Larry Szto
- Listed as
- architect, authorized agent-others
- Firm
- Szto Associates
- Based in
- San Francisco
- On San Francisco permits
- Apr 2001 to Jul 2025
50 permits since 2000 (architect on 49 permits, authorized agent-others on 1 permit): 39 completed, 8 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 24, 2025 | Completed final sign-off Aug 2026 | 1750 Cesar Chavez St | Opi Commercial Builders | unit a, t.i. of (e) warehouse suite. scope include non-structural demolition, new non-structural partitions, ceilings, finishs, light fixtures, and door.Details
unit a, t.i. of (e) warehouse suite. scope include non-structural demolition, new non-structural partitions, ceilings, finishs, light fixtures, and door. | $1,985,920 |
| Dec 6, 2024 | Completed final sign-off May 2025 | 1740 Cesar Chavez St | Opi Commercial Builders | interior demolition of existing vacant tenant space for future tenant improvement. disabled access features to be provided once the space is re-occupied per ab-017Details
interior demolition of existing vacant tenant space for future tenant improvement. disabled access features to be provided once the space is re-occupied per ab-017 | $50,000 |
| Aug 13, 2024 | Completed final sign-off Dec 2024 | 1750 Cesar Chavez St | Opi Commercial Builders | t.i. to (e) 1 story building site 1 (e) parking stalls is compliant per ada requirements 2. remove landscape with (n) a.c. paving at (n) roll-up door drive way 3. provide new international accessibility sign /symbol exterior 1. new 10x12 roll up door in (e) opening to match (e) interiorDetails
t.i. to (e) 1 story building site 1 (e) parking stalls is compliant per ada requirements 2. remove landscape with (n) a.c. paving at (n) roll-up door drive way 3. provide new international accessibility sign /symbol exterior 1. new 10x12 roll up door in (e) opening to match (e) interior | $23,500 |
| Mar 21, 2024 | Completed final sign-off Jan 2025 | 1740 Cesar Chavez St | Opi Commercial Builders | reconfigure hallway to make it ada accessible for common area and elevator. upgrade bathroom to be ada compliant.Details
reconfigure hallway to make it ada accessible for common area and elevator. upgrade bathroom to be ada compliant. | $25,000 |
| Nov 8, 2023 | Completed final sign-off Jul 2024 | 1750 Cesar Chavez St | Opi Commercial Builders | demo only- interior only, non-structural demolition of vacant tenant space for future tenant improvement. disable acces features to be provided once space is re-occupied per ab-017Details
demo only- interior only, non-structural demolition of vacant tenant space for future tenant improvement. disable acces features to be provided once space is re-occupied per ab-017 | $75,500 |
| Mar 6, 2014 | Completed final sign-off Mar 2015 | 150 Post St | Constructive Building Services Inc Dba C | 4th floor suite #480- t.i. demo non structural partitions, construct new gyp. board partitions as indicated. relocate existing fluorescent light fixtures.Details
4th floor suite #480- t.i. demo non structural partitions, construct new gyp. board partitions as indicated. relocate existing fluorescent light fixtures. | $18,000 |
| Mar 4, 2014 | Completed final sign-off Mar 2015 | 150 Post St | Constructive Building Services Inc Dba C | #620- t.i., remove (e) gyp. board partition and replace with glazed partition, demo partitions as shown, build new +/- 69" high gyp.board partition.Details
#620- t.i., remove (e) gyp. board partition and replace with glazed partition, demo partitions as shown, build new +/- 69" high gyp.board partition. | $11,000 |
| Sep 23, 2013 | Completed final sign-off Oct 2013 | 1266 Market St | to obtain final inspection for work approved under pa #2001.09.19.8671. all work is complete.Details
to obtain final inspection for work approved under pa #2001.09.19.8671. all work is complete. | ||
| Sep 23, 2013 | Completed final sign-off Oct 2013 | 1266 Market St | to obtain final inspection for work approved under pa #2003.02.13.7434. all work is complete.Details
to obtain final inspection for work approved under pa #2003.02.13.7434. all work is complete. | ||
| Sep 23, 2013 | Completed final sign-off Oct 2013 | 1266 Market St | to obtain final inspection for work approved under pa #2002.09.20.7060. all work is complete.Details
to obtain final inspection for work approved under pa #2002.09.20.7060. all work is complete. | ||
| Apr 5, 2013 | Expired or cancelled withdrawn Jun 2013 | 2180 Harrison St | Paradigm General Contractors | 3rd floor - t.i. remove existing non-structural partition, door & door frame as shown on plan.Details
