Block 0629, lot 042
2252 Fillmore St
- City’s use
- Commercial Office
- Built
- 1906
- Stories
- 4
- Units
- 10
- Rooms
- 5 bathrooms
- Building
- 9,600 sq ft
- Lot
- 2,321 sq ft
- Zoning
- FILLMR
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
17 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 23, 2025 | Completed final sign-off Oct 2025 | 2252 Fillmore St | A B W Construction Inc, V And G Builders | interior remodel of existing commercial mercantile space on the gr fl or a 3 story building. no change of occupancy, no structural work, no change to building envelope or facade. limited restaurane use.Details
interior remodel of existing commercial mercantile space on the gr fl or a 3 story building. no change of occupancy, no structural work, no change to building envelope or facade. limited restaurane use. | $75,000 |
| Apr 27, 2023 | Never finaled issued Apr 2023, no final | 2252 Fillmore St | Ningzhi Hu Signs Company | 1-illuminated wall single-faced sign #1 "zero& reimagined tea & boba"Details
1-illuminated wall single-faced sign #1 "zero& reimagined tea & boba" | $800 |
| Apr 27, 2023 | Never finaled issued Apr 2023, no final | 2252 Fillmore St | Ningzhi Hu Signs Company | 1-illuminated wall single-faced sign #2 "0& " led blade signDetails
1-illuminated wall single-faced sign #2 "0& " led blade sign | $500 |
| Nov 30, 2022 | Completed final sign-off Jun 2023 | 2252 Fillmore St | Castillo Builders Inc | ti: 1st/flr- remodel of former retail space to boba drink shop located on the 1st flr of a 4-story commercial bldg. scope includes 1-ada compliant restroom, new partitions, new doors, food service equip., casework, hvac, lighting & plumbing.Details
ti: 1st/flr- remodel of former retail space to boba drink shop located on the 1st flr of a 4-story commercial bldg. scope includes 1-ada compliant restroom, new partitions, new doors, food service equip., casework, hvac, lighting & plumbing. | $300,000 |
| May 23, 2017 | Never finaled issued May 2017, no final | 2252 Fillmore St | street spaceDetails
street space | ||
| Nov 21, 2014 | Completed final sign-off Jun 2017 | 2252 Fillmore St | Sage Building Company | because of a hidden beam, open the gondola docking area to the rear alley. revision to pa#201303182446 no new building footprint expansion.Details
because of a hidden beam, open the gondola docking area to the rear alley. revision to pa#201303182446 no new building footprint expansion. | |
| Jul 11, 2013 | Completed final sign-off Apr 2014 | 2252 Fillmore St | Sage Building Company | install new tbar and gyboard ceiling to hide pipes and mechanical ducts per plan.Details
install new tbar and gyboard ceiling to hide pipes and mechanical ducts per plan. | $6,020 |
| Mar 18, 2013 | Completed final sign-off Jun 2017 | 2252 Fillmore St | Sage Building Company | remove 2 skylights & 2 windows @ rear of building to build a shed as the docking area of garbage gondolas.Details
remove 2 skylights & 2 windows @ rear of building to build a shed as the docking area of garbage gondolas. | $64,000 |
| Nov 16, 2012 | Completed final sign-off Feb 2013 | 2252 Fillmore St | John L Potter Medical Gas System | central piping system for 02 n20 to 4 use points. ti 201208137254Details
central piping system for 02 n20 to 4 use points. ti 201208137254 | $3,000 |
| Oct 16, 2012 | Expired or cancelled cancelled Jan 2026 | 2252 Fillmore St | expand 52 sq ft into lightwell for a waiting area. install counter with sink for coffee makingDetails
expand 52 sq ft into lightwell for a waiting area. install counter with sink for coffee making | $10,000 | |
| Aug 13, 2012 | Completed final sign-off Feb 2013 | 2252 Fillmore St | Professional Commercial Interiors Inc | t.i work for a new dental office (b-67) from a vacant office space (b-10). install 2 ada restrooms, level rear of space to eliminate ramp for accessDetails
t.i work for a new dental office (b-67) from a vacant office space (b-10). install 2 ada restrooms, level rear of space to eliminate ramp for access | $135,400 |
| Dec 2, 2011 | Completed final sign-off Dec 2011 | 2252 Fillmore St | install postal boxes at gr fl lobby. shall not encroach into the required width of hallway.Details
install postal boxes at gr fl lobby. shall not encroach into the required width of hallway. | $350 | |
| Apr 29, 2011 | Completed final sign-off Jul 2011 | 2252 Fillmore St | The Window Specialist | replace 10 windows in-kind reproduction replacement. visible from the street. max u value is 0.4.Details
replace 10 windows in-kind reproduction replacement. visible from the street. max u value is 0.4. | $21,950 |
| Jun 27, 2007 | Never finaled issued Jun 2007, no final | 2250 Fillmore St | street space & side walk permit.Details
street space & side walk permit. | ||
| Jan 16, 2003 | Completed final sign-off Mar 2003 | 2252 Fillmore St | oti-2 4/f el meDetails
oti-2 4/f el me | $100 | |
| Jan 3, 2003 | Completed final sign-off Mar 2003 | 2252 Fillmore St | oti-1, 4th floor, elDetails
oti-1, 4th floor, el | $11,400 | |
| Jul 22, 2002 | Never finaled issued Jul 2002, no final | 2252 Fillmore St | Young's Roofing, Inc. | app180 & composition reroofing workDetails
app180 & composition reroofing work | $7,500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Sage Building Company (3), Ningzhi Hu Signs Company (2), A B W Construction Inc, Castillo Builders Inc, John L Potter Medical Gas System, Professional Commercial Interiors Inc, The Window Specialist, V And G Builders, Young's Roofing, Inc.
- Architects
- Heston Chau (5), Henry Kwong, Michael Baushke
- Engineers
- Christian Natalus Dalimarta, Wilson Lee
- Authorized agent-otherss
- Yifeng Yu (2), Eduardo Negrete
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.