Ahmad Mohazab
- Listed as
- architect, authorized agent-others, designer, engineer, pmt consultant/expediter
- Firm
- Tecta Associates
- Based in
- San Francisco
- On San Francisco permits
- Jul 2000 to Sep 2026
416 permits since 2000 (architect on 382 permits, authorized agent-others on 11 permits, pmt consultant/expediter on 10 permits, designer on 8 permits, engineer on 6 permits): 246 completed, 13 in progress, 84 never finaled, 73 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 416.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 17, 2026 | In progress filed Sep 2026, not yet issued | 2140 Clement St | tenant improvement in existing ground floor kitchen restaurant space. non structural walls, new equipment, modified finishes, new finishes in existing restrooms, minor plumbing, mechanical and electrical. no change in occupancy or exiting.Details
tenant improvement in existing ground floor kitchen restaurant space. non structural walls, new equipment, modified finishes, new finishes in existing restrooms, minor plumbing, mechanical and electrical. no change in occupancy or exiting. | $180,000 | |
| Sep 10, 2026 | In progress issued Sep 2026 | 3450 California St | S L M Development Inc. | revision to bpa: 2026.0128.4718 - relocation of doors, deleted conference room, relocate kitchen cabinets + print room. no need plumbing fixture.Details
revision to bpa: 2026.0128.4718 - relocation of doors, deleted conference room, relocate kitchen cabinets + print room. no need plumbing fixture. | |
| Sep 3, 2026 | In progress filed Sep 2026, not yet issued | 2031 Chestnut St | tenant improvement in an existing restaurant space. new storefront door, non-structural wall demo, new equipment under hood. relocate existing restroom door and paint exterior of building.Details
tenant improvement in an existing restaurant space. new storefront door, non-structural wall demo, new equipment under hood. relocate existing restroom door and paint exterior of building. | $45,000 | |
| Aug 24, 2026 | In progress filed Aug 2026, not yet issued | 721 Larkin St | g/l t.i. take over e) restaurant (sweet glory) and remove espresso machine & countertop ice machine, and provide 2 induction burners, countertop soup warmer & food warmerDetails
g/l t.i. take over e) restaurant (sweet glory) and remove espresso machine & countertop ice machine, and provide 2 induction burners, countertop soup warmer & food warmer | $1,000 | |
| Jun 11, 2026 | In progress issued Jul 2026 | 3450 California St | S L M Development Inc. | revision to pa# 202601284718: structural reinforcement of two interior walls at (e) interior tenant improvement for a private office.Details
revision to pa# 202601284718: structural reinforcement of two interior walls at (e) interior tenant improvement for a private office. | $3,000 |
| Jun 2, 2026 | In progress issued Jun 2026 | 115 Sansome St | Rudolph Commercial Interiors Inc, Rci | 7th fl: nonstructural interior construction and installation of new finishes in 2 new offices and 2 new phone rooms in portion of existing suite. construction of interior walls, partitions, rcp, lighting fixtures. electrical mechanical, mep and fire sprinkler modifications by design build contractorDetails
7th fl: nonstructural interior construction and installation of new finishes in 2 new offices and 2 new phone rooms in portion of existing suite. construction of interior walls, partitions, rcp, lighting fixtures. electrical mechanical, mep and fire sprinkler modifications by design build contractor | $32,000 |
| Apr 28, 2026 | In progress issued Jun 2026 | 2140 Clement St | Terence Mcmahon Construction | tenant improvement in an (e) second story commissary kitchen restaurant space, non-structural. walls, new equipment modified finishes. new finishes in (e) restroom, minor plumbing, mechanical and electrical. permit only to provide occ to the second floor kitchenDetails
tenant improvement in an (e) second story commissary kitchen restaurant space, non-structural. walls, new equipment modified finishes. new finishes in (e) restroom, minor plumbing, mechanical and electrical. permit only to provide occ to the second floor kitchen | $65,000 |
| Apr 7, 2026 | In progress filed Apr 2026, not yet issued | 3450 California St | S L M Development Inc. | revision to pa 202601284718 change framing non-structural from metal studs to wood studsDetails
revision to pa 202601284718 change framing non-structural from metal studs to wood studs | |
| Mar 13, 2026 | Completed final sign-off Mar 2026 | 126 New Montgomery St | Nemarti Modern World Construction | move handicapped table, revision to 202507030100Details
move handicapped table, revision to 202507030100 | |
| Jan 30, 2026 | Completed final sign-off Jun 2026 | 1701 Fillmore St | Business Information Sergent Revital-Con | demolition of esisting interior non structural walls, equipment, finishes. prep. for new tenant improvement work.Details
demolition of esisting interior non structural walls, equipment, finishes. prep. for new tenant improvement work. | $7,800 |
| Jan 28, 2026 | In progress issued Mar 2026 | 3450 California St | S L M Development Inc. | 2/f: interior t.i for a private office of non-structural partitions and new finishes in an occupancy space. mep is deferred.Details
2/f: interior t.i for a private office of non-structural partitions and new finishes in an occupancy space. mep is deferred. | $335,000 |
