024 | 2574 San Bruno Av | Transworld Construction | tenant improvement: upgrade lighting, millwork and finishes. ref. pa 201504012520.Details
tenant improvement: upgrade lighting, millwork and finishes. ref. pa 201504012520. | $150,000 |
| Oct 8, 2021 | Completed final sign-off Jul 2022 | 1390 Market St | Clune Construction Company L P | g/f suite 109: a 2542 sq. ft. single tenant improvement for medical office. no exterior modification. tenant improvement for non-emergency medical office.Details
g/f suite 109: a 2542 sq. ft. single tenant improvement for medical office. no exterior modification. tenant improvement for non-emergency medical office. | $850,000 |
| Sep 17, 2020 | Completed final sign-off Nov 2021 | 1 Warriors Wy | Build Group Inc. | revision to permit #2019-1025-5629 to deduct work scope to mechanical, structural & architectural work scope.Details
revision to permit #2019-1025-5629 to deduct work scope to mechanical, structural & architectural work scope. | |
| Mar 13, 2020 | Expired or cancelled cancelled Jul 2024 | 728 Pacific Av | suite #118: wall to be infilled. new storefront system with new door. all previous finishes to be removed and replaced with new finishes. light fixtures to be removed and replaced with new light fixtures. new dedicated hvac unit in ceiling space for this space.Details
suite #118: wall to be infilled. new storefront system with new door. all previous finishes to be removed and replaced with new finishes. light fixtures to be removed and replaced with new light fixtures. new dedicated hvac unit in ceiling space for this space. | $20,000 | |
| Oct 8, 2019 | Completed final sign-off Dec 2019 | 5 The Embarcadero | Ssw Construction Corp | philz coffee: equipment replacement for barista, new door to scullery, handsink added for health/convenience at barista. additional existing door activated/made operational for existing. new point of sale location. new cabinetry at customer area. maher naDetails
philz coffee: equipment replacement for barista, new door to scullery, handsink added for health/convenience at barista. additional existing door activated/made operational for existing. new point of sale location. new cabinetry at customer area. maher na | $150,000 |
| Aug 6, 2019 | Completed final sign-off Jul 2020 | 728 Pacific Av | suite #200: removal/demolition of (e) interior non-structural elements, new walls & doors for interior offices & rooms, new restrooms, new lighting, new interior finishes. maher naDetails
suite #200: removal/demolition of (e) interior non-structural elements, new walls & doors for interior offices & rooms, new restrooms, new lighting, new interior finishes. maher na | $400,000 | |
| Apr 12, 2019 | Completed final sign-off Jul 2019 | 440 Turk St | Polr Electric | install all new electrical on drawings including sub panels, power, lighting and t-24. electrical only. reference p.a. #2018 1030 4528Details
install all new electrical on drawings including sub panels, power, lighting and t-24. electrical only. reference p.a. #2018 1030 4528 | $500,000 |
| Apr 9, 2019 | Completed final sign-off Nov 2019 | 2300 16th St | Reeve-Knight Construction Inc. | suite 220: t.i. improvement in (e) retail space, new walls, doors, lighting, power, plumbing, mechanical/duct work. n/a maher ref demo pa 2019-0606-2778.Details
suite 220: t.i. improvement in (e) retail space, new walls, doors, lighting, power, plumbing, mechanical/duct work. n/a maher ref demo pa 2019-0606-2778. | $1,400,000 |
| Mar 15, 2019 | Completed final sign-off Nov 2019 | 1455 Stockton St | G Swanson Constr. Inc. | interior ti new partial height partitions. new wellness room, new unisex restroom ada teller accessibility compliance, new lighting,mepDetails
interior ti new partial height partitions. new wellness room, new unisex restroom ada teller accessibility compliance, new lighting,mep | $860,000 |
| Feb 21, 2019 | Completed final sign-off Mar 2021 | 3060 Fillmore St | Build Group Inc. | core & shell- minor exterior work. new wall access opening. new elec and gas room, new restrooms, exit corridor & finishes. roof top mech platform. building remain vacant & future tenants requires ti permits.Details
core & shell- minor exterior work. new wall access opening. new elec and gas room, new restrooms, exit corridor & finishes. roof top mech platform. building remain vacant & future tenants requires ti permits. | $750,000 |
| Feb 1, 2019 | Never finaled filed Feb 2019, never issued | 425 Mission St | tjpa first ti for street level coffee shop suite 100. scope to include instalation of new gysum board walls & ceilings, millwork, finishes & food servie equip. mech, elec & plumbing systems.Details
tjpa first ti for street level coffee shop suite 100. scope to include instalation of new gysum board walls & ceilings, millwork, finishes & food servie equip. mech, elec & plumbing systems. | $500,000 | |
