Donald Swanson
- Listed as
- authorized agent-others, contractor
- Firm
- G Swanson Constr. Inc.
- Based in
- Milpitas
- On San Francisco permits
- Sep 2000 to Jun 2026
156 permits since 2000 (contractor on 156 permits, authorized agent-others on 3 permits): 124 completed, 5 in progress, 21 never finaled, 6 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 156.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 29, 2026 | In progress issued Jul 2026 | 2001 Mission St | G Swanson Constr. Inc. | tenant improvement to existing us bank. mechanincal and electrical upgrades only architectural/ada compliance under 202605292144Details
tenant improvement to existing us bank. mechanincal and electrical upgrades only architectural/ada compliance under 202605292144 | $55,000 |
| Jun 23, 2026 | Completed final sign-off Jul 2026 | 106 West Portal Av | G Swanson Constr. Inc. | to obtain final inspection for work approved under pa # 201912260709 & 202007099884. all work is complete.Details
to obtain final inspection for work approved under pa # 201912260709 & 202007099884. all work is complete. | |
| May 29, 2026 | In progress issued Jun 2026 | 2001 Mission St | G Swanson Constr. Inc. | ground floor- ti of (e) us bank space to include addition of banking equipment, accessiblity upgrades, power (outlet) additions, and millworkDetails
ground floor- ti of (e) us bank space to include addition of banking equipment, accessiblity upgrades, power (outlet) additions, and millwork | $163,750 |
| Mar 24, 2026 | Completed final sign-off Jun 2026 | 106 West Portal Av | G Swanson Constr. Inc. | add a new greeter desk focal wall to the existing lobby area. existing beverage bar to be removed and new closet added. scope of work includes typical electrical modifications as needed. ther are no planned alterations to the mechanical,plumbing,fire protection or overall building structureDetails
add a new greeter desk focal wall to the existing lobby area. existing beverage bar to be removed and new closet added. scope of work includes typical electrical modifications as needed. ther are no planned alterations to the mechanical,plumbing,fire protection or overall building structure | $65,000 |
| Dec 23, 2025 | Completed final sign-off Apr 2026 | 1850 Irving St | G Swanson Constr. Inc. | revision to pa# 202503242856: to include new oneline diagram and load calculation table.Details
revision to pa# 202503242856: to include new oneline diagram and load calculation table. | $35,000 |
| Nov 19, 2025 | Completed final sign-off Aug 2026 | 44 Montgomery St | G Swanson Constr. Inc. | l 1 suite 140: t.i. : demo of existing and install of new partitions, millwork, equipment,and finishes. no exterior or structural work.Details
l 1 suite 140: t.i. : demo of existing and install of new partitions, millwork, equipment,and finishes. no exterior or structural work. | $750,000 |
| Oct 24, 2025 | Completed final sign-off Mar 2026 | 315 Montgomery St | G Swanson Constr. Inc. | deferred submittal for pa# 2025-0610-8308. installation of bank teller line bandit barrierDetails
deferred submittal for pa# 2025-0610-8308. installation of bank teller line bandit barrier | |
| Jul 21, 2025 | Completed final sign-off Mar 2026 | 443 Castro St | G Swanson Constr. Inc., Construction Resources Inc | 1st/fl: interior tenant improvement for existing us bank at their existing 1820 sqft single space that recently had fire damage. contents of the interior has been demolished under previous permit. restoring the bank to its original look prior to the fire. new mechanical electrical & plumbing equipmeDetails
1st/fl: interior tenant improvement for existing us bank at their existing 1820 sqft single space that recently had fire damage. contents of the interior has been demolished under previous permit. restoring the bank to its original look prior to the fire. new mechanical electrical & plumbing equipme | $1,649,600 |
| Jul 1, 2025 | Completed final sign-off May 2026 | 1455 Stockton St | G Swanson Constr. Inc. | interior modification to an existing financial center modification teller line, addition and modification offices, finishes, furniture, and equipment. no changes to use, occupancy or floor area.Details
interior modification to an existing financial center modification teller line, addition and modification offices, finishes, furniture, and equipment. no changes to use, occupancy or floor area. | $435,000 |
| Jun 10, 2025 | Completed final sign-off Mar 2026 | 315 Montgomery St | G Swanson Constr. Inc. | 1st fl: reconfiguration of teller line, breakroom, furniture and finishes upgrade. interior tenant improvement of (e) space. no change of use or occupancy. (e) bank of americaDetails
1st fl: reconfiguration of teller line, breakroom, furniture and finishes upgrade. interior tenant improvement of (e) space. no change of use or occupancy. (e) bank of america | $850,000 |
| Mar 26, 2025 | In progress issued Mar 2025 | 1525 Market St | G Swanson Constr. Inc. | 8/fl-remove (e) exterior channel letters for bank of america facing street located on the north mech. house on the 8th floor. will stucco and waterproof (e) holes to match (e) siding.Details