| Jan 16, 2026 | Completed final sign-off Jun 2026 | 1701 Fillmore St | Business Information Sergent Revital-Con | g/f -tenant improvement in an existing resaurant space. non structural walls, equipment, modified finishes, new finishes in existing restrooms, minor plumbing, mechanical and eletricalDetails
g/f -tenant improvement in an existing resaurant space. non structural walls, equipment, modified finishes, new finishes in existing restrooms, minor plumbing, mechanical and eletrical | $120,000 |
| Oct 2, 2025 | Completed final sign-off Apr 2026 | 534 Pacific Av | B-Side Inc. | revision to 202412106465 1/f: interior t.i consisting of new interior partitions and finishes in a vacant bldg. 2/f: int. t.i consisting new interior partitions and finishes. addition of a new restrm and breakrm, utilizing (e) plumbing stubouts provided under 202412106465Details
revision to 202412106465 1/f: interior t.i consisting of new interior partitions and finishes in a vacant bldg. 2/f: int. t.i consisting new interior partitions and finishes. addition of a new restrm and breakrm, utilizing (e) plumbing stubouts provided under 202412106465 | $20,000 |
| Sep 12, 2025 | Completed final sign-off Oct 2025 | 57 Hotaling Pl | B-Side Inc. | revise p/a 2025-0509-6177 to address field/construction conditions as requested by field inspector and associated with the structrual footing and detail at underside of door for support conect of beamstop at front of building.Details
revise p/a 2025-0509-6177 to address field/construction conditions as requested by field inspector and associated with the structrual footing and detail at underside of door for support conect of beamstop at front of building. | $15,000 |
| Jul 3, 2025 | Completed final sign-off Mar 2026 | 126 New Montgomery St | Nemarti Modern World Construction | t.i. improvement of restaurant in vacant restaurant space, no walls new equpiment , new finishes w/mechanical. plumbing and electric design buildDetails
t.i. improvement of restaurant in vacant restaurant space, no walls new equpiment , new finishes w/mechanical. plumbing and electric design build | $10,000 |
| Jun 6, 2025 | Completed final sign-off Apr 2026 | 284 Noe St | Dba Golden Gate Termite, Diodati Inc | ground level: non-structural interior remodel with new finishes for an existing restroom to make it ada accessible all gender restroom. mep design build.Details
ground level: non-structural interior remodel with new finishes for an existing restroom to make it ada accessible all gender restroom. mep design build. | $40,000 |
| May 28, 2025 | Completed final sign-off Dec 2025 | 28 02nd St | Trainor Commercial Construction Inc. | 1st floor: installation of non structural partitions, and new finishes. this project is located on the ground floor. mep under seperate permit.Details
1st floor: installation of non structural partitions, and new finishes. this project is located on the ground floor. mep under seperate permit. | $160,000 |
| May 15, 2025 | In progress issued Nov 2025 | 639 Geary St | Camp Roofing Ltd Dba Camp Construction | non-structural interior construction and installation of new finishes. ada upgrades to existing all gender restroom to full compliance. mechanical and electrical plan.Details
non-structural interior construction and installation of new finishes. ada upgrades to existing all gender restroom to full compliance. mechanical and electrical plan. | $170,000 |
| May 15, 2025 | Completed final sign-off Jul 2025 | 311 03rd St | 415 Design+Build | revision to 202402085494 to show no work needed or performed for range hoodDetails
revision to 202402085494 to show no work needed or performed for range hood | |
| May 9, 2025 | Completed final sign-off Oct 2025 | 57 Hotaling Pl | B-Side Inc. | alterations to existing entry door and addition of an ada ramp for accessible entry to the retail floor. an acoa approval record 2025-002600coa.Details
alterations to existing entry door and addition of an ada ramp for accessible entry to the retail floor. an acoa approval record 2025-002600coa. | $15,000 |
| Feb 10, 2025 | In progress issued Feb 2025 | 160 Northwood Dr | R W Company | revision to pa # 2023-0615-0196 window revision and new garage doorDetails
revision to pa # 2023-0615-0196 window revision and new garage door | $500 |
| Dec 19, 2024 | Completed final sign-off Jul 2025 | 100 Montgomery St | Rudolph Commercial Interiors Inc, Rci | 20th fl - non structural interior constructionof new partitions, ceiling lighting fixtures, electrical and mechanical fixtures and finishes. mep modifications by design building contractorDetails
20th fl - non structural interior constructionof new partitions, ceiling lighting fixtures, electrical and mechanical fixtures and finishes. mep modifications by design building contractor | $145,000 |
| Dec 10, 2024 | Completed final sign-off Mar 2026 | 536 Pacific Av | B-Side Inc. | g/f (536 pacific) non structural demo of interior walls restrooms & breakroom. remove barriers in e) vacant bldg for ada accessible entry & ada compliant restroom & accessible walkway to breakroom. 2nd/f (534 pacific) demo interior walls & stairs provide compliants stairs restrooms for future tenantDetails
