Swinerton Builders
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Aug 2026
- Last 24 months
- 50 permits filed
2,175 permits since 2000: 1,535 completed, 31 in progress, 283 never finaled, 326 expired or cancelled.
Of the 283 never-finaled permits, 25 are 3 to 5 years old, 71 are 5 to 10 years old, 187 are over 10 years old. 3 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
69 stairs permits: 48 completed, 10 never finaled, 11 expired or cancelled. Typically 52 days from filing to permit and 250 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 9, 2025 | Completed final sign-off Jan 2026 | 1805 Geary Bl | revision to permit 202202212343 ground floor tentant 1539 fillmore st. reconfigure machine room, restroom @ ground fl; remove stair & 2nd fl lula elevator from scopeDetails
revision to permit 202202212343 ground floor tentant 1539 fillmore st. reconfigure machine room, restroom @ ground fl; remove stair & 2nd fl lula elevator from scope | |
| May 6, 2024 | Completed final sign-off Apr 2025 | 555 Bryant St | revision to metal stair addendum #6 due to design changes tracked by rev3 and rev4. reference pa# 2021.02.12.4635 s6Details
revision to metal stair addendum #6 due to design changes tracked by rev3 and rev4. reference pa# 2021.02.12.4635 s6 | |
| Jun 15, 2023 | Completed final sign-off Sep 2023 | 116 New Montgomery St | revision to 202208080112 and 202212168572 to remove temporary egress passageway used during construction. provide access to egress stair #2. no exterior workDetails
revision to 202208080112 and 202212168572 to remove temporary egress passageway used during construction. provide access to egress stair #2. no exterior work | $25,000 |
| Feb 21, 2023 | Completed final sign-off Jan 2026 | 1805 Geary Bl | voluntary replacement of (e) rear fire stair #2, (n) ada lula elevator from 2nd to 3rd fl, repl concrete pad of side alley service lift.Details
voluntary replacement of (e) rear fire stair #2, (n) ada lula elevator from 2nd to 3rd fl, repl concrete pad of side alley service lift. | $176,000 |
| Feb 10, 2023 | Expired or cancelled expired Jan 2026 | 1805 Geary Bl | voluntary replacement of (e) front fire stair in-kind and replace alleyway gate.Details
voluntary replacement of (e) front fire stair in-kind and replace alleyway gate. | $64,000 |
| Dec 16, 2022 | Completed final sign-off Aug 2023 | 116 New Montgomery St | 1/f & 2/f: revision to pa# 202208080111. revision to 1st & 2nd floor interior stair.Details
1/f & 2/f: revision to pa# 202208080111. revision to 1st & 2nd floor interior stair. | |
| Aug 24, 2022 | Never finaled issued Dec 2022, no final | 900 North Point St | clock tower: demo of partitions only per ab-017. space (3rd and 4th floor) to remain vacant- stair to remain. remaining build out to be under sep permit. no exterior work under this permit.Details
clock tower: demo of partitions only per ab-017. space (3rd and 4th floor) to remain vacant- stair to remain. remaining build out to be under sep permit. no exterior work under this permit. | $660,750 |
| Aug 8, 2022 | Completed final sign-off Jan 2024 | 116 New Montgomery St | construct new interior egress corridor and stair from 2/f to the g/f. stair connects 2 stories and is enclosed in 1-hr rated corridor per cbc 1023.2. no work at historic facade, stair, and balcony on this permit.Details
construct new interior egress corridor and stair from 2/f to the g/f. stair connects 2 stories and is enclosed in 1-hr rated corridor per cbc 1023.2. no work at historic facade, stair, and balcony on this permit. | $210,000 |
| Jul 21, 2022 | Completed final sign-off Apr 2024 | 928 Harrison St | rev 202106182812: foam protection added to(e) beams in equipment platform area. low headroom signs added to all (e) beam in equipment platform area/north access stairway to provide warning as professional approaches landing &(e) beam. self-closing gate with low headroom sign added to bottom.Details
rev 202106182812: foam protection added to(e) beams in equipment platform area. low headroom signs added to all (e) beam in equipment platform area/north access stairway to provide warning as professional approaches landing &(e) beam. self-closing gate with low headroom sign added to bottom. | $700 |