8/fl-remove (e) exterior channel letters for bank of america facing street located on the north mech. house on the 8th floor. will stucco and waterproof (e) holes to match (e) siding. | $2,000 |
| Mar 24, 2025 | Completed final sign-off Apr 2026 | 1850 Irving St | G Swanson Constr. Inc. | phase 2 - commercial ti existing us bank, including ada upgrades. phase 2. no work in public rowDetails
phase 2 - commercial ti existing us bank, including ada upgrades. phase 2. no work in public row | $62,000 |
| Mar 13, 2025 | In progress issued Mar 2025 | 1525 Market St | G Swanson Constr. Inc. | paint over existing blade sign.Details
paint over existing blade sign. | $750 |
| Mar 13, 2025 | In progress issued Mar 2025 | 1525 Market St | G Swanson Constr. Inc. | paint over existing sign awning.Details
paint over existing sign awning. | $750 |
| Feb 19, 2025 | Completed final sign-off Apr 2026 | 1850 Irving St | G Swanson Constr. Inc. | hvac upgrades to existing bankDetails
hvac upgrades to existing bank | $125,000 |
| Feb 10, 2025 | Completed final sign-off Sep 2025 | 1435 Stockton St | G Swanson Constr. Inc. | tenant improvement to (e) us bank to include millwork, finishes, bank equipment & partitions /interior doorsDetails
tenant improvement to (e) us bank to include millwork, finishes, bank equipment & partitions /interior doors | $83,000 |
| Jan 27, 2025 | Completed final sign-off Mar 2025 | 443 Castro St | G Swanson Constr. Inc. | interior demo for us bank of existing 1689 square foot space to comply with nov 20202432460. ab-017 appliesDetails
interior demo for us bank of existing 1689 square foot space to comply with nov 20202432460. ab-017 applies | $150,000 |
| Jan 13, 2025 | Completed final sign-off Sep 2025 | 3550 Geary Bl | G Swanson Constr. Inc. | install new banking equipment and associated electrical and plumbing w/underground work. remove and replace milwork and ada upgrades. no exterior workDetails
install new banking equipment and associated electrical and plumbing w/underground work. remove and replace milwork and ada upgrades. no exterior work | $192,300 |
| Jan 13, 2025 | Completed final sign-off Sep 2025 | 3550 Geary Bl | G Swanson Constr. Inc. | install new mechanical components at existing bank with associated electricals plumbingDetails
install new mechanical components at existing bank with associated electricals plumbing | $125,000 |
| Jul 11, 2024 | Completed final sign-off Oct 2024 | 245 Winston Dr | G Swanson Constr. Inc. | project is an exterior improvement of e bank. no additonal area or height is part scope. scope is limited to exterior only including removal of existing metal clad awning, painting exterior walls and installation of bollard in front of atm sunshade.Details
project is an exterior improvement of e bank. no additonal area or height is part scope. scope is limited to exterior only including removal of existing metal clad awning, painting exterior walls and installation of bollard in front of atm sunshade. | $100,000 |
| May 31, 2024 | Completed final sign-off Mar 2025 | 4098 24th St | G Swanson Constr. Inc. | alteration level 2: interior reconfiguration of office area, csr area, and back of house areas including wellness room, atm, and work room with new ceiling layout, finishes, and furniture.Details
alteration level 2: interior reconfiguration of office area, csr area, and back of house areas including wellness room, atm, and work room with new ceiling layout, finishes, and furniture. | $430,000 |
| Mar 12, 2024 | Completed final sign-off Aug 2024 | 1007 Taraval St | G Swanson Constr. Inc. | project is exterior improvement of an (e) bank (bank of america). no additional area or height is part of the scope. scope is limited to exterior only including but not limited to cleaning and painting the exterior of the building and replaceing (1) light fixture.Details
project is exterior improvement of an (e) bank (bank of america). no additional area or height is part of the scope. scope is limited to exterior only including but not limited to cleaning and painting the exterior of the building and replaceing (1) light fixture. | $175,000 |
| Feb 27, 2024 | Completed final sign-off Aug 2024 | 555 California St | G Swanson Constr. Inc. | basemnt ti. 891 sf non structural remodel of mail room in an existing office tenant space. work including minor demo. remove (1) existing door with wall infll, (1) new non-bearing partition, new ceiling, existing doors to receive new door hardware, finishes,furnitures and card readers at entry doorsDetails
basemnt ti. 891 sf non structural remodel of mail room in an existing office tenant space. work including minor demo. remove (1) existing door with wall infll, (1) new non-bearing partition, new ceiling, existing doors to receive new door hardware, finishes,furnitures and card readers at entry doors | $40,000 |
| Jan 30, 2024 | Completed final sign-off May 2024 | 944 Stockton St | G Swanson Constr. Inc. | interior renovation of the back of house in an extg bank branch back of houose area in a high rise, multi-tenant mixed use bldg. scope of work includes: ceiling grid and tile replacement, lighting, finishes, flooring, millwork, furniture and equipment.Details
