Robert Dade
- Listed as
- authorized agent-others, contractor
- Firm
- R 3 Builders Inc.
- Based in
- Benicia
- On San Francisco permits
- Sep 2001 to Jul 2026
124 permits since 2000 (contractor on 124 permits, authorized agent-others on 1 permit): 83 completed, 3 in progress, 32 never finaled, 6 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 124.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 16, 2026 | In progress filed Jul 2026, not yet issued | 354 Divisadero St | R 3 Builders Inc. | ab-17, soft demo non structural interior componets, drywall , flooring, ceilings, fixtures, and utlites in prepartion for ti under 202605070885, accessbility requirements for this pa deferred to ti permit listed above -Details
ab-17, soft demo non structural interior componets, drywall , flooring, ceilings, fixtures, and utlites in prepartion for ti under 202605070885, accessbility requirements for this pa deferred to ti permit listed above - | $20,000 |
| May 7, 2026 | In progress issued Sep 2026 | 354 Divisadero St | R 3 Builders Inc. | tenant improvement of existing gr fl and basement. retail paint store to a restaurant. new commercial kitchen, dining and restrooms area and req accessibility upgrades. no work to existing 2nd fl.Details
tenant improvement of existing gr fl and basement. retail paint store to a restaurant. new commercial kitchen, dining and restrooms area and req accessibility upgrades. no work to existing 2nd fl. | $410,000 |
| Jan 21, 2026 | In progress issued Apr 2026 | 448 Brannan St | R 3 Builders Inc. | tenant improvement: equipment replacement in kitchen. existing hoods/mech to remain. new finishes, lighting, furniture & dining areas. bars & bathrooms. 1 new ada/ 1 non ada bathroom. all interior work no exterior alterations.Details
tenant improvement: equipment replacement in kitchen. existing hoods/mech to remain. new finishes, lighting, furniture & dining areas. bars & bathrooms. 1 new ada/ 1 non ada bathroom. all interior work no exterior alterations. | $600,000 |
| Dec 23, 2022 | Never finaled issued Jul 2023, no final | 3352 Steiner St | R 3 Builders Inc. | interior remodel of existing restaurant. upgrade (e) accessible restroom. no exterior alterations. no structural work.Details
interior remodel of existing restaurant. upgrade (e) accessible restroom. no exterior alterations. no structural work. | $180,000 |
| Nov 23, 2022 | Completed final sign-off Jan 2024 | 2090 Union St | R 3 Builders Inc. | interior t.i. general mech/elec/plumbing. minor exterior improvements to preserve (e) architecture as approved by planning. no site changes. new interior partitions, furnishing & finishes. fillout of (e) retail space.no structural demo.Details
interior t.i. general mech/elec/plumbing. minor exterior improvements to preserve (e) architecture as approved by planning. no site changes. new interior partitions, furnishing & finishes. fillout of (e) retail space.no structural demo. | $500,000 |
| Nov 7, 2022 | Completed final sign-off Jan 2024 | 2090 Union St | R 3 Builders Inc. | interior tenant improvement demolition only. removal of non bearing interior wall pre plan, partial demolition of existing ceiling. removal of existing lights as indicated, removal of existing finishes. (ab-017)Details
interior tenant improvement demolition only. removal of non bearing interior wall pre plan, partial demolition of existing ceiling. removal of existing lights as indicated, removal of existing finishes. (ab-017) | $500,000 |
| Mar 31, 2022 | Completed final sign-off Nov 2022 | 430 Folsom St | R 3 Builders Inc. | revision to permit 202102195021. add build up slab and toppings slab to march existing door thresholds futures tenant improvement under seperate permit application.Details
revision to permit 202102195021. add build up slab and toppings slab to march existing door thresholds futures tenant improvement under seperate permit application. | $10,000 |
| Mar 30, 2022 | Completed final sign-off Nov 2022 | 430 Folsom St | R 3 Builders Inc. | structural work for restaurant t.i. pa202103176730.Details
structural work for restaurant t.i. pa202103176730. | $10,000 |
| Dec 22, 2021 | Completed final sign-off Jun 2022 | 90 New Montgomery St | R 3 Builders Inc. | ste 250. new carpet & ceiling grid, relocating heat pump and add new grills. relocate lights and add new occupancy sensors. demo of partition wallDetails
ste 250. new carpet & ceiling grid, relocating heat pump and add new grills. relocate lights and add new occupancy sensors. demo of partition wall | $300,000 |
| Apr 2, 2021 | Expired or cancelled withdrawn Mar 2024 | 531 Rhode Island St | R 3 Builders Inc. | new interior stair that connects the 3 levels. reconfiguring the lower level to include bedroom & bathroom. reconfiguring the main level to have an open floor plan. reconfigure upper level to have 2 bedrooms & 2 bathrooms. structural improvements: moment frames & foundation workDetails
new interior stair that connects the 3 levels. reconfiguring the lower level to include bedroom & bathroom. reconfiguring the main level to have an open floor plan. reconfigure upper level to have 2 bedrooms & 2 bathrooms. structural improvements: moment frames & foundation work | $80,000 |