| Jun 10, 2021 | Completed final sign-off May 2022 | 2 Folsom St | 10/fl: select demo (e) partitions, kitchenette, ceilings, light fixs, & flr finish. const of new partitions, kitchenette, ceilings, flr fin & light fixs. restroom updates. conver of copy rm to mothers rm. lumi egress markings at egress stairs & exit passageways. fire alarm/sprink under sep permits.Details
10/fl: select demo (e) partitions, kitchenette, ceilings, light fixs, & flr finish. const of new partitions, kitchenette, ceilings, flr fin & light fixs. restroom updates. conver of copy rm to mothers rm. lumi egress markings at egress stairs & exit passageways. fire alarm/sprink under sep permits. | $300,000 |
| Apr 26, 2021 | Expired or cancelled cancelled Jan 2026 | 2 Folsom St | 6th fl: construction of new partitions, ceilings, floor finishes + light fixtures. conversion of (e) men's restroom to all gender restroom. update of all other restrooms. conversion of copy room to mother's room. luminous egress path. marrings at egress stairs + exit passage way.Details
6th fl: construction of new partitions, ceilings, floor finishes + light fixtures. conversion of (e) men's restroom to all gender restroom. update of all other restrooms. conversion of copy room to mother's room. luminous egress path. marrings at egress stairs + exit passage way. | $850,000 |
| Apr 21, 2021 | Completed final sign-off Jan 2022 | 1169 Market St | add 2 gates at north plaza (market st & 8th st openings) to secure interior of site at nite. gates are fully removable/stored in the storage rm in daytime hours. egress from stairs #2, #3 & #5 will occur thru the plaza and use the gates. gates are fully accessible via lock-box by emergency servicesDetails
add 2 gates at north plaza (market st & 8th st openings) to secure interior of site at nite. gates are fully removable/stored in the storage rm in daytime hours. egress from stairs #2, #3 & #5 will occur thru the plaza and use the gates. gates are fully accessible via lock-box by emergency services | $175,000 |
| Apr 5, 2021 | Completed final sign-off May 2022 | 2 Folsom St | level 2 selective demo of (e) partitions, light fixtures & floor finish. construction of (n) partitions, ceilings, fl finishes, pantry upgrade, restroom upgrade, new mother's room & structural suppoert for high density storage. luminous egress markings at egress stairs & exit passageways.Details
level 2 selective demo of (e) partitions, light fixtures & floor finish. construction of (n) partitions, ceilings, fl finishes, pantry upgrade, restroom upgrade, new mother's room & structural suppoert for high density storage. luminous egress markings at egress stairs & exit passageways. | $1,204,000 |
| Apr 2, 2021 | Completed final sign-off May 2022 | 2 Folsom St | level 3: selective demolition of (e) partitions, light fixtures, and flr finish. construction of new partitions, flr finishes and ligth fixtures. crestroom upgrades, pantry upgrades, new structural supports for shelving,luminuous egress markings at egress stairs and exit passageways. mech and elecDetails
level 3: selective demolition of (e) partitions, light fixtures, and flr finish. construction of new partitions, flr finishes and ligth fixtures. crestroom upgrades, pantry upgrades, new structural supports for shelving,luminuous egress markings at egress stairs and exit passageways. mech and elec | $900,000 |
| Jun 15, 2018 | Completed final sign-off Dec 2018 | 201 Mission St | 13th flr - project consists of interior aleration work to the elevator lobby and corridor. does not affect (e) suites, exit access, egress paths, or exit stairs. (e) exiting to remain as is. (e) sprinkler and life-safety systems to be under separate permitDetails
13th flr - project consists of interior aleration work to the elevator lobby and corridor. does not affect (e) suites, exit access, egress paths, or exit stairs. (e) exiting to remain as is. (e) sprinkler and life-safety systems to be under separate permit | $200,000 |
| Jun 6, 2018 | Completed final sign-off Aug 2022 | 170 Ofarrell St | revision to construction for ti spaces. pa#201711012866. deferred structural details for 2 metal stairs from one retail space to mezzanine floor. maher not reqDetails