interior renovation of the back of house in an extg bank branch back of houose area in a high rise, multi-tenant mixed use bldg. scope of work includes: ceiling grid and tile replacement, lighting, finishes, flooring, millwork, furniture and equipment. | $120,000 |
| Oct 20, 2023 | Completed final sign-off Mar 2026 | 4610 Mission St | G Swanson Constr. Inc. | t.i.: interior remodel of flooring,power, millwork cabinet & acessibilty items. exterior: parking restriping (gate & curb cut) & exterior sign by owner's vendor (sep permit). interior scope is limited to be under cal valuation threshhod of $200299.Details
t.i.: interior remodel of flooring,power, millwork cabinet & acessibilty items. exterior: parking restriping (gate & curb cut) & exterior sign by owner's vendor (sep permit). interior scope is limited to be under cal valuation threshhod of $200299. | $575,000 |
| Oct 17, 2023 | Completed final sign-off May 2024 | 1640 Van Ness Av | G Swanson Constr. Inc. | tenant improvement of existing bank, scope limited to interior only, finishes, partitions, minor electrical.Details
tenant improvement of existing bank, scope limited to interior only, finishes, partitions, minor electrical. | $77,415 |
| Aug 3, 2023 | Completed final sign-off Nov 2023 | 188 Spear St | G Swanson Constr. Inc. | 7/f: install interior partitions, door and card reader to enclose secure storage room, project area is approx 698 sqft.Details
7/f: install interior partitions, door and card reader to enclose secure storage room, project area is approx 698 sqft. | $30,000 |
| Jan 12, 2023 | Completed final sign-off May 2023 | 555 California St | G Swanson Constr. Inc. | replacement of furniture, floor and wall finishes and electrial and data receptacles in the existing telepresence room on level 44Details
replacement of furniture, floor and wall finishes and electrial and data receptacles in the existing telepresence room on level 44 | $45,000 |
| Aug 12, 2022 | Completed final sign-off May 2023 | 18 Geary St | G Swanson Constr. Inc. | to comply with the accessible business entry program. abe 202206071311. installing of automatic door operator, interior and exterior push plates at existing entrance doors.Details
to comply with the accessible business entry program. abe 202206071311. installing of automatic door operator, interior and exterior push plates at existing entrance doors. | $50,000 |
| Jun 16, 2022 | Completed final sign-off Dec 2022 | 501 Castro St | G Swanson Constr. Inc. | cleaning and painting of exterior building facade. remove extg sheet metal panels and install painting stucco finish at extg atm wall. no change in bldg footprint, no change in use/occupancyDetails
cleaning and painting of exterior building facade. remove extg sheet metal panels and install painting stucco finish at extg atm wall. no change in bldg footprint, no change in use/occupancy | $25,000 |
| Jan 26, 2022 | Completed final sign-off Jul 2022 | 5150 Mission St | G Swanson Constr. Inc. | exterior modification of bank, exterior signage upgrade, clearning/patching stucco, re clad metal canopy. all signate uder separate permit. mosaic murals to remain. no additional area/height.Details
exterior modification of bank, exterior signage upgrade, clearning/patching stucco, re clad metal canopy. all signate uder separate permit. mosaic murals to remain. no additional area/height. | $45,000 |
| Dec 3, 2021 | Completed final sign-off Dec 2021 | 555 California St | G Swanson Constr. Inc. | flrs 6 & 11: revise pa 202102195039 cover page to state no mechanical work and electrical work only on flr 6.Details
flrs 6 & 11: revise pa 202102195039 cover page to state no mechanical work and electrical work only on flr 6. | |
| Nov 5, 2021 | Completed final sign-off Jul 2022 | 2675 Geary Bl | G Swanson Constr. Inc. | ste 105. t.i. of extg retail space. no additional height or area in this scope. interior only. new partitions and associated mech, electrical, and plumbing work. new finishes to be installed throughout.Details
ste 105. t.i. of extg retail space. no additional height or area in this scope. interior only. new partitions and associated mech, electrical, and plumbing work. new finishes to be installed throughout. | $900,000 |
| Sep 8, 2021 | Completed final sign-off Jul 2022 | 1995 Union St | G Swanson Constr. Inc. | to remove (e) vault located at the bank of america which is being decommissioned,adding a bath. bank is vacant space. adding one new restroom & associated mepDetails
to remove (e) vault located at the bank of america which is being decommissioned,adding a bath. bank is vacant space. adding one new restroom & associated mep | $197,000 |
| Jun 29, 2021 | Completed final sign-off Jan 2022 | 1640 Van Ness Av | G Swanson Constr. Inc. | exterior improvement of (e) bank. no additional area or height is part of the scope. including but not limited to partial demo of painting, signage, & (n) canopy lighting. signage removal under separate permit.Details
exterior improvement of (e) bank. no additional area or height is part of the scope. including but not limited to partial demo of painting, signage, & (n) canopy lighting. signage removal under separate permit. | $35,000 |