| Mar 17, 2021 | Never finaled issued Apr 2022, no final | 430 Folsom St | R 3 Builders Inc. | tenant improvement for proposed restaurant & bar located at current vacant retail space 2 & 5. including full commercial kitchen, 2 ada restrooms, and sushi bar at retail 2, and full bar & seating at retail 5. upgrade existing path of travel from folsom st with new 1:20 ramp.Details
tenant improvement for proposed restaurant & bar located at current vacant retail space 2 & 5. including full commercial kitchen, 2 ada restrooms, and sushi bar at retail 2, and full bar & seating at retail 5. upgrade existing path of travel from folsom st with new 1:20 ramp. | $467,000 |
| Oct 29, 2020 | Completed final sign-off Jun 2022 | 200 Brannan St | R 3 Builders Inc. | replacing appliances in kitchen, replace sheetrock in kitchen and bathroom bedrooms. reinstall doors, replace tile and vanities in 2 bathrooms. replace wood flooring througout. revision to pa# 201909202293. unit 424Details
replacing appliances in kitchen, replace sheetrock in kitchen and bathroom bedrooms. reinstall doors, replace tile and vanities in 2 bathrooms. replace wood flooring througout. revision to pa# 201909202293. unit 424 | $65,000 |
| Feb 6, 2020 | Never finaled issued Feb 2020, no final | 2105 Chestnut St | R 3 Builders Inc. | repair & weather proofing of an existing storefront, replace existing windowsDetails
repair & weather proofing of an existing storefront, replace existing windows | $15,000 |
| Dec 6, 2019 | Completed final sign-off Jul 2020 | 1796 Union St | R 3 Builders Inc., Centric Building Inc. | 1/f: tenant improvement of existing restaurant. cosmetic, title 24 upgrades.Details
1/f: tenant improvement of existing restaurant. cosmetic, title 24 upgrades. | $75,000 |
| Dec 5, 2019 | Completed final sign-off Mar 2020 | 2105 Chestnut St | R 3 Builders Inc. | minor non-structural remodel to an existing restaurant. provide new ada compliance entrance, new pos and stair modification for accessibility compliance. deferred submittal: exterior signage & mepDetails
minor non-structural remodel to an existing restaurant. provide new ada compliance entrance, new pos and stair modification for accessibility compliance. deferred submittal: exterior signage & mep | $166,000 |
| Apr 17, 2018 | Never finaled issued May 2018, no final | 161 Jessie St | R 3 Builders Inc. | g/f: scope of work includes new lighting , kitchenette, and accessible restrooms. majority of existing mechanical to remain with minor modifications. ref #201803305083. maher naDetails
g/f: scope of work includes new lighting , kitchenette, and accessible restrooms. majority of existing mechanical to remain with minor modifications. ref #201803305083. maher na | |
| Mar 30, 2018 | Completed final sign-off Oct 2018 | 161 Jessie St | R 3 Builders Inc. | project is a t.i. w/in an extg ground floor space: scope includes new accessible restrooms, kitchenette, and minor non structural partition framing. defered mech, elect, plmg, & fire life safety. n/a for maherDetails
project is a t.i. w/in an extg ground floor space: scope includes new accessible restrooms, kitchenette, and minor non structural partition framing. defered mech, elect, plmg, & fire life safety. n/a for maher | $400,000 |
| Feb 15, 2018 | Completed final sign-off Apr 2018 | 761 03rd St | R 3 Builders Inc. | revision to exterior facade. add one window to king street facade. ref. #2018-02-01-0148. maher n/aDetails
revision to exterior facade. add one window to king street facade. ref. #2018-02-01-0148. maher n/a | |
| Feb 1, 2018 | Completed final sign-off Sep 2018 | 761 03rd St | R 3 Builders Inc. | interior ti to include new partitions, ada restrooms, & meps. maher naDetails
interior ti to include new partitions, ada restrooms, & meps. maher na | $140,000 |
| Feb 1, 2018 | Completed final sign-off Sep 2018 | 761 03rd St | R 3 Builders Inc. | exterior facade - improvements to include replacement of door, glazing & lighting exterior.Details
exterior facade - improvements to include replacement of door, glazing & lighting exterior. | $50,000 |
| Dec 1, 2017 | Completed final sign-off Sep 2018 | 761 03rd St | R 3 Builders Inc. | ti demo of interior and mezzanine, partitions, ceiling. install new partition, ada restroom, ceiling and structural maher naDetails
ti demo of interior and mezzanine, partitions, ceiling. install new partition, ada restroom, ceiling and structural maher na | $800,000 |
| May 22, 2017 | Completed final sign-off Jun 2017 | 680 Folsom St | R 3 Builders Inc. | revision to 201512735875. revising t-bar ceilingDetails
revision to 201512735875. revising t-bar ceiling | $5,000 |
| Feb 16, 2017 | Completed final sign-off Apr 2017 | 100 Van Ness Av | R 3 Builders Inc. | revision to pa #201508184601 - removal of two light fixtures. n/a maher ord. 155-13Details
revision to pa #201508184601 - removal of two light fixtures. n/a maher ord. 155-13 | |
