Neil Joson
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Sj Engineers
- Based in
- San Francisco
- On San Francisco permits
- Aug 2001 to Jun 2026
21 permits since 2000 (engineer on 19 permits, architect on 1 permit, authorized agent-others on 1 permit): 10 completed, 7 in progress, 3 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 4, 2026 | In progress issued Aug 2026 | 235 Stockton St | Singular Builders | (n) interior build-out. will consist of (n) custom millwork island , (n) food service equipment, new mechanical exhaust system and fire suppression system, new interior finishes, flour, paint and tile, new non load bearing, furring partition, revised fin/life safety/information, revise fire alarmDetails
(n) interior build-out. will consist of (n) custom millwork island , (n) food service equipment, new mechanical exhaust system and fire suppression system, new interior finishes, flour, paint and tile, new non load bearing, furring partition, revised fin/life safety/information, revise fire alarm | $1,030,000 |
| Mar 24, 2026 | Completed final sign-off Jul 2026 | 201 Spear St | Hathaway Dinwiddie Co. | deferred mep for office ti permit 202603036821. spec suites 250 and 270.Details
deferred mep for office ti permit 202603036821. spec suites 250 and 270. | $200,000 |
| Sep 22, 2025 | In progress issued May 2026 | 1200 Carroll Av | Swinerton Builders | site permit-1 of 4, site design for the new san francisco fire department division of training facility. work includes general site design, egress and site utilities.Details
site permit-1 of 4, site design for the new san francisco fire department division of training facility. work includes general site design, egress and site utilities. | $37,433,135 |
| Jun 2, 2025 | In progress issued Jul 2026 | 880 Mcallister St | Guzman Construction Group Inc. | 100% afforable senior housing for a 104,000sf type 1, 7 story/115 unit with commerical ground floor. 81 1-bedroom and 35-2 bedroom units. 2 ground floor landscape courtyard and roof terrace.Details
100% afforable senior housing for a 104,000sf type 1, 7 story/115 unit with commerical ground floor. 81 1-bedroom and 35-2 bedroom units. 2 ground floor landscape courtyard and roof terrace. | $70,000,000 |
| Apr 16, 2025 | In progress issued Jul 2026 | 245 East Clementina St | Swinerton Builders | project is commercial t.i.for non-profit childcare facility ages 0-5 w/in (e) residential building. inclds. 4 classrooms, for infant-toddlers and pre-school + administrative areas and 2 outdoor play areas. existing core and shell warm shell conditions to remain.Details
project is commercial t.i.for non-profit childcare facility ages 0-5 w/in (e) residential building. inclds. 4 classrooms, for infant-toddlers and pre-school + administrative areas and 2 outdoor play areas. existing core and shell warm shell conditions to remain. | $1,821,294 |
| May 17, 2024 | In progress issued Mar 2025 | 375 Woodside Av | modernize (e)elevator & provide(n)machine room access.remodel two (e) restroom on level 1 for ada accessibility. alternate 1: remodel two (e) restrooms on level 2 for ada accesiblity.Details
modernize (e)elevator & provide(n)machine room access.remodel two (e) restroom on level 1 for ada accessibility. alternate 1: remodel two (e) restrooms on level 2 for ada accesiblity. | $1,552,259 | |
| May 6, 2024 | In progress issued Feb 2026 | 555 07th St | modernization of a 3-stop single passenger elevator and elevator machine room with added ventilation to the machine room at 555 7th street in san francisco.Details
modernization of a 3-stop single passenger elevator and elevator machine room with added ventilation to the machine room at 555 7th street in san francisco. | $641,675 | |
| Apr 1, 2024 | In progress issued Apr 2024 | 1240 Valencia St | Swinerton Builders | to complete work installing new ducts, new bathrooms, kitchen, interiror ref pa# 2023-0622-0639 sep mep permits will be obtainedDetails
to complete work installing new ducts, new bathrooms, kitchen, interiror ref pa# 2023-0622-0639 sep mep permits will be obtained | $100,000 |
| Apr 1, 2022 | Never finaled issued Sep 2022, no final | 220 Geary St | union square/market st station concourse level - construct 2 vendor kiosks; convert 2 (e) storage to all gender accessible restroom; kiosks & all gender will include elec and plumb for new lightings, power and (n) water use fixtures; (e) undeveloped space to be renovated to a down-time room reservDetails
union square/market st station concourse level - construct 2 vendor kiosks; convert 2 (e) storage to all gender accessible restroom; kiosks & all gender will include elec and plumb for new lightings, power and (n) water use fixtures; (e) undeveloped space to be renovated to a down-time room reserv | $1,000,000 | |
| Feb 10, 2021 | Completed final sign-off May 2022 | 100 Channel | revised fuel oil system for 100- channel. relocated fuel oil fill port to sidewalk 2 hour rated ceiling added at corridor 160 - fuel stroage room 230. add fire wrap to fuel oil piping in mechanical room 232. ref app#201509227707 (s8)Details
