Swinerton Builders
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Aug 2026
- Last 24 months
- 50 permits filed
2,175 permits since 2000: 1,535 completed, 31 in progress, 283 never finaled, 326 expired or cancelled.
Of the 283 never-finaled permits, 25 are 3 to 5 years old, 71 are 5 to 10 years old, 187 are over 10 years old. 3 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
4 deck permits: 2 completed, 1 in progress, 1 expired or cancelled. Typically 26 days from filing to permit and 372 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 4, 2026 | In progress issued Jul 2026 | 201 Spear St | new 112 sq ft exterior trelis on (e) rooftop amenity deck at 18th floor. amenity deck for tenant on same level. mep under separate deferred permit. design build by future contractor. trelis is of non-combust material on a non-combust deck on a concrete roof.Details
new 112 sq ft exterior trelis on (e) rooftop amenity deck at 18th floor. amenity deck for tenant on same level. mep under separate deferred permit. design build by future contractor. trelis is of non-combust material on a non-combust deck on a concrete roof. | $38,000 |
| Jul 27, 2017 | Expired or cancelled cancelled Jan 2026 | 50 Fremont St | installtion of shade sails at plaza of 50 fremont. only one (1) shade sail attached to the plaza deck.Details
installtion of shade sails at plaza of 50 fremont. only one (1) shade sail attached to the plaza deck. | $10,000 |
| Mar 11, 2016 | Completed final sign-off Oct 2016 | 851 Beach St | renovation of (e) vacant restaurant at powerhouse bldg. work includes partial replacement of (e)steel framing & concrete deck. (n)accessible stair & guardrail system. no exterior work. no change to historic bldg fabric. space to remain vacant per ab-017. compliance with maher ordin. 155-15 not req.Details
renovation of (e) vacant restaurant at powerhouse bldg. work includes partial replacement of (e)steel framing & concrete deck. (n)accessible stair & guardrail system. no exterior work. no change to historic bldg fabric. space to remain vacant per ab-017. compliance with maher ordin. 155-15 not req. | $300,000 |
| Oct 12, 2012 | Completed final sign-off May 2014 | 650 07th St | new communication stair between floors 1,2,3. new opening in structural wood floor deck for communicating stairsDetails
new communication stair between floors 1,2,3. new opening in structural wood floor deck for communicating stairs | $515,075 |