g/f (536 pacific) non structural demo of interior walls restrooms & breakroom. remove barriers in e) vacant bldg for ada accessible entry & ada compliant restroom & accessible walkway to breakroom. 2nd/f (534 pacific) demo interior walls & stairs provide compliants stairs restrooms for future tenant | $145,000 |
| Dec 10, 2024 | Expired or cancelled withdrawn Jan 2025 | 534 Pacific Av | non structrual interior walls on the restrooms and breakroom on 1st floor. replacing non conforming stairs with new cold grey shell condiotion for future tenants and abe program accessibility upgrades to main entry at 534 and 536 pacific ave. abe 201901104151Details
non structrual interior walls on the restrooms and breakroom on 1st floor. replacing non conforming stairs with new cold grey shell condiotion for future tenants and abe program accessibility upgrades to main entry at 534 and 536 pacific ave. abe 201901104151 | $45,000 | |
| Sep 16, 2024 | In progress issued Oct 2024 | 335 Powell St | Trainor Commercial Construction Inc. | conversion of a hotel suite on 12flr london suite into conference roos and converting an exsiting bathroom into an ada compliant all gender restroom. mep design built.Details
conversion of a hotel suite on 12flr london suite into conference roos and converting an exsiting bathroom into an ada compliant all gender restroom. mep design built. | $194,000 |
| Sep 4, 2024 | In progress filed Sep 2024, not yet issued | 590 London St | legalize (e) unauthorized adu on ground floor beind (e) garage. construct 1 hour fire rated exit corridor in garage to new entry door. remodel portion of kitchen to allow for 2 new patio doors to replace (e) aluminum window. replace all other (e) windows in unit, in kind. remove 2 interior partitionDetails
legalize (e) unauthorized adu on ground floor beind (e) garage. construct 1 hour fire rated exit corridor in garage to new entry door. remodel portion of kitchen to allow for 2 new patio doors to replace (e) aluminum window. replace all other (e) windows in unit, in kind. remove 2 interior partition | ||
| Aug 12, 2024 | Completed final sign-off Jan 2025 | 680 Terry A Francois Bl | Skyline Construction | space #26: interior construction in an (e) vacant space. installation of non-structural walls, finishes, and equipment. mep included.Details
space #26: interior construction in an (e) vacant space. installation of non-structural walls, finishes, and equipment. mep included. | $45,000 |
| Jul 16, 2024 | Completed final sign-off Jan 2025 | 28 02nd St | Axel8 Construction | deferred mep for pa# 202312082195. no exterior workDetails
deferred mep for pa# 202312082195. no exterior work | $80,000 |
| Apr 25, 2024 | Completed final sign-off May 2024 | 1504 Church St | revision to equiment layout per permit #202309136471 per field conditon.Details
revision to equiment layout per permit #202309136471 per field conditon. | ||
| Mar 28, 2024 | Completed final sign-off Jul 2024 | 688 Mission St | J M E Construction Services Inc | rev 202401053503- remove (e) bar equipment to keep (e) floor sink and change seating layout to keep (e) low wall for restaurantDetails
rev 202401053503- remove (e) bar equipment to keep (e) floor sink and change seating layout to keep (e) low wall for restaurant | $500 |
| Feb 15, 2024 | Completed final sign-off Feb 2024 | 474 Liberty St | Z Construction Company Inc | revise 202102044019, remove fireplace onlyDetails
revise 202102044019, remove fireplace only | |
| Feb 8, 2024 | Completed final sign-off Jul 2025 | 311 03rd St | 415 Design+Build | ref 202310249315 & 202311301703- ti work dart bar/restaurant, no removal of structural walls, new bars and equipment. new (5) neutral gender restrooms, new finishes and fixtures. includes mep related workDetails
ref 202310249315 & 202311301703- ti work dart bar/restaurant, no removal of structural walls, new bars and equipment. new (5) neutral gender restrooms, new finishes and fixtures. includes mep related work | $215,000 |
| Jan 5, 2024 | Completed final sign-off Jul 2024 | 688 Mission St | J M E Construction Services Inc | tenant improvement to remodel (e) bar w/ new equipment and finishes. open cased opening between the (e) grove restaurant and (e) pizza restaurant.Details
tenant improvement to remodel (e) bar w/ new equipment and finishes. open cased opening between the (e) grove restaurant and (e) pizza restaurant. | $56,000 |
| Dec 8, 2023 | Completed final sign-off Jan 2025 | 28 02nd St | Axel8 Construction | 2/f: construction of interior partition and demountable furniture, act ceiling, lighting, plumbing fixtures, millwork and finishes. mep and life safety under a separate permit.Details
2/f: construction of interior partition and demountable furniture, act ceiling, lighting, plumbing fixtures, millwork and finishes. mep and life safety under a separate permit. | $215,000 |
| Dec 5, 2023 | Completed final sign-off Feb 2025 | 2001 Chestnut St | 415 Design+Build | remove (e) main bar location, built new bar location at west wall w/equipement and finishes, mechanincal, plumbing & electrical design buildDetails
remove (e) main bar location, built new bar location at west wall w/equipement and finishes, mechanincal, plumbing & electrical design build | $45,000 |
| Nov 30, 2023 | Expired or cancelled cancelled Jun 2024 | 311 03rd St | 415 Design+Build | revision to 202310249315, due to infield condtions changes to wall removal as shown on plans. orig scope: demo interior commercial space per abm interior remodel an disabled access in future permitDetails
