Michael Charles Gratton
- Listed as
- contractor, designer
- Firm
- Specialized Graphics Inc
- Based in
- Concord
- On San Francisco permits
- Feb 2012 to Jul 2026
87 permits since 2000 (contractor on 87 permits, designer on 1 permit): 31 completed, 9 in progress, 41 never finaled, 6 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. Their ranked record as a contractor is on their contractor page. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Architects
- Fred Pollack (2), Harvey J Hacker (2), Rex Mclean (2)
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 4
- Commercial 77
- Other or unknown 6
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in. 2 of 87 have no building type on record and are shown as other.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 29, 2026 | In progress issued Jul 2026 | 201 Mission St | Specialized Graphics Inc | emergency evacuation map installation/inspectionDetails
emergency evacuation map installation/inspection | $5,000 |
| Jun 30, 2026 | In progress issued Jun 2026 | 33 New Montgomery St | Specialized Graphics Inc | 9/f: 3 evacuation plan maps for fire reviewDetails
9/f: 3 evacuation plan maps for fire review | $1,500 |
| Apr 10, 2026 | In progress filed Apr 2026, not yet issued | 325 Pacific Av | Specialized Graphics Inc | (1) illumintaed blade sign, double face, sign "rho". | $6,500 |
| Feb 27, 2026 | In progress issued Mar 2026 | 101 Townsend St | Specialized Graphics Inc | to replace electrical sign (cloud)Details
to replace electrical sign (cloud) | $11,600 |
| Dec 5, 2025 | In progress issued Dec 2025 | 55 Spear St | Specialized Graphics Inc | 4 evac maps on the 19/f | $2,000 |
| Sep 19, 2025 | In progress issued Sep 2025 | 333 Bush St | Specialized Graphics Inc | 4 11th fl evacuation maps | $5,460 |
| Sep 19, 2025 | In progress issued Sep 2025 | 333 Bush St | Specialized Graphics Inc | (4) 7th fl evacuation maps | $5,460 |
| Jul 11, 2025 | In progress issued Jul 2025 | 555 California St | Specialized Graphics Inc | 24/f: 4-evacuation maps | $600 |
| Apr 30, 2025 | Completed final sign-off Aug 2025 | 11 Innes Ct | Specialized Graphics Inc | install building number "275" on concrete planter, non -illunimated & non structuralDetails
install building number "275" on concrete planter, non -illunimated & non structural | $2,000 |
| Apr 30, 2025 | Completed final sign-off Aug 2025 | 11 Innes Ct | Specialized Graphics Inc | install building name sign "dorris m vicent apartment" on plaster wall, non -illunimated & non structuralDetails
install building name sign "dorris m vicent apartment" on plaster wall, non -illunimated & non structural | $2,000 |
| Apr 5, 2024 | In progress issued Apr 2024 | 657 Howard St | Specialized Graphics Inc | erect projecting non-illuminated business new signDetails
erect projecting non-illuminated business new sign | $2,500 |
| Nov 20, 2023 | Never finaled issued Nov 2023, no final | 357 Kearny St | Specialized Graphics Inc | install one single faced, non illuminated wall mounted sign at front entrance "ar har ya"Details
install one single faced, non illuminated wall mounted sign at front entrance "ar har ya" | $2,500 |
| Nov 20, 2023 | Never finaled issued Nov 2023, no final | 357 Kearny St | Specialized Graphics Inc | install of 1, non-illuminated, dimensional letterset onto (e) building wall. wall is stucco over brick. no (e) signage to remove/no wasteDetails
install of 1, non-illuminated, dimensional letterset onto (e) building wall. wall is stucco over brick. no (e) signage to remove/no waste | $1,250 |
| Jun 7, 2023 | Never finaled issued Jun 2023, no final | 555 California St | Specialized Graphics Inc | non-electric single face wall sign "parking" - east (california street)Details
non-electric single face wall sign "parking" - east (california street) | $1,500 |
| Jun 7, 2023 | Never finaled issued Jun 2023, no final | 555 California St | Specialized Graphics Inc | non-electric single face wall sign "clearance" - california streetDetails