revision to construction for ti spaces. pa#201711012866. deferred structural details for 2 metal stairs from one retail space to mezzanine floor. maher not req | $46,190 |
| Apr 26, 2017 | Never finaled issued May 2017, no final | 100 California St | 14/f, 15/f- rev to pa#201602129534 changes to access stair #2 includes deletion of corridor and repositioning of the door, provision of a 2 hr. joisted floor ceiling infill at (e) opening, add access hatch from 14/f elevator lobby to machine room above. n/a ordinance #155-13Details
14/f, 15/f- rev to pa#201602129534 changes to access stair #2 includes deletion of corridor and repositioning of the door, provision of a 2 hr. joisted floor ceiling infill at (e) opening, add access hatch from 14/f elevator lobby to machine room above. n/a ordinance #155-13 | $2,000 |
| Dec 22, 2016 | Completed final sign-off Jun 2019 | 100 California St | revision to 201602129534. new non combustible private roof deck with pedestal pavers, glass and metal reailings. structural improvement atthe undersid of roof slab, new steel interior stair, elevator from 14th fl. new elevator machine room 13th fl. elec/plumbing stubouts. 4250 sf areaDetails
revision to 201602129534. new non combustible private roof deck with pedestal pavers, glass and metal reailings. structural improvement atthe undersid of roof slab, new steel interior stair, elevator from 14th fl. new elevator machine room 13th fl. elec/plumbing stubouts. 4250 sf area | $993,061 |
| May 18, 2016 | Completed final sign-off Jan 2017 | 222 02nd St | install (2) security gates on 1st floor stairsDetails
install (2) security gates on 1st floor stairs | $25,000 |
| Mar 11, 2016 | Completed final sign-off Oct 2016 | 851 Beach St | renovation of (e) vacant restaurant at powerhouse bldg. work includes partial replacement of (e)steel framing & concrete deck. (n)accessible stair & guardrail system. no exterior work. no change to historic bldg fabric. space to remain vacant per ab-017. compliance with maher ordin. 155-15 not req.Details
renovation of (e) vacant restaurant at powerhouse bldg. work includes partial replacement of (e)steel framing & concrete deck. (n)accessible stair & guardrail system. no exterior work. no change to historic bldg fabric. space to remain vacant per ab-017. compliance with maher ordin. 155-15 not req. | $300,000 |
| Mar 2, 2016 | Completed final sign-off Jan 2017 | 222 02nd St | revision to ref pa 2015 0818 4604:install staircase on 2nd floor to 1st floor maher naDetails
revision to ref pa 2015 0818 4604:install staircase on 2nd floor to 1st floor maher na | |
| Nov 9, 2015 | Never finaled issued Feb 2016, no final | 900 North Point St | exterior work only within ghirardelli plaza work includes replacement of non-historic stairs in 2 locations, and (n) ada-lift. removal of planter, (n) concrete benchesDetails
exterior work only within ghirardelli plaza work includes replacement of non-historic stairs in 2 locations, and (n) ada-lift. removal of planter, (n) concrete benches | $150,000 |
| Aug 18, 2015 | Completed final sign-off Jan 2017 | 222 02nd St | 1st flr: partial t.i. consists of addition of 2 exit stairs, one door opening, one server room & 2 small offices; maher n/aDetails
1st flr: partial t.i. consists of addition of 2 exit stairs, one door opening, one server room & 2 small offices; maher n/a | $1,200,000 |
| Jul 21, 2015 | Completed final sign-off Jan 2017 | 222 02nd St | partial commercial t.i. including stairs, handrail, guardrails, selective structural reinforcement. n/a ordinance #155-13Details
partial commercial t.i. including stairs, handrail, guardrails, selective structural reinforcement. n/a ordinance #155-13 | $200,000 |
| Oct 8, 2014 | Completed final sign-off Dec 2014 | 170 Ofarrell St | new door opening and stairs to macys north sports from jewelry department - 1st floor. n/a ordinance #155-13Details
new door opening and stairs to macys north sports from jewelry department - 1st floor. n/a ordinance #155-13 | $17,000 |
| Sep 11, 2014 | Completed final sign-off Sep 2015 | 333 Brannan St | added communicating openings with 345 brannan & ab 010 form; revised 333 bldg facade @ property line to coordinate with 345 brannan expansion joint. base bldg elec room moved from roof to 5th fl. ramp, stair & egress path changed @ courtyard. change to roof landscape design & lighting. adjustment toDetails