| May 28, 2021 | Never finaled issued Jun 2021, no final | 555 California St | G Swanson Constr. Inc. | 6th flr - existing circuits feeding old electricfied furniture will be demoed and removed. new and some existing circuits will be installed to feed new electricfied furnitures. ref pa 202102195039.Details
6th flr - existing circuits feeding old electricfied furniture will be demoed and removed. new and some existing circuits will be installed to feed new electricfied furnitures. ref pa 202102195039. | $75,000 |
| Apr 27, 2021 | Never finaled issued May 2021, no final | 50 California St | G Swanson Constr. Inc. | 1st fl: installation of a new wellness room. to comply with california state labor code chapter 3.8, lactation accomodation sections 1030-1034.Details
1st fl: installation of a new wellness room. to comply with california state labor code chapter 3.8, lactation accomodation sections 1030-1034. | $5,500 |
| Feb 19, 2021 | Completed final sign-off Dec 2021 | 555 California St | G Swanson Constr. Inc. | 6th floor and 11th floor: partial floor remodel and full finishes. non-structural demolition, new non load bearing partitions. new interior finishes.Details
6th floor and 11th floor: partial floor remodel and full finishes. non-structural demolition, new non load bearing partitions. new interior finishes. | $256,725 |
| Dec 4, 2020 | Completed final sign-off May 2021 | 5500 Geary Bl | G Swanson Constr. Inc. | installation of bandit barrier at (e) bank. structural only. no demo. no mep. interior only. no deferred submittals.Details
installation of bandit barrier at (e) bank. structural only. no demo. no mep. interior only. no deferred submittals. | $35,000 |
| Nov 23, 2020 | Completed final sign-off Aug 2021 | 1 California St | G Swanson Constr. Inc. | 21st fl: int tenant improvement (e) off space. work incl non-struc demo & add of non-load bearing walls, doors & refresh of int finishes. no struc work. no chg of occup. no chg of use. new air distrib in area of work with new heat pump. ref pa 202010015688. sprinkler/fire alarm under sep permits.Details
21st fl: int tenant improvement (e) off space. work incl non-struc demo & add of non-load bearing walls, doors & refresh of int finishes. no struc work. no chg of occup. no chg of use. new air distrib in area of work with new heat pump. ref pa 202010015688. sprinkler/fire alarm under sep permits. | $491,750 |
| Oct 24, 2020 | Completed final sign-off Jul 2021 | 1 Powell St | G Swanson Constr. Inc. | g/f: t.i. for removal of an non-load bearing paritions for breakroom & install new paritions associated finishes, electrical, and light fixture. accessible upgrades. maher n/aDetails
g/f: t.i. for removal of an non-load bearing paritions for breakroom & install new paritions associated finishes, electrical, and light fixture. accessible upgrades. maher n/a | $10,000 |
| Oct 1, 2020 | Completed final sign-off Aug 2021 | 1 California St | G Swanson Constr. Inc. | barrier removal only at 21st fl. toilet rooms, remove, replace relocate accessories, all plumb fixtures to remain no mep sprinkler or life safety as all (e) equipment and devices to remain. n/a maherDetails
barrier removal only at 21st fl. toilet rooms, remove, replace relocate accessories, all plumb fixtures to remain no mep sprinkler or life safety as all (e) equipment and devices to remain. n/a maher | $29,685 |
| Sep 14, 2020 | Completed final sign-off Feb 2021 | 501 Castro St | G Swanson Constr. Inc. | revision to pa# 202002255299. minor electrical changes and entry way floor plans.Details
revision to pa# 202002255299. minor electrical changes and entry way floor plans. | |
| Sep 2, 2020 | Completed final sign-off Feb 2021 | 800 Irving St | G Swanson Constr. Inc. | deferred submittal for existing pa# 202001162067. bandit barrier/teller line install.Details
deferred submittal for existing pa# 202001162067. bandit barrier/teller line install. | |
| Jul 16, 2020 | Completed final sign-off Oct 2020 | 1233 Castro St | G Swanson Constr. Inc. | comply w/ abe program. voluntary accessibility upgrade only to the main entrance door for this ste. per cbc 2019 ccr title 24. project scope will not alter bldg envelope, structure, or occupant load. no interior scope of work. exterior scope of work of accessiblity upgrade to main entrance landing.Details
comply w/ abe program. voluntary accessibility upgrade only to the main entrance door for this ste. per cbc 2019 ccr title 24. project scope will not alter bldg envelope, structure, or occupant load. no interior scope of work. exterior scope of work of accessiblity upgrade to main entrance landing. | $6,000 |
| Feb 25, 2020 | Completed final sign-off Jan 2021 | 501 Castro St | G Swanson Constr. Inc. | interior t.i. demo of extg non-bearing partitions, ceiling finishes, doors, millwork, floor finihses & associated mechanical, plumbing, electrical & lighting fixtures. construction of non bearing partitions for offices, tellers, lobby, break rm & associated doors, ceilings, finishes, elec, mechanicDetails