| Jun 15, 2018 | Completed final sign-off Jan 2019 | 1945 Irving St | G Swanson Constr. Inc. | t.i. of extg bank of america. interior scope includes new partitions, restroom and breakroom. regrade exterior sidewalk to provide level landing at main entry door and extg atm and night depository.Details
t.i. of extg bank of america. interior scope includes new partitions, restroom and breakroom. regrade exterior sidewalk to provide level landing at main entry door and extg atm and night depository. | $750,000 |
| Jun 11, 2018 | Completed final sign-off Dec 2019 | 2234 Polk St | Tri-Quest Builders & Developers Inc | change of use from bookstore to coffee shop. tenant improvement incl electrical, plumbing, mechanical & interior partitions. maher n/a.Details
change of use from bookstore to coffee shop. tenant improvement incl electrical, plumbing, mechanical & interior partitions. maher n/a. | $350,000 |
| Nov 7, 2017 | Never finaled issued Nov 2017, no final | 650 California St | Bcci Construction Company | 30th floor - interior tenant improvement of an existing space. new partitions, new millwork, countertops, fixtures, m.e.p., card reader in elevator lobby. n/a maher ordinanceDetails
30th floor - interior tenant improvement of an existing space. new partitions, new millwork, countertops, fixtures, m.e.p., card reader in elevator lobby. n/a maher ordinance | $1,500,000 |
| Oct 30, 2017 | Completed final sign-off Jan 2023 | 33 New Montgomery St | G Swanson Constr. Inc., Clune Construction Company L P | replacement of existing atm's with atm's. minor electrical, structural. change one office & one atm room to a training room. n/a maher ordinanceDetails
replacement of existing atm's with atm's. minor electrical, structural. change one office & one atm room to a training room. n/a maher ordinance | $175,000 |
| Jul 13, 2017 | Never finaled issued Jan 2018, no final | 110 Channel | Terra Nova Industries | tenant improvement for fitness training studio. new bldg pa#201408133766 sprinkler and fire alarm separte permit.Details
tenant improvement for fitness training studio. new bldg pa#201408133766 sprinkler and fire alarm separte permit. | $300,000 |
| May 15, 2017 | Never finaled issued May 2017, no final | 90 New Montgomery St | Angotti & Reilly Inc. | 2/f #250- t.i. for an office space in an existing multi story office bldg. scope includes new gypsum board walls, millwork, minor electrical, plumbing & hvac, paint & finishes. n/a ordinance #155-13Details
2/f #250- t.i. for an office space in an existing multi story office bldg. scope includes new gypsum board walls, millwork, minor electrical, plumbing & hvac, paint & finishes. n/a ordinance #155-13 | $141,000 |
| Sep 29, 2016 | Completed final sign-off Dec 2016 | 5900 03rd St | P S R West Coast Builders Inc | revision to pa #201602089065 - tenant improvement for new coffee bar in (e) reatil market.Details
revision to pa #201602089065 - tenant improvement for new coffee bar in (e) reatil market. | $65,000 |
| Aug 23, 2016 | Never finaled issued Sep 2016, no final | 150 Columbus Av | Bobby Castle Construction | ground floor t.i. space for 'gohealth' clinic #308 - new work includes partitions, doors, ceilings, mechanical, ducts & diffusers, plumbing, electricla & lighting.Details
ground floor t.i. space for 'gohealth' clinic #308 - new work includes partitions, doors, ceilings, mechanical, ducts & diffusers, plumbing, electricla & lighting. | $430,000 |
| Jul 26, 2016 | Completed final sign-off Feb 2017 | 3259 Pierce St | Bobby Castle Construction | g/f -change of use to clinic; ti space for go health: demo of interior non structural eleements, new plumbing, interior walls and doors, restrooms, ceilings, ducts, lighting; separate sprinkler permit. rear patio for employees onlyDetails
g/f -change of use to clinic; ti space for go health: demo of interior non structural eleements, new plumbing, interior walls and doors, restrooms, ceilings, ducts, lighting; separate sprinkler permit. rear patio for employees only | $430,000 |
| Jun 16, 2016 | Completed final sign-off Mar 2017 | 1245 South Van Ness Av | Tilton Pacific Const Inc. | t-i for new grocery story within existing building that previously house a grocery store. construction to includes new offices, refrigeration to hvac equipment to new store fixtures.Details
t-i for new grocery story within existing building that previously house a grocery store. construction to includes new offices, refrigeration to hvac equipment to new store fixtures. | $850,000 |
| Jun 9, 2016 | Completed final sign-off Dec 2016 | 5900 03rd St | P S R West Coast Builders Inc | revision to pa #201603172292 - revision of sales area light fixtures. n/a maher ordinanceDetails
revision to pa #201603172292 - revision of sales area light fixtures. n/a maher ordinance | |