3rd floor - t.i. remove existing non-structural partition, door & door frame as shown on plan. | $1,500 |
| Jun 13, 2011 | Completed final sign-off Sep 2011 | 445 Bush St | Rudolph Commercial Interiors Inc, Rci | remodel extg 1st floor space to include private offices conference room, sound recording and video editing suites. demo under separate permit. sprinkler and life safety under seperate permit. mechanical under separate permit.Details
remodel extg 1st floor space to include private offices conference room, sound recording and video editing suites. demo under separate permit. sprinkler and life safety under seperate permit. mechanical under separate permit. | $125,290 |
| Dec 3, 2010 | Completed final sign-off Jun 2011 | 50 Main St | C B 2 Builders Incorporated | remove and replace existing sidewalk acess doors to meter room in basement with new sidewalk. existing meter room in basement to remain in useDetails
remove and replace existing sidewalk acess doors to meter room in basement with new sidewalk. existing meter room in basement to remain in use | $11,000 |
| Jan 29, 2010 | Completed final sign-off Mar 2010 | 300 Montgomery St | 3-D Construction | office ti on 9th floor. construct 4 new offices,modify lunch rm, new ceiling grid system, relocate (e) lights, new lights,relocate (e)hvac grills per new lay out. sprinklers, life saftey and electrical with lighting title 24 under separate permit.Details
office ti on 9th floor. construct 4 new offices,modify lunch rm, new ceiling grid system, relocate (e) lights, new lights,relocate (e)hvac grills per new lay out. sprinklers, life saftey and electrical with lighting title 24 under separate permit. | $46,000 |
| Aug 20, 2009 | Completed final sign-off Mar 2010 | 300 Montgomery St | Hillhouse Construction Company Inc | 3rd floor t.i. revision to appl #200904146220 - add second exit door at back of space. build 1-hr exit corridor at main entry. delete plan check comment to install smoke guard at passenger elevator doors.Details
3rd floor t.i. revision to appl #200904146220 - add second exit door at back of space. build 1-hr exit corridor at main entry. delete plan check comment to install smoke guard at passenger elevator doors. | $16,500 |
| Jan 8, 2009 | Completed final sign-off Mar 2009 | 333 Market St | Rudolph Commercial Interiors Inc, Rci | construct new gyp board partitions for new offices, existing ceiling system, lights & sprinklers are to remain, existing hvac to remain. partitions for new offices, sprinklers under separate permit.Details
construct new gyp board partitions for new offices, existing ceiling system, lights & sprinklers are to remain, existing hvac to remain. partitions for new offices, sprinklers under separate permit. | $21,000 |
| Nov 4, 2008 | Never finaled issued Nov 2008, no final | 300 Montgomery St | remove extg ceiling grid and tiles. salvage extg light fixtures and hvac grills for re-use. install new 24" x 48" ceiling grid and ceiling tiles. re-install salvage light fixtures and hvac grills. fire sprnkr and life safety work under seperate permitDetails
remove extg ceiling grid and tiles. salvage extg light fixtures and hvac grills for re-use. install new 24" x 48" ceiling grid and ceiling tiles. re-install salvage light fixtures and hvac grills. fire sprnkr and life safety work under seperate permit | $5,100 | |
| Jun 20, 2008 | Never finaled issued Jun 2008, no final | 300 Montgomery St | 8th floor-remove (e) ceiling grid & ceiling tiles. salvage (e) lights, hvac grills for re-use. install new 2x4 ceiling grid & tiles. reinstall (e) lights & hvac diffusers. fire sprinkler & life safety under seperate permitsDetails
8th floor-remove (e) ceiling grid & ceiling tiles. salvage (e) lights, hvac grills for re-use. install new 2x4 ceiling grid & tiles. reinstall (e) lights & hvac diffusers. fire sprinkler & life safety under seperate permits | $11,200 | |
| Mar 13, 2008 | Completed final sign-off Sep 2010 | 230 Jones St | interior demolition only. remove existing non-structural partitions. comply with ab107.Details
interior demolition only. remove existing non-structural partitions. comply with ab107. | $13,000 | |
| Oct 15, 2007 | Completed final sign-off Apr 2008 | 345 Spear St | Skyline Construction | 2nd. floor tenant improvement. t.i. remodel existing vacant space. build new walls for office and conference rooms. relocate (e) lights, existing ceiling grid & tile to remain, patch as req'd. hvac, fire sprinkler, life safety, elect., under separate permits.Details