revision to 202310249315, due to infield condtions changes to wall removal as shown on plans. orig scope: demo interior commercial space per abm interior remodel an disabled access in future permit | |
| Oct 24, 2023 | Expired or cancelled cancelled Jun 2024 | 311 03rd St | 415 Design+Build | demo interior commercial space per ab17. interior remodel and disabled access in future permit.Details
demo interior commercial space per ab17. interior remodel and disabled access in future permit. | $60,000 |
| Oct 12, 2023 | Expired or cancelled withdrawn Aug 2024 | 590 London St | to comply w/nov# 201774532, to remodel 1/f, remove full kitchen & provide wet bar only for new family room, alter bathroom for plumbing code compliance.Details
to comply w/nov# 201774532, to remodel 1/f, remove full kitchen & provide wet bar only for new family room, alter bathroom for plumbing code compliance. | $15,000 | |
| Sep 13, 2023 | Completed final sign-off May 2024 | 1504 Church St | tenant improvement of gelato ice cream shop in vacant ground floor space. non structural walls, equipment and finishes. mep deferred. new ada accessible restroom.Details
tenant improvement of gelato ice cream shop in vacant ground floor space. non structural walls, equipment and finishes. mep deferred. new ada accessible restroom. | $35,000 | |
| Aug 3, 2023 | Completed final sign-off Mar 2024 | 1058 Hyde St | Stupakk Construction Inc | chagen of use frmo retial to solan per planning comm #21314, non-structural interior in vacant space. no change in sq. ft./ext/footprint/parking. gr/f improvements, (6) new wax rooms, office, rest room remodel for full compliance, new hvac, electricalDetails
chagen of use frmo retial to solan per planning comm #21314, non-structural interior in vacant space. no change in sq. ft./ext/footprint/parking. gr/f improvements, (6) new wax rooms, office, rest room remodel for full compliance, new hvac, electrical | $210,000 |
| Jun 26, 2023 | Expired or cancelled cancelled Jan 2026 | 1330 Bush St | cold grey shell tenant improvement: new bathrooms,redo interior non-structural walls, new bathrooms. maher n/a. space to remain vacant & separate t.i. permitDetails
cold grey shell tenant improvement: new bathrooms,redo interior non-structural walls, new bathrooms. maher n/a. space to remain vacant & separate t.i. permit | $154,000 | |
| May 9, 2023 | Completed final sign-off Sep 2023 | 69 West Portal Av | close up opening between 69 & 75 west portal, return 75 back to owner t.t. of (e) restuarnt non-structural walls, equipment, replacements, finishes w/ associated electrical and plumbing w/ new furnatureDetails
close up opening between 69 & 75 west portal, return 75 back to owner t.t. of (e) restuarnt non-structural walls, equipment, replacements, finishes w/ associated electrical and plumbing w/ new furnature | $85,000 | |
| Apr 11, 2023 | Never finaled issued Apr 2023, no final | 248 Sutter St | J & K Project Mgmt Consultants Llc | revision to 202207088071 relocate laundry machine and relocate hvac unitsDetails
revision to 202207088071 relocate laundry machine and relocate hvac units | $300 |
| Mar 20, 2023 | Completed final sign-off Jul 2023 | 386 Geary St | Richlen Construction | tenant improvement of (e) l'costa restaurant to seafood restaurant, non-structural low walls, equipment, finishes with associated electrical and new furniture.Details
tenant improvement of (e) l'costa restaurant to seafood restaurant, non-structural low walls, equipment, finishes with associated electrical and new furniture. | $25,000 |
| Dec 30, 2022 | Never finaled filed Dec 2022, never issued | 423 Burnett Av | construction of a new residential unit and adu.Details
construction of a new residential unit and adu. | $950,000 | |
| Dec 30, 2022 | Expired or cancelled cancelled Jan 2024 | 2697 Alemany Bl | construct adu (1 bedroom) 532 sq ft on g/f. convert the single car garage ito habitble space & add kitchen facilities into (e) space. provide heat to unit. convert remaining (e) habitable space on 1/f to (n) family room & omit gym space. update laundry area. new mechanical space.Details
construct adu (1 bedroom) 532 sq ft on g/f. convert the single car garage ito habitble space & add kitchen facilities into (e) space. provide heat to unit. convert remaining (e) habitable space on 1/f to (n) family room & omit gym space. update laundry area. new mechanical space. | $60,000 | |
| Dec 28, 2022 | Never finaled filed Dec 2022, never issued | 423 Burnett Av | horizontal & vertical additions to (e) structure expanding to 2 dwelling units.Details
horizontal & vertical additions to (e) structure expanding to 2 dwelling units. | $889,000 | |
| Dec 27, 2022 | Completed final sign-off Sep 2024 | 333 03rd St | Advanced Home Energy Inc. | demo of interior (non-structural) walls and finishes in suite 205. isntallation of (n) demising walls, new finishes to convert (e) office space into (8) residential units.Details
demo of interior (non-structural) walls and finishes in suite 205. isntallation of (n) demising walls, new finishes to convert (e) office space into (8) residential units. | $1,560,000 |
| Dec 20, 2022 | Expired or cancelled expired Sep 2024 | 180 Yerba Buena Av | Z Construction Company Inc | garage level structural modification for apprved glass structure @ 2nd fl pa 202208050039. new pair of doors to back yard @ south facing (e) wall. re-grading @ rear yard adjacent to new door.Details
