Kathryn E. Duytschaever
- License
- M37130
- Mechanical engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up M37130 at the Board for Professional Engineers
- Listed as
- engineer
- On San Francisco permits
- Nov 2020 to May 2026
4 permits since 2000 (engineer on 4 permits): 2 completed, 1 in progress, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- G Swanson Constr. Inc. (2), Acco Engineered Systems Inc. Dba Acco En, J K S - Ca Corp Dba Everstrong Construct
- Architects
- Scott Klopfer (2), John A Chipman
- Engineers
- Randall V. Moss (3), Kelsey Brown
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 4
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 29, 2026 | In progress issued Jun 2026 | 2001 Mission St | G Swanson Constr. Inc. | ground floor- ti of (e) us bank space to include addition of banking equipment, accessiblity upgrades, power (outlet) additions, and millworkDetails
ground floor- ti of (e) us bank space to include addition of banking equipment, accessiblity upgrades, power (outlet) additions, and millwork | $163,750 |
| Feb 19, 2025 | Completed final sign-off Apr 2026 | 1850 Irving St | G Swanson Constr. Inc. | hvac upgrades to existing bankDetails
hvac upgrades to existing bank | $125,000 |
| Apr 12, 2022 | Never finaled issued Apr 2022, no final | 415 Natoma St | Acco Engineered Systems Inc. Dba Acco En | level p-2: installation of 2 new ac units and 2 new condensing units with associated refrigerant piping.Details
level p-2: installation of 2 new ac units and 2 new condensing units with associated refrigerant piping. | $68,802 |
| Nov 17, 2020 | Completed final sign-off Jul 2026 | 934 Market St | J K S - Ca Corp Dba Everstrong Construct | t.i. & exterior alteration: change payless store to restaurant. tenant build-out (n) tenant space, for a sit-down restaurant w/ no sq ft being added. signage & all hood ansul modifications shall be designed by a license ansul contractor under sep permit.Details
t.i. & exterior alteration: change payless store to restaurant. tenant build-out (n) tenant space, for a sit-down restaurant w/ no sq ft being added. signage & all hood ansul modifications shall be designed by a license ansul contractor under sep permit. | $1,050,000 |