non-electric single face wall sign "clearance" - california street | $1,500 |
| Jun 7, 2023 | Never finaled issued Jun 2023, no final | 555 California St | Specialized Graphics Inc | non-electric single face wall sign "parking" - west (california street)Details
non-electric single face wall sign "parking" - west (california street) | $1,500 |
| Jun 7, 2023 | Never finaled issued Jun 2023, no final | 555 California St | Specialized Graphics Inc | non-electric single face wall sign "clearance" - pine streetDetails
non-electric single face wall sign "clearance" - pine street | $1,500 |
| Jan 20, 2022 | Completed final sign-off Feb 2022 | 1150 Union St | Specialized Graphics Inc | 32 evacuation maps (10 story residential bldg)Details
32 evacuation maps (10 story residential bldg) | $3,200 |
| Jan 20, 2022 | Never finaled issued Jan 2022, no final | 360 Spear St | Specialized Graphics Inc | install 1 non-electric single faced wall sign "vitalant"Details
install 1 non-electric single faced wall sign "vitalant" | $1,100 |
| Sep 29, 2021 | Completed final sign-off Nov 2021 | 315 Montgomery St | Specialized Graphics Inc | evacuation maps for 315 montgomery st 2nd & 3rd fl. 10 total mapsDetails
evacuation maps for 315 montgomery st 2nd & 3rd fl. 10 total maps | $3,500 |
| Sep 24, 2021 | Completed final sign-off Mar 2022 | 2 Embarcadero Center | Specialized Graphics Inc | 4 evacuation maps on 15th floor.Details
4 evacuation maps on 15th floor. | $800 |
| Aug 24, 2021 | Never finaled issued Sep 2021, no final | 768 Stanyan St | Specialized Graphics Inc | install electric, double face sign, 4 sf "harborside" blade signDetails
install electric, double face sign, 4 sf "harborside" blade sign | $2,800 |
| Aug 24, 2021 | Never finaled issued Sep 2021, no final | 768 Stanyan St | Specialized Graphics Inc | install electric, single face sign, 16 sf "harborside" chanel letterDetails
install electric, single face sign, 16 sf "harborside" chanel letter | $8,900 |
| Jun 8, 2021 | Never finaled issued Jun 2021, no final | 1 De Haro St | Specialized Graphics Inc | installation of 1 set of single-faced wall illuminated channel letters/logo for "samsara"Details
installation of 1 set of single-faced wall illuminated channel letters/logo for "samsara" | $15,000 |
| Oct 27, 2020 | Never finaled filed Oct 2020, never issued | 2 Henry Adams St | Specialized Graphics Inc | install 1 illuminated parapet sign. | $16,800 |
| Oct 27, 2020 | Never finaled issued Jan 2021, no final | 2 Henry Adams St | Specialized Graphics Inc | install 3 illuminated blade signs.Details
install 3 illuminated blade signs. | $16,800 |
| Aug 24, 2020 | Never finaled issued Jan 2021, no final | 420 Taylor St | Specialized Graphics Inc | installation of (2) halo lit channel letter/logo signsDetails
installation of (2) halo lit channel letter/logo signs | $20,000 |
| Jul 31, 2020 | Completed final sign-off Oct 2020 | 345 Montgomery St | Specialized Graphics Inc | (13) evacuation maps (floors basement through floor 3)Details
(13) evacuation maps (floors basement through floor 3) | $2,600 |
| Jul 2, 2020 | Never finaled issued Oct 2020, no final | 2 Henry Adams St | Specialized Graphics Inc | install 7 sets of dimension letteres on (e) canopies. maher n/a.Details
install 7 sets of dimension letteres on (e) canopies. maher n/a. | $7,000 |
| Jul 2, 2020 | Never finaled issued Oct 2020, no final | 2 Henry Adams St | Specialized Graphics Inc | install 3 non-illuminated single sided panel signs 24x36in, 2 henry adams, 1909 alameda, logo samsara.Details
install 3 non-illuminated single sided panel signs 24x36in, 2 henry adams, 1909 alameda, logo samsara. | $3,000 |
| Jul 2, 2020 | Never finaled issued Oct 2020, no final | 2 Henry Adams St | Specialized Graphics Inc | install 17 non-illuminated double sided tenant blade signs, 24x24in, 2.5in thickness,Details
install 17 non-illuminated double sided tenant blade signs, 24x24in, 2.5in thickness, | $17,000 |