garage level structural modification for apprved glass structure @ 2nd fl pa 202208050039. new pair of doors to back yard @ south facing (e) wall. re-grading @ rear yard adjacent to new door. | $20,000 |
| Oct 31, 2022 | Completed final sign-off Jun 2023 | 3251 20th Av | Norcal Custom Builders | #250d: minor tenant improvement for blondies pizza in food court space. front counter, signage, and misc work. some equipment to remain. mep is design build.no new plubming fixtures.Details
#250d: minor tenant improvement for blondies pizza in food court space. front counter, signage, and misc work. some equipment to remain. mep is design build.no new plubming fixtures. | $38,500 |
| Oct 25, 2022 | Expired or cancelled expired Sep 2024 | 180 Yerba Buena Av | Z Construction Company Inc | construct (2) new wood dual glazed windows @ (e) west facade wall above garage, relocate (e) terra cotta parapet shingles & lower parapet to allow for new windows. patch & repair stuccoDetails
construct (2) new wood dual glazed windows @ (e) west facade wall above garage, relocate (e) terra cotta parapet shingles & lower parapet to allow for new windows. patch & repair stucco | $4,500 |
| Aug 12, 2022 | Completed final sign-off Jun 2023 | 100 Montgomery St | Rudolph Commercial Interiors Inc, Rci | 13th flr - non structural interior construction and installation of new finishes in (e) vacant suite, const. of interior walls partitions, rcp ligting fixtueres, elec and mech fixtures, millwork, window bunds.Details
13th flr - non structural interior construction and installation of new finishes in (e) vacant suite, const. of interior walls partitions, rcp ligting fixtueres, elec and mech fixtures, millwork, window bunds. | $828,874 |
| Jul 12, 2022 | Completed final sign-off Feb 2023 | 100 Montgomery St | Rudolph Commercial Interiors Inc, Rci | suite# 1800: non-structural interior construction and installation of (n)finishes in existing vacant suite. mech, elect, plumbing and fire sprinkler modification by design build contractor.Details
suite# 1800: non-structural interior construction and installation of (n)finishes in existing vacant suite. mech, elect, plumbing and fire sprinkler modification by design build contractor. | $650,000 |
| Jul 12, 2022 | Completed final sign-off Sep 2022 | 28 02nd St | Trainor Commercial Construction Inc. | 4/f: construction of sofit & interior demountable furniture installation. rev to 202102255364Details
4/f: construction of sofit & interior demountable furniture installation. rev to 202102255364 | $1,000 |
| Jul 8, 2022 | Completed final sign-off Sep 2023 | 248 Sutter St | J & K Project Mgmt Consultants Llc | ti work for hot 8 yoga with non structural walls, new restrooms, locker rooms, yoga studios, laundry room with associated plumbing, mechanical and electricalDetails
ti work for hot 8 yoga with non structural walls, new restrooms, locker rooms, yoga studios, laundry room with associated plumbing, mechanical and electrical | $350,000 |
| Jun 28, 2022 | Completed final sign-off May 2023 | 28 02nd St | Trainor Commercial Construction Inc. | 7th fl: construction of interior partition and demountable furniture, act ceiling, lighting, plumbing fixtures, millwork, finishes. sprinklers and fire alarm under separate permit.Details
7th fl: construction of interior partition and demountable furniture, act ceiling, lighting, plumbing fixtures, millwork, finishes. sprinklers and fire alarm under separate permit. | $250,000 |
| Jun 22, 2022 | Completed final sign-off Nov 2022 | 2241 Market St | Stupakk Construction Inc | rev to pa 202111081998. layout change to reception area. added mechanical, electrical & plumbing. change to reception lay-out.Details
rev to pa 202111081998. layout change to reception area. added mechanical, electrical & plumbing. change to reception lay-out. | $100,000 |
| Jun 14, 2022 | Completed final sign-off Aug 2022 | 1660 Geary Bl | North Star Plumbing & Development Inc | minor tenant improvement to existing karaoke place (k-box), non-structural wall and new bboa tea equipment and finishes.Details
minor tenant improvement to existing karaoke place (k-box), non-structural wall and new bboa tea equipment and finishes. | $25,000 |
| May 31, 2022 | Completed final sign-off Jul 2022 | 301 Hayes St | Astorga Construction Inc | ti of 301 hayes restaurant, non structural walls, equipment and finishes. no lighting changes.Details
ti of 301 hayes restaurant, non structural walls, equipment and finishes. no lighting changes. | $12,500 |
| May 27, 2022 | Completed final sign-off Sep 2024 | 180 Yerba Buena Av | Z Construction Company Inc | remodel all floors of (e) 3 story sfr. remodel (e) kitchen, powder room, and all bedrooms,1 bath rm to be added on the upper fl. one powder rm on the main fl. update all elect, mech, & plumb, and finishes. solarioum under separate permitDetails
remodel all floors of (e) 3 story sfr. remodel (e) kitchen, powder room, and all bedrooms,1 bath rm to be added on the upper fl. one powder rm on the main fl. update all elect, mech, & plumb, and finishes. solarioum under separate permit | $65,000 |
