James Hielbronner
- Listed as
- architect, designer
- Firm
- Architectural Dimensions
- Based in
- Oakland
- On San Francisco permits
- Apr 2008 to Jan 2019
38 permits since 2000 (architect on 37 permits, designer on 1 permit): 22 completed, 12 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 16, 2019 | Never finaled issued Jan 2019, no final | 250 04th St | revision to previously approved pa #201708286124. designated 12th fl passageway as part of kitchen ceiling height from 7'6" to 7'0", revised sheets cs-5- egress plan and revised occupant load on level 12. maher n/a.Details
revision to previously approved pa #201708286124. designated 12th fl passageway as part of kitchen ceiling height from 7'6" to 7'0", revised sheets cs-5- egress plan and revised occupant load on level 12. maher n/a. | ||
| Oct 30, 2018 | Never finaled issued Nov 2018, no final | 250 04th St | revision to pa #201611042066. revised smoke control report as requested by sffd plan check to be shown on mechanical sheets.Details
revision to pa #201611042066. revised smoke control report as requested by sffd plan check to be shown on mechanical sheets. | ||
| Jan 5, 2018 | Never finaled issued Jan 2018, no final | 250 04th St | revision to previously approved pa #201708286124. designated 12th fl passageway as part of kitchen. ceiling height from 7'-6" to 7'-0".Details
revision to previously approved pa #201708286124. designated 12th fl passageway as part of kitchen. ceiling height from 7'-6" to 7'-0". | ||
| Nov 29, 2017 | Completed final sign-off Feb 2018 | 1900 19th Av | Gray West Construction Inc | revision to #201405095351 to correct stairwell details/as-builtes noted on plan as "delta 9".Details
revision to #201405095351 to correct stairwell details/as-builtes noted on plan as "delta 9". | |
| Oct 4, 2017 | Completed final sign-off Oct 2017 | 1715 Octavia St | administrative permit to vest planning commision motion no.19765. to increase enrollment cap for (e) school from 210 to 250 students. no work/construction under this permit.Details
administrative permit to vest planning commision motion no.19765. to increase enrollment cap for (e) school from 210 to 250 students. no work/construction under this permit. | ||
| Sep 20, 2017 | Completed final sign-off Feb 2018 | 1900 19th Av | Gray West Construction Inc | revision to 201405095351, revise storefront and facade parapit detailing, includes ada ramp on 2/f & enlarged entry on 1/f.Details
revision to 201405095351, revise storefront and facade parapit detailing, includes ada ramp on 2/f & enlarged entry on 1/f. | $25,000 |
| Aug 28, 2017 | Never finaled issued Aug 2017, no final | 250 04th St | interior improvements for lower level, lobby level, mezzanine and 12th floor: interior lighting and associated title 24 to be submitted to sfdbi under separate permit. ref. p.a. #201306280802s4Details
interior improvements for lower level, lobby level, mezzanine and 12th floor: interior lighting and associated title 24 to be submitted to sfdbi under separate permit. ref. p.a. #201306280802s4 | $25,000 | |
| Jun 27, 2017 | Completed final sign-off Nov 2017 | 388 Beale St | Cobalt Facities Inc Sba Cobalt Construct | adding bike parking to the ground fl level of an (e) parking garage, upgrades to the (e) ada parking stalls at the 1st, 2nd fl equal to the minimum threshold of 20% of construction cost. authorizing change of use of 40 automobile & 5 motorcycle parking spaces from accesor residential parking toDetails
adding bike parking to the ground fl level of an (e) parking garage, upgrades to the (e) ada parking stalls at the 1st, 2nd fl equal to the minimum threshold of 20% of construction cost. authorizing change of use of 40 automobile & 5 motorcycle parking spaces from accesor residential parking to | $20,000 |
| Jun 8, 2017 | Never finaled issued Oct 2017, no final | 2394 Folsom St | administrative permit to document and memorialize 16,376 sf of trade shop. no construction under this permit. mezzanine level previously approved for office and storage under bpa 275605Details
administrative permit to document and memorialize 16,376 sf of trade shop. no construction under this permit. mezzanine level previously approved for office and storage under bpa 275605 | ||
| May 31, 2017 | Expired or cancelled cancelled Mar 2020 | 350 Rhode Island St | administrative permit to document & memorialize conditions of approval establishing & confirming office designation of 250,000 gsf under planning commission motion no# 14988. no construction under this permit. ** maher: n/a **Details