| Jul 2, 2020 | Never finaled issued Oct 2020, no final | 2 Henry Adams St | Specialized Graphics Inc | install 1 set of dimensional logo, single sided, wall mounted, 16ftx70in.Details
install 1 set of dimensional logo, single sided, wall mounted, 16ftx70in. | $1,000 |
| Feb 28, 2020 | Completed final sign-off Aug 2020 | 274 Brannan St | Specialized Graphics Inc | 4 evacuation maps on 6th flDetails
4 evacuation maps on 6th fl | $900 |
| Feb 28, 2020 | Never finaled issued Feb 2020, no final | 101 Henry Adams St | Specialized Graphics Inc | install 1 illuminated double-faced projecting wall sign.Details
install 1 illuminated double-faced projecting wall sign. | $4,580 |
| Feb 5, 2020 | Never finaled issued Feb 2020, no final | 1685 Haight St | Specialized Graphics Inc | installation of 1 illuminated blade sign "c"Details
installation of 1 illuminated blade sign "c" | $4,500 |
| Aug 21, 2019 | Never finaled issued Aug 2019, no final | 251 Rhode Island St | Specialized Graphics Inc | (1) exterior illuminated sign.Details
(1) exterior illuminated sign. | $7,500 |
| Mar 28, 2019 | Expired or cancelled cancelled Jan 2026 | 555 California St | Specialized Graphics Inc | install 1 non illuminated dimensional letter sign | $2,000 |
| Mar 28, 2019 | Expired or cancelled cancelled Jan 2026 | 555 California St | Specialized Graphics Inc | install 1 illuminated panel sign | $2,000 |
| Mar 28, 2019 | Expired or cancelled cancelled Jan 2026 | 555 California St | Specialized Graphics Inc | install 1 non illuminated dimensional letter sign | $1,750 |
| Mar 28, 2019 | Expired or cancelled cancelled Jan 2026 | 555 California St | Specialized Graphics Inc | install 2 sets of edge lit illuminated letters on (e) canopyDetails
install 2 sets of edge lit illuminated letters on (e) canopy | $6,000 |
| Sep 25, 2018 | Never finaled issued Sep 2018, no final | 465 Pine St | Specialized Graphics Inc | installation of (1) non-illuminated double-faced blade sign.Details
installation of (1) non-illuminated double-faced blade sign. | $4,000 |
| Mar 22, 2018 | Never finaled issued Mar 2018, no final | 180 Montgomery St | Specialized Graphics Inc | install 2 electric "address number" signs. n/a for maher.Details
install 2 electric "address number" signs. n/a for maher. | $1,500 |
| Mar 22, 2018 | Completed final sign-off Jul 2019 | 400 Montgomery St | Specialized Graphics Inc | 8 evacuation maps: 2 maps on 6th, 8th, 10th and 11th floor; n/a maherDetails
8 evacuation maps: 2 maps on 6th, 8th, 10th and 11th floor; n/a maher | $1,600 |
| Feb 22, 2018 | Completed final sign-off Mar 2018 | 55 Hawthorne St | Specialized Graphics Inc | 3 evacuation maps 8th flDetails
3 evacuation maps 8th fl | $600 |
| Jan 26, 2018 | Completed final sign-off Feb 2018 | 400 Montgomery St | Specialized Graphics Inc | evacuation maps: 2 on 2nd floor. 2 on 3rd floor. n/a for maherDetails
evacuation maps: 2 on 2nd floor. 2 on 3rd floor. n/a for maher | $900 |
| Oct 10, 2017 | Never finaled issued Oct 2017, no final | 350 Bush St | Specialized Graphics Inc | install a projecting electrical triple faced sign "[twitch logo]" maher n/a.Details
install a projecting electrical triple faced sign "[twitch logo]" maher n/a. | $7,500 |
| Mar 31, 2017 | Never finaled issued Apr 2017, no final | 633 Battery St | Specialized Graphics Inc | to erect electrical led halo illuminated sign. n/a for maherDetails
to erect electrical led halo illuminated sign. n/a for maher | $4,000 |
| Dec 5, 2016 | Expired or cancelled cancelled Jan 2026 | 180 Howard St | Specialized Graphics Inc | install (3) electric projecting signs | $3,600 |
| Dec 5, 2016 | Expired or cancelled cancelled Jan 2026 | 180 Howard St | Specialized Graphics Inc | install (3) electric projecting signs | $3,600 |
| Jun 20, 2016 | Completed final sign-off Feb 2017 | 2181 Greenwich St | Specialized Graphics Inc | legalize (e) awning on north & west side of bldg. remove signage on awnings.Details
legalize (e) awning on north & west side of bldg. remove signage on awnings. | $3,000 |