| May 2, 2022 | Completed final sign-off Apr 2025 | 2579 28th Av | 2 bedroom 1 bath: 1st fl. convert a portion of the (e) garage fl into habitable space, 1st fl. remodel will include the additon of a second bath, enclosure of the (e) atrium, rebuild of the (e) back balcony. no work to front facade.Details
2 bedroom 1 bath: 1st fl. convert a portion of the (e) garage fl into habitable space, 1st fl. remodel will include the additon of a second bath, enclosure of the (e) atrium, rebuild of the (e) back balcony. no work to front facade. | $250,000 | |
| Apr 13, 2022 | Completed final sign-off Dec 2022 | 100 Montgomery St | Rudolph Commercial Interiors Inc, Rci | 14th floor: suite 1410 non structural interior construction in extg vacant suite. ada upgraded to extg men's and women's restrooms to full compliance. mep and fire sprinkler by design build contractor under separate permit.Details
14th floor: suite 1410 non structural interior construction in extg vacant suite. ada upgraded to extg men's and women's restrooms to full compliance. mep and fire sprinkler by design build contractor under separate permit. | $280,000 |
| Apr 8, 2022 | Expired or cancelled expired Sep 2024 | 180 Yerba Buena Av | Z Construction Company Inc | replace wood single glazed, devided lite damaged windows with new wood clad windows at (e) location. replace 2 exterior damaged wood doors with new at (e) location. replace wood single car garage doors with new in-kind wood garage doors. street facing windows to be wood. 27 total.Details
replace wood single glazed, devided lite damaged windows with new wood clad windows at (e) location. replace 2 exterior damaged wood doors with new at (e) location. replace wood single car garage doors with new in-kind wood garage doors. street facing windows to be wood. 27 total. | $5,500 |
| Feb 24, 2022 | Completed final sign-off Dec 2022 | 28 02nd St | Trainor Commercial Construction Inc. | 6th floor: construction of interior partition and demountable furniture, act ceiling, lighting, plumbing fixtures, millwork and finishes. this project is located on 6th floor. suite #600. sprinkler and fire alarm system designs will be submitted under seperate permits.Details
6th floor: construction of interior partition and demountable furniture, act ceiling, lighting, plumbing fixtures, millwork and finishes. this project is located on 6th floor. suite #600. sprinkler and fire alarm system designs will be submitted under seperate permits. | $250,000 |
| Feb 17, 2022 | Expired or cancelled cancelled Jan 2023 | 2114 Fillmore St | Hasz Construction Inc | tenant improvement of glaze teriyaki restaurant, non-structural walls, finishes, w/design build plumbing, electrical and mechanicalDetails
tenant improvement of glaze teriyaki restaurant, non-structural walls, finishes, w/design build plumbing, electrical and mechanical | $36,500 |
| Jan 26, 2022 | Completed final sign-off Jul 2022 | 4802 Geary Bl | remodel existing kitchen as it stands. non structuralDetails
remodel existing kitchen as it stands. non structural | $5,000 | |
| Jan 3, 2022 | Completed final sign-off Dec 2022 | 28 02nd St | Trainor Commercial Construction Inc. | 5/f: construction of interior partition , act ceiling, lighting, plumbing fixtures, millwork, and finishes. this project is located on 5/f, ste 500. sprinkler and fire alarm system design will be submitted under sep permits.Details
5/f: construction of interior partition , act ceiling, lighting, plumbing fixtures, millwork, and finishes. this project is located on 5/f, ste 500. sprinkler and fire alarm system design will be submitted under sep permits. | $250,000 |
| Dec 21, 2021 | Never finaled issued Mar 2022, no final | 601 Laguna St | Hasz Construction Inc | tenant improvement of glaze teriyaki restaurant, non-structural walls, equipment, finish with design build plumbing, electrical and mechanical. add address 602 hayes street.Details
tenant improvement of glaze teriyaki restaurant, non-structural walls, equipment, finish with design build plumbing, electrical and mechanical. add address 602 hayes street. | $16,500 |
| Dec 3, 2021 | Never finaled filed Dec 2021, never issued | 566 Kansas St | abate n.o.v 202177691 & legalize master bath at (e) solarium on 3rd flr.leagalize area of roof deck w/3rd flr guardrail outdr space. leagalize relaced wndws w/ (n) layout & type of window at 3rd fl. (n) rear spiral stairsDetails
abate n.o.v 202177691 & legalize master bath at (e) solarium on 3rd flr.leagalize area of roof deck w/3rd flr guardrail outdr space. leagalize relaced wndws w/ (n) layout & type of window at 3rd fl. (n) rear spiral stairs | $9,000 | |
| Nov 23, 2021 | Completed final sign-off Dec 2021 | 4126 18th St | for records only. no new work. this permit: change ground floor commercial to alcohol retail sales per planning commission motion #20982 cua 2021005099.Details
for records only. no new work. this permit: change ground floor commercial to alcohol retail sales per planning commission motion #20982 cua 2021005099. | ||
| Nov 8, 2021 | Completed final sign-off Nov 2022 | 2241 Market St | Stupakk Construction Inc | improvement at gr fl. 6 new rooms, lobby, office and 2 storage rooms, remodel e accessible restroom. no structural or exterior work. no change in useDetails
improvement at gr fl. 6 new rooms, lobby, office and 2 storage rooms, remodel e accessible restroom. no structural or exterior work. no change in use | $118,000 |
