Back to bathroom remodel contractors
Swinerton Builders
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Aug 2026
- Last 24 months
- 50 permits filed
2,175 permits since 2000: 1,535 completed, 31 in progress, 283 never finaled, 326 expired or cancelled.
Of the 283 never-finaled permits, 25 are 3 to 5 years old, 71 are 5 to 10 years old, 187 are over 10 years old. 3 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
28 bathroom remodel permits: 20 completed, 2 in progress, 3 never finaled, 3 expired or cancelled. Typically 56 days from filing to permit and 232 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 3, 2026 | Completed final sign-off Aug 2026 | 680 Folsom St | 4/fl- ti work includes construction of non load bearing partitions, (n) ceilings, carpet and paint. replace finishes in kind for the (e) bathrooms.Details
4/fl- ti work includes construction of non load bearing partitions, (n) ceilings, carpet and paint. replace finishes in kind for the (e) bathrooms. | $4,100,000 |
| Jan 30, 2026 | In progress issued Mar 2026 | 1212 Maryland St | tenant improvement at ground fl of the sophie maxwell building. work includes buildout of retail display area, showroom, sales center, bathroom, support spaces.Details
tenant improvement at ground fl of the sophie maxwell building. work includes buildout of retail display area, showroom, sales center, bathroom, support spaces. | $225,000 |
| Sep 10, 2024 | Completed final sign-off Mar 2025 | 1240 Valencia St | revision to pa # 2019-1230-0998 non structural ti to create 1 infant, 1 preschool & 2 toddler classroom with 4 bathrooms & 2 offices. (e) sklights to be covered with new lights. revise change of use from e to i-4.Details
revision to pa # 2019-1230-0998 non structural ti to create 1 infant, 1 preschool & 2 toddler classroom with 4 bathrooms & 2 offices. (e) sklights to be covered with new lights. revise change of use from e to i-4. | |
| Apr 1, 2024 | In progress issued Apr 2024 | 1240 Valencia St | to complete work installing new ducts, new bathrooms, kitchen, interiror ref pa# 2023-0622-0639 sep mep permits will be obtainedDetails
to complete work installing new ducts, new bathrooms, kitchen, interiror ref pa# 2023-0622-0639 sep mep permits will be obtained | $100,000 |
| Sep 2, 2021 | Never finaled issued Sep 2021, no final | 851 Beach St | tenant improvement for subpar expansion. work includes removal of interior partition between 2 e tenant spaces. construction of 2 single occ bathrooms. new non structural partitions.Details
tenant improvement for subpar expansion. work includes removal of interior partition between 2 e tenant spaces. construction of 2 single occ bathrooms. new non structural partitions. | $150,000 |
| Dec 30, 2019 | Completed final sign-off Mar 2025 | 1240 Valencia St | ti - non-structural in (e) space to create 2 preschool & 2 toddler classrooms. includes 4 bathrooms & offices. demo under pa #201910043650. site work under pa #201912139558.Details
ti - non-structural in (e) space to create 2 preschool & 2 toddler classrooms. includes 4 bathrooms & offices. demo under pa #201910043650. site work under pa #201912139558. | $342,000 |
| Dec 23, 2019 | Completed final sign-off Dec 2020 | 1 Front St | 23rd floor: demo non structural partitions, doors, lights, finishes. construct new non structural partitions, lights, doors & modify mech for new layout. new ada bathroom. sprinkler, fire alarm and two-way comm all under sep permit.Details
23rd floor: demo non structural partitions, doors, lights, finishes. construct new non structural partitions, lights, doors & modify mech for new layout. new ada bathroom. sprinkler, fire alarm and two-way comm all under sep permit. | $620,720 |
| Dec 23, 2019 | Completed final sign-off Mar 2021 | 1 Front St | 22nd floor: demo non structural partitions doors, lights, finishes. construct new non structural partitions, lights, modify mech, doors finishes and new ada bathroom.Details
22nd floor: demo non structural partitions doors, lights, finishes. construct new non structural partitions, lights, modify mech, doors finishes and new ada bathroom. | $916,260 |
| Dec 18, 2019 | Expired or cancelled expired Jan 2025 | 1240 Valencia St | ti - non-structural in (e) space, new demising wall, new accessible restroom, reconfigure existing bathroom to make accessible. demo under separate permit #201910043650. maher naDetails
ti - non-structural in (e) space, new demising wall, new accessible restroom, reconfigure existing bathroom to make accessible. demo under separate permit #201910043650. maher na | $18,000 |