added communicating openings with 345 brannan & ab 010 form; revised 333 bldg facade @ property line to coordinate with 345 brannan expansion joint. base bldg elec room moved from roof to 5th fl. ramp, stair & egress path changed @ courtyard. change to roof landscape design & lighting. adjustment to | $195,000 |
| Jun 10, 2014 | Completed final sign-off Dec 2014 | 535 Mission St | 8/f: t. i. consisting of non structural non-load bearing interior partitions, ceilings, millwork, power/signal and finishes. access control egress door at stair #2 and elev lobby.Details
8/f: t. i. consisting of non structural non-load bearing interior partitions, ceilings, millwork, power/signal and finishes. access control egress door at stair #2 and elev lobby. | $1,000,000 |
| Jun 17, 2013 | Completed final sign-off Dec 2013 | 480 Ellis St | revision to app#200811076130.demolish non complying toilet facilities in 488 and 486 ellis st spaces.demolish extg damaged wood joists and replace with concrete slab on grade. demolish mezzanine and mezzanine stairs at 486 ellis st. revise hardships 4 and 5 and remove hardships 6 & 7Details
revision to app#200811076130.demolish non complying toilet facilities in 488 and 486 ellis st spaces.demolish extg damaged wood joists and replace with concrete slab on grade. demolish mezzanine and mezzanine stairs at 486 ellis st. revise hardships 4 and 5 and remove hardships 6 & 7 | |
| Jun 12, 2013 | Completed final sign-off Dec 2014 | 535 Mission St | reference app#200508049463. deferred permit:installation of interior stairs.Details
reference app#200508049463. deferred permit:installation of interior stairs. | $100,000 |
| Apr 1, 2013 | Completed final sign-off Mar 2015 | 1411 Market St | revise south lobby, north lobby & business center provide leasing center mailbox numbering, finish schedule, door schedule, stairs s3, n8 and n4 have been revised. men's and women's lockers changed into additional storage ref 200607207084Details
revise south lobby, north lobby & business center provide leasing center mailbox numbering, finish schedule, door schedule, stairs s3, n8 and n4 have been revised. men's and women's lockers changed into additional storage ref 200607207084 | $350,000 |
| Jan 24, 2013 | Completed final sign-off Jul 2015 | 814 Mission St | ti for (e) office & meeting rooms. work includes elect & mech upgrades & (n) partitions. all work interior only. replace stairway in kind, breakroom sink in kind. ref. to pa# 2011-0707-9644 & 2011-0706-9568 for common areas.Details
ti for (e) office & meeting rooms. work includes elect & mech upgrades & (n) partitions. all work interior only. replace stairway in kind, breakroom sink in kind. ref. to pa# 2011-0707-9644 & 2011-0706-9568 for common areas. | $600,000 |
| Jan 3, 2013 | Completed final sign-off Oct 2014 | 201 Spear St | interior ti to (e) office space on floors 8 & 9. work to include new conference rooms, pantry food prep room & communicating stairs connecting the 8th & 9th. includes mechanical and electrical. floors 8-9 becoming one zone for mechanical and fire alarm. sprinlers & fire alarm sep. permit.Details
interior ti to (e) office space on floors 8 & 9. work to include new conference rooms, pantry food prep room & communicating stairs connecting the 8th & 9th. includes mechanical and electrical. floors 8-9 becoming one zone for mechanical and fire alarm. sprinlers & fire alarm sep. permit. | $1,500,000 |
| Oct 12, 2012 | Completed final sign-off May 2014 | 650 07th St | new communication stair between floors 1,2,3. new opening in structural wood floor deck for communicating stairsDetails
new communication stair between floors 1,2,3. new opening in structural wood floor deck for communicating stairs | $515,075 |
| Feb 29, 2012 | Never finaled issued May 2012, no final | 1275 Market St | voluntary upgrade to the extg building egress. exterior to 2 extg egress stairs between floor 1-2 and 3-8.Details
voluntary upgrade to the extg building egress. exterior to 2 extg egress stairs between floor 1-2 and 3-8. | $1,100,000 |
| May 13, 2011 | Never finaled issued Jun 2011, no final | 111 Pine St | revision to 200903254817/r2 9th fl: add stairs and partition typs from sheetrock to glass.new 9th floor opening for new spiral stairs to 8th floorDetails