| Oct 5, 2021 | Completed final sign-off Jul 2022 | 2301 Bryant St | voluntary access upgrade.(ada compliance)Details
voluntary access upgrade.(ada compliance) | $12,500 | |
| Sep 21, 2021 | Completed final sign-off Mar 2022 | 845 Market St | Rudolph Commercial Interiors Inc, Rci | minor tenant improvement for blondies pizza in food court space. front counter, signage, misc work in existing space. not same equip to remain. minor plumbing and electrical.Details
minor tenant improvement for blondies pizza in food court space. front counter, signage, misc work in existing space. not same equip to remain. minor plumbing and electrical. | $28,500 |
| Aug 25, 2021 | Never finaled filed Aug 2021, never issued | 1131 Anza St | demolition of a type 5, 2 story two family dwelling unit, for block lot: 1545/051Details
demolition of a type 5, 2 story two family dwelling unit, for block lot: 1545/051 | $35,000 | |
| Aug 25, 2021 | Never finaled filed Aug 2021, never issued | 1131 Anza St | erect new 4 story two family dwelling unit, add adu, type 5 construction on block/lot 1545/051.Details
erect new 4 story two family dwelling unit, add adu, type 5 construction on block/lot 1545/051. | $300,000 | |
| Aug 4, 2021 | Completed final sign-off Jul 2022 | 4802 Geary Bl | Partners Construction Inc | unit #4802: convert a portion of an (e) porch into a bathroom. relocate (e) elec panel, water heater & stacked w/d on 2nd fl. residential unit.Details
unit #4802: convert a portion of an (e) porch into a bathroom. relocate (e) elec panel, water heater & stacked w/d on 2nd fl. residential unit. | $10,000 |
| May 7, 2021 | Expired or cancelled withdrawn Mar 2022 | 2136 Palou Av | interior tenant improvement for commissary kitchens, restrooms. storage, food truck parking and offices in an existing vacant warehouse building. mep plans included.Details
interior tenant improvement for commissary kitchens, restrooms. storage, food truck parking and offices in an existing vacant warehouse building. mep plans included. | $580,000 | |
| Mar 4, 2021 | Expired or cancelled cancelled Jan 2026 | 1700 Lombard St | accessibility upgrades to vacant commercial space. lower floor level to remove step. remodel (e) restroom. ada compliance.Details
accessibility upgrades to vacant commercial space. lower floor level to remove step. remodel (e) restroom. ada compliance. | $156,000 | |
| Feb 4, 2021 | Completed final sign-off Feb 2024 | 474 Liberty St | Z Construction Company Inc | build single story 102 ft horizontal addition on g/f to extend (e) family room 7.5 ft to rear yard. build roof deck above addition with french doors into (e) adjacent room. install exterior stair from roof deck to rear yard. build interior wall to divide (e) family room & create guest bedroom.Details
build single story 102 ft horizontal addition on g/f to extend (e) family room 7.5 ft to rear yard. build roof deck above addition with french doors into (e) adjacent room. install exterior stair from roof deck to rear yard. build interior wall to divide (e) family room & create guest bedroom. | $50,000 |
| Nov 30, 2020 | Never finaled issued Feb 2021, no final | 1033 Sanchez St | Z Construction Company Inc | revision to pa #2018-0313-3583: provide nfpa-13r system per code for new adu at basement level. revise from previosly approved nfpa-13 system.Details
revision to pa #2018-0313-3583: provide nfpa-13r system per code for new adu at basement level. revise from previosly approved nfpa-13 system. | |
| Nov 2, 2020 | Expired or cancelled withdrawn Feb 2021 | 2136 Palou Av | interior tenant improvement for commissary kitchens, restrooms, storage, walk-in coolers with associated plumbing, mechanical and electrical.Details
interior tenant improvement for commissary kitchens, restrooms, storage, walk-in coolers with associated plumbing, mechanical and electrical. | $780,000 | |
| Oct 17, 2020 | Completed final sign-off Feb 2021 | 422 Lyon St | Urban Builder General Contracting Inc | revision to pa 201709158388. soft story upgrade.Details
revision to pa 201709158388. soft story upgrade. | $100,000 |
| Sep 30, 2020 | Completed final sign-off Mar 2021 | 4015 Cesar Chavez St | replace damaged windows with like in-kind, new finishes at front of building. enlarge rear door opening.Details
replace damaged windows with like in-kind, new finishes at front of building. enlarge rear door opening. | $75,000 | |
| Aug 14, 2020 | Never finaled filed Aug 2020, never issued | 422 Lyon St | conversion of existing basement used from storagae into 2 adu's per ordinance no 162-17.Details
conversion of existing basement used from storagae into 2 adu's per ordinance no 162-17. | $60,000 | |
| May 21, 2020 | Completed final sign-off Feb 2022 | 100 Montgomery St | Rudolph Commercial Interiors Inc, Rci | 18th flr. non-structural interior alteration in (e) vacant suite. ada upgrades to (e) men and women's restrooms to full compliance. mep and fire sprinkler by design-build contractorDetails
18th flr. non-structural interior alteration in (e) vacant suite. ada upgrades to (e) men and women's restrooms to full compliance. mep and fire sprinkler by design-build contractor | $742,398 |
| Feb 25, 2020 | Never finaled issued Mar 2020, no final | 333 03rd St | Bhogal Brothers Construction Inc | demolition of interior walls (non-structural) & finishes in an vacant space. ab-017.Details