| Mar 12, 2019 | Expired or cancelled expired Jul 2022 | 170 Ofarrell St | revision to pa #201808066521. add to scope: update existing bathrooms, change corridor partitions, change conference room layout. update mep as reqiured. 8th fl.Details
revision to pa #201808066521. add to scope: update existing bathrooms, change corridor partitions, change conference room layout. update mep as reqiured. 8th fl. | $50,000 |
| Aug 17, 2018 | Completed final sign-off Nov 2019 | 125 Grant Av | interior t.i. for walls, ceilings, door, millwork, furniture, floor finshes & (2) (n) accessible bathrooms.Details
interior t.i. for walls, ceilings, door, millwork, furniture, floor finshes & (2) (n) accessible bathrooms. | $2,700,000 |
| May 2, 2018 | Completed final sign-off Mar 2019 | 33 08th St | temporary mock-ups of kitchens, bathrooms & bedrooms in (e) ground flr commercial space adjacent to summerton construction office. no public access provided; appliances & plumbing are not operational; no cooking or sleeping in the temporary space.Details
temporary mock-ups of kitchens, bathrooms & bedrooms in (e) ground flr commercial space adjacent to summerton construction office. no public access provided; appliances & plumbing are not operational; no cooking or sleeping in the temporary space. | $50,000 |
| Jun 27, 2017 | Completed final sign-off Feb 2019 | 285 Geary St | t.i. non structural partitions, structural work including new floor, joists, structural, supports, electrical, mechanical, plumbing ceiling, lighting and finishes. new bathroom on ground floor. no exterior or storefront demo, under sep. permitDetails
t.i. non structural partitions, structural work including new floor, joists, structural, supports, electrical, mechanical, plumbing ceiling, lighting and finishes. new bathroom on ground floor. no exterior or storefront demo, under sep. permit | $1,600,000 |
| Nov 10, 2015 | Completed final sign-off Oct 2016 | 405 Howard St | demo (e) partitions, flooring, finishes. construct new non structural partitions. install (n) doors, frames, finishes, lights and mech to accomodate new layout add 2 ada bathrooms. maher naDetails
demo (e) partitions, flooring, finishes. construct new non structural partitions. install (n) doors, frames, finishes, lights and mech to accomodate new layout add 2 ada bathrooms. maher na | $745,000 |
| May 13, 2014 | Completed final sign-off Oct 2014 | 1355 Market St | concstruct new non structural partitions (n) ceiling lights, door, frames, (n) bathroom , millwork, finishing mechanincal system, planters in suite 140 n/a maherDetails
concstruct new non structural partitions (n) ceiling lights, door, frames, (n) bathroom , millwork, finishing mechanincal system, planters in suite 140 n/a maher | $750,000 |
| Jan 13, 2014 | Completed final sign-off May 2014 | 333 Bay St | barrier removal ada bathroom and entry doors and ramp. t.i. for retail on ground floor. fls and mep under separate permitsDetails
barrier removal ada bathroom and entry doors and ramp. t.i. for retail on ground floor. fls and mep under separate permits | $85,000 |
| Dec 26, 2013 | Completed final sign-off Jun 2014 | 49 Stevenson St | 2nd floor: t.i. interior installation of new 1 hour partitions, doors, finishes, and ceilings. bathroom remodel to make comply. mechanical and electrical under separate permit.Details
2nd floor: t.i. interior installation of new 1 hour partitions, doors, finishes, and ceilings. bathroom remodel to make comply. mechanical and electrical under separate permit. | $173,300 |
| Sep 9, 2013 | Completed final sign-off Nov 2015 | 1050 South Van Ness Av | adding occupancy for residential shelter on the first and second floor per plan. also 1)upgrade electrical, 2) fix guardrails,& handrails. 3) remodel 2 bathrooms and add one unisex bathroom. 4)new ventilation system. 5)new water heater. 6)new furnace, 7)new signage.Details
adding occupancy for residential shelter on the first and second floor per plan. also 1)upgrade electrical, 2) fix guardrails,& handrails. 3) remodel 2 bathrooms and add one unisex bathroom. 4)new ventilation system. 5)new water heater. 6)new furnace, 7)new signage. | $478,000 |
| Jun 17, 2013 | Completed final sign-off Dec 2013 | 480 Ellis St | revision to app#200811076130.changing residential unit bathroom doors from bifold to swing or accordion doors. changing layout of kitchenettes in units#203,214,215,217,218,226,227,330,314,315,316,317,318,326,327,403,414,416,417,418,426,427. changing layout at antorio alley exit door 133b.Details
revision to app#200811076130.changing residential unit bathroom doors from bifold to swing or accordion doors. changing layout of kitchenettes in units#203,214,215,217,218,226,227,330,314,315,316,317,318,326,327,403,414,416,417,418,426,427. changing layout at antorio alley exit door 133b. | |