| Dec 6, 2016 | Never finaled issued Dec 2016, no final | 1 Hallidie Pz | R 3 Builders Inc. | revision to pa 2015-0417-4008 remove wall, combine 2 offices into one officeDetails
revision to pa 2015-0417-4008 remove wall, combine 2 offices into one office | $18,000 |
| Aug 31, 2016 | Never finaled issued Aug 2016, no final | 680 Folsom St | R 3 Builders Inc. | remove window insert signDetails
remove window insert sign | $8,000 |
| Jul 21, 2016 | Completed final sign-off Oct 2018 | 680 Folsom St | R 3 Builders Inc. | suite 120 - install air and cooling system in basement for restaurant - ref pa 201512235875Details
suite 120 - install air and cooling system in basement for restaurant - ref pa 201512235875 | |
| Jul 12, 2016 | Completed final sign-off Nov 2018 | 680 Folsom St | R 3 Builders Inc. | suite 120 - commercial ti for a restaurant. ref pa 2015-1223-5875Details
suite 120 - commercial ti for a restaurant. ref pa 2015-1223-5875 | |
| Jul 11, 2016 | Completed final sign-off Apr 2017 | 100 Van Ness Av | R 3 Builders Inc. | ground floor. administrative correction to pa#201508184601. t.i. for 92 occupant restaurant was incorrectly labeled b, correct to a-2 occupancy. no work.Details
ground floor. administrative correction to pa#201508184601. t.i. for 92 occupant restaurant was incorrectly labeled b, correct to a-2 occupancy. no work. | |
| Jun 30, 2016 | Expired or cancelled withdrawn Oct 2018 | 680 Folsom St | R 3 Builders Inc. | revision to 201512235875; change in ceiling type, from act to black iron and sheetrock. change in egress from back kitchen.Details
revision to 201512235875; change in ceiling type, from act to black iron and sheetrock. change in egress from back kitchen. | |
| Apr 15, 2016 | Completed final sign-off Jan 2017 | 2029 Market St | R 3 Builders Inc. | at extg ground floor commercial tenant space, remove extg non structural interior partitions, doors, plumbing fixtures, light fixtures and millwork. under ab-017Details
at extg ground floor commercial tenant space, remove extg non structural interior partitions, doors, plumbing fixtures, light fixtures and millwork. under ab-017 | $10,000 |
| Apr 11, 2016 | Never finaled issued May 2016, no final | 400 Sutter St | R 3 Builders Inc. | underpinning for excavation for electrical vault. ref app#201310280417Details
underpinning for excavation for electrical vault. ref app#201310280417 | $60,000 |
| Apr 8, 2016 | Never finaled issued Nov 2016, no final | 2379 Chestnut St | R 3 Builders Inc. | interior foundation work only to ground floor; maher n/a. interior work ref. permit #201509156983.Details
interior foundation work only to ground floor; maher n/a. interior work ref. permit #201509156983. | $10,000 |
| Feb 26, 2016 | Never finaled issued Feb 2016, no final | 400 Sutter St | R 3 Builders Inc. | temp walkway associated w/ped sidewalk closure along sutter st during req'd improvements to row. ground floor tenant(cvs)to remain unoccupied until ramp removed and exiting restored to original permitted configuration. compliance with maher ordinance 155-13 not required.Details
temp walkway associated w/ped sidewalk closure along sutter st during req'd improvements to row. ground floor tenant(cvs)to remain unoccupied until ramp removed and exiting restored to original permitted configuration. compliance with maher ordinance 155-13 not required. | $10,000 |
| Feb 19, 2016 | Completed final sign-off Apr 2017 | 100 Van Ness Av | R 3 Builders Inc. | revision to appl #201508184601 - scope is ot replace hog with air-maid system per sffd requirements , revised structural & mep plans. n/a maher ordinanceDetails
revision to appl #201508184601 - scope is ot replace hog with air-maid system per sffd requirements , revised structural & mep plans. n/a maher ordinance | $20,000 |
| Feb 8, 2016 | Completed final sign-off Feb 2016 | 710 03rd St | R 3 Builders Inc. | lighting only per inspectors request. title 24 requirement should be removed. not required as extg lighting is reduced by 8% no change to envelope or glazing or mech. ref app#201506199465. n/a for maher.Details
lighting only per inspectors request. title 24 requirement should be removed. not required as extg lighting is reduced by 8% no change to envelope or glazing or mech. ref app#201506199465. n/a for maher. | |
| Jan 27, 2016 | Never finaled issued Feb 2016, no final | 1446 Market St | R 3 Builders Inc. | revision to permit #2014-12-24-4497. request by inspector for handicap information.Details
revision to permit #2014-12-24-4497. request by inspector for handicap information. | |
| Jan 22, 2016 | Never finaled issued Jan 2016, no final | 100 Van Ness Av | R 3 Builders Inc. | companion electrical plans for work under pa #201509298302. n/a meher ordinanceDetails
companion electrical plans for work under pa #201509298302. n/a meher ordinance | $55,000 |
| Jan 6, 2016 | Completed final sign-off Jan 2016 | 601 Mission St | R 3 Builders Inc. | shelving only for cvs drugstore. t.i. approved under app#201311222669Details
shelving only for cvs drugstore. t.i. approved under app#201311222669 | $30,000 |