revised fuel oil system for 100- channel. relocated fuel oil fill port to sidewalk 2 hour rated ceiling added at corridor 160 - fuel stroage room 230. add fire wrap to fuel oil piping in mechanical room 232. ref app#201509227707 (s8) | $25,000 | |
| Dec 17, 2020 | Completed final sign-off Sep 2022 | 1 Warriors Wy | Dpr Construction | ti work for community service center includes open work space, conference room, restrooms & other support spaces. work is located in tenant space 20 & 21 on level 200Details
ti work for community service center includes open work space, conference room, restrooms & other support spaces. work is located in tenant space 20 & 21 on level 200 | $320,000 |
| Sep 30, 2019 | Never finaled issued Oct 2019, no final | 300 16th St | Shawmut Woodworking & Supply Inc | rev to pa# 201904087340; space 14: revise mechanincal layout. n/a maherDetails
rev to pa# 201904087340; space 14: revise mechanincal layout. n/a maher | |
| May 7, 2019 | Completed final sign-off Aug 2019 | 300 16th St | Mortenson Clark A Joint Venture | health only -review of recycled systems. ref 201606149949 s4, 201606149952 & 201606149954Details
health only -review of recycled systems. ref 201606149949 s4, 201606149952 & 201606149954 | |
| Apr 15, 2019 | Completed final sign-off Nov 2022 | 3850 17th St | partial interior renovations. exterior building seismic upgrade & landscape improvement.Details
partial interior renovations. exterior building seismic upgrade & landscape improvement. | $5,000,000 | |
| Apr 8, 2019 | Never finaled issued Sep 2019, no final | 300 16th St | Shawmut Woodworking & Supply Inc | building new electrical closets, janitor closets, 2 all-gender restrooms and 4 food prep areas. each space will be installed w/ plumbing fixtures, electrical equipment, electrical outlets, lighting fixtures, mechanical equipment and registers. (1st time tenant improvement)Details
building new electrical closets, janitor closets, 2 all-gender restrooms and 4 food prep areas. each space will be installed w/ plumbing fixtures, electrical equipment, electrical outlets, lighting fixtures, mechanical equipment and registers. (1st time tenant improvement) | $3,150,000 |
| May 23, 2017 | Completed final sign-off Jan 2018 | 350 Bush St | Hathaway Dinwiddie Co. | mep revision to pa #2007-0807-8938 & including deferred work for pa #2016-1214-4926.Details
mep revision to pa #2007-0807-8938 & including deferred work for pa #2016-1214-4926. | |
| May 16, 2016 | Completed final sign-off Sep 2017 | 250 Howard St | provide fire water underground service for block 5 park tower project, the incoming fire service will be two (2) 8" fire mains entering the s.w. corner of the project @ beale & howard. n/a ordinance #155-13Details
provide fire water underground service for block 5 park tower project, the incoming fire service will be two (2) 8" fire mains entering the s.w. corner of the project @ beale & howard. n/a ordinance #155-13 | $20,000 | |
| Jun 26, 2014 | Completed final sign-off Mar 2018 | 1 Newhall St | Clark Construction Group Ca Lp, Johnson Controls Fire | interior expansion, exterior renovation of (e) 2 story warehouse (circa 1986). new 2nd floor, new roof, renovated & upgraded building & site. change of use from city storage facility to sf office of chief med exam. ** maher: compliance with ordinance no# 155-13 required; route to dph **Details
interior expansion, exterior renovation of (e) 2 story warehouse (circa 1986). new 2nd floor, new roof, renovated & upgraded building & site. change of use from city storage facility to sf office of chief med exam. ** maher: compliance with ordinance no# 155-13 required; route to dph ** | $28,000,000 |
| Nov 22, 2011 | Completed final sign-off Apr 2012 | 1001 Potrero Av | Rodan Builders Inc | barrier removal, construct 3 offices, interior finishes hvac. fire alarm revisions under separate application.Details
barrier removal, construct 3 offices, interior finishes hvac. fire alarm revisions under separate application. | $947,230 |
| Sep 29, 2011 | Completed final sign-off Apr 2013 | 555 North Point St | Howard S. Wright Constructors Lp | new ingress / access corridor to allow independant accessible path of travel to 4 meeting rooms. (e) meeting rooms will receive new finishes, paint, carpet, trim, wall covering, some rooms will receive new / replaced light fixtures. toilet facilities being renovated completly & fully accessible.Details
new ingress / access corridor to allow independant accessible path of travel to 4 meeting rooms. (e) meeting rooms will receive new finishes, paint, carpet, trim, wall covering, some rooms will receive new / replaced light fixtures. toilet facilities being renovated completly & fully accessible. | $962,576 |
| Aug 13, 2001 | Expired or cancelled expired Sep 2002 | 2527 15th Av | renovate extg garage/add partitions fodr new family room/hallway/laundryrm/bthrm/w.in closetDetails
renovate extg garage/add partitions fodr new family room/hallway/laundryrm/bthrm/w.in closet | $40,000 |