Block 3774, lot 400
200 Brannan St
- City’s use
- Single Family Residential
- Built
- 2004
- Stories
- 2
- Rooms
- 2 bedrooms, 2 bathrooms
- Building
- 1,939 sq ft
- Zoning
- NA
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
5 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 16, 2020 | Completed final sign-off Apr 2021 | 200 Brannan St | T N T Fire Protection Inc. | modify (e) fire sprinkler system to accomodate unit #424 renovations/alterations.Details
modify (e) fire sprinkler system to accomodate unit #424 renovations/alterations. | $6,500 |
| Oct 29, 2020 | Completed final sign-off Jun 2022 | 200 Brannan St | R 3 Builders Inc. | replacing appliances in kitchen, replace sheetrock in kitchen and bathroom bedrooms. reinstall doors, replace tile and vanities in 2 bathrooms. replace wood flooring througout. revision to pa# 201909202293. unit 424Details
replacing appliances in kitchen, replace sheetrock in kitchen and bathroom bedrooms. reinstall doors, replace tile and vanities in 2 bathrooms. replace wood flooring througout. revision to pa# 201909202293. unit 424 | $65,000 |
| Jul 19, 2020 | Completed final sign-off Sep 2021 | 200 Brannan St | Battalion One Fire Protection | ste 424. add, relocate, or demo sprinkler heads as required by the t.i. existing system to remain. ref pa# 201909202293. 7 heads totalDetails
ste 424. add, relocate, or demo sprinkler heads as required by the t.i. existing system to remain. ref pa# 201909202293. 7 heads total | $3,500 |
| Sep 20, 2019 | Completed final sign-off Jun 2022 | 200 Brannan St | Eldredge Woodworks | remodel kitchen- in kind: same location. no walls moved or layout changed.Details
remodel kitchen- in kind: same location. no walls moved or layout changed. | $25,000 |
| Oct 3, 2005 | Completed final sign-off Apr 2006 | 200 Brannan St | Bay Marin Construction | replace all tile in master bath; replace doors in master bath. lower bath & bedrooms. in lower bath: replace tile, pull tub and make shower stall;Details
replace all tile in master bath; replace doors in master bath. lower bath & bedrooms. in lower bath: replace tile, pull tub and make shower stall; | $75,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Battalion One Fire Protection, Bay Marin Construction, Eldredge Woodworks, R 3 Builders Inc., T N T Fire Protection Inc.
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.