| Dec 23, 2015 | Completed final sign-off Oct 2018 | 680 Folsom St | R 3 Builders Inc. | new restaurant in 1985 sq ft restaurant with kitchen and seating areaDetails
new restaurant in 1985 sq ft restaurant with kitchen and seating area | $400,000 |
| Dec 14, 2015 | Never finaled issued Dec 2015, no final | 1446 Market St | R 3 Builders Inc. | revised title 24 calculations. revision to app#201412244497 for lighting changes. n/a for maher.Details
revised title 24 calculations. revision to app#201412244497 for lighting changes. n/a for maher. | |
| Dec 10, 2015 | Never finaled issued Dec 2015, no final | 100 Van Ness Av | R 3 Builders Inc. | install electric wall single faced sign. maher naDetails
install electric wall single faced sign. maher na | $7,500 |
| Dec 10, 2015 | Never finaled issued Dec 2015, no final | 100 Van Ness Av | R 3 Builders Inc. | install projecting electrical double faced signDetails
install projecting electrical double faced sign | $7,500 |
| Dec 10, 2015 | Never finaled issued Dec 2015, no final | 100 Van Ness Av | R 3 Builders Inc. | install projecting electrical single faced sign. maher naDetails
install projecting electrical single faced sign. maher na | $5,000 |
| Nov 20, 2015 | Completed final sign-off Jan 2017 | 2029 Market St | R 3 Builders Inc. | change of use. from a-2 (restaurant) to b,m (medical cannabis dispensary). remove interior non-structural partitions, doors, millwork and plumbing fixtures. install new partitions, doors and millwork.Details
change of use. from a-2 (restaurant) to b,m (medical cannabis dispensary). remove interior non-structural partitions, doors, millwork and plumbing fixtures. install new partitions, doors and millwork. | $684,000 |
| Sep 29, 2015 | Completed final sign-off Jun 2016 | 100 Van Ness Av | R 3 Builders Inc. | no change to (e) bldg footprint,square footage,of height, ti. including (n) food prep area, retail/seating area,elec,mech & plmbg work with 1 new accessible restroom,signage & exterior seating area under separate permit,no changes to exterior facade;maher n/aDetails
no change to (e) bldg footprint,square footage,of height, ti. including (n) food prep area, retail/seating area,elec,mech & plmbg work with 1 new accessible restroom,signage & exterior seating area under separate permit,no changes to exterior facade;maher n/a | $128,000 |
| Sep 17, 2015 | Completed final sign-off Nov 2015 | 506 Castro St | R 3 Builders Inc. | interior non-structural demo in preperation for future t.i. per ab-017. tenant improvement under separate permit. n/a for maherDetails
interior non-structural demo in preperation for future t.i. per ab-017. tenant improvement under separate permit. n/a for maher | $10,000 |
| Sep 15, 2015 | Never finaled issued Jul 2016, no final | 2379 Chestnut St | R 3 Builders Inc. | interior remodel within existing building commercial, change of use to restaurant, no improvements to exterior patio in rear (seperate permit). structural work under sperate permit.Details
interior remodel within existing building commercial, change of use to restaurant, no improvements to exterior patio in rear (seperate permit). structural work under sperate permit. | $250,000 |
| Aug 24, 2015 | Expired or cancelled cancelled Mar 2017 | 71 Stevenson St | R 3 Builders Inc. | interior, soft demo of extg restaurant finishes. interior work only ab-017 arch., mep, l/s under separate permitDetails
interior, soft demo of extg restaurant finishes. interior work only ab-017 arch., mep, l/s under separate permit | $30,000 |
| Aug 18, 2015 | Completed final sign-off Apr 2017 | 100 Van Ness Av | R 3 Builders Inc. | ti for (n) restaurant on g/f work includes (n) equipment, fixtures, finishes, restrooms, mep (n) ext. doors steps and risers. fire protection and signage under separate permit. n/a for maher ordinance.Details
ti for (n) restaurant on g/f work includes (n) equipment, fixtures, finishes, restrooms, mep (n) ext. doors steps and risers. fire protection and signage under separate permit. n/a for maher ordinance. | $311,000 |
| Aug 6, 2015 | Never finaled issued Aug 2015, no final | 465 Hayes St | R 3 Builders Inc. | title 24 - as builts. to cpmply with nov 2015 52101 dated 18 june 2015Details
title 24 - as builts. to cpmply with nov 2015 52101 dated 18 june 2015 | |
| Aug 4, 2015 | Completed final sign-off Apr 2017 | 2379 Chestnut St | R 3 Builders Inc., Upcycle Builders Inc. | g/f - demo permit only; non-structural only; separate ti permit to file; ab-007 applies; maher na change of use permit previously issuedDetails
g/f - demo permit only; non-structural only; separate ti permit to file; ab-007 applies; maher na change of use permit previously issued | $900 |
| Jul 21, 2015 | Never finaled issued Jul 2015, no final | 710 03rd St | R 3 Builders Inc. | interior non structural demo per ab-017. n/a ordinance #155-13Details
interior non structural demo per ab-017. n/a ordinance #155-13 | $5,000 |
| Jul 17, 2015 | Expired or cancelled cancelled Jul 2022 | 807 Montgomery St | R 3 Builders Inc. | remove existing awning, clean brick, remove attached lettering, maher ordinance - extended ordinance #155-13 not requiredDetails