interior t.i. demo of extg non-bearing partitions, ceiling finishes, doors, millwork, floor finihses & associated mechanical, plumbing, electrical & lighting fixtures. construction of non bearing partitions for offices, tellers, lobby, break rm & associated doors, ceilings, finishes, elec, mechanic | $1,300,000 |
| Dec 3, 2019 | Completed final sign-off Jan 2020 | 4098 24th St | G Swanson Constr. Inc. | install prefab interior wall assembliesDetails
install prefab interior wall assemblies | $45,200 |
| Nov 21, 2019 | Completed final sign-off Oct 2020 | 800 Irving St | G Swanson Constr. Inc. | remediation of (e) exterior paths of travel. replacing non-compliant sidewalks that have excessive slope or cross slope with compliant level landing on exterior business entry door.Details
remediation of (e) exterior paths of travel. replacing non-compliant sidewalks that have excessive slope or cross slope with compliant level landing on exterior business entry door. | $250,000 |
| Nov 1, 2019 | Completed final sign-off Jan 2020 | 2325 Noriega St | G Swanson Constr. Inc. | install power activated door hardware maher not reqDetails
install power activated door hardware maher not req | $20,000 |
| Oct 24, 2019 | Never finaled issued Oct 2019, no final | 1455 Stockton St | G Swanson Constr. Inc. | street spaceDetails
street space | |
| Oct 24, 2019 | Never finaled issued Oct 2019, no final | 4098 24th St | G Swanson Constr. Inc. | street spaceDetails
street space | |
| Oct 22, 2019 | Completed final sign-off Dec 2019 | 15 Ocean Av | G Swanson Constr. Inc. | accessiblity upgrade of (e) exterior ramp slopeDetails
accessiblity upgrade of (e) exterior ramp slope | $25,000 |
| Oct 18, 2019 | Completed final sign-off Jul 2020 | 4098 24th St | G Swanson Constr. Inc. | t.i. improvement of an (e) bank, no additional area or ht. is part of the scope. scope is limited to removal of an (e) exterior atm & its associated surround patch & pair of exterior wall to match (e) & installation of a new atm surroundDetails
t.i. improvement of an (e) bank, no additional area or ht. is part of the scope. scope is limited to removal of an (e) exterior atm & its associated surround patch & pair of exterior wall to match (e) & installation of a new atm surround | $7,500 |
| Oct 17, 2019 | Completed final sign-off Dec 2020 | 315 Montgomery St | G Swanson Constr. Inc. | 5th floor t.i. /interior alateration to extg 5th floor. new partitions, doors, ceilings, light fixtures. millwork and finishes. fully sprinklered bldg. meps and structural included.Details
5th floor t.i. /interior alateration to extg 5th floor. new partitions, doors, ceilings, light fixtures. millwork and finishes. fully sprinklered bldg. meps and structural included. | $1,200,000 |
| Sep 12, 2019 | Completed final sign-off Sep 2019 | 1 Powell St | G Swanson Constr. Inc. | ref 201806192207 shop dwgs to install teller lineDetails
ref 201806192207 shop dwgs to install teller line | |
| Sep 3, 2019 | Completed final sign-off Dec 2019 | 1640 Van Ness Av | G Swanson Constr. Inc. | replace (e) vestible glass enclosure install bandit barrierDetails
replace (e) vestible glass enclosure install bandit barrier | $325,000 |
| Aug 8, 2019 | Never finaled issued Aug 2019, no final | 1335 04th St | G Swanson Constr. Inc. | reference to permit #201902284052. shop drawings to install teller line.Details
reference to permit #201902284052. shop drawings to install teller line. | |
| Aug 6, 2019 | Expired or cancelled cancelled Jan 2026 | 2835 Geary Bl | G Swanson Constr. Inc. | voluntary ada upgrade for bank of america including adjusting door closer, acceibility signage, and accesibilty upgrade to path of travel and parking stallsDetails
voluntary ada upgrade for bank of america including adjusting door closer, acceibility signage, and accesibilty upgrade to path of travel and parking stalls | $80,000 |
| Aug 1, 2019 | Completed final sign-off Jun 2020 | 555 California St | G Swanson Constr. Inc. | 6th fl mech and electrical 201907095377Details
6th fl mech and electrical 201907095377 | |
| Jul 9, 2019 | Completed final sign-off Jun 2020 | 555 California St | G Swanson Constr. Inc. | 6th fl - ti, interior, (n) finishes to select areas. bldg fully sprinkleredDetails
6th fl - ti, interior, (n) finishes to select areas. bldg fully sprinklered | $220,000 |
| Jul 2, 2019 | Completed final sign-off Feb 2020 | 3250 Mission St | G Swanson Constr. Inc. | voluntary barrier removal upgrade per cbc 11b 202.4 at interior of bank. new tactile signs, remove and install new check desk, replqace entry door, new partial height and cntrtop. at exterior, modifications will be made to e accessible parking, located within property lineDetails
voluntary barrier removal upgrade per cbc 11b 202.4 at interior of bank. new tactile signs, remove and install new check desk, replqace entry door, new partial height and cntrtop. at exterior, modifications will be made to e accessible parking, located within property line | $115,000 |
| Jun 18, 2019 | Completed final sign-off Nov 2019 | 1455 Stockton St | G Swanson Constr. Inc. | revision to pa #201903155392. interior ti - provide details for partitions. deferrref submittal to pa #201903155392.Details
revision to pa #201903155392. interior ti - provide details for partitions. deferrref submittal to pa #201903155392. | |