administrative permit to document & memorialize conditions of approval establishing & confirming office designation of 250,000 gsf under planning commission motion no# 14988. no construction under this permit. ** maher: n/a ** | ||
| Apr 28, 2017 | Completed final sign-off Dec 2017 | 610 Brannan St | Peacock Construction | restriping of existing of an existing parking lot to include the addition of new ada parking stalls and signage and installation of new bike parking per planning commission motion 19835Details
restriping of existing of an existing parking lot to include the addition of new ada parking stalls and signage and installation of new bike parking per planning commission motion 19835 | $16,000 |
| Jan 9, 2017 | Expired or cancelled withdrawn Jan 2019 | 2150 Folsom St | administrative permit to legalize the (e) light manufacturing and arts use for approx 7363 sf on the 2nd floor to comply with planning enf 2016-009706Details
administrative permit to legalize the (e) light manufacturing and arts use for approx 7363 sf on the 2nd floor to comply with planning enf 2016-009706 | ||
| Jan 9, 2017 | Expired or cancelled withdrawn Jan 2019 | 2170 Folsom St | administrative permit to legalize the (e) light manufacturing and arts use for the 1st and 2nd floor to comply with planning enforcement 2016-009706.Details
administrative permit to legalize the (e) light manufacturing and arts use for the 1st and 2nd floor to comply with planning enforcement 2016-009706. | ||
| Nov 18, 2016 | Completed final sign-off Feb 2018 | 799 Beach St | Eric F Anderson Incorporated | ti for new cvs pharmacy, work includes new partitions. fixtures finishes. elevator pit & partitions, mep. exterior work under pa 201604124615, fire protection, signage under separate permits maher naDetails
ti for new cvs pharmacy, work includes new partitions. fixtures finishes. elevator pit & partitions, mep. exterior work under pa 201604124615, fire protection, signage under separate permits maher na | $1,620,000 |
| Nov 4, 2016 | Never finaled issued Dec 2016, no final | 250 04th St | revision to ref 2013 0628 0802 s3: revise archsheets to re-label elevators & lobbies as fire service access elevators & basement and 1st floor as lower level & lobby respectively. revise roof plan to show catwalk, as well as mechanical sheets to show control report and panels as reqd by sffdDetails
revision to ref 2013 0628 0802 s3: revise archsheets to re-label elevators & lobbies as fire service access elevators & basement and 1st floor as lower level & lobby respectively. revise roof plan to show catwalk, as well as mechanical sheets to show control report and panels as reqd by sffd | ||
| Apr 26, 2016 | Never finaled issued Jul 2017, no final | 1120 Ortega St | Gray West Construction Inc | resurfacing of extg parking lot and installation of new light pole and chain link fence.Details
resurfacing of extg parking lot and installation of new light pole and chain link fence. | $400,000 |
| Feb 26, 2016 | Never finaled issued Feb 2016, no final | 400 Sutter St | R 3 Builders Inc. | temp walkway associated w/ped sidewalk closure along sutter st during req'd improvements to row. ground floor tenant(cvs)to remain unoccupied until ramp removed and exiting restored to original permitted configuration. compliance with maher ordinance 155-13 not required.Details
temp walkway associated w/ped sidewalk closure along sutter st during req'd improvements to row. ground floor tenant(cvs)to remain unoccupied until ramp removed and exiting restored to original permitted configuration. compliance with maher ordinance 155-13 not required. | $10,000 |
| Oct 30, 2015 | Never finaled issued Jan 2016, no final | 250 04th St | The Whiting-Turner Contracting Company | revision to 2013-06-28-0802-s1. providing revision to foundation, site permit, underground utilities.Details
revision to 2013-06-28-0802-s1. providing revision to foundation, site permit, underground utilities. | $5,000 |
| May 4, 2015 | Never finaled issued Jun 2015, no final | 995 Market St | Eric F Anderson Incorporated | ground flr: removal & replacement of a portion of (e) slab. ti approved under separate permit 2015 0227 9585Details
ground flr: removal & replacement of a portion of (e) slab. ti approved under separate permit 2015 0227 9585 | $100,000 |
| Feb 27, 2015 | Completed final sign-off Oct 2015 | 995 Market St | Eric F Anderson Incorporated | ti for (n) cvs pharmacy on grnd flr & basement. work includes (n) partitions, fixtures, finished, restrooms mep, installation of (n) freight lift from basement to grnd flr. fire protection & shelving under seperate permit. no exterior workDetails