| Nov 30, 2011 | Expired or cancelled withdrawn Jul 2014 | 1050 South Van Ness Av | remodel 2 (e) 2nd floor bathrooms to repair them & to bring up to code including ada. the bathrooms will be used in conjunction with a homeless shelter on the same floor. 75% of the construction cost of the work is to establish ada complainceDetails
remodel 2 (e) 2nd floor bathrooms to repair them & to bring up to code including ada. the bathrooms will be used in conjunction with a homeless shelter on the same floor. 75% of the construction cost of the work is to establish ada complaince | $111,100 |
| Jun 29, 2011 | Never finaled issued Jul 2011, no final | 111 Pine St | demo non structural partitions, doors, frames, ceilings, lights, finishes, construct new non structural partitions, ceiling lights, bathrooms, finishes,modify mech.Details
demo non structural partitions, doors, frames, ceilings, lights, finishes, construct new non structural partitions, ceiling lights, bathrooms, finishes,modify mech. | $481,500 |
| Sep 30, 2010 | Completed final sign-off Jun 2011 | 111 Pine St | 10th floor-demo extg stairs that go to 11th floor. demo bathrooms. construct new partitions, ceilings, finishes,bathrooms m, e, p lighting,doors and frames. fire alarm and sprinkler on seperate permit.Details
10th floor-demo extg stairs that go to 11th floor. demo bathrooms. construct new partitions, ceilings, finishes,bathrooms m, e, p lighting,doors and frames. fire alarm and sprinkler on seperate permit. | $481,500 |
| Jul 16, 2010 | Completed final sign-off Apr 2011 | 2375 Golden Gate Av | ti for ground floor of univ. student center incl. remodeled existing bookstore, cafe, offices and ada bathrooms. work includes partitions, ceilings, flooring, new mep. no exterior work. fire protection under separate permit. demo ti approved under 2010.05.18.2698Details
ti for ground floor of univ. student center incl. remodeled existing bookstore, cafe, offices and ada bathrooms. work includes partitions, ceilings, flooring, new mep. no exterior work. fire protection under separate permit. demo ti approved under 2010.05.18.2698 | $1,342,000 |
| Feb 10, 2010 | Completed final sign-off Sep 2010 | 2375 Golden Gate Av | usf. demo and construct (n) offices on 5th fl. work include (n) bathrooms, (n) partitions, doors, fixtures. no exterior work. mep and fire protection under separate permitDetails
usf. demo and construct (n) offices on 5th fl. work include (n) bathrooms, (n) partitions, doors, fixtures. no exterior work. mep and fire protection under separate permit | $570,000 |
| Apr 30, 2009 | Completed final sign-off Aug 2009 | 117 Diamond St | playground improvements, water trough. new sink in art studio in basement, remove office wall, replace bath stalls for barrier removal. provide 2 handicap stalls, and restripe parking, alter kitchen for accessibility, replace toilet partitionsin boys toilet for accessibility,replac fire ext,cbinetsDetails
playground improvements, water trough. new sink in art studio in basement, remove office wall, replace bath stalls for barrier removal. provide 2 handicap stalls, and restripe parking, alter kitchen for accessibility, replace toilet partitionsin boys toilet for accessibility,replac fire ext,cbinets | $100,000 |
| Nov 7, 2008 | Completed final sign-off Jun 2013 | 480 Ellis St | addition of bathroom, kitchenettes to (e) sro congregate bedrooms, plumbing, electrical, mechanical upgrade, (n) partition walls, voluntary seismic upgrade, finish upgrades. 82 tourist room + 91 residential bedrooms to be revised to 154 residential bedrooms. no tourist rooms.Details
addition of bathroom, kitchenettes to (e) sro congregate bedrooms, plumbing, electrical, mechanical upgrade, (n) partition walls, voluntary seismic upgrade, finish upgrades. 82 tourist room + 91 residential bedrooms to be revised to 154 residential bedrooms. no tourist rooms. | $3,500,000 |
| Aug 6, 2007 | Never finaled issued Aug 2007, no final | 1809 Irving St | revision to appl#200612089473 add gluelamb to load bearing wall & head out of joist in bathroom floor.Details
revision to appl#200612089473 add gluelamb to load bearing wall & head out of joist in bathroom floor. | $1,200 |
| Dec 5, 2006 | Completed final sign-off Mar 2007 | 845 Market St | space #455: retail buildout: rev. to existing permit. storefront bulkhead rated assembly (2006/03/31/8068), bath layout & head of wall detail.Details
space #455: retail buildout: rev. to existing permit. storefront bulkhead rated assembly (2006/03/31/8068), bath layout & head of wall detail. |