Block 0936, lot 009
2414 Lombard St
- City’s use
- Multi-Family Residential
- Built
- 1915
- Stories
- 2
- Units
- 2
- Rooms
- 2 bedrooms, 2 bathrooms
- Building
- 3,493 sq ft
- Lot
- 2,500 sq ft
- Zoning
- NC3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
19 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 21, 2018 | Completed final sign-off Oct 2022 | 2414 Lombard St | change of use. at (e) ground flr commercial tenant space, change of use from medical cannabis dispensary to cannabis retail. no change of occupancy group. no proposed demolition or (n) construction.Details
change of use. at (e) ground flr commercial tenant space, change of use from medical cannabis dispensary to cannabis retail. no change of occupancy group. no proposed demolition or (n) construction. | ||
| Jul 6, 2017 | Completed final sign-off Jul 2017 | 2414 Lombard St | International Commercial Awning, Inc. | install new canvas awning over entrance door. n/a maher ordinanceDetails
install new canvas awning over entrance door. n/a maher ordinance | $950 |
| Jul 6, 2017 | Completed final sign-off Jul 2017 | 2414 Lombard St | International Commercial Awning, Inc. | non-structural, painted sign on awning "apothecarium 2414"Details
non-structural, painted sign on awning "apothecarium 2414" | $500 |
| Feb 28, 2017 | Completed final sign-off Jul 2017 | 2414 Lombard St | San Francisco Fire Protection | sprinkler waterflow and supervisory system. install new control unit. smoke det above and pull station near panel by the main entry. install monitor modules to tie in waterflow and 2 tamper switches to new panelDetails
sprinkler waterflow and supervisory system. install new control unit. smoke det above and pull station near panel by the main entry. install monitor modules to tie in waterflow and 2 tamper switches to new panel | $3,000 |
| Feb 15, 2017 | Never finaled issued Feb 2017, no final | 2414 Lombard St | Triad Fire Protection System | g/f- new fire sprinkler system to nfpa 13 with 18 recessed pendents & 13 uprights at oh2 design. riser with backflow preventer, new 4" d.i. cement lined fire underground service. demand at 461 gpm @ 44 psi to 12" lombard.capped tee for future 2nd floor. ref. pa#201503039784 n/a ordinance #155-13Details
g/f- new fire sprinkler system to nfpa 13 with 18 recessed pendents & 13 uprights at oh2 design. riser with backflow preventer, new 4" d.i. cement lined fire underground service. demand at 461 gpm @ 44 psi to 12" lombard.capped tee for future 2nd floor. ref. pa#201503039784 n/a ordinance #155-13 | $35,000 |
| Jan 25, 2017 | Completed final sign-off Jul 2017 | 2414 Lombard St | Nabi Construction & Engineering Inc | to obtain final inspection for work approved under pa#2012-03-08-5644 and 2013-10-11-9131. all work is completeDetails
to obtain final inspection for work approved under pa#2012-03-08-5644 and 2013-10-11-9131. all work is complete | |
| Mar 3, 2015 | Completed final sign-off Jul 2017 | 2414 Lombard St | R 3 Builders Inc. | change of use. interior tenant improvement at ground floor of an existing two-story mixed-use building, remove interior, non-structural partitions, provide interior partitions, millwork plumb fixtures, remove door at areaway and infill opening, remove and replace glazing & doors at storfront.Details
change of use. interior tenant improvement at ground floor of an existing two-story mixed-use building, remove interior, non-structural partitions, provide interior partitions, millwork plumb fixtures, remove door at areaway and infill opening, remove and replace glazing & doors at storfront. | $208,564 |
| Jan 17, 2014 | Never finaled issued Jan 2014, no final | 2414 Lombard St | street space permit (renewal of permit # 1312071Details
street space permit (renewal of permit # 1312071 | ||
| Dec 11, 2013 | Never finaled issued Dec 2013, no final | 2414 Lombard St | street space w/mtaDetails
street space w/mta | ||
| Oct 11, 2013 | Expired or cancelled expired Jul 2017 | 2414 Lombard St | Nabi Construction & Engineering Inc | revision to pa 201203085644. 1-lower a small portion of new roof 16". 2 - install a 1-hr fire resistive ceiling in storage 106 in lieu of a 1-hr rated parapet at p.l. wall. 3- reconfig proposed stairsDetails
revision to pa 201203085644. 1-lower a small portion of new roof 16". 2 - install a 1-hr fire resistive ceiling in storage 106 in lieu of a 1-hr rated parapet at p.l. wall. 3- reconfig proposed stairs | |
| Sep 24, 2013 | Never finaled issued Sep 2013, no final | 2414 Lombard St | street space & mta parking meterDetails
street space & mta parking meter | ||
| Aug 20, 2013 | Never finaled issued Aug 2013, no final | 2414 Lombard St | street space w/mtaDetails
street space w/mta | ||
| Jul 11, 2013 | Never finaled issued Jul 2013, no final | 2412 Lombard St | Tara Roofing | reroofingDetails
reroofing | $9,500 |
| Jun 24, 2013 | Completed final sign-off Sep 2013 | 2412 Lombard St | Narrowback Construction Co. | remove (6) (e) aluminum sungle glazed windows at upper residential unit. install (6) new double glazed insulated glass/double hung windows "marvin" ultimate clad exterior wood interior (not egress windows).Details
remove (6) (e) aluminum sungle glazed windows at upper residential unit. install (6) new double glazed insulated glass/double hung windows "marvin" ultimate clad exterior wood interior (not egress windows). | $3,000 |
| May 14, 2013 | Never finaled issued May 2013, no final | 2412 Lombard St | street spaceDetails
street space | ||
| Aug 16, 2012 | Expired or cancelled cancelled Feb 2013 | 2414 Lombard St | (refer to planning dept #20120685d). demolish & reconstruct portion of 1st floor, adding 88 sq ft. provide accessible restroom, mech/elect/sprinkler on separate permit. marina compassionate care patients collective dba golden gate wellness.Details
(refer to planning dept #20120685d). demolish & reconstruct portion of 1st floor, adding 88 sq ft. provide accessible restroom, mech/elect/sprinkler on separate permit. marina compassionate care patients collective dba golden gate wellness. | $50,000 | |
| Mar 8, 2012 | Expired or cancelled expired Jul 2017 | 2414 Lombard St | Nabi Construction & Engineering Inc | 1)demolish and reconstruct portion of ground floor, adding 140 sq ft. 2)add power operator at primary entrance.3)provide accessible restroom. 4)mechanical and electrical under separate permit.Details
1)demolish and reconstruct portion of ground floor, adding 140 sq ft. 2)add power operator at primary entrance.3)provide accessible restroom. 4)mechanical and electrical under separate permit. | $30,000 |
| Sep 14, 2011 | Completed final sign-off Nov 2011 | 2412 Lombard St | Mcleran Inc | to obtain final inspection for work approved under pa 9700585; all work is completeDetails
to obtain final inspection for work approved under pa 9700585; all work is complete | |
| May 24, 2006 | Never finaled issued May 2006, no final | 2412 Lombard St | street spaceDetails
street space |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Nabi Construction & Engineering Inc (3), International Commercial Awning, Inc. (2), Mcleran Inc, Narrowback Construction Co., R 3 Builders Inc., San Francisco Fire Protection, Tara Roofing, Triad Fire Protection System
- Architects
- Mark Brand, Paul Vincent Gonzaga
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.