| Jun 20, 2016 | Completed final sign-off Feb 2017 | 2181 Greenwich St | Specialized Graphics Inc | install projection single faced signDetails
install projection single faced sign | $500 |
| Apr 15, 2016 | Never finaled issued Apr 2016, no final | 425 Market St | Specialized Graphics Inc | evacuation maps on 26th floor | $900 |
| Aug 20, 2015 | Never finaled issued Aug 2015, no final | 555 California St | Specialized Graphics Inc | evacuation maps - 3rd floor - 5 mapsDetails
evacuation maps - 3rd floor - 5 maps | $1,500 |
| Jun 2, 2015 | Never finaled issued Aug 2015, no final | 875 Stevenson St | Specialized Graphics Inc | 2 non electric signs double facedDetails
2 non electric signs double faced | $5,000 |
| Oct 8, 2014 | Never finaled issued Apr 2015, no final | 115 Sansome St | Specialized Graphics Inc | fabrication and installation of two exterior non-illuminated blade signs double faced.Details
fabrication and installation of two exterior non-illuminated blade signs double faced. | $4,500 |
| Aug 22, 2014 | Completed final sign-off Jul 2016 | 555 California St | Specialized Graphics Inc | flrs: 21 &22 : evacuation maps (5) maps each floor; maher n/aDetails
flrs: 21 &22 : evacuation maps (5) maps each floor; maher n/a | $2,500 |
| Aug 22, 2014 | Completed final sign-off Jul 2016 | 1050 Battery St | Specialized Graphics Inc | evacuation maps: basement, 1st, 2nd,3rd floors (13) maps; maher n/aDetails
evacuation maps: basement, 1st, 2nd,3rd floors (13) maps; maher n/a | $3,250 |
| Aug 22, 2014 | Completed final sign-off Jul 2016 | 111 Sutter St | Specialized Graphics Inc | evacuation maps - 11th flr (4), 10th flr (4); maher n/aDetails
evacuation maps - 11th flr (4), 10th flr (4); maher n/a | $2,400 |
| Aug 1, 2014 | Completed final sign-off Jul 2016 | 1 Sansome St | Specialized Graphics Inc | 4 evacuation maps on 39th floor. n/a ordinance #155-13.Details
4 evacuation maps on 39th floor. n/a ordinance #155-13. | $1,000 |
| May 19, 2014 | Never finaled issued May 2014, no final | 101 Mission St | Specialized Graphics Inc | erect an electric single faced wall sign. n/a maher ordinance 155-13Details
erect an electric single faced wall sign. n/a maher ordinance 155-13 | $5,000 |
| Mar 24, 2014 | Never finaled issued Oct 2014, no final | 490 Geary St | Specialized Graphics Inc | to erect electric, projecting, single faced sign. ** compliance with maher ordinance no.155-13 not required **Details
to erect electric, projecting, single faced sign. ** compliance with maher ordinance no.155-13 not required ** | $6,000 |
| Mar 24, 2014 | Never finaled issued Oct 2014, no final | 490 Geary St | Specialized Graphics Inc | to erect electric, projecting, double faced sign. ** compliance with maher ordinance no.155-13 not required **Details
to erect electric, projecting, double faced sign. ** compliance with maher ordinance no.155-13 not required ** | $14,600 |
| Oct 25, 2013 | Never finaled issued Oct 2013, no final | 717 Market St | Specialized Graphics Inc | to erect electrical 2 banners with led lighting in the posts.Details
to erect electrical 2 banners with led lighting in the posts. | $2,000 |
| Oct 25, 2013 | Never finaled issued Oct 2013, no final | 717 Market St | Specialized Graphics Inc | to erect electrical wall graphic with led light tape.Details
to erect electrical wall graphic with led light tape. | $5,000 |
| Oct 25, 2013 | Never finaled issued Oct 2013, no final | 717 Market St | Specialized Graphics Inc | to erect electrical halo lit led channel letters.Details
to erect electrical halo lit led channel letters. | $10,000 |
| Oct 25, 2013 | Never finaled issued Oct 2013, no final | 717 Market St | Specialized Graphics Inc | painted logo on garage door. non-structural signDetails
painted logo on garage door. non-structural sign | $750 |
| Oct 23, 2013 | Completed final sign-off Dec 2013 | 717 Market St | Specialized Graphics Inc | evacuation maps: three at basement, three at first floor, and three at second floor. (9) total signs.Details