ti for (n) cvs pharmacy on grnd flr & basement. work includes (n) partitions, fixtures, finished, restrooms mep, installation of (n) freight lift from basement to grnd flr. fire protection & shelving under seperate permit. no exterior work | $1,600,000 |
| Feb 2, 2015 | Completed final sign-off Oct 2015 | 3600 Geary Bl | Gidel & Kocal Construction Co Inc | t.i. for (n) cvs pharmacy including (n) restrooms, fixtures, finishes, partitions, mep. (n) vertical lift to mezzanineDetails
t.i. for (n) cvs pharmacy including (n) restrooms, fixtures, finishes, partitions, mep. (n) vertical lift to mezzanine | $1,282,000 |
| Sep 26, 2014 | Never finaled issued Sep 2014, no final | 400 Sutter St | R 3 Builders Inc. | revision to approved appl. 2014.0421.3765. to add ul listed smoke curtains to the openings of elevator shaft. maher n/a.Details
revision to approved appl. 2014.0421.3765. to add ul listed smoke curtains to the openings of elevator shaft. maher n/a. | $20,000 |
| Sep 12, 2014 | Completed final sign-off Oct 2014 | 1 Jefferson St | Gidel & Kocal Construction Co Inc | revision to previously approved pa#201405024752 altering architectural finishes & m.e.p. n/a ordinance #155-13. compliance with maher ordinance no. 155-13 not required.Details
revision to previously approved pa#201405024752 altering architectural finishes & m.e.p. n/a ordinance #155-13. compliance with maher ordinance no. 155-13 not required. | |
| May 9, 2014 | Completed final sign-off Feb 2018 | 1900 19th Av | Gray West Construction Inc, R 3 Builders Inc. | site permit & change of use for (n) retail pharmacy on ground flr, work includes demo of offices on 2nd flr parking lot & adding parking.Details
site permit & change of use for (n) retail pharmacy on ground flr, work includes demo of offices on 2nd flr parking lot & adding parking. | $950,000 |
| May 2, 2014 | Completed final sign-off Oct 2014 | 1 Jefferson St | revision to appl #2013.1025.0281 - changes include ceiling & mechanical systems. adjustments to column layout & building shell to reflect accurate as-built conditions. compliance with ordinance #155-13 not requiredDetails
revision to appl #2013.1025.0281 - changes include ceiling & mechanical systems. adjustments to column layout & building shell to reflect accurate as-built conditions. compliance with ordinance #155-13 not required | ||
| Apr 21, 2014 | Never finaled issued Jun 2014, no final | 400 Sutter St | revision to 201310280417. main scope is to replace approved escalator with stairway. changes include structural, flooring, partitions.Details
revision to 201310280417. main scope is to replace approved escalator with stairway. changes include structural, flooring, partitions. | ||
| Jan 7, 2014 | Completed final sign-off Apr 2014 | 1285 Sutter St | Gidel & Kocal Construction Co Inc | correction to pa#201310179570, the district inspector has requested this pa to be reviewed by health department due to a new pharmacy location.Details
correction to pa#201310179570, the district inspector has requested this pa to be reviewed by health department due to a new pharmacy location. | |
| Dec 16, 2013 | Completed final sign-off Mar 2014 | 2280 Market St | Gidel & Kocal Construction Co Inc | correction permit to pa# 201308013302, the district inspector has requested this pa. to be review by the health dpt. &sffd.dur ot a pharmacylocation & occupancy. fire alarm submittal under separated application. no changes to previous permitDetails
correction permit to pa# 201308013302, the district inspector has requested this pa. to be review by the health dpt. &sffd.dur ot a pharmacylocation & occupancy. fire alarm submittal under separated application. no changes to previous permit | |
| Nov 26, 2013 | Completed final sign-off Feb 2016 | 601 Mission St | R 3 Builders Inc. | facade work only for (n) cvs pharmacy. scope is to replace 1 window w/ (n) door on 2nd street & relocate 1 set of doors on mission street & replace 2 others w/ windows. all work on street level. no other work. t.i. under separate permit.Details
facade work only for (n) cvs pharmacy. scope is to replace 1 window w/ (n) door on 2nd street & relocate 1 set of doors on mission street & replace 2 others w/ windows. all work on street level. no other work. t.i. under separate permit. | $30,000 |
| Oct 25, 2013 | Completed final sign-off Oct 2014 | 1 Jefferson St | Gidel & Kocal Construction Co Inc | replacement of 1 existing service door on powell with new pair of 30 and 16 doors. no sidewalk encroachment or other work. compliance with ordinance #155-13 not required.Details