2nd. floor tenant improvement. t.i. remodel existing vacant space. build new walls for office and conference rooms. relocate (e) lights, existing ceiling grid & tile to remain, patch as req'd. hvac, fire sprinkler, life safety, elect., under separate permits. | $1,108,000 |
| Jun 18, 2007 | Completed final sign-off Apr 2008 | 345 Spear St | t.i. for (e) i.t. server room - including (n) 1-hr rated walls, (n) ramp, (n) i.t. racks.Details
t.i. for (e) i.t. server room - including (n) 1-hr rated walls, (n) ramp, (n) i.t. racks. | $125,000 | |
| May 25, 2007 | Completed final sign-off Jan 2008 | 345 Spear St | Skyline Construction | oti-1, google, 4th floor, el, me, ls, sp.Details
oti-1, google, 4th floor, el, me, ls, sp. | $1,500,000 |
| May 10, 2007 | Completed final sign-off Dec 2007 | 555 09th St | install self contained atm machine in covered walkwayDetails
install self contained atm machine in covered walkway | $6,000 | |
| Mar 29, 2007 | Completed final sign-off Jul 2007 | 300 Montgomery St | replace (e) 1x1 ceiling grid tiles with (n) 2x4 ceiling grid and tiles reinstall (e) light fixtures and (e) hvac diffusers fire protection under separate permitDetails
replace (e) 1x1 ceiling grid tiles with (n) 2x4 ceiling grid and tiles reinstall (e) light fixtures and (e) hvac diffusers fire protection under separate permit | $8,800 | |
| Mar 29, 2007 | Completed final sign-off Mar 2008 | 350 California St | Swinerton Builders | relocation of 10th floor lobby. includes locks on doors per sffd bulletin 6.02. life safty and sprinklers under seperate permitDetails
relocation of 10th floor lobby. includes locks on doors per sffd bulletin 6.02. life safty and sprinklers under seperate permit | $150,000 |
| Jan 22, 2007 | Never finaled issued Jan 2007, no final | 875 Stevenson St | Rudolph Commercial Interiors Inc, Rci | 6th floor-demolition-remove (e) soffit at building perimeter and abandoned duct work.Details
6th floor-demolition-remove (e) soffit at building perimeter and abandoned duct work. | $5,600 |
| Jan 22, 2007 | Completed final sign-off Apr 2007 | 725 Pine St | Cci Com'l Constr & Improv**See 985808*** | demolition work-remove (e) appliances, bathroom fixtures, wall tiles, non rated and non structural partitions.Details
demolition work-remove (e) appliances, bathroom fixtures, wall tiles, non rated and non structural partitions. | $8,000 |
| Dec 6, 2006 | Expired or cancelled expired Apr 2009 | 334 Brannan St | ground floor - install new 90" high pre-fabricated assembly room - no welding required during field installation.Details
ground floor - install new 90" high pre-fabricated assembly room - no welding required during field installation. | $12,000 | |
| Nov 8, 2006 | Completed final sign-off Aug 2007 | 1000 Grant Av | Niscayah Inc. | install exterior atm, modify extg storefront system, construct new exterior wall with cement plaster finish. construct interior drywall partitions. installl structural support in basement for atmDetails
install exterior atm, modify extg storefront system, construct new exterior wall with cement plaster finish. construct interior drywall partitions. installl structural support in basement for atm | $22,000 |
| Oct 30, 2006 | Completed final sign-off Apr 2008 | 1 Montgomery St | San Marin Construction Inc. | voluntary barrier removal-replace pair 30" w x 7' h, door with 36" w x 7' h door, install accessible lift from street level to main level.Details
voluntary barrier removal-replace pair 30" w x 7' h, door with 36" w x 7' h door, install accessible lift from street level to main level. | $34,000 |
| Oct 11, 2006 | Completed final sign-off Jan 2007 | 2815 Diamond St | install freee standing atm at exterior entrance. provide electical to atm.Details
install freee standing atm at exterior entrance. provide electical to atm. | $13,300 | |
| Oct 10, 2006 | Completed final sign-off Jan 2007 | 525 Market St | 10th floor-remove (e) non structural gyp board partitions, relocate (e) lights, no hvac work. life safety & fire sprinklers under seperate permit.Details
10th floor-remove (e) non structural gyp board partitions, relocate (e) lights, no hvac work. life safety & fire sprinklers under seperate permit. | $2,500 | |
| Aug 22, 2006 | Completed final sign-off Sep 2006 | 633 Folsom St | construct new office with metal studs & gyp. board. sprinkler & life safety under separate permit. hvac & lighting existing in proposed office. no change.Details
construct new office with metal studs & gyp. board. sprinkler & life safety under separate permit. hvac & lighting existing in proposed office. no change. | $9,600 | |