remove existing awning, clean brick, remove attached lettering, maher ordinance - extended ordinance #155-13 not required | $5,000 |
| Jul 9, 2015 | Completed final sign-off Jan 2016 | 568 Hayes St | R 3 Builders Inc. | t.i. interior remodel, expose floor brick at entry, move push pad to interior side wall.Details
t.i. interior remodel, expose floor brick at entry, move push pad to interior side wall. | $5,000 |
| Jun 19, 2015 | Completed final sign-off Feb 2016 | 710 03rd St | R 3 Builders Inc. | remodel extg fast food restaurant, work include replaceing kitchen equipment wall finishes, rebuild wall at drink station and new pass thru window at exterior. mep and fire protection under seperate permit. n/a for maher.Details
remodel extg fast food restaurant, work include replaceing kitchen equipment wall finishes, rebuild wall at drink station and new pass thru window at exterior. mep and fire protection under seperate permit. n/a for maher. | $50,000 |
| May 14, 2015 | Never finaled issued May 2015, no final | 807 Montgomery St | R 3 Builders Inc. | demo floors, millwork per ab-017 demo rugs only. demo only surface mounted materials. no walls to be moved all assembles to be maintained. call district inspector prior to start of work. n/a for maher.Details
demo floors, millwork per ab-017 demo rugs only. demo only surface mounted materials. no walls to be moved all assembles to be maintained. call district inspector prior to start of work. n/a for maher. | $10,000 |
| Apr 17, 2015 | Completed final sign-off Aug 2017 | 1 Hallidie Pz | R 3 Builders Inc. | 5th & 6th flr: ti - 6th flr - reconfigure (e) office area. new lighting & air outlet relocation. 5th flr -reconfigure (e) office area - new ada restroom with shower. new ligting & hvac system...building exempt from sprink rqmnt, filed verify. fa separate permitDetails
5th & 6th flr: ti - 6th flr - reconfigure (e) office area. new lighting & air outlet relocation. 5th flr -reconfigure (e) office area - new ada restroom with shower. new ligting & hvac system...building exempt from sprink rqmnt, filed verify. fa separate permit | $350,000 |
| Mar 19, 2015 | Completed final sign-off Mar 2015 | 465 Hayes St | R 3 Builders Inc. | to comply with correction notice by bi d dated 3/19/2015 - to install exit sign in front of space (interior)Details
to comply with correction notice by bi d dated 3/19/2015 - to install exit sign in front of space (interior) | $400 |
| Mar 3, 2015 | Never finaled issued May 2015, no final | 1466 Haight St | R 3 Builders Inc. | new restaurant in space previously occupied by restaurant. woek includes providing handicapped accessibility to 20%Details
new restaurant in space previously occupied by restaurant. woek includes providing handicapped accessibility to 20% | $98,500 |
| Mar 3, 2015 | Completed final sign-off Jul 2017 | 2414 Lombard St | R 3 Builders Inc. | change of use. interior tenant improvement at ground floor of an existing two-story mixed-use building, remove interior, non-structural partitions, provide interior partitions, millwork plumb fixtures, remove door at areaway and infill opening, remove and replace glazing & doors at storfront.Details
change of use. interior tenant improvement at ground floor of an existing two-story mixed-use building, remove interior, non-structural partitions, provide interior partitions, millwork plumb fixtures, remove door at areaway and infill opening, remove and replace glazing & doors at storfront. | $208,564 |
| Dec 2, 2014 | Never finaled issued Sep 2015, no final | 2136 Union St | Terra Nova Industries, R 3 Builders Inc. | removal of barriers to ada standards. this is an ada upgrades, changing front door, rear door, bathrooms to comply with ada regs.Details
removal of barriers to ada standards. this is an ada upgrades, changing front door, rear door, bathrooms to comply with ada regs. | $35,000 |
| Sep 26, 2014 | Never finaled issued Sep 2014, no final | 400 Sutter St | R 3 Builders Inc. | revision to approved appl. 2014.0421.3765. to add ul listed smoke curtains to the openings of elevator shaft. maher n/a.Details
revision to approved appl. 2014.0421.3765. to add ul listed smoke curtains to the openings of elevator shaft. maher n/a. | $20,000 |
| Aug 13, 2014 | Never finaled issued Aug 2014, no final | 400 Sutter St | R 3 Builders Inc. | shelving work only for new retail pharmacy. ti approved under pa# 2013-1028-0417.Details
shelving work only for new retail pharmacy. ti approved under pa# 2013-1028-0417. | $50,000 |
| May 9, 2014 | Completed final sign-off Feb 2018 | 1900 19th Av | Gray West Construction Inc, R 3 Builders Inc. | site permit & change of use for (n) retail pharmacy on ground flr, work includes demo of offices on 2nd flr parking lot & adding parking.Details
site permit & change of use for (n) retail pharmacy on ground flr, work includes demo of offices on 2nd flr parking lot & adding parking. | $950,000 |