| Jun 7, 2019 | Completed final sign-off Jan 2020 | 4098 24th St | G Swanson Constr. Inc. | int ti of (e) bank - no additioal area or height, demo of int partitions (non-load bearing), doors, millwork, finishes & assoc mep & light fixtures. new work - installation of non load bearing partitions, doors, millwork, finishes & assoc mep & light fixturesDetails
int ti of (e) bank - no additioal area or height, demo of int partitions (non-load bearing), doors, millwork, finishes & assoc mep & light fixtures. new work - installation of non load bearing partitions, doors, millwork, finishes & assoc mep & light fixtures | $845,000 |
| Jun 5, 2019 | Completed final sign-off Jul 2020 | 4098 24th St | G Swanson Constr. Inc. | exterior work only, make sidewalks ada compliant add ada atm.Details
exterior work only, make sidewalks ada compliant add ada atm. | $25,000 |
| May 24, 2019 | Completed final sign-off Jan 2021 | 1 Powell St | G Swanson Constr. Inc. | interior ti work includes addition of wellness room in the (e) breakroom. mepDetails
interior ti work includes addition of wellness room in the (e) breakroom. mep | $10,000 |
| May 17, 2019 | Completed final sign-off Nov 2019 | 1455 Stockton St | G Swanson Constr. Inc. | remove ceiling tile due to mold replace w/gypbd (n) lighting layout revised mech to use (e)Details
remove ceiling tile due to mold replace w/gypbd (n) lighting layout revised mech to use (e) | |
| Apr 30, 2019 | Completed final sign-off Aug 2021 | 1007 Taraval St | G Swanson Constr. Inc. | ti of existing bank. no additional area or height is part of the scope. interior only including but not limited to partial demo of interior spaces, new finishes, partitions, mechanical, electrical and plumbingDetails
ti of existing bank. no additional area or height is part of the scope. interior only including but not limited to partial demo of interior spaces, new finishes, partitions, mechanical, electrical and plumbing | $865,000 |
| Apr 26, 2019 | Completed final sign-off Jun 2021 | 1 Market St | G Swanson Constr. Inc. | 1st flr. demo non-bearing partitions, ceiling, doors, flooring. construct partitions for wellness room, new door, ceiling and mech & electr.Details
1st flr. demo non-bearing partitions, ceiling, doors, flooring. construct partitions for wellness room, new door, ceiling and mech & electr. | $20,000 |
| Mar 22, 2019 | Completed final sign-off Jun 2019 | 5150 Mission St | G Swanson Constr. Inc. | as approved by sf dpw per minor sidewalk encoarchment permit #17mse-0579, a push button will be installed at the mission st entrance to comply with sf dbi information sheet da-04 the use of power door operators inlieu of level landing at door. this also fulfills sf information sheet da-17.Details
as approved by sf dpw per minor sidewalk encoarchment permit #17mse-0579, a push button will be installed at the mission st entrance to comply with sf dbi information sheet da-04 the use of power door operators inlieu of level landing at door. this also fulfills sf information sheet da-17. | $250 |
| Mar 15, 2019 | Completed final sign-off Nov 2019 | 1455 Stockton St | G Swanson Constr. Inc. | interior ti new partial height partitions. new wellness room, new unisex restroom ada teller accessibility compliance, new lighting,mepDetails
interior ti new partial height partitions. new wellness room, new unisex restroom ada teller accessibility compliance, new lighting,mep | $860,000 |
| Mar 7, 2019 | Completed final sign-off Jun 2021 | 1 Market St | G Swanson Constr. Inc. | revision to app#201812037273 switch ada restroom location. modify teller partition. 300 sq ft. n/a for maherDetails
revision to app#201812037273 switch ada restroom location. modify teller partition. 300 sq ft. n/a for maher | $20,000 |
| Feb 28, 2019 | Never finaled issued Apr 2019, no final | 1335 04th St | G Swanson Constr. Inc. | new interior t.i. restrooms, breakroom, teller line, doors, millwork, flooring and mep'sDetails
new interior t.i. restrooms, breakroom, teller line, doors, millwork, flooring and mep's | $600,000 |
| Dec 20, 2018 | Completed final sign-off Jul 2019 | 2325 Noriega St | G Swanson Constr. Inc. | minor remodel to (e) bank; work to include atm replacement and office retrofit, no change in use ore areaDetails
minor remodel to (e) bank; work to include atm replacement and office retrofit, no change in use ore area | $40,000 |
| Dec 3, 2018 | Completed final sign-off Jun 2021 | 1 Market St | G Swanson Constr. Inc. | t.i. demo non bearing walls, ceiling, doors, millwork, floors, and some mep, construction of non bearing partitions for offices, tellers, lobby breakroom & doors ceiling, finishes, mep @ ground floorDetails
t.i. demo non bearing walls, ceiling, doors, millwork, floors, and some mep, construction of non bearing partitions for offices, tellers, lobby breakroom & doors ceiling, finishes, mep @ ground floor | $800,000 |
| Aug 6, 2018 | Completed final sign-off Sep 2018 | 1640 Van Ness Av | G Swanson Constr. Inc. | revision to app#201804065730: t.i. low hgt movable furnature partitions.Details
revision to app#201804065730: t.i. low hgt movable furnature partitions. | $50,000 |