| Apr 13, 2006 | Completed final sign-off Jul 2008 | 420 Montgomery St | Paradigm General Contractors | remove (e) partitions, ceiling & lights. build new offices with new ceiling, lighting, carpet & paint. upgrade (e) toilets to comply with ada & title 24. life safety. sprinklers under separate permit.Details
remove (e) partitions, ceiling & lights. build new offices with new ceiling, lighting, carpet & paint. upgrade (e) toilets to comply with ada & title 24. life safety. sprinklers under separate permit. | $375,000 |
| Mar 7, 2006 | Never finaled issued Apr 2006, no final | 420 Montgomery St | Paradigm General Contractors | oti-2 3rd floor el meDetails
oti-2 3rd floor el me | $122,000 |
| Jan 19, 2006 | Never finaled issued Mar 2006, no final | 420 Montgomery St | Paradigm General Contractors | oti-1, 3rd floor, el, me, ls, sp.Details
oti-1, 3rd floor, el, me, ls, sp. | $246,500 |
| Sep 29, 2005 | Completed final sign-off Jan 2006 | 420 Montgomery St | remove (e) furniture workstations. construct new office, modify hual & electrical.Details
remove (e) furniture workstations. construct new office, modify hual & electrical. | $96,000 | |
| Jul 11, 2005 | Completed final sign-off Oct 2005 | 525 Market St | build new drywall offices & conference room, relocate (e) light fixtures. interior work only. sprinlDetails
build new drywall offices & conference room, relocate (e) light fixtures. interior work only. sprinl | $102,000 | |
| Jun 30, 2005 | Completed final sign-off Oct 2005 | 525 Market St | remove (e) non-structural dry wall partitions, door frames & doors. interior work only.Details
remove (e) non-structural dry wall partitions, door frames & doors. interior work only. | $5,200 | |
| May 3, 2005 | Completed final sign-off Oct 2005 | 201 Spear St | t.i.-in exist retail business demo-remove &dispose of pos counter tops.remove furniture,new.........Details
t.i.-in exist retail business demo-remove &dispose of pos counter tops.remove furniture,new......... | $40,000 | |
| May 3, 2005 | Completed final sign-off May 2006 | 744 Irving St | t.i. to exist coffee house.remove&dispose casework.counter,patch walls,paint.condoment display......Details
t.i. to exist coffee house.remove&dispose casework.counter,patch walls,paint.condoment display...... | $40,000 | |
| Apr 15, 2005 | Never finaled issued Apr 2005, no final | 300 Montgomery St | remove (e) ceiling grid & tiles, replace with new 2x4 grid & tilesDetails
remove (e) ceiling grid & tiles, replace with new 2x4 grid & tiles | $16,500 | |
| Feb 17, 2005 | Never finaled issued Mar 2005, no final | 300 Montgomery St | Dinos Construction | oti-1, 10th floor, el, me, ls, sp.Details
oti-1, 10th floor, el, me, ls, sp. | $150,000 |
| Feb 16, 2005 | Never finaled issued Feb 2005, no final | 300 Montgomery St | oti-1 9th floor, el, me, ls, spDetails
oti-1 9th floor, el, me, ls, sp | $78,000 | |
| Jan 18, 2005 | Expired or cancelled expired Sep 2005 | 120 Howard St | demo existing drywall partitions construct new dry wall partitions for new offices relocate existingDetails
demo existing drywall partitions construct new dry wall partitions for new offices relocate existing | $24,000 | |
| Dec 15, 2004 | Completed final sign-off Mar 2005 | 1900 Union St | construct gyp.board partitions & ceiling to secure (e)atn & night deposit equipment.no exterior workDetails
construct gyp.board partitions & ceiling to secure (e)atn & night deposit equipment.no exterior work | $8,500 | |
| Dec 15, 2004 | Completed final sign-off Jun 2005 | 490 Brannan St | remove (e) non-structural partition and counters. install new ceiling,lights,paint & carpetDetails
remove (e) non-structural partition and counters. install new ceiling,lights,paint & carpet | $30,000 | |
| Nov 1, 2004 | Completed final sign-off Aug 2005 | 1726 Haight St | ti.i. -work incl `walls, lighting, ducting, finishes,equip. 1st time tenant in a new building.Details
ti.i. -work incl `walls, lighting, ducting, finishes,equip. 1st time tenant in a new building. | $200,000 | |
| Oct 29, 2004 | Completed final sign-off Apr 2005 | 460 Sutter St | Rudolph Commercial Interiors Inc, Rci | remodel ground floor space to add 3 desks add new aoa toilet, build new wall. interior work onlyDetails
remodel ground floor space to add 3 desks add new aoa toilet, build new wall. interior work only | $16,000 |
| Apr 20, 2001 | Completed final sign-off Aug 2001 | 633 Folsom St | oti-1 6th floor ltg mech ls sprDetails
oti-1 6th floor ltg mech ls spr | $32,000 |