| Mar 13, 2014 | Completed final sign-off Aug 2014 | 115 Sansome St | R 3 Builders Inc. | 14th and 15th floors:upgrade extg finishes, add new casework, replace lighting construct new non-bearing partition walls for storage areas. new decorative ceiling feature to replace extg acoustic ceiling tile. mep & fire alarm under separate permitDetails
14th and 15th floors:upgrade extg finishes, add new casework, replace lighting construct new non-bearing partition walls for storage areas. new decorative ceiling feature to replace extg acoustic ceiling tile. mep & fire alarm under separate permit | $199,000 |
| Dec 31, 2013 | Completed final sign-off Feb 2014 | 1101 04th St | R 3 Builders Inc. | revision to pa201310159237; change in finish floor slabDetails
revision to pa201310159237; change in finish floor slab | $5,000 |
| Nov 26, 2013 | Completed final sign-off Feb 2016 | 601 Mission St | R 3 Builders Inc. | facade work only for (n) cvs pharmacy. scope is to replace 1 window w/ (n) door on 2nd street & relocate 1 set of doors on mission street & replace 2 others w/ windows. all work on street level. no other work. t.i. under separate permit.Details
facade work only for (n) cvs pharmacy. scope is to replace 1 window w/ (n) door on 2nd street & relocate 1 set of doors on mission street & replace 2 others w/ windows. all work on street level. no other work. t.i. under separate permit. | $30,000 |
| Nov 22, 2013 | Completed final sign-off Feb 2016 | 601 Mission St | Gidel & Kocal Construction Co Inc, R 3 Builders Inc. | t.i. for (n) retail pharmacy on ground floor & basement work includes (n) fixtures, bathrooms, mep & non-passenger vertical lift. no exterior work, fire protection under separate permit.Details
t.i. for (n) retail pharmacy on ground floor & basement work includes (n) fixtures, bathrooms, mep & non-passenger vertical lift. no exterior work, fire protection under separate permit. | $835,000 |
| Nov 21, 2013 | Completed final sign-off Feb 2016 | 601 Mission St | R 3 Builders Inc. | interior non-structural demo on ground floor & basement ab-017. no construction work.Details
interior non-structural demo on ground floor & basement ab-017. no construction work. | $25,000 |
| Oct 18, 2013 | Completed final sign-off Aug 2016 | 400 Sutter St | R 3 Builders Inc. | install new double door delivery entry on sutter street for new cvs pharmancy. (under seperate permit) ** maher: compliance with ordinance no# 155-13 not required **Details
install new double door delivery entry on sutter street for new cvs pharmancy. (under seperate permit) ** maher: compliance with ordinance no# 155-13 not required ** | $1,000 |
| Oct 15, 2013 | Completed final sign-off Feb 2014 | 1101 04th St | R 3 Builders Inc. | interior core and shell. (new building pa 201104224606 is not complete todate) to include new makeup auir and exhaust, space conditioning for future retail space and finish floor slabDetails
interior core and shell. (new building pa 201104224606 is not complete todate) to include new makeup auir and exhaust, space conditioning for future retail space and finish floor slab | $450,000 |
| Sep 6, 2013 | Completed final sign-off Apr 2014 | 303 02nd St | R 3 Builders Inc. | ste f - interior tenant improvement for a grab & co sandwich store. new wall finishes, ceiling, flooring, new prep kitchen, restroom & sale counter.Details
ste f - interior tenant improvement for a grab & co sandwich store. new wall finishes, ceiling, flooring, new prep kitchen, restroom & sale counter. | $200,000 |
| Sep 6, 2013 | Completed final sign-off May 2014 | 303 02nd St | R 3 Builders Inc. | ste h - inteiror tenant improvement for new full service restaurant in (e) restaurant space. space shall include new kitchen, restrooms, bar & dining areas.Details
ste h - inteiror tenant improvement for new full service restaurant in (e) restaurant space. space shall include new kitchen, restrooms, bar & dining areas. | $463,000 |
| Aug 29, 2013 | Never finaled issued Aug 2013, no final | 499 Haight St | R 3 Builders Inc. | shelving only for (n) cvs pharmacy approved under pa#201212065665Details
shelving only for (n) cvs pharmacy approved under pa#201212065665 | $50,000 |
| Jun 19, 2013 | Completed final sign-off Aug 2013 | 1101 Market St | R 3 Builders Inc. | work will include installation of (n) madix shelving in the main sales area & (n) uniweb shelving in the pharmacy area.Details
work will include installation of (n) madix shelving in the main sales area & (n) uniweb shelving in the pharmacy area. | $75,000 |
| Jun 14, 2013 | Completed final sign-off Aug 2013 | 1101 Market St | R 3 Builders Inc. | revision to app#201305076291. change is to make 2nd exit on 7th street to serve as accessible mean of egress. add section detail at entry ways.Details
revision to app#201305076291. change is to make 2nd exit on 7th street to serve as accessible mean of egress. add section detail at entry ways. | $15,000 |
| May 7, 2013 | Completed final sign-off Aug 2013 | 1101 Market St | R 3 Builders Inc. | minor revisions to prevously approved app#201206223274. work will include raising finish floor, reconfigure elevator, remove utility room 113, change inerior doors, raise ceiling heights, new water heater and condeser, new interior signage, revised interior finishes, new door harware and schedule.Details
