Block 5981, lot 011
2574 San Bruno Ave
- City’s use
- Commercial Office
- Built
- 2010
- Stories
- 2
- Rooms
- 10 bathrooms
- Building
- 22,920 sq ft
- Lot
- 8,119 sq ft
- Zoning
- NC2
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
21 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 2, 2026 | In progress filed Sep 2026, not yet issued | 2574 San Bruno Av | remove and replace (e) wood siding with (n) aluminum sidingDetails
remove and replace (e) wood siding with (n) aluminum siding | $45,000 | |
| Jun 8, 2026 | In progress filed Jun 2026, not yet issued | 2574 San Bruno Av | remove and replace existing mechanical rooftop unit.Details
remove and replace existing mechanical rooftop unit. | $10,000 | |
| Oct 18, 2021 | Completed final sign-off Jun 2024 | 2574 San Bruno Av | Transworld Construction | tenant improvement: upgrade lighting, millwork and finishes. ref. pa 201504012520.Details
tenant improvement: upgrade lighting, millwork and finishes. ref. pa 201504012520. | $150,000 |
| Dec 17, 2015 | Completed final sign-off Jan 2016 | 2574 San Bruno Av | San Francisco Fire Protection | as-builts to pa #201511203212 - relocate 2 existing notificatoin appliances to new location.Details
as-builts to pa #201511203212 - relocate 2 existing notificatoin appliances to new location. | |
| Nov 30, 2015 | Never finaled issued Dec 2015, no final | 2574 San Bruno Av | Transworld Construction | revision to app# 201504012520. add approx 8 l.f of non-bearing glass partition.Details
revision to app# 201504012520. add approx 8 l.f of non-bearing glass partition. | |
| Nov 20, 2015 | Completed final sign-off Jan 2016 | 2574 San Bruno Av | San Francisco Fire Protection | due to the interior remodeling on 1st floor, one ceiling mount strobe will be install & tie-in existing notification circuit. three exist devices will be relocate to new location. new & exst devices will be connect to exst control panel. ti pa# 201504012520Details
due to the interior remodeling on 1st floor, one ceiling mount strobe will be install & tie-in existing notification circuit. three exist devices will be relocate to new location. new & exst devices will be connect to exst control panel. ti pa# 201504012520 | $2,000 |
| Oct 27, 2015 | Never finaled issued Oct 2015, no final | 2574 San Bruno Av | street space permitDetails
street space permit | ||
| Jun 1, 2015 | Never finaled issued Dec 2015, no final | 2574 San Bruno Av | Transworld Construction | mechanical system for air electrical and plumbing for new equipmentDetails
mechanical system for air electrical and plumbing for new equipment | $50,000 |
| Apr 1, 2015 | Completed final sign-off Dec 2015 | 2574 San Bruno Av | Transworld Construction | convert medical exam room to dental clinic. convert storage room to x-ray. 5/29/15 mc slip sheets per mech comments:revised some pg & add 00a e00b/ e0.1/e0.2/e.03/e1.0/e1.1/e2.2/e3.0/e3.1e3.2Details
convert medical exam room to dental clinic. convert storage room to x-ray. 5/29/15 mc slip sheets per mech comments:revised some pg & add 00a e00b/ e0.1/e0.2/e.03/e1.0/e1.1/e2.2/e3.0/e3.1e3.2 | $130,000 |
| Jul 29, 2013 | Never finaled issued Jul 2013, no final | 2574 San Bruno Av | street spaceDetails
street space | ||
| Feb 17, 2010 | Completed final sign-off Mar 2010 | 2574 San Bruno Av | Titan Electrical Construction Inc | (2) horn strobes, (2) monitor modules (4) relay for door, due to field changes. revision to application 200906220917.Details
(2) horn strobes, (2) monitor modules (4) relay for door, due to field changes. revision to application 200906220917. | $2,000 |
| Jan 13, 2010 | Completed final sign-off Mar 2010 | 2574 San Bruno Av | Priority Architectural Graphics Dba Prio | eleven evacuation signs for sffd review only. pa#n 2007.07.31.8322 for new construction, issued but not completed yet.Details
eleven evacuation signs for sffd review only. pa#n 2007.07.31.8322 for new construction, issued but not completed yet. | $2,400 |
| Aug 18, 2009 | Never finaled issued Aug 2009, no final | 2574 San Bruno Av | street space permitDetails
street space permit | ||
| Aug 6, 2009 | Completed final sign-off Mar 2010 | 2574 San Bruno Av | Aaa Restaurant Fire Control/Dba Aaa Fire | install 6" underground piping (ductile iron) for fire service.Details
install 6" underground piping (ductile iron) for fire service. | $6,000 |
| Jun 22, 2009 | Completed final sign-off Mar 2010 | 2574 San Bruno Av | Titan Electrical Construction Inc | fire alarm basement, 1st, 2nd, roofDetails
fire alarm basement, 1st, 2nd, roof | $16,700 |
| Jun 22, 2009 | Expired or cancelled cancelled Mar 2010 | 2574 San Bruno Av | Transworld Construction | rev.to appl.200707318322 s3/r1.1)add it server room @ bsmt fl.2 modify signage type & location per code. 3-revise room identification signs. 4) add fire damper @ 1 hr fr wall due occupancy separation. 5)mod.stair dimensions at basement per code req. 6) modify glazzing sizes door hardwaresand type.Details
rev.to appl.200707318322 s3/r1.1)add it server room @ bsmt fl.2 modify signage type & location per code. 3-revise room identification signs. 4) add fire damper @ 1 hr fr wall due occupancy separation. 5)mod.stair dimensions at basement per code req. 6) modify glazzing sizes door hardwaresand type. | $20,000 |
| Jan 30, 2009 | Never finaled issued Jan 2009, no final | 2574 San Bruno Av | street spaceDetails
street space | ||
| Dec 29, 2008 | Completed final sign-off Apr 2010 | 2574 San Bruno Av | Aaa Restaurant Fire Control/Dba Aaa Fire | new sprinkler system per nfpa 13, 358 heads.Details
new sprinkler system per nfpa 13, 358 heads. | $60,000 |
| May 1, 2008 | Completed final sign-off Mar 2010 | 2574 San Bruno Av | Transworld Construction | shoring and underpinning the street property adjoining a new building site.Details
shoring and underpinning the street property adjoining a new building site. | $30,000 |
| Jul 31, 2007 | Completed final sign-off Apr 2010 | 2574 San Bruno Av | Transworld Construction | erect 2-story, type 5, 1-hr medical clinic building with basement.Details
erect 2-story, type 5, 1-hr medical clinic building with basement. | $4,000,000 |
| Jul 31, 2007 | Completed final sign-off Mar 2010 | 2574 San Bruno Av | Peak Engineering Inc | demolish 1-story recreation building.Details
demolish 1-story recreation building. |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.