evacuation maps: three at basement, three at first floor, and three at second floor. (9) total signs. | $1,800 |
| Oct 23, 2013 | Completed final sign-off Nov 2013 | 719 Market St | Specialized Graphics Inc | install (1) evacuation sign on ground floor.Details
install (1) evacuation sign on ground floor. | $300 |
| Oct 23, 2013 | Completed final sign-off Nov 2013 | 1 Sansome St | Specialized Graphics Inc | four evacuation maps on the 14th floor. four evacuation maps on the 20th floor.Details
four evacuation maps on the 14th floor. four evacuation maps on the 20th floor. | $1,600 |
| Aug 5, 2013 | Completed final sign-off Aug 2013 | 1 Market St | Specialized Graphics Inc | evacuation maps for 23rd and 24th floorsDetails
evacuation maps for 23rd and 24th floors | $1,600 |
| Jul 16, 2013 | Never finaled issued Jul 2013, no final | 1 Market St | Specialized Graphics Inc | 23rd & 24th floors-evacuation maps-8 totalDetails
23rd & 24th floors-evacuation maps-8 total | $1,600 |
| Jul 16, 2013 | Completed final sign-off Aug 2013 | 1 Sansome St | Specialized Graphics Inc | 15th floor-evacuation maps-4 totalDetails
15th floor-evacuation maps-4 total | $800 |
| Jul 3, 2013 | Completed final sign-off Aug 2013 | 50 Green St | Specialized Graphics Inc | evacuation maps (4) on 1, mezz, and 2nd floor.Details
evacuation maps (4) on 1, mezz, and 2nd floor. | $800 |
| May 17, 2013 | Never finaled issued May 2013, no final | 333 Bush St | Specialized Graphics Inc | evacuation maps of floors 16 and 24.Details
evacuation maps of floors 16 and 24. | $2,000 |
| May 6, 2013 | Completed final sign-off Aug 2013 | 1725 Montgomery St | Specialized Graphics Inc | evacuation maps of 3rd floorDetails
evacuation maps of 3rd floor | $950 |
| Mar 6, 2013 | Completed final sign-off Mar 2013 | 555 California St | Specialized Graphics Inc | evacuation maps on the 19th floor (5) maps.Details
evacuation maps on the 19th floor (5) maps. | $1,000 |
| Dec 12, 2012 | Never finaled issued Dec 2012, no final | 15 Lombard St | Specialized Graphics Inc | #7, non-illuminated blade signDetails
#7, non-illuminated blade sign | $1,300 |
| Dec 12, 2012 | Never finaled issued Dec 2012, no final | 15 Lombard St | Specialized Graphics Inc | non-illuminated blade sign | $1,300 |
| Dec 12, 2012 | Never finaled issued Dec 2012, no final | 15 Lombard St | Specialized Graphics Inc | #9, non-illuminated blade signDetails
#9, non-illuminated blade sign | $1,300 |
| Nov 2, 2012 | Completed final sign-off Nov 2012 | 23 Geary St | Specialized Graphics Inc | 3rd floor-4 evacuation mapsDetails
3rd floor-4 evacuation maps | $800 |
| Oct 3, 2012 | Completed final sign-off Nov 2012 | 333 Bush St | Specialized Graphics Inc | evacuation maps of floors 9,10,11 (14 maps)Details
evacuation maps of floors 9,10,11 (14 maps) | $2,400 |
| Oct 3, 2012 | Completed final sign-off Nov 2012 | 555 California St | Specialized Graphics Inc | evacuation maps on 8th and 9th fl, 10 mapsDetails
evacuation maps on 8th and 9th fl, 10 maps | $2,000 |
| Aug 28, 2012 | Never finaled issued Aug 2012, no final | 1 Sansome St | Specialized Graphics Inc | evacuation maps on flors 29,31,34 and 35. 17 mapsDetails
evacuation maps on flors 29,31,34 and 35. 17 maps | $1,700 |
| May 29, 2012 | Completed final sign-off Jun 2012 | 333 Bush St | Specialized Graphics Inc | evacuation maps on 17th, 18th, and 19th floors:4 maps each.Details
evacuation maps on 17th, 18th, and 19th floors:4 maps each. | $1,600 |
| Feb 23, 2012 | Completed final sign-off Jun 2012 | 555 California St | Specialized Graphics Inc | 53rd floor - (3) evacuation mapsDetails
53rd floor - (3) evacuation maps | $300 |
| Feb 17, 2012 | Completed final sign-off Apr 2012 | 1 Market St | Specialized Graphics Inc | spear tower, floor 25, 26, 27, 29 - (5) evacuation maps on each floor.Details
spear tower, floor 25, 26, 27, 29 - (5) evacuation maps on each floor. | $2,000 |
| Feb 17, 2012 | Completed final sign-off Mar 2012 | 333 Bush St | Specialized Graphics Inc | 16th floor - (4) evacuation mapsDetails
16th floor - (4) evacuation maps | $400 |