| Jun 28, 2018 | Never finaled issued Aug 2018, no final | 1844 Market St | G Swanson Constr. Inc. | atm vestibule. deferred submittal m, e & structural from application 201603212579- sprinklers and fire alarm separate permit.Details
atm vestibule. deferred submittal m, e & structural from application 201603212579- sprinklers and fire alarm separate permit. | |
| Jun 25, 2018 | Never finaled issued Sep 2018, no final | 3565 California St | G Swanson Constr. Inc. | voluntary barrier removal: replace non-compliant interior door with accessible door.Details
voluntary barrier removal: replace non-compliant interior door with accessible door. | $20,000 |
| Jun 19, 2018 | Completed final sign-off Jun 2020 | 1 Powell St | G Swanson Constr. Inc. | bank ti on basement (12,500 sq ft) and 1st floor (230 sq ft), includes demo non bearing partitions, doors, millwork,floors, amep, new work- offices, ada restrooms, tellerline, atm, new doors, millwork, floors. fire under separate permit(s).Details
bank ti on basement (12,500 sq ft) and 1st floor (230 sq ft), includes demo non bearing partitions, doors, millwork,floors, amep, new work- offices, ada restrooms, tellerline, atm, new doors, millwork, floors. fire under separate permit(s). | $1,000,000 |
| Jun 15, 2018 | Completed final sign-off Jan 2019 | 1945 Irving St | G Swanson Constr. Inc. | t.i. of extg bank of america. interior scope includes new partitions, restroom and breakroom. regrade exterior sidewalk to provide level landing at main entry door and extg atm and night depository.Details
t.i. of extg bank of america. interior scope includes new partitions, restroom and breakroom. regrade exterior sidewalk to provide level landing at main entry door and extg atm and night depository. | $750,000 |
| Apr 6, 2018 | Completed final sign-off Sep 2018 | 1640 Van Ness Av | G Swanson Constr. Inc. | ti - demo & improvement within the (e) shell space. construct non load bearing partitions, carpet, flooring, paint finishes, furniture, bld infrastructure systems, minor hvac & heathing changesDetails
ti - demo & improvement within the (e) shell space. construct non load bearing partitions, carpet, flooring, paint finishes, furniture, bld infrastructure systems, minor hvac & heathing changes | $750,000 |
| Mar 13, 2018 | Completed final sign-off Jun 2018 | 425 Market St | G Swanson Constr. Inc. | revision to 201710100706, add water source heat pump, upgrade ele to accomodate heat pump add exit signs. na maherDetails
revision to 201710100706, add water source heat pump, upgrade ele to accomodate heat pump add exit signs. na maher | $35,000 |
| Feb 12, 2018 | Completed final sign-off Jul 2018 | 315 Montgomery St | G Swanson Constr. Inc. | modification to entry doors & breezeway, electrified door hardware, add alphone card readers, install vinyl window graphics w/ wayfingding & logo on both entry locations(not to exceed 30% of total glazing)**maher n/a**Details
modification to entry doors & breezeway, electrified door hardware, add alphone card readers, install vinyl window graphics w/ wayfingding & logo on both entry locations(not to exceed 30% of total glazing)**maher n/a** | $50,000 |
| Feb 6, 2018 | Completed final sign-off Sep 2018 | 3701 Balboa St | G Swanson Constr. Inc. | t.i. to replace extg teller line millwork. add new bandit barrier wall & bullet resistant glass barrier between customers & tellers with required structureDetails
t.i. to replace extg teller line millwork. add new bandit barrier wall & bullet resistant glass barrier between customers & tellers with required structure | $120,000 |
| Dec 6, 2017 | Completed final sign-off Nov 2018 | 2701 Mission St | G Swanson Constr. Inc. | revision to 201606018871. ti of bank remodelDetails
revision to 201606018871. ti of bank remodel | |
| Nov 13, 2017 | Completed final sign-off Jul 2018 | 501 Brannan St | G Swanson Constr. Inc. | demo on non bearing partitions, doors, millwork, floors & mep. new lights, offices, ada restrooms, breakroom, telliner line doors, millwork, floors & mepDetails
demo on non bearing partitions, doors, millwork, floors & mep. new lights, offices, ada restrooms, breakroom, telliner line doors, millwork, floors & mep | $850,000 |
| Oct 30, 2017 | Completed final sign-off Jan 2023 | 33 New Montgomery St | G Swanson Constr. Inc., Clune Construction Company L P | replacement of existing atm's with atm's. minor electrical, structural. change one office & one atm room to a training room. n/a maher ordinanceDetails
replacement of existing atm's with atm's. minor electrical, structural. change one office & one atm room to a training room. n/a maher ordinance | $175,000 |
| Oct 10, 2017 | Completed final sign-off Jun 2018 | 425 Market St | G Swanson Constr. Inc. | 1/f: demo of non-bearing partitions, doors,millwork, floor finishes & mech, elect. new construction of atm vestibule, video conf booth, new partitions, doors, millwork, floor finihses & mech/elec. maher n/a.Details
1/f: demo of non-bearing partitions, doors,millwork, floor finishes & mech, elect. new construction of atm vestibule, video conf booth, new partitions, doors, millwork, floor finihses & mech/elec. maher n/a. | $179,000 |