demolition of interior walls (non-structural) & finishes in an vacant space. ab-017. | $14,500 |
| Jan 13, 2020 | Completed final sign-off Dec 2021 | 100 Montgomery St | Rudolph Commercial Interiors Inc, Rci | 15th floor: non structural interior construction in extg vacant suite. ada upgrade to extg men's and women's by design build contractors.Details
15th floor: non structural interior construction in extg vacant suite. ada upgrade to extg men's and women's by design build contractors. | $1,600,000 |
| Dec 24, 2019 | Expired or cancelled cancelled Feb 2024 | 865 Market St | disabled access compliance status ab-056Details
disabled access compliance status ab-056 | ||
| Dec 24, 2019 | Expired or cancelled cancelled Feb 2024 | 845 Market St | disabled access compliance status ab-056Details
disabled access compliance status ab-056 | ||
| Dec 6, 2019 | Completed final sign-off Feb 2020 | 121 Spear St | Marchetti Group | ground fl suite b8: demolition of non-structural walls & finishes.Details
ground fl suite b8: demolition of non-structural walls & finishes. | $20,000 |
| Oct 28, 2019 | Completed final sign-off Sep 2021 | 721 Larkin St | Kobuksan Construction | t.i. of sweet glory dessert cafe, non-strutural walls, equipment, finishes with associated plumbing, electrical and mechanical.Details
t.i. of sweet glory dessert cafe, non-strutural walls, equipment, finishes with associated plumbing, electrical and mechanical. | $38,000 |
| Oct 22, 2019 | Completed final sign-off Nov 2019 | 115 Sansome St | Gci, Inc | 10th floor: revision to pa#201909202216. reconfigure office layout to reflect under 50 occupancyDetails
10th floor: revision to pa#201909202216. reconfigure office layout to reflect under 50 occupancy | |
| Oct 17, 2019 | Completed final sign-off May 2022 | 301 Valencia St | O Donoghue Construction Inc. | residential: soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. ref pa 2017-0912-7842 & 2017-0912-7848 soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4.Details
residential: soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. ref pa 2017-0912-7842 & 2017-0912-7848 soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. | $769,358 |
| Oct 16, 2019 | Completed final sign-off Nov 2020 | 301 Valencia St | O Donoghue Construction Inc. | commercial: soft story upgrades to (e) historic building ada upgrades to (e) restrooms to full compliance. ref pa 2017-0912-7842 and 2017-0912-7848 soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
commercial: soft story upgrades to (e) historic building ada upgrades to (e) restrooms to full compliance. ref pa 2017-0912-7842 and 2017-0912-7848 soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $80,000 |
| Sep 24, 2019 | Never finaled issued Nov 2019, no final | 865 Market St | Rylko Builders Inc. | (e) storefront redesign. nordstrom display (d2) fire life safety and fire sprinklers to be under sep permit. ti storefront under sep permit. landlord shell work refer to 201702099047 new ada post w high low door opener within property lineDetails
(e) storefront redesign. nordstrom display (d2) fire life safety and fire sprinklers to be under sep permit. ti storefront under sep permit. landlord shell work refer to 201702099047 new ada post w high low door opener within property line | $80,000 |
| Sep 23, 2019 | Never finaled issued Nov 2019, no final | 100 Montgomery St | Rudolph Commercial Interiors Inc, Rci | demolition of non-structural storefront and addition of storefront of retail ground level. installation of demising wallsDetails
demolition of non-structural storefront and addition of storefront of retail ground level. installation of demising walls | $784,185 |
| Sep 20, 2019 | Completed final sign-off Jan 2020 | 115 Sansome St | Gci, Inc | 10th flr. demo of non structural interior walls, installtion of (n) non structural walls & finishesDetails
10th flr. demo of non structural interior walls, installtion of (n) non structural walls & finishes | $454,084 |
| Sep 20, 2019 | Completed final sign-off Jun 2020 | 100 Montgomery St | Rudolph Commercial Interiors Inc, Rci | demoltion of door & glazing at ground floor lobby & installation of (n)door at elevator lobby.Details
demoltion of door & glazing at ground floor lobby & installation of (n)door at elevator lobby. | $12,400 |
| Sep 13, 2019 | Never finaled filed Sep 2019, never issued | 1501 Tennessee St | comply w/nov 201778281 to legalize use and provide egress, disabled access as well as memorialize fire separation for space occupied by el nino gym. ventilation under separate permit. add new address of 2920 - 3rd st. (4) bathrooms @ mezzanineDetails
comply w/nov 201778281 to legalize use and provide egress, disabled access as well as memorialize fire separation for space occupied by el nino gym. ventilation under separate permit. add new address of 2920 - 3rd st. (4) bathrooms @ mezzanine | $15,000 | |
| Aug 29, 2019 | Never finaled issued Feb 2021, no final | 639 Geary St | Advanced Home Energy Inc. | revision to pa# 201612296199. reduction of scope for final inspection. the only areas of work which was completed was work area 4 and partial work to work area 1. no work done in other areas.Details
revision to pa# 201612296199. reduction of scope for final inspection. the only areas of work which was completed was work area 4 and partial work to work area 1. no work done in other areas. |