minor revisions to prevously approved app#201206223274. work will include raising finish floor, reconfigure elevator, remove utility room 113, change inerior doors, raise ceiling heights, new water heater and condeser, new interior signage, revised interior finishes, new door harware and schedule. | $125,000 |
| Apr 9, 2013 | Completed final sign-off Jun 2018 | 2479 Francisco St | R 3 Builders Inc. | ground floor horizontal addition @ rear yard. 3rd floor vertical addition. roof deck access. remodel include interior renovation.Details
ground floor horizontal addition @ rear yard. 3rd floor vertical addition. roof deck access. remodel include interior renovation. | $495,000 |
| Jan 29, 2013 | Never finaled issued Jan 2013, no final | 1401 California St | R 3 Builders Inc. | shelving only to cvs pharmacy approved 201212035330. no other work. uniweb shelving through out store. madix shelving in pharmacy onlyDetails
shelving only to cvs pharmacy approved 201212035330. no other work. uniweb shelving through out store. madix shelving in pharmacy only | $15,000 |
| Jan 25, 2013 | Completed final sign-off Apr 2013 | 1401 California St | R 3 Builders Inc. | remove (e) spandrel panels at store front, replace with (n) aluminum storefront system with clear glass panels to match trader joes.Details
remove (e) spandrel panels at store front, replace with (n) aluminum storefront system with clear glass panels to match trader joes. | $10,000 |
| Dec 6, 2012 | Completed final sign-off Oct 2013 | 499 Haight St | R 3 Builders Inc. | basement & 1st floor-interior t.i for new cvs pharmacy at ground level. work includes new walls, restrooms, finishes, casework, m.e.p & non passenger liftDetails
basement & 1st floor-interior t.i for new cvs pharmacy at ground level. work includes new walls, restrooms, finishes, casework, m.e.p & non passenger lift | $600,000 |
| Dec 3, 2012 | Completed final sign-off Apr 2013 | 1401 California St | R 3 Builders Inc. | revision to pa# 2012-0424-8990-new work includes minor to structural, architectural, plumbing, mechanical, electrical for cost reduction or to accomodate site conditionsDetails
revision to pa# 2012-0424-8990-new work includes minor to structural, architectural, plumbing, mechanical, electrical for cost reduction or to accomodate site conditions | |
| Nov 1, 2012 | Completed final sign-off Jun 2013 | 2027 Chestnut St | R 3 Builders Inc. | exterior remodel. new wood slats above entrance, new gooseneck light, paint existing heater, paint existing storefront wall, paint existing storefront, all black ledgestone at the entrnceDetails
exterior remodel. new wood slats above entrance, new gooseneck light, paint existing heater, paint existing storefront wall, paint existing storefront, all black ledgestone at the entrnce | $25,000 |
| Aug 21, 2012 | Completed final sign-off Dec 2012 | 3885 24th St | R 3 Builders Inc. | revision to 201205150522. remove e wood flooring. replce any floor joists (with structural damage) in kind. build new sub floor sheathing and new wood flooringDetails
revision to 201205150522. remove e wood flooring. replce any floor joists (with structural damage) in kind. build new sub floor sheathing and new wood flooring | $6,000 |
| Jun 22, 2012 | Completed final sign-off Aug 2013 | 1101 Market St | R 3 Builders Inc. | change of use from check cashing to pharmacy-t.i. for new retail pharmacy work includes new partitions, fixtures, finishes, m.e.p, new bathrooms, interior stairs & interior elevator. fire protection under seperate permit. new storefront & facade under seperate pa# 201205170670Details
change of use from check cashing to pharmacy-t.i. for new retail pharmacy work includes new partitions, fixtures, finishes, m.e.p, new bathrooms, interior stairs & interior elevator. fire protection under seperate permit. new storefront & facade under seperate pa# 201205170670 | $400,000 |
| Jun 8, 2012 | Never finaled issued Jun 2012, no final | 701 Portola Dr | R 3 Builders Inc. | revision to approved core-shell permit for new retail building, pa# 2011-0725-0987-work is revised truss & beams for floor & roof. no other workDetails
revision to approved core-shell permit for new retail building, pa# 2011-0725-0987-work is revised truss & beams for floor & roof. no other work | $10,000 |
| May 23, 2012 | Never finaled issued Jun 2012, no final | 701 Portola Dr | R 3 Builders Inc. | installation of new shelving & racking associated with a t.i under pa# 2011-0810-2209Details
installation of new shelving & racking associated with a t.i under pa# 2011-0810-2209 | $11,500 |
| May 17, 2012 | Completed final sign-off Aug 2013 | 1101 Market St | R 3 Builders Inc. | new facade / storefront system to replace (e) interior t.i. & mep work to be filed under separate permit.Details
new facade / storefront system to replace (e) interior t.i. & mep work to be filed under separate permit. | $200,000 |