| Jun 1, 2016 | Completed final sign-off Nov 2018 | 2701 Mission St | G Swanson Constr. Inc. | tenant improvement to (e)bank: scope includes demolition of non-bearing partitions,atms,teller line,acoustic ceiling & removal of furniture & finishes.(e)restrooms,stairs,night drop & vault to remain,new scope includes offices,breakroom,tellerline,doors,millwork,floor finish & associated hvac,a/v &Details
tenant improvement to (e)bank: scope includes demolition of non-bearing partitions,atms,teller line,acoustic ceiling & removal of furniture & finishes.(e)restrooms,stairs,night drop & vault to remain,new scope includes offices,breakroom,tellerline,doors,millwork,floor finish & associated hvac,a/v & | $900,000 |
| Apr 25, 2016 | Completed final sign-off Nov 2016 | 2282 Market St | Bobby Castle Construction | #301 - t. i. build out for gohealth urgent care.Details
#301 - t. i. build out for gohealth urgent care. | $430,000 |
| Dec 28, 2015 | Expired or cancelled expired Feb 2025 | 999 Van Ness Av | S F Garage Company Inc., Build Group Inc. | new mechanical, electrical & plumbing system per plans. no change to existing occupancy.Details
new mechanical, electrical & plumbing system per plans. no change to existing occupancy. | $100,000 |
| Nov 12, 2015 | Completed final sign-off Apr 2016 | 3251 20th Av | Del Smith Design Build | ste 138: relocation and expansion of an established massage therapy in ground level, scope includes wall partitions, suspended ceiling, electrical, mechanical and plumbing.Details
ste 138: relocation and expansion of an established massage therapy in ground level, scope includes wall partitions, suspended ceiling, electrical, mechanical and plumbing. | $95,000 |
| Apr 21, 2015 | Completed final sign-off Feb 2016 | 1019 Clement St | Amone Corp | interior iprovement of pharmacy, offices, restrooms and mezzanine office. n/a ordinance #155-13.Details
interior iprovement of pharmacy, offices, restrooms and mezzanine office. n/a ordinance #155-13. | $250,000 |
| Jun 30, 2014 | Never finaled issued Jul 2014, no final | 415 Jackson St | toilet room upgrade. maher- compliance with ordinance no. 155-13. not required. barrier removal.Details
toilet room upgrade. maher- compliance with ordinance no. 155-13. not required. barrier removal. | $48,000 | |
| Feb 5, 2013 | Completed final sign-off Feb 2014 | 6333 Geary Bl | Tilton Pacific Const Inc. | tenant improvement to(e) 12,544 sf building(formerly cala foods/ delanos)new partitions, ceilings, lighting, finishes, fixtures, associated plumbing, elec, refrig, new hvac & distribution work, new steel canopy at entry area, replace auto sliding entry doors with new accessible parking lot striping.Details
tenant improvement to(e) 12,544 sf building(formerly cala foods/ delanos)new partitions, ceilings, lighting, finishes, fixtures, associated plumbing, elec, refrig, new hvac & distribution work, new steel canopy at entry area, replace auto sliding entry doors with new accessible parking lot striping. | $900,000 |
| Sep 10, 2012 | Never finaled issued Sep 2012, no final | 1095 Hyde St | P S R West Coast Builders Inc | revision to appl #2012.0530.1508 - minor lighting revision, no other work.Details
revision to appl #2012.0530.1508 - minor lighting revision, no other work. | |
| Jul 13, 2012 | Completed final sign-off Feb 2020 | 645 Larkin St | All Applied Construction Inc | change of use. tenant improvement of former tatoo parlor to restaurant on ground floor.Details
change of use. tenant improvement of former tatoo parlor to restaurant on ground floor. | $238,000 |
| Aug 6, 2008 | Expired or cancelled expired Dec 2009 | 2552 Taylor St | revision to pa# 2007-04-05-8156-r1. revise storefront at entry lobby and entrance, relocate market place display area, relocate chairwall display area, replace drinking fountain, revise electrical lighting to accomodate display relocation.Details
revision to pa# 2007-04-05-8156-r1. revise storefront at entry lobby and entrance, relocate market place display area, relocate chairwall display area, replace drinking fountain, revise electrical lighting to accomodate display relocation. | $115,000 | |
| May 29, 2008 | Completed final sign-off Jul 2008 | 3251 20th Av | ti for existing retail space. construct new extended display walls, new display fixtures for sales merchandise, add 4 light fixtures and new outlet locations. (stonestown galleria)Details
ti for existing retail space. construct new extended display walls, new display fixtures for sales merchandise, add 4 light fixtures and new outlet locations. (stonestown galleria) | $14,000 | |
| Nov 10, 2004 | Completed final sign-off Mar 2005 | 266 Cumberland St | to comply with nov# 200119518 (ced) & order of abatement # 8029-a. remove kitchen at lower floorDetails
to comply with nov# 200119518 (ced) & order of abatement # 8029-a. remove kitchen at lower floor |