| Oct 2, 2017 | Expired or cancelled withdrawn Jan 2019 | 2701 Mission St | G Swanson Constr. Inc. | revision to 201606018871, relocation of offices from previous layoutDetails
revision to 201606018871, relocation of offices from previous layout | $900,000 |
| Sep 15, 2017 | Completed final sign-off May 2018 | 315 Montgomery St | G Swanson Constr. Inc. | 1/f- t.i. modifications to include relocated access ramp and stairs, new financial and client advisor rooms & client meeting rooms, new ceilings. (e) restrooms and breakrooms to remain. new furniture and finishes. n/a ordinance #155-13Details
1/f- t.i. modifications to include relocated access ramp and stairs, new financial and client advisor rooms & client meeting rooms, new ceilings. (e) restrooms and breakrooms to remain. new furniture and finishes. n/a ordinance #155-13 | $700,000 |
| Aug 28, 2017 | Never finaled filed Aug 2017, never issued | 3565 California St | G Swanson Constr. Inc. | replacement of atm equipment, required accessiblility upgrades of sidewalk at atm to achieve level landing.Details
replacement of atm equipment, required accessiblility upgrades of sidewalk at atm to achieve level landing. | $75,000 |
| Aug 17, 2017 | Never finaled issued Sep 2017, no final | 315 Montgomery St | G Swanson Constr. Inc. | 1st fl - ti, modify existing banking center. new ucr rooms, atm room, open offices, new ceilingDetails
1st fl - ti, modify existing banking center. new ucr rooms, atm room, open offices, new ceiling | $600,000 |
| Jul 21, 2017 | Completed final sign-off Jun 2019 | 5150 Mission St | G Swanson Constr. Inc. | voluntary barrier removal project to interior of e bank, existing exterior parking lot . new gate will replace e parking lot gate along mission. main entrance landing repair to provide level bldg.repair e sidewalk btwn main entrc and new gate to improve slopesDetails
voluntary barrier removal project to interior of e bank, existing exterior parking lot . new gate will replace e parking lot gate along mission. main entrance landing repair to provide level bldg.repair e sidewalk btwn main entrc and new gate to improve slopes | $150,000 |
| Mar 27, 2017 | Completed final sign-off May 2017 | 2200 Chestnut St | G Swanson Constr. Inc. | revision to app#201606089423: adjust extg restroom signage to unisex restroom signage for 2 uni-sex restrooms. shift 1 sink in unisex restroom. n/a for maherDetails
revision to app#201606089423: adjust extg restroom signage to unisex restroom signage for 2 uni-sex restrooms. shift 1 sink in unisex restroom. n/a for maher | |
| Mar 27, 2017 | Completed final sign-off May 2017 | 288 West Portal Av | G Swanson Constr. Inc. | revise restrooms signage to extg restrooms. provide unisex restroom signage to 2 unisex restrooms. revision to app#201608175273Details
revise restrooms signage to extg restrooms. provide unisex restroom signage to 2 unisex restrooms. revision to app#201608175273 | |
| Mar 6, 2017 | Completed final sign-off Feb 2019 | 1844 Market St | G Swanson Constr. Inc., Coast Sign Incorporated | erect electric, single face sign.Details
erect electric, single face sign. | $5,000 |
| Dec 1, 2016 | Never finaled issued Jan 2017, no final | 33 New Montgomery St | G Swanson Constr. Inc. | full remodel of (e) banking center 1. remove (e) interior partitions. 2. construct new offices. 3. new accessible unisex restroom. 4. new lighting per title 24. 5. upgrade interior finishes. revision to 201506249741 maher naDetails
full remodel of (e) banking center 1. remove (e) interior partitions. 2. construct new offices. 3. new accessible unisex restroom. 4. new lighting per title 24. 5. upgrade interior finishes. revision to 201506249741 maher na | $500,000 |
| Dec 1, 2016 | Completed final sign-off Aug 2017 | 625 Market St | G Swanson Constr. Inc. | full remodel of (e) banking center. 1. remove (e) teller ares. 2. new vault workroom & 2 new atas. 3. new 24 hour vestible. 4. new lighting per title 24. revisions to 201606249734Details
full remodel of (e) banking center. 1. remove (e) teller ares. 2. new vault workroom & 2 new atas. 3. new 24 hour vestible. 4. new lighting per title 24. revisions to 201606249734 | $350,000 |
| Nov 23, 2016 | Completed final sign-off Apr 2018 | 1 Powell St | G Swanson Constr. Inc. | install power door system to extg front entry door. barrier removal only; voluntary ada upgrades n/a for maherDetails
install power door system to extg front entry door. barrier removal only; voluntary ada upgrades n/a for maher | $17,000 |
| Sep 28, 2016 | Completed final sign-off May 2017 | 288 West Portal Av | G Swanson Constr. Inc. | revision to pa #201605238168 - install bullet - resistant glass over teller line.Details
revision to pa #201605238168 - install bullet - resistant glass over teller line. | $175,000 |
| Aug 29, 2016 | Completed final sign-off Jan 2018 | 5500 Geary Bl | G Swanson Constr. Inc. | commercial ti - upgrade consist of upgrading the atm machines to be ada compliance; replace non compliance handrail, repair flooring & paint fixtures & finishes updateDetails
commercial ti - upgrade consist of upgrading the atm machines to be ada compliance; replace non compliance handrail, repair flooring & paint fixtures & finishes update | $750,000 |