Block 0041, lot 035
22 Vandewater St
- City’s use
- Multi-Family Residential
- Built
- 1975
- Stories
- 4
- Units
- 25
- Rooms
- 36 bathrooms
- Building
- 19,535 sq ft
- Lot
- 7,022 sq ft
- Zoning
- C2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
38 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 23, 2026 | Completed final sign-off Apr 2026 | 22 Vandewater St | Hon's Construction Inc. | repair one loose balcony bolt and reinforce with new wood blocking, back of bldg. seal pipe peetrations with paint and stucco for unit 206-208. this is to comply with sb721 reuirement and is less than 50% repair.Details
repair one loose balcony bolt and reinforce with new wood blocking, back of bldg. seal pipe peetrations with paint and stucco for unit 206-208. this is to comply with sb721 reuirement and is less than 50% repair. | $12,941 |
| Sep 25, 2025 | Completed final sign-off Mar 2026 | 22 Vandewater St | Axel8 Construction | unit 108: rehabilitate existing kitchen and bathroom. install washer and dryer. no removal of structural walls.Details
unit 108: rehabilitate existing kitchen and bathroom. install washer and dryer. no removal of structural walls. | $63,000 |
| Nov 9, 2022 | Completed final sign-off Mar 2023 | 333 Bay St | Au Electric Corporation/Aec Alarms | as-built permit 202108317500: fire devices change. install add'l (2) hardwired monitor modules for water flow and valve tamper switches. install add'l (1) hardwired horn/strobe at b/l. relocate trademen door pull staion from 1/f to b/l using hardwired.Details
as-built permit 202108317500: fire devices change. install add'l (2) hardwired monitor modules for water flow and valve tamper switches. install add'l (1) hardwired horn/strobe at b/l. relocate trademen door pull staion from 1/f to b/l using hardwired. | $1,000 |
| Apr 7, 2022 | Completed final sign-off Aug 2022 | 22 Vandewater St | Boss Construction Inc. | #308. rehab (e) kitchen. rehab (e) bathroom. install washer/dryer. no removal of struct. walls.Details
#308. rehab (e) kitchen. rehab (e) bathroom. install washer/dryer. no removal of struct. walls. | $18,000 |
| Oct 13, 2021 | Completed final sign-off Jul 2022 | 22 Vandewater St | Boss Construction Inc. | apt 307: rehab (e) kitchen & bathroom. install washer/dryer. no removal of structural walls.Details
apt 307: rehab (e) kitchen & bathroom. install washer/dryer. no removal of structural walls. | $28,000 |
| Aug 31, 2021 | Completed final sign-off Mar 2023 | 333 Bay St | Au Electric Corporation/Aec Alarms | upgrade e fire alarm system to comply with sffc 1103.7.6.1 and nfpa 72Details
upgrade e fire alarm system to comply with sffc 1103.7.6.1 and nfpa 72 | $28,000 |
| Jul 26, 2021 | Expired or cancelled cancelled Jan 2026 | 22 Vandewater St | Boss Construction Inc. | unit 201: revision to bpa#202106041673 (kitchen & bath only-no plans); rehabilitate (e) kitchen, rehabilitate (e) bathroom, install washer/dryerDetails
unit 201: revision to bpa#202106041673 (kitchen & bath only-no plans); rehabilitate (e) kitchen, rehabilitate (e) bathroom, install washer/dryer | $10,000 |
| Jun 4, 2021 | Completed final sign-off Oct 2021 | 22 Vandewater St | Boss Construction Inc. | #201: remodel existing kitchen and bath. like for like, relocate electrical subpanel.Details
#201: remodel existing kitchen and bath. like for like, relocate electrical subpanel. | $30,000 |
| Feb 4, 2021 | Completed final sign-off Aug 2021 | 22 Vandewater St | Boss Construction Inc. | unit 203: remodel existing kitchen and bath in kind. add laundry in bath (dryer to be self condensing) no wall change.Details
unit 203: remodel existing kitchen and bath in kind. add laundry in bath (dryer to be self condensing) no wall change. | $35,000 |
| Feb 3, 2021 | Expired or cancelled cancelled Jan 2026 | 333 Bay St | remove extg letters and installl new channel letters on a panelDetails
remove extg letters and installl new channel letters on a panel | $3,400 | |
| Aug 14, 2020 | Completed final sign-off Nov 2020 | 22 Vandewater St | Boss Construction Inc. | unit# 208: remodel existing kitchen & bathroom in kind. add self condensing washer/dryer in existing closet. no structural work.Details
unit# 208: remodel existing kitchen & bathroom in kind. add self condensing washer/dryer in existing closet. no structural work. | $30,000 |
| Aug 14, 2020 | Completed final sign-off Jan 2021 | 22 Vandewater St | Boss Construction Inc. | unit# 304: remodel existing kitchen & bathroom in kind. add self condensing washer/dryer in existing closet. no structural work.Details
unit# 304: remodel existing kitchen & bathroom in kind. add self condensing washer/dryer in existing closet. no structural work. | $30,000 |
| Aug 14, 2020 | Completed final sign-off Nov 2020 | 22 Vandewater St | Boss Construction Inc. | unit# 205: remodel existing kitchen & bathroom in kind. add self condensing washer/dryer in existing closet. no structural work.Details