revision to 200903254817/r2 9th fl: add stairs and partition typs from sheetrock to glass.new 9th floor opening for new spiral stairs to 8th floor | $481,500 |
| Mar 17, 2011 | Completed final sign-off Nov 2012 | 333 Bush St | accessibility upgrades to exterior stairs, handrails, ground floor entry & basement levels 1 & 2.Details
accessibility upgrades to exterior stairs, handrails, ground floor entry & basement levels 1 & 2. | $100,000 |
| Dec 22, 2010 | Completed final sign-off Aug 2011 | 600 Montgomery St | 6th & 7th floor- stair demolition including: demolition of stair finishes, structure, balustrade, guardrail & lighting. demolition of ceiling finishes, framing & lighting. infill of structural slab on 7th floor & associated finishes will be under separate permit to follow.Details
6th & 7th floor- stair demolition including: demolition of stair finishes, structure, balustrade, guardrail & lighting. demolition of ceiling finishes, framing & lighting. infill of structural slab on 7th floor & associated finishes will be under separate permit to follow. | $101,300 |
| Dec 2, 2010 | Completed final sign-off Jan 2011 | 333 Bush St | demolition of partition to reopen stair between floors 21 and 22. life safety and sprinkler submitted separately.Details
demolition of partition to reopen stair between floors 21 and 22. life safety and sprinkler submitted separately. | $12,000 |
| Sep 30, 2010 | Completed final sign-off Jun 2011 | 111 Pine St | 10th floor-demo extg stairs that go to 11th floor. demo bathrooms. construct new partitions, ceilings, finishes,bathrooms m, e, p lighting,doors and frames. fire alarm and sprinkler on seperate permit.Details
10th floor-demo extg stairs that go to 11th floor. demo bathrooms. construct new partitions, ceilings, finishes,bathrooms m, e, p lighting,doors and frames. fire alarm and sprinkler on seperate permit. | $481,500 |
| Sep 10, 2010 | Never finaled issued Sep 2010, no final | 111 Pine St | modify extg finishes at 8th floor stair area. demo slab on 9,10,11 floors to construct new none emergency convenience stairs floors 9,10,11. revise/update existing stairwell signage as per 10(a-3) as per plans.Details
modify extg finishes at 8th floor stair area. demo slab on 9,10,11 floors to construct new none emergency convenience stairs floors 9,10,11. revise/update existing stairwell signage as per 10(a-3) as per plans. | $180,000 |
| Aug 31, 2010 | Completed final sign-off Jun 2011 | 111 Pine St | office ti on the 11th floor. demo partitions, ceiling, mech, electrical and slab to install (n) stairs. construct (n) partitions. mech, elect. plumbing, (n) restrooms for ada.Details
office ti on the 11th floor. demo partitions, ceiling, mech, electrical and slab to install (n) stairs. construct (n) partitions. mech, elect. plumbing, (n) restrooms for ada. | $481,500 |
| Aug 30, 2010 | Completed final sign-off Dec 2011 | 2375 Golden Gate Av | enclose (e) outdoor patio on the e.side grnd fl of uc bldg w/ new 1 story steel&glass struc. add a new dr & ext. stairwy into the landing of an (e) stair on the so.side of uc, btn the grnd & 2nd fl, add a new wheelchair accesible path into the patio encl. on no.side.provide lounge seating,gas fp.Details
enclose (e) outdoor patio on the e.side grnd fl of uc bldg w/ new 1 story steel&glass struc. add a new dr & ext. stairwy into the landing of an (e) stair on the so.side of uc, btn the grnd & 2nd fl, add a new wheelchair accesible path into the patio encl. on no.side.provide lounge seating,gas fp. | $355,000 |
| Mar 25, 2009 | Never finaled issued Jun 2009, no final | 111 Pine St | tenant improvement demo e partitions, ceilings, finishes. construct new partitions, ceilings, finishes, construct new convenience stairs to e convenience stairs from 8th fl to 9th fl. fire alarm and sprinkler sep permitDetails
tenant improvement demo e partitions, ceilings, finishes. construct new partitions, ceilings, finishes, construct new convenience stairs to e convenience stairs from 8th fl to 9th fl. fire alarm and sprinkler sep permit | $851,000 |