replacement of 1 existing service door on powell with new pair of 30 and 16 doors. no sidewalk encroachment or other work. compliance with ordinance #155-13 not required. | $1,000 |
| Oct 25, 2013 | Completed final sign-off Oct 2014 | 1 Jefferson St | Gidel & Kocal Construction Co Inc | ti for new cvs retail store on gr fl. includes new partitons, fixtures, finishes, mep. no exterior work under this permit. fire protection under separate permit. ordinance complianec with #155-13 not required.Details
ti for new cvs retail store on gr fl. includes new partitons, fixtures, finishes, mep. no exterior work under this permit. fire protection under separate permit. ordinance complianec with #155-13 not required. | $1,600,000 |
| Oct 18, 2013 | Completed final sign-off Aug 2016 | 400 Sutter St | R 3 Builders Inc. | install new double door delivery entry on sutter street for new cvs pharmancy. (under seperate permit) ** maher: compliance with ordinance no# 155-13 not required **Details
install new double door delivery entry on sutter street for new cvs pharmancy. (under seperate permit) ** maher: compliance with ordinance no# 155-13 not required ** | $1,000 |
| Sep 12, 2013 | Completed final sign-off Apr 2014 | 1285 Sutter St | Gidel & Kocal Construction Co Inc | revision to 200712069866 for new 1 hour rated service shaft from garage to 1st fl and rerouting of e 2 hour egress pathDetails
revision to 200712069866 for new 1 hour rated service shaft from garage to 1st fl and rerouting of e 2 hour egress path | $170,000 |
| Aug 15, 2013 | Completed final sign-off Feb 2015 | 2280 Market St | Gidel & Kocal Construction Co Inc | exterior improvements to retail store (cvs) - work include storefront demo & portions of facade, (n) doors & windows, (n) curtain wall system, (n) rain screen, (n) cement board siding, (n) elevator with lobbles on ea flr & penthouse, (n) mech support shelf on roof. all other work under separate ap.Details
exterior improvements to retail store (cvs) - work include storefront demo & portions of facade, (n) doors & windows, (n) curtain wall system, (n) rain screen, (n) cement board siding, (n) elevator with lobbles on ea flr & penthouse, (n) mech support shelf on roof. all other work under separate ap. | $500,000 |
| May 7, 2013 | Completed final sign-off Aug 2013 | 1101 Market St | R 3 Builders Inc. | minor revisions to prevously approved app#201206223274. work will include raising finish floor, reconfigure elevator, remove utility room 113, change inerior doors, raise ceiling heights, new water heater and condeser, new interior signage, revised interior finishes, new door harware and schedule.Details
minor revisions to prevously approved app#201206223274. work will include raising finish floor, reconfigure elevator, remove utility room 113, change inerior doors, raise ceiling heights, new water heater and condeser, new interior signage, revised interior finishes, new door harware and schedule. | $125,000 |
| May 17, 2012 | Completed final sign-off Aug 2013 | 1101 Market St | R 3 Builders Inc. | new facade / storefront system to replace (e) interior t.i. & mep work to be filed under separate permit.Details
new facade / storefront system to replace (e) interior t.i. & mep work to be filed under separate permit. | $200,000 |
| May 8, 2012 | Completed final sign-off Aug 2012 | 581 Market St | Midstate Construction Corporation | revision to appl #2012.03.16.6250 & 2011.11.23.9520: marked in delta 1 and 2:includes non-passenger vertical reciprocating lift conveyor to be installed by manufacturer; close-in openings to shaft on all floors; infill of (e) hoistway pit to a depth of 7'; no exterior or other work.Details
revision to appl #2012.03.16.6250 & 2011.11.23.9520: marked in delta 1 and 2:includes non-passenger vertical reciprocating lift conveyor to be installed by manufacturer; close-in openings to shaft on all floors; infill of (e) hoistway pit to a depth of 7'; no exterior or other work. | $110,000 |
| Apr 18, 2008 | Expired or cancelled cancelled Aug 2016 | 4127 18th St | expansion of an adjacent extg pharmacy with new restrooms comunity meeting space and store front. ( ref case no 20080140c) tenant improvement of 2 extg 1st floor tenant spaces to converge into one retail space. in addition per the rear elevations and roof plan (a-5 & a-10) there will also be theDetails
expansion of an adjacent extg pharmacy with new restrooms comunity meeting space and store front. ( ref case no 20080140c) tenant improvement of 2 extg 1st floor tenant spaces to converge into one retail space. in addition per the rear elevations and roof plan (a-5 & a-10) there will also be the | $325,000 |