| Apr 24, 2012 | Completed final sign-off Mar 2013 | 1401 California St | R 3 Builders Inc. | ti for new pharmacy. work includes new partitions, fixtures, finishes, new mep. no exterior work. fire protection under separate permitDetails
ti for new pharmacy. work includes new partitions, fixtures, finishes, new mep. no exterior work. fire protection under separate permit | $450,000 |
| Apr 2, 2012 | Never finaled issued Apr 2012, no final | 701 Portola Dr | R 3 Builders Inc. | revision to pa #2011.07.25..0987: work is to add 5 exterior light fixtures & updated finish schedule to show specs for wall tile.Details
revision to pa #2011.07.25..0987: work is to add 5 exterior light fixtures & updated finish schedule to show specs for wall tile. | $3,000 |
| Mar 22, 2012 | Completed final sign-off Apr 2012 | 351 California St | R 3 Builders Inc. | interior retail shelving only for new cvs pharmacy approved under 201109013753. no other work.Details
interior retail shelving only for new cvs pharmacy approved under 201109013753. no other work. | $30,000 |
| Mar 6, 2012 | Never finaled issued Mar 2012, no final | 2125 Fillmore St | R 3 Builders Inc. | minor t.i to (e) full service restaurant, build new wall betweem bar & kitchen. extend (e) bar.no increase in occupant load less than 49- b occupancyDetails
minor t.i to (e) full service restaurant, build new wall betweem bar & kitchen. extend (e) bar.no increase in occupant load less than 49- b occupancy | $24,000 |
| Jan 23, 2012 | Completed final sign-off Sep 2012 | 701 Portola Dr | R 3 Builders Inc. | temporary shoring along s.w. property line of proposed cvs pharmacy in advance of construction approved under app #201107260987.Details
temporary shoring along s.w. property line of proposed cvs pharmacy in advance of construction approved under app #201107260987. | $30,000 |
| Jan 11, 2012 | Completed final sign-off Apr 2012 | 1760 Ocean Av | R 3 Builders Inc. | installation of light duty storage shelving in the pharmacy, sales floor & storage. no exterior work. fire protection under seperate permitDetails
installation of light duty storage shelving in the pharmacy, sales floor & storage. no exterior work. fire protection under seperate permit | $20,000 |
| Dec 12, 2011 | Completed final sign-off Apr 2012 | 1760 Ocean Av | R 3 Builders Inc. | revision to approved app#201108303554. new work includes an increase to floor height over an increased area. changes to the approved ramps and stairs at egress points.Details
revision to approved app#201108303554. new work includes an increase to floor height over an increased area. changes to the approved ramps and stairs at egress points. | $20,000 |
| Nov 30, 2011 | Completed final sign-off Jun 2012 | 550 Gough St | R 3 Builders Inc. | t.i. for self service specialty food service planning code sec. 790.93 in (e) vacant space. 1st time tenant improvement.Details
t.i. for self service specialty food service planning code sec. 790.93 in (e) vacant space. 1st time tenant improvement. | $179,000 |
| Sep 1, 2011 | Completed final sign-off May 2012 | 351 California St | R 3 Builders Inc. | int. t i for new pharmacy drug store. work includes new partitions, bathrooms, fixtures, finishes, mech, lighting and plumbing. no exterior work. fire protection under separate permit. all shelving and racking under separate permitDetails
int. t i for new pharmacy drug store. work includes new partitions, bathrooms, fixtures, finishes, mech, lighting and plumbing. no exterior work. fire protection under separate permit. all shelving and racking under separate permit | $500,000 |
| Aug 30, 2011 | Completed final sign-off Jul 2012 | 1760 Ocean Av | R 3 Builders Inc. | tenant improvement-new drugstore/pharmacy work includes new partitions, fixtures, finishes, new bathrooms, m.e.p. no exterior work. fire protection & signage under seperate permitsDetails
tenant improvement-new drugstore/pharmacy work includes new partitions, fixtures, finishes, new bathrooms, m.e.p. no exterior work. fire protection & signage under seperate permits | $200,000 |
| Aug 10, 2011 | Completed final sign-off Oct 2012 | 701 Portola Dr | R 3 Builders Inc. | t.i. for new retail pharmacy & drug store. shell bldg under pa# 2011-0725-0987, work includes new partitions, fixtures, finishes, m.e.p. no exterior work under this permit. fire protection under seperate permit, shelving under seperate permitDetails
t.i. for new retail pharmacy & drug store. shell bldg under pa# 2011-0725-0987, work includes new partitions, fixtures, finishes, m.e.p. no exterior work under this permit. fire protection under seperate permit, shelving under seperate permit | $400,000 |
| Jul 12, 2011 | Never finaled issued Aug 2011, no final | 3251 Scott St | R 3 Builders Inc. | revision to pa# 2011-0321-2450-replace damaged wall (exterior) & remove interior partition wall. no change in occupant load, occupant load to remain the same.Details
revision to pa# 2011-0321-2450-replace damaged wall (exterior) & remove interior partition wall. no change in occupant load, occupant load to remain the same. | $500 |