| Mar 11, 2009 | Completed final sign-off Dec 2009 | 933 Grant Av | basement & 1st floor t.i. incl removal & replace old stair w/new compli stair, remove dumbwaiter, replace entry door only, new partitions, lighting, electrical, mechanical, ductwork, ada restrooms, teller line, plumbingg, security system. fire life safety & sprinklers under separate permit.Details
basement & 1st floor t.i. incl removal & replace old stair w/new compli stair, remove dumbwaiter, replace entry door only, new partitions, lighting, electrical, mechanical, ductwork, ada restrooms, teller line, plumbingg, security system. fire life safety & sprinklers under separate permit. | $700,000 |
| Feb 24, 2009 | Completed final sign-off Jul 2009 | 933 Grant Av | work on #1st fl + basement.demolishing and abatement of ground floor and basement levels for future ti. stairs and life safety to remain per ab017Details
work on #1st fl + basement.demolishing and abatement of ground floor and basement levels for future ti. stairs and life safety to remain per ab017 | $40,000 |
| Dec 28, 2007 | Completed final sign-off Mar 2008 | 315 Montgomery St | build a 2 hour rated landing at central stair on the 12th floor to comply with code. move door at stair# 2 to receive 12" clearance and update hardware at exit stair doors. electrical under separate permit.Details
build a 2 hour rated landing at central stair on the 12th floor to comply with code. move door at stair# 2 to receive 12" clearance and update hardware at exit stair doors. electrical under separate permit. | $59,000 |
| Oct 3, 2007 | Completed final sign-off Mar 2008 | 315 Montgomery St | t/i 6th floor, restroom upgrade for ada compliance, new stairwell doors,new elevator lobby doors, remove existing tenant doors at elevator lobby, new 2hr shft walls and 90 min doors at south stair. locked elevator lobby, fire alarm and fire sprinklers under separate application.Details
t/i 6th floor, restroom upgrade for ada compliance, new stairwell doors,new elevator lobby doors, remove existing tenant doors at elevator lobby, new 2hr shft walls and 90 min doors at south stair. locked elevator lobby, fire alarm and fire sprinklers under separate application. | $150,000 |
| Mar 6, 2007 | Expired or cancelled expired Oct 2007 | 466 Bush St | app #200201237562s4 - as-built revise stair #1 smoke vestibule in bsmt. kitchn grease exhaust duct:fire wrapped in lieu of 2 hr shaft enclose. kitchn exit dr g25b change door swing direction. revise 9/f terrace drs to meet ada.revise staff toilet(sk-145).Details
app #200201237562s4 - as-built revise stair #1 smoke vestibule in bsmt. kitchn grease exhaust duct:fire wrapped in lieu of 2 hr shaft enclose. kitchn exit dr g25b change door swing direction. revise 9/f terrace drs to meet ada.revise staff toilet(sk-145). | |
| Feb 13, 2007 | Completed final sign-off Aug 2007 | 50 Fremont St | upgrade men's & womens restrooms on 38th and 39th floor. new communicating stair between 38th & 39th floors.Details
upgrade men's & womens restrooms on 38th and 39th floor. new communicating stair between 38th & 39th floors. | $500,000 |
| Mar 7, 2006 | Completed final sign-off Jan 2009 | 420 Montgomery St | reconfigure of non-bearing partition walls (interior), construct a new non-rated stairway between 7th & 8th floor, upgrade (1) one non-conforming set of restrooms, finishes, paint, carpet, (n) ceiling, light fixtures scope of work only on 7th and 8th floorsDetails
reconfigure of non-bearing partition walls (interior), construct a new non-rated stairway between 7th & 8th floor, upgrade (1) one non-conforming set of restrooms, finishes, paint, carpet, (n) ceiling, light fixtures scope of work only on 7th and 8th floors | $1,000,000 |
| Apr 8, 2005 | Completed final sign-off Sep 2005 | 133 Shipley St | deferred permit for steel stairs in community center. refer to pa# 2003/05/28/5574 's'1.Details
deferred permit for steel stairs in community center. refer to pa# 2003/05/28/5574 's'1. | |
| Oct 21, 2004 | Expired or cancelled withdrawn Mar 2005 | 1 Front St | 2nd floor - stair infill and steel support for operable partitionDetails
2nd floor - stair infill and steel support for operable partition | $20,000 |
| Oct 15, 2004 | Never finaled issued Oct 2004, no final | 1 Front St | 2nd/fl demolition including: stairway & stairway partitions. minimal portition demolitiion nearDetails
2nd/fl demolition including: stairway & stairway partitions. minimal portition demolitiion near | $12,800 |