unit# 205: remodel existing kitchen & bathroom in kind. add self condensing washer/dryer in existing closet. no structural work. | $30,000 |
| Jun 30, 2020 | Completed final sign-off Oct 2020 | 22 Vandewater St | Boss Construction Inc. | unit #202: remodel(e) kitchen & bath like for like. add washer & dryer(self consending) in bathroom. relocate electrical panel out of closet. no wall change.Details
unit #202: remodel(e) kitchen & bath like for like. add washer & dryer(self consending) in bathroom. relocate electrical panel out of closet. no wall change. | $30,000 |
| Jun 30, 2020 | Completed final sign-off Oct 2020 | 22 Vandewater St | Boss Construction Inc. | unit #301: remodel (e) kitchen & bath like for like. add washer dryer in bathroom(self condensing).relocate sub panel out of closet. no wall change.Details
unit #301: remodel (e) kitchen & bath like for like. add washer dryer in bathroom(self condensing).relocate sub panel out of closet. no wall change. | $30,000 |
| Feb 6, 2020 | Completed final sign-off Jul 2020 | 22 Vandewater St | Boss Construction Inc. | unit 303: remodel existing kitchen e bath like for like. add self condensing washer & dryer in bathrooom. no wall change. comply with cel 150.0 (k) 3 & 150.0 (k) 5Details
unit 303: remodel existing kitchen e bath like for like. add self condensing washer & dryer in bathrooom. no wall change. comply with cel 150.0 (k) 3 & 150.0 (k) 5 | $30,000 |
| Jan 10, 2020 | Completed final sign-off Mar 2020 | 22 Vandewater St | Boss Construction Inc. | apt 207: remodel (e) kitchen & bathroom. like for like. add washer/dryer/ ventless in bathroom. relocate electrical subpanel out of closet . no wall change.Details
apt 207: remodel (e) kitchen & bathroom. like for like. add washer/dryer/ ventless in bathroom. relocate electrical subpanel out of closet . no wall change. | $30,000 |
| Oct 11, 2019 | Completed final sign-off Nov 2019 | 22 Vandewater St | Boss Construction Inc. | unit 103: add washer dryer outlet in existing bathroom. washer/dryer to be self condensing, ventless. upgrade electrical subpanelDetails
unit 103: add washer dryer outlet in existing bathroom. washer/dryer to be self condensing, ventless. upgrade electrical subpanel | $5,000 |
| Sep 9, 2019 | Completed final sign-off Nov 2019 | 22 Vandewater St | Boss Construction Inc. | unit 306: remodel existing kitchen. remodel existing bath and add washer/dryer. outlet upgrade electrical subpanel in unit 306. no change of (e) floor plan.Details
unit 306: remodel existing kitchen. remodel existing bath and add washer/dryer. outlet upgrade electrical subpanel in unit 306. no change of (e) floor plan. | $20,000 |
| Sep 9, 2019 | Completed final sign-off Nov 2019 | 22 Vandewater St | Boss Construction Inc. | unit 206: remodel existing kitchen. remodel existing bath and add washer/dryer. outlet upgrade electrical subpanel in unit 206. no change of (e) floor plan.Details
unit 206: remodel existing kitchen. remodel existing bath and add washer/dryer. outlet upgrade electrical subpanel in unit 206. no change of (e) floor plan. | $20,000 |
| Aug 31, 2018 | Completed final sign-off Jan 2019 | 333 Bay St | Prime Retail Services Inc | new racking for sherwin williams paints store. maher n/aDetails
new racking for sherwin williams paints store. maher n/a | $20,000 |
| Aug 1, 2018 | Completed final sign-off Jan 2019 | 333 Bay St | Prime Retail Services Inc | install new non illuminated wall sign, mounted "sherwin williams paints"Details
install new non illuminated wall sign, mounted "sherwin williams paints" | $3,000 |
| Jul 18, 2018 | Completed final sign-off Jan 2019 | 333 Bay St | Prime Retail Services Inc | replace double sided existing sign (sherwin williams paints) 44 1/2x 48 1/2Details
replace double sided existing sign (sherwin williams paints) 44 1/2x 48 1/2 | $1,125 |
| Jun 28, 2018 | Completed final sign-off Jan 2019 | 333 Bay St | Prime Retail Services Inc | interior remodel new interior walls, new fixtures, finishes. new electrical plugs, minor plumbingDetails
interior remodel new interior walls, new fixtures, finishes. new electrical plugs, minor plumbing | $70,000 |
| Dec 3, 2014 | Never finaled issued Dec 2014, no final | 333 Bay St | Johnson United Inc Dba United Sign Syste | erect an electric double faced projecting sign; maher n/aDetails
erect an electric double faced projecting sign; maher n/a | $4,800 |
| Jun 25, 2014 | Completed final sign-off Aug 2014 | 333 Bay St | Westates Mechanical Corporation Inc | modify duct work from an exposed ceiling application to a concealed application, hand duct at diffusers will be replaced with flexible duct including new ceiling diffusers. ref. to pa#201405297030. n/a ordinance #155-13.Details
modify duct work from an exposed ceiling application to a concealed application, hand duct at diffusers will be replaced with flexible duct including new ceiling diffusers. ref. to pa#201405297030. n/a ordinance #155-13. | $29,000 |
| Jun 25, 2014 | Completed final sign-off Jul 2014 | 333 Bay St | Westates Mechanical Corporation Inc | install (21) new pendent sprinklers to new ceiling grid layout & demolish (19) existing pendent sprinkler heads. ref. to pa#201405297030. n/a ordinance #155-13.Details
install (21) new pendent sprinklers to new ceiling grid layout & demolish (19) existing pendent sprinkler heads. ref. to pa#201405297030. n/a ordinance #155-13. | $9,570 |
| May 29, 2014 | Never finaled issued Jun 2014, no final | 333 Bay St | Schieberl Inc. Dba R R Construction | t.i. improvement. intall new flooring, paint exterior walls, install new t-bar ceiling and atc, install racking and shelves. maher n/a.Details
t.i. improvement. intall new flooring, paint exterior walls, install new t-bar ceiling and atc, install racking and shelves. maher n/a. | $45,000 |
| Mar 21, 2014 | Completed final sign-off Apr 2014 | 333 Bay St | Westates Mechanical Corporation Inc | demolish (34) existing sprinkler heads & replace w/(34) new sprinkler pendent sprinkler heads. add (1) upgright & (1) horiz side wall sprinkler heads to bring tenant location updated. ref #2014.0113.6119.n/a for maher ordinance #155-13Details
demolish (34) existing sprinkler heads & replace w/(34) new sprinkler pendent sprinkler heads. add (1) upgright & (1) horiz side wall sprinkler heads to bring tenant location updated. ref #2014.0113.6119.n/a for maher ordinance #155-13 | $7,850 |
| Jan 13, 2014 | Completed final sign-off May 2014 | 333 Bay St | Swinerton Builders | barrier removal ada bathroom and entry doors and ramp. t.i. for retail on ground floor. fls and mep under separate permitsDetails
barrier removal ada bathroom and entry doors and ramp. t.i. for retail on ground floor. fls and mep under separate permits | $85,000 |
| Jan 7, 2014 | Never finaled issued Jan 2014, no final | 333 Bay St | Johnson United Inc Dba United Sign Syste | to erect electrical illuminated wall sign (sign a)Details
to erect electrical illuminated wall sign (sign a) | $3,000 |
| Jan 7, 2014 | Never finaled issued Jan 2014, no final | 333 Bay St | Johnson United Inc Dba United Sign Syste | to erect electrical illuminated wall sign (sign b)Details
to erect electrical illuminated wall sign (sign b) | $3,000 |
| Nov 22, 2013 | Never finaled issued Nov 2013, no final | 333 Bay St | street space & mta parking only.Details
street space & mta parking only. | ||
| Sep 12, 2013 | Never finaled issued Sep 2013, no final | 22 Vandewater St | street space & sidewalk repairDetails
street space & sidewalk repair | ||
| Sep 12, 2012 | Completed final sign-off May 2013 | 22 Vandewater St | repair stucco in kind throughout. repair dry rot as needed; no strl work. replace tile on (e) decks with epoxy coating; replace railings on (e) int. balconies frm wood to metal. replace 46 windows & 22 sliders; no change to opening size; sliders to casements. kitchen green house windows to casementsDetails
repair stucco in kind throughout. repair dry rot as needed; no strl work. replace tile on (e) decks with epoxy coating; replace railings on (e) int. balconies frm wood to metal. replace 46 windows & 22 sliders; no change to opening size; sliders to casements. kitchen green house windows to casements | $375,000 | |
| Oct 1, 2010 | Completed final sign-off Jan 2011 | 22 Vandewater St | Enterprise Roofing Service Inc | reroofingDetails
reroofing | $204,300 |
| Sep 21, 2009 | Completed final sign-off Oct 2009 | 333 Bay St | Kevin Webb Construction Inc | exterior stucco repair in kind approx 60 sq ft & replacement of slding door for the failed slding glass door & surrounding stucco on side of building. not visible from streetDetails
exterior stucco repair in kind approx 60 sq ft & replacement of slding door for the failed slding glass door & surrounding stucco on side of building. not visible from street | $5,000 |
| Jun 20, 2008 | Never finaled issued Jun 2008, no final | 333 Bay St | street space & sidewalk permit only.Details
street space & sidewalk permit only. |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Boss Construction Inc. (15), Prime Retail Services Inc (4), Johnson United Inc Dba United Sign Syste (3), Westates Mechanical Corporation Inc (3), Au Electric Corporation/Aec Alarms (2), Axel8 Construction, Enterprise Roofing Service Inc, Hon's Construction Inc., Kevin Webb Construction Inc, Schieberl Inc. Dba R R Construction, Swinerton Builders
- Architects
- Katherine Baker, Robert Roice Sesar
- Engineers
- Joe Win Kon (3), Joe Kon, Peter Kogan
- Designers
- Aec Alarms
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.