| Aug 12, 2004 | Never finaled issued Dec 2004, no final | 111 Pine St | construction of convenience stairs floors 6 to 8Details
construction of convenience stairs floors 6 to 8 | $300,000 |
| Jun 15, 2004 | Completed final sign-off Nov 2004 | 2345 Golden Gate Av | reve200205176919. r-5. add new stair to connect 2nd fl addition to 3rd fl (e) mclaren bldg. copy ofDetails
reve200205176919. r-5. add new stair to connect 2nd fl addition to 3rd fl (e) mclaren bldg. copy of | $1,000 |
| Feb 20, 2004 | Completed final sign-off Sep 2004 | 650 Bush St | ada upgrade of stairs tolobby and check in counter electrical will be under seprate permit ***Details
ada upgrade of stairs tolobby and check in counter electrical will be under seprate permit *** | $12,000 |
| Dec 5, 2003 | Expired or cancelled cancelled Dec 2007 | 20 Franklin St | revision to existing permit 200208285175- basement stair, using historical code, to be reduced frm 4Details
revision to existing permit 200208285175- basement stair, using historical code, to be reduced frm 4 | $10,000 |
| Jun 27, 2003 | Expired or cancelled expired May 2006 | 1 Powell St | revise to app #200303260728 change stair case as shown on original permit to (e) fire escape installDetails
revise to app #200303260728 change stair case as shown on original permit to (e) fire escape install | $2,000 |
| May 20, 2003 | Expired or cancelled expired Mar 2005 | 345 California St | installation of interconnecting stairway between 22nd & 23rd flDetails
installation of interconnecting stairway between 22nd & 23rd fl | $75,000 |
| Mar 21, 2003 | Expired or cancelled expired May 2005 | 1301 Polk St | 2 new unisex ada compliance rest rooms new exit stair and exit pathway out of 2 comm'l spaces as 2ndDetails
2 new unisex ada compliance rest rooms new exit stair and exit pathway out of 2 comm'l spaces as 2nd | $90,000 |
| Aug 28, 2002 | Completed final sign-off Mar 2003 | 340 Post St | demo concrete fl for (n) openings (stairs/elevator) & foundation (footings) for (n) moment frameDetails
demo concrete fl for (n) openings (stairs/elevator) & foundation (footings) for (n) moment frame | $85,000 |
| Nov 28, 2001 | Completed final sign-off May 2002 | 235 02nd St | installation of electric locksets/mag locks with shell elvator lobey & stairs doorsDetails
installation of electric locksets/mag locks with shell elvator lobey & stairs doors | $7,000 |
| Aug 24, 2001 | Never finaled issued Dec 2001, no final | 215 Fremont St | extend exit stair steel,treads,risers,handrails only 7th fl to 7a & 8 2 hr shaft to underside 8th flDetails
extend exit stair steel,treads,risers,handrails only 7th fl to 7a & 8 2 hr shaft to underside 8th fl | $100,000 |
| Feb 27, 2001 | Expired or cancelled expired Jun 2001 | 475 Brannan St | renew app #9923225 for final inspection for interior stairsDetails
renew app #9923225 for final inspection for interior stairs | |
| Feb 8, 2001 | Completed final sign-off Mar 2003 | 235 02nd St | base building stair renovation & additional floor openings, lighting under separate permitDetails
base building stair renovation & additional floor openings, lighting under separate permit | $465,000 |
| Oct 2, 2000 | Completed final sign-off Jan 2002 | 111 Pine St | extension of extg stairs from the 3rd floor to the 6th floor/5th floor t.i. workDetails
extension of extg stairs from the 3rd floor to the 6th floor/5th floor t.i. work | $180,000 |
| Aug 25, 2000 | Completed final sign-off Dec 2000 | 1 Sansome St | addition of wall & door at bottom of tenant stair-doors to access space provided for maint onlyDetails
addition of wall & door at bottom of tenant stair-doors to access space provided for maint only | |
| May 19, 2000 | Expired or cancelled expired May 2001 | 199 Fremont St | addition of connecting stair between tenant floors 24 & 25 (base bldg floors 23 & 24) per plansDetails
addition of connecting stair between tenant floors 24 & 25 (base bldg floors 23 & 24) per plans | $150,000 |
| Mar 20, 2000 | Expired or cancelled expired Jun 2002 | 475 Brannan St | structural work/new stairs/wall openings/new tube steel column/200003083743/200003083742Details
structural work/new stairs/wall openings/new tube steel column/200003083743/